3797/ktd…02…CPS/AUX/068
…02…NPP/831221…02……02…#
CAMPS
INSTALLATION
PROCEDURES
SITE 16…02…Issue
1…02… CAMPS
5.9 P̲O̲W̲E̲R̲ ̲U̲P̲ ̲A̲N̲D̲ ̲C̲H̲E̲C̲K̲ ̲O̲U̲T̲
Before powering up, verify that a̲l̲l̲ ̲s̲w̲i̲t̲c̲h̲e̲s̲ on a̲l̲l̲
e̲q̲u̲i̲p̲m̲e̲n̲t̲ are i̲n̲ ̲p̲o̲s̲i̲t̲i̲o̲n̲ ̲o̲f̲f̲ or O.
5.9.1 G̲r̲o̲u̲n̲d̲i̲n̲g̲s̲
a) Measure with an Ohm-meter that no short circuit
exists between the safety group (cabinets) and
the lines of circuit no. 1 through 9 and 1a through
3a.
b) Remount the lids of the power line filters by the
30 screws.
c) Start the powering up in the below sequence, starting
at the CAMPS power distribution board (PDB):
5.9.2 C̲A̲M̲P̲S̲ ̲P̲D̲B̲
T̲U̲R̲N̲ ̲O̲N̲: Main circuit breaker
T̲U̲R̲N̲ ̲O̲N̲: Miniature circuit breakers
C̲H̲E̲C̲K̲O̲U̲T̲: No fuses in the CAMPS PDB blown due to
short circuit in the installation.
Figure 5.9.1
Front Layout for CCA
5.9.3 D̲i̲s̲k̲ ̲D̲r̲i̲v̲e̲s̲
To examine that the 3 disk drives are supplied from
3 separate phases proceed in the below sequence:
a) D̲I̲S̲K̲ ̲#̲1̲ ̲(̲M̲M̲D̲)̲ ̲R̲A̲C̲K̲ ̲A̲
1) TURN ON: Power switch 1 (left hand) on
the front of the mains switch
located in the bottom of rack
A.
2) C̲H̲E̲C̲K̲:̲ "Power on" lamp lit on mains
switch.
3) T̲U̲R̲N̲ ̲O̲N̲:̲ Rear power switch disk drive
No. 1 located in rack A.
4) C̲H̲E̲C̲K̲ Disk running and "ready" lamp
in front of disk lit (wait for
30 sec.).
5) T̲U̲R̲N̲ ̲OFF: Miniature circuit breaker (CAMPS
PDB) corresponding to power
circuit no. 1 for disk 1 (see
ATBB drawing 120).
6) C̲H̲E̲C̲K̲:̲ Disk 1 powered down.
7) Leave the miniature circuit breaker in position
OFF.
b) D̲I̲S̲K̲ ̲#̲2̲ ̲(̲S̲M̲D̲)̲
Repeat step 5.9.3a-1 through a-2 for disk drive
#2 (rack B).
3) T̲U̲R̲N̲ ̲O̲N̲:̲ Rear switches "AC power" and
"power supply".
4) C̲H̲E̲C̲K̲:̲ Disk running. /No ready lamp
if no disc pack mounted.
Proceed by repeating step 5.93a-5 thru a-7 for
circuit no. 2.
c) D̲i̲s̲k̲ ̲#̲3̲ ̲(̲M̲M̲D̲)̲
Repeat step 5.9.3 a-1 through a-7 for disk drive
#3 (rack C).
d) Turn on the 3 miniature circuit breakers in the
CAMPS PDB one by one.
e) Check that all disks are operating.
f) T̲U̲R̲N̲ ̲O̲F̲F̲:̲ Miniature circuit breaker in
CAMPS PDB for circuit no. 1,
2 and 3.
5.9.4 M̲a̲i̲n̲ ̲S̲w̲i̲t̲c̲h̲ ̲R̲a̲c̲k̲ ̲A̲ ̲S̲w̲i̲t̲c̲h̲ ̲2̲ ̲C̲i̲r̲c̲u̲i̲t̲ ̲N̲o̲.̲ ̲4̲
1) T̲U̲R̲N̲ ̲O̲N̲:̲ Power switch No. 2 (right hand)
on front of the main switch
in rack A.
2) C̲H̲E̲C̲K̲:̲ "Power on" lamps lit.
3) T̲U̲R̲N̲ ̲O̲N̲:̲ Supply A (right hand) and supply
B (left hand) on the rear of
the M-fan located in rack A
(A1A2).
4) C̲H̲E̲C̲K̲:̲ Fan running/green lamp in front
lit.
5) T̲U̲R̲N̲ ̲O̲N̲:̲ Power supply A (right hand)
and power supply B (left hand)
on the rear of the processor
crate in rack A (A1A1).
6) C̲H̲E̲C̲K̲:̲ Green "power on" lamp above
switches lit.
7) T̲U̲R̲N̲ ̲O̲N̲:̲ Power supply A (left hand) and
power supply B (right hand)
from the front of the processor
crate.
8) C̲H̲E̲C̲K̲:̲ All 5 power indicator lamps
lit on front of the power supplies.
(All 10 lamps lit when A o̲r̲
B in
poss. on).
9) T̲U̲R̲N̲ ̲O̲N̲:̲ Supply A (right hand) on the
rear of the M-fan located in
rack B.
10) C̲H̲E̲C̲K̲:̲ Fan running/corresponding green
lamp in front lit.
11) T̲U̲R̲N̲ ̲O̲N̲:̲ Power supply B (left hand) on
the rear of the channel unit
crate in rack B (A2A1).
12) C̲H̲E̲C̲K̲:̲ Green "power on" lamp above
switch lit.
13) T̲U̲R̲N̲ ̲O̲N̲:̲ Power supply B (right hand)
from the front of the CU.
14) C̲H̲E̲C̲K̲:̲ All 5 power indicator lamps
lit on front of the power supply.
15) T̲U̲R̲N̲ ̲O̲N̲:̲ Power switch on adapter power
supply, right hand part on the
rear of the adapter crate in
rack C (A3A5A23).
16) C̲H̲E̲C̲K̲:̲ "Power on" lamps lit on left
hand section of the adapter
crate (2 L/L adapters and 2
Opto T/R)
17) T̲U̲R̲N̲ ̲O̲F̲F̲:̲ Miniature circuit breaker in
CAMPS PDB corresponding to power
circuit for main switch in rack
A. Leave the circuit breaker
in position OFF.
5.9.5 M̲a̲i̲n̲ ̲S̲w̲i̲t̲c̲h̲ ̲R̲a̲c̲k̲ ̲B̲ ̲S̲w̲i̲t̲c̲h̲ ̲2̲ ̲C̲i̲r̲c̲u̲i̲t̲ ̲N̲o̲.̲ ̲5̲
1) T̲U̲R̲N̲ ̲O̲N̲: Right hand power switch on front of
the main switch in rack B.
2) C̲H̲E̲C̲K̲: Green "power on" lamp above switch
lit.
3) T̲U̲R̲N̲ ̲O̲N̲: Switch on power supply located on the
rear of the watchdog crate (A2A4).
4) C̲H̲E̲C̲K̲:̲ Green "Power on" lamp above switch
lit.
Fans running (build-in fans right hand
side of the crate).
5) T̲U̲R̲N̲ ̲O̲F̲F̲:̲ Miniature circuit breaker in CAMPS
PDB corresponding to power circuit
for switch 1 in main switch rack B.
Leave the miniature circuit breaker
in position OFF.
5.9.6 M̲a̲i̲n̲ ̲S̲w̲i̲t̲c̲h̲ ̲R̲a̲c̲k̲ ̲B̲ ̲S̲w̲i̲t̲c̲h̲ ̲1̲ ̲C̲i̲r̲c̲u̲i̲t̲ ̲N̲o̲.̲ ̲2̲
Left hand power switch on front of the main switch
in rack B is in position ON. Turn on the mini circuit
breaker in CAMPS PDB for circuit No. 2.
1) T̲U̲R̲N̲ ̲O̲N̲:̲ Main switch on the rear side of floppy
disk station.
2) C̲H̲E̲C̲K̲:̲ "Power on" lamp lit and blower inside
both floppy disk drives running.
(Power on lamp lit behind the PDP).
3) T̲U̲R̲N̲ ̲O̲F̲F̲:̲ CAMPS PDB mini circuit breaker circuit
No. 2.
5.9.7 M̲a̲i̲n̲ ̲S̲w̲i̲t̲c̲h̲ ̲R̲a̲c̲k̲ ̲C̲ ̲S̲w̲i̲t̲c̲h̲ ̲2̲ ̲C̲i̲r̲c̲u̲i̲t̲ ̲N̲o̲.̲ ̲6̲
S-FAN will be in poss. on and starts running.
Repeat step 5.9.4 item 1 thru 8 for the main switch
and equipment in rack C (right hand switch).
9) T̲U̲R̲N̲ ̲O̲N̲:̲ Supply B (left hand) on the rear of
the M-fan in rack B.
10) C̲H̲E̲C̲K̲:̲ Fan running/green lamp in front of
fan lit.
11) T̲U̲R̲N̲ ̲O̲N̲:̲ Power supply B (left hand) on the rear
of the channel unit crate in rack B.
12) C̲H̲E̲C̲K̲:̲ Green "power on" lamp above switch
lit.
13) T̲U̲R̲N̲ ̲O̲N̲:̲ Power supply B (right hand) from the
front of the CU.
14) C̲H̲E̲C̲K̲:̲ All 5 power indicator lamps lit on
front of the power supply.
15) T̲U̲R̲N̲ ̲O̲N̲:̲ Power switch on adapter power supply,
left hand part on the rear of the adapter
crate in rack C (A3A5A22).
16) C̲H̲E̲C̲K̲:̲ "Power on" lamps lit on right hand
section of the adapter crate (4 L/L
adapters)
17) T̲U̲R̲N̲ ̲O̲F̲F̲:̲ Miniature circuit breaker in CAMPS
PDB corresponding to power circuit
for switch 2 in main switch rack C.
5.9.8 M̲a̲i̲n̲ ̲S̲w̲i̲t̲c̲h̲ ̲R̲a̲c̲k̲ ̲D̲ ̲S̲w̲i̲t̲c̲h̲ ̲1̲ ̲C̲i̲r̲c̲u̲i̲t̲ ̲N̲o̲.̲ ̲7̲
1) T̲U̲R̲N̲ ̲O̲N̲:̲ Power switch No. 1 (left hand) on front
of the main switch in rack D.
2) C̲H̲E̲C̲K̲:̲ Green "power on" lamp above switch
lit.
3) T̲U̲R̲N̲ ̲O̲N̲:̲ Power switch on the rear main power
panel of TDX crate assy #1 (2A1A9).
Power switch on the front of the main
power supply TDX crate assy #1.
4) C̲H̲E̲C̲K̲:̲ +/-12V and 5V lamps on main power supply
lit.
5) T̲U̲R̲N̲ ̲O̲N̲:̲ Power switch on the rear adapter power
supply TDX crate assy #1.
6) C̲H̲E̲C̲K̲:̲ Green power lamps on all adapter modules
in TDX crate assy #1 lit.
7) T̲U̲R̲N̲ ̲O̲N̲:̲ Rear power switch on S-fan located
below TDX crate assy #1.
8) C̲H̲E̲C̲K̲:̲ Fan running
9) Repeat step 5.9.8 item 3 thru 6 for TDX crate assy
#2 (2A1A7).
5.9.9 M̲a̲i̲n̲ ̲S̲w̲i̲t̲c̲h̲ ̲R̲a̲c̲k̲ ̲E̲ ̲S̲w̲i̲t̲c̲h̲ ̲1̲ ̲C̲i̲r̲c̲u̲i̲t̲ ̲N̲o̲.̲ ̲9̲
1) T̲U̲R̲N̲ ̲O̲N̲:̲ Power switch No. 1 (left hand) on front
of the main switch in rack E.
2) Repeat step 5.9.8 item 3 through 8 for TDX crate
assy #5 (2A2A9) and the S-fan (2A2A11).
3) Repeat step 5.9.8 item 3 through 6 for TDX crate
assy #6 (2A2A7).
5.9.10 M̲a̲i̲n̲ ̲S̲w̲i̲t̲c̲h̲ ̲R̲a̲c̲k̲ ̲D̲ ̲S̲w̲i̲t̲c̲h̲ ̲2̲ ̲C̲i̲r̲c̲u̲i̲t̲ ̲N̲o̲.̲ ̲8̲
1) T̲U̲R̲N̲ ̲O̲N̲:̲ Power switch No. 2 (right hand) on
front of the main switch in rack D.
2) Repeat step 5.9.8 item 3 through 8 for TDX crate
assy #3 (2A1A3) and the S-fan (2A1A5).
3) Repeat step 5.9.8 item 3 through 6 for TDX crate
assy #4 (2A1A1).
5.9.11 M̲a̲i̲n̲ ̲S̲w̲i̲t̲c̲h̲ ̲R̲a̲c̲k̲ ̲F̲ ̲S̲w̲i̲t̲c̲h̲ ̲2̲ ̲C̲i̲r̲c̲u̲i̲t̲ ̲N̲o̲.̲ ̲8̲
1) T̲U̲R̲N̲ ̲O̲N̲:̲ Power switch No. 2 (right hand) on
front of the main switch in rack F.
2) Repeat step 5.9.8 item 3 through 8 for TDX crate
assy #9 (2A3A3) and the S-fan (2A3A5).
3) Repeat step 5.9.8 item 3 through 8 for TDX crate
assy # 10.
4) T̲U̲R̲N̲ ̲O̲F̲F̲:̲ Miniature circuit breaker in CAMPS
PDB corresponding to power circuit
for PLF line 8.
5.9.12 M̲a̲i̲n̲ ̲S̲w̲i̲t̲c̲h̲ ̲R̲a̲c̲k̲ ̲E̲ ̲S̲w̲i̲t̲c̲h̲ ̲2̲ ̲C̲i̲r̲c̲u̲i̲t̲ ̲7̲
1) T̲U̲R̲N̲ ̲O̲N̲:̲ Power Switch No. 2 (right hand) on
front of the Main switch in Rack E.
2) Repeat Step 5.9.8, Item 3 through 8 for TDX crate
Assy # 7 (2A2A3) and the S-Fan (2A2A5)
3) Repeat Step 5.9.8 Itlem 3 through 8 for TDX Crate
Assy # 8 (2A2A1).
4) T̲U̲R̲N̲ ̲O̲F̲F̲:̲ Miniature circuit breaker in CAMPS
PDB corresponding to power circuit
for PLF Line 7.
5.9.13 M̲a̲i̲n̲ ̲S̲w̲i̲t̲c̲h̲ ̲R̲a̲c̲k̲ ̲F̲ ̲S̲w̲i̲t̲c̲h̲ ̲1̲ ̲C̲i̲r̲c̲u̲i̲t̲ ̲N̲o̲.̲ ̲8̲
1) T̲U̲R̲N̲ ̲O̲N̲: Power Switch No. 1 (left hand) on front
of the Main switch in Rack F.
2) Repeat Step 5.9.8, item 3 through 8 for TDX crate
Assy # 11 (2A3A18) and the S-fan (2A3A20).
3) T̲U̲R̲N̲ ̲O̲F̲F̲: Miniature circuit breaker in CAMPS
PDB corresponding to power circuit
for PLF line 9.
5.9.14 T̲U̲R̲N̲ ̲O̲N̲:̲ All the miniature circuit breakers in the
CAMPS PDB switched off in step 5.9.3, 5.9.4,
5.9.5, 5.9.6, 5.9.7, 5.9.11, 5.9.12., and
5.9.13.
5.9.15 V̲e̲r̲i̲f̲y̲ ̲S̲u̲p̲p̲l̲y̲ ̲V̲o̲l̲t̲a̲g̲e̲ ̲o̲n̲ ̲P̲U̲ ̲C̲r̲a̲t̲e̲s̲
All voltages used in the processor units are verified
by a digital multimeter.
The measurements are carried out on the front panel
of the crate configuration adapter (CCA) located on
the rear side of the PU crates (1A1A23 and 1A3A23),
refer to Figure 5.9.1. The voltages are checked to
be within below limits:
5V = 5.1 - 5.3V
+12V = 12.1 - 12.3V
-12V = 12.1 - 12.4V
5.9.16 V̲e̲r̲i̲f̲y̲ ̲S̲u̲p̲p̲l̲y̲ ̲V̲o̲l̲t̲a̲g̲e̲ ̲o̲n̲ ̲C̲U̲ ̲C̲r̲a̲t̲e̲
All voltages used in the channel unit are verified
by a digital multimeter. The measurements are carried
out on the front panel of the CCA located on the rear
side of the CU crate (1A2A1A25), refer to Figure 5.9.1.
The voltages are checked to be within below limits:
+24V = 22.8 - 25.2V
+12V = 12.6 - 12.8V
+5V = 5.68 - 5.72V
-12V = 12.6 - 12.8V
-24V = 22.8 - 25.2V
5.10 I̲N̲S̲P̲E̲C̲T̲I̲O̲N̲ ̲O̲F̲ ̲S̲W̲I̲T̲C̲H̲ ̲S̲E̲T̲T̲I̲N̲G̲S̲ ̲A̲N̲D̲ ̲S̲T̲A̲T̲U̲S̲ ̲L̲E̲D̲S̲
In order to receive a preliminary impression on the
condition of the system after powering up use the below
tables for a visual check of the status LEDS.
If any discrepancies, refer to the CAMPS Site Level
Maintenance Manual, Doc. No. CPS/TCM/005.
5.10.1 S̲w̲i̲t̲c̲h̲ ̲S̲e̲t̲t̲i̲n̲g̲s̲
Before checking the status LED's, all switches must
be placed in correct positions:
U̲N̲I̲T̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲S̲W̲I̲T̲C̲H̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲N̲O̲R̲M̲A̲L̲ ̲P̲O̲S̲S̲
MAP S2 MAIN/NRM NRM
S3 DIS/EN EN
CUCP CU BUS A AUTO
CU BUS B -
DISK CTRL 1 -
DISK CTRL 2 -
DISK CTRL 3 -
LTU 1-5 -
ST.FD. CTLR -
CCBA S1 EN/DIS EN
BSM-X S1 BUS BUS 2
S2 AUTO/MAN/OFF MAN
LTUX-S CH1-CH4 ON
CCA RESET DOWN
After power up press MC on PROC 1 and 2.
5.10.2 L̲E̲D̲ ̲I̲n̲d̲i̲c̲a̲t̲o̲r̲s̲
The following table list the normal condition of the
equipment LED indicators.
UNIT LED NORM. COND. NOTE
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
M̲A̲P̲ POWER ON
TEST OFF ON
FOR
APP.
10
SEC.
AFTER
POWER
UP
P. FAIL OFF
NO CPU OFF BLINKING
A
FEW
SEC.
AFTER
TEST
OFF
CB DMA OFF
DC DMA OFF
PUDIS OFF ON
=
SWITCH
S3
IN
POSS.
DIS.
INH OFF ON = SWITCH S2
IS OR HAS BEEN
IN POSS.
MAINT.
HALT OFF ON
=
SWITCH
S2
IN
POSS.
MAINT.
MAINT OFF ON
=
SWITCH
S2
IN
POSS.
MAINT.
C̲P̲U̲/̲C̲A̲C̲H̲E̲ POWER ON
CACHE OFF ON
TEST OFF ON
FOR
APP.
1
SEC.
AFTER
POWER
UP
R̲A̲M̲ POWER ON
S̲T̲I̲ POWER ON
TEST OFF ON
FOR
APP.
10
SEC.
AFTER
POWER
UP
BUSY OFF
HIDMA OFF
P.ERR OFF
C.ERR OFF
M.ERR OFF
RX STAT OFF
M̲I̲A̲ POWER ON
ENABLE ON OFF
=
SWITCH
S3
ON
MAP
IN
POSS.
DIS.
T̲I̲A̲ POWER ON
TEST ON (OFF
WHEN
INITALIZED)
UNIT LED NORM. COND. NOTE
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
C̲C̲A̲ POWER ON
BUSY OFF
M̲B̲T̲ POWER ON
D̲I̲S̲K̲ ̲C̲T̲R̲L̲ POWER ON
TEST OFF ON
FOR
APP.
10
SEC.
AFTER
POWER
UP
ABUS OFF
BBUS OFF
BUSY OFF
S̲T̲.̲F̲D̲.̲C̲T̲R̲L̲ POWER ON
TEST ON
ABUS OFF
BBUS OFF
BUSY ON
FRONT LED OFF
C̲U̲C̲P̲ POWER ON
AUTO CTRL ON
CU BUS A
AUTO ON
CU BUS B
AUTO ON
L̲T̲U̲ POWER ON
TEST OFF ON
FOR
APP.
10
SEC.
AFTER
POWER
UP
BUS A OFF
BUS B OFF
BOOTL. OFF…86…1 …02…
…02… …02… …02…
UNIT LED NORM. COND. NOTE
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
C̲I̲A̲-̲A̲/̲B̲ POWER ON
P.FAIL OFF
W̲C̲A̲ POWER ON
ENABLE ON OFF:
SWITCH
S1
IN
POSS.
DIS
D̲C̲A̲ POWER ON
B̲S̲M̲-̲X̲ POWER ON
EXT.POWER ON
BUS 1 OFF
BUS 2 ON
AUTO OFF OFF:
S2
IN
POSS.
MAN.
OR
OFF
MAN ON ON: S2 IN POSS.
MAN. OR OFF
C̲T̲X̲.̲C̲O̲N̲T̲ POWER ON
TEST OFF ON
FOR
APP.
10
SEC.
AFTER
POWER
UP
REC.ST. OFF
TR.ST. OFF
FUSE OFF
O̲P̲T̲O̲ ̲T̲/̲R̲ POWER ON
RCVL ON RED
LIGHT
(NO
TERM.
CONN)
RTS ON
CTS OFF
SYNC ON RED
LIGHT
(NO
TERM.
CONN)
L̲/̲L̲ ̲A̲D̲A̲P̲ POWER ON
L̲T̲U̲X̲-̲S̲ POWER ON
TEST OFF ON
FOR
APP.
10
SEC.
AFTER
POWER
UP
TDX.ST OFF
CH 1-4 ON OFF:
SWITCH
1-4
OFF
UNIT LED NORM. COND. NOTE
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
…02…M̲M̲D̲ READY ON
FAULT/CLEAR OFF
WRITE PROT. OFF ON:
SWITCH
ACTIVATED
S̲M̲D̲ START ON
READY FLASHING
FAULT OFF
PROT. OFF ON:
SWITCH
ACTIVATED
W̲D̲ ̲C̲R̲A̲T̲E̲ POWER ON TERMINATOR
BOARD
INSIDE
CRATE
5.11 I̲N̲S̲T̲A̲L̲L̲A̲T̲I̲O̲N̲ ̲O̲F̲ ̲D̲E̲L̲T̲A̲ ̲V̲D̲U̲
a) The terminals are distributed to the installation
sites according to ATBB drawings 102, 105, and
110.
b) Supervisory and maintenance terminals must be placed
on CR provided tables.
5.11.1 P̲o̲w̲e̲r̲ ̲P̲l̲u̲g̲ ̲C̲o̲n̲n̲e̲c̲t̲i̲o̲n̲s̲
Power plug connections must be exchanged to fit host
nation provided power outlets.
P̲O̲W̲E̲R̲ ̲C̲O̲R̲D̲ ̲F̲R̲O̲M̲ ̲D̲E̲L̲T̲A̲ 3̲-̲P̲I̲N̲N̲E̲D̲ ̲P̲L̲U̲G̲
Brown Phase
Blue Neutral
Green/Yellow Ground
5.11.2 T̲e̲r̲m̲i̲n̲a̲t̲i̲o̲n̲ ̲o̲f̲ ̲O̲p̲t̲o̲ ̲C̲a̲b̲l̲e̲s̲
a) Before terminating the opto cable, a rubber tubing,
size 8 x 12 x 250 mm, must be mounted on the cable,
see ATBB dwg. 130.
b) The opto fibres are to be pulled through the rear
waveguide (port 3) into the VDU.
(See ATBB dwg. 130).
c) The two fibres must be terminated with special
opto connectors.
For detailed termination procedures refer to para
1.3, doc. No. 4.
d) In case of opto splicing this will be done by mounting
of an adapter between the two male connectors,
using the same kind of male connectors as for the
terminals.
e) Before connecting the two fibres to the optical
modem board in the VDU, the black receiver cable
with the opto connector must be checked for supplying
enough light emission.
The transmitter of the opto T/R in the TDX crate
is used as source for the opto fibre (black cable
connected).
f) Connect the black fibre in the VDU end to the 11XE
fiber optic power meter and verify that the optical
power output is not less than -34.6dBm.
g) If the optical power output is less than -34.6
dBm, the cable will be terminated with a new pair
of OPTO connectors. If still outside tolerance,
the cable will be marked as Bad and a new cable
must be installed.
h) To get access to the optical modem board located
inside the VDU, unlock the two snappers on the
rear and lift the terminal access cover of the
VDU.
i) The white fibre must be connected to the transmitter
jack ("out") and the black fibre to the receiver
jack ("in") (see ATBB drawing 130).
j) The opto cable must be permanently marked with
cable No during the termination procedure.
5.11.3 M̲o̲u̲n̲t̲i̲n̲g̲ ̲o̲f̲ ̲K̲e̲y̲b̲o̲a̲r̲d̲ ̲a̲n̲d̲ ̲K̲e̲y̲s̲
a) The keyboard cable is connected to the female cannon
plug located on the lower right hand front of the
terminal. The connector is secured by the two front
screws.
b) Remove the two keys placed on the inside of the
terminal access cover and insert the keys in the
key-lock on front of the terminal.
5.12 I̲N̲S̲T̲A̲L̲L̲A̲T̲I̲O̲N̲ ̲O̲F̲ ̲T̲R̲A̲C̲O̲R̲ ̲M̲S̲P̲
5.12.1 P̲o̲w̲e̲r̲ ̲P̲l̲u̲g̲ ̲C̲o̲n̲n̲e̲c̲t̲i̲o̲n̲s̲
Repeat step 5.11.1 for the power plug of the MSP.
5.12.2 T̲e̲r̲m̲i̲n̲a̲t̲i̲o̲n̲ ̲o̲f̲ ̲O̲p̲t̲o̲ ̲C̲a̲b̲l̲e̲s̲
Repeat step 4.11.2 item a) thru g).
h) To get access to the optical modem board located
inside the printer, unlock the two snappers in
front of the printer and lift the cover of the
printer.
i) Install the fibres through the rear connector entry
hole, route through the optical cable entry hole
and connect the white fibre to the transmitter
("output") and the black fibre to the receiver
("input"). (See ATBB dwg. 130).
j) The opto cable must be permanently marked with
cable number during the termination procedure.
5.12.3 I̲n̲s̲t̲a̲l̲l̲a̲t̲i̲o̲n̲ ̲o̲f̲ ̲P̲a̲p̲e̲r̲ ̲a̲n̲d̲ ̲R̲i̲b̲b̲o̲n̲
Install the paper and the ribbon according to the instructions
in the operator's manual.
5.12.4 I̲n̲s̲t̲a̲l̲l̲a̲t̲i̲o̲n̲ ̲o̲f̲ ̲p̲i̲s̲t̲o̲n̲ ̲s̲p̲r̲i̲n̲g̲
Mount the Piston spring between the bottom and the
lid of the printer by rotating the piston spring clockwise
into the screw thread in the bottom of the printer.
The piston spring is connected to the lid by the screw
through the hinge mounted in the lid.
5.13 I̲N̲S̲T̲A̲L̲L̲A̲T̲I̲O̲N̲ ̲O̲F̲ ̲P̲T̲P̲/̲P̲T̲R̲
a) The PTP/PTR is installed in the off-line encryption
area (ref ATBB drawing 105).
b) The 3/4" 45…0e…o…0f… fitting is mounted in the J-box and
fastened from inside the J-box by the nut.
c) The metallic conduit is mounted to the fitting
by means of the hose lock and the lock nut.
d) Repeat step b) and c) for mounting of the conduit
to the PTP/PTR (see ATBB drawing 131).
e) The metallic interface cable coming from the filter
box is pulled through the conduit into the PTP/PTR.
The cable will be terminated by a cannon plug according
to the pin assignment table 5.3.2 page 5.5 in the
ATBB Doc.
f) The cable is connected according to ATBB drawing
131.
5.14 T̲E̲S̲T̲ ̲O̲F̲ ̲S̲U̲P̲/̲U̲S̲E̲R̲ ̲T̲E̲R̲M̲I̲N̲A̲L̲S̲
5.14.1 T̲e̲s̲t̲ ̲o̲f̲ ̲D̲e̲l̲t̲a̲ ̲V̲D̲U̲
a) Connect the power plug to the wall outlet.
b) Turn on the "power on/off" switch located on the
lower right front of the terminal.
c) Operate the keylock switch to the ON position (right
hand front panel).
d) Immediately after power up the terminal executes
a series of system diagnostics. If all are working
properly, the power-up menu will be displayed on
the screen within 10 seconds.
e) Adjust the intensity and focus until the characters
are clear and bright. Do not advance the intensity
too far or the display area may be highlighted.
f) Adjust the audible alarm for the desired sound
level (control shift and the G key).
g) When all the terminals have been switched on and
locally tested, the transmitter of the optical
modem board in the VDU, the white opto cable, and
the opto connection to the TDX crate must be checked
for supplying enough light emission.
h) Connect one by one all the white fibres terminated
in the opto T/R located in the TDX crates to the
11XE fibre optic power meter and check that the
optical power output is not less than -34.6dBm.
i) If the optical power output is less than -34.6
dBm, the cable will be terminated with a new pair
of OPTO connectors. If still outside tolerance,
the cable will be marked as Bad and a new cable
must be installed.
5.14.2 O̲p̲e̲r̲a̲t̲i̲o̲n̲a̲l̲ ̲T̲e̲s̲t̲
a) Assure that the required terminal functions and
characteristics are correctly stored by checking
the contents of the configuration menu.
Correct CAMPS application contents to be:
DEL/BS = N̲ PRT CR DLY = O̲
ECHO = N̲ PRT LF AFT CR = N̲
CR=XOFF = N̲ PRT PROT DATA = N̲
XMT SO SEQ = N̲ PRT BSY = N̲
MEM RELEASED = Y̲ PRT BUSY=HIGH = N̲
BAUDOT = N PRT FF = N̲
PRT BUF (0,1,2,3) = O̲
WRU?X̲7̲2̲6̲0̲ WHATRU? CAMPS MCLK 0̲0̲0̲0̲0̲0̲
I/O HOST PRINT
CHAR 7̲ 7̲
PARITY E̲ E̲
STOP BITS C̲ C̲
BAUD RATE G̲ G̲
b) The terminal is logged on to the system according
to procedures stated in the Operator's Manual.
c) Messages are sent/rec. between the terminal and
other terminals.
5.14.3 T̲e̲s̲t̲ ̲o̲f̲ ̲T̲r̲a̲c̲o̲r̲ ̲M̲S̲P̲
a) Connect the power plug to the wall outlet.
b) Turn on the power switch located on the rear right
hand side.
Verify that the power lamp on the front panel lights.
c) Operate the key-lock switch to the ON position
(left hand side in front).
d) Depress the "line feed" button on the TCM front
panel and verify that line feed of paper occurs.
e) Press the test button for not more than 4 sec.
Verify that all lamps on the printer lights.
f) Press the test button for at least 5 sec. Verify
that the following is printed:
NO ERRORS IN ROM
NO ERRORS IN RAM
66 LINES BARBERPOLE PATTERN
g) Repeat step 5.14.1 item h) and i) for test of transmitter
and opto connections.
5.14.4 O̲p̲e̲r̲a̲t̲i̲o̲n̲a̲l̲ ̲T̲e̲s̲t̲
Arrange to have one or more messages sent to the MSP
and verify message contents with the transmitting station.
Verify during print out that the key-lock switch stops
the printing and that no part of the message is lost
when it is turned on again.
5.15 T̲E̲S̲T̲ ̲O̲F̲ ̲P̲T̲P̲/̲P̲T̲R̲
Testing the PTP/PTR is a part of the PROCESSOR/LINE
TERMINATION TEST. Ref. 5.16.
5.16 H̲/̲W̲ ̲T̲E̲S̲T̲ ̲P̲R̲O̲C̲E̲S̲S̲O̲R̲/̲L̲I̲N̲E̲ ̲T̲E̲R̲M̲.̲ ̲U̲N̲I̲T̲S̲
By means of the M&D- and the Test Drive Software, all
hardware- and interface functions shall be verified.
The following step by step procedure outlines the major
tasks of the testing sequence.
For a detailed description of the test procedure including
informations of test control, test data, expected test
results, test execution procedures, see CPS/TRP/001
FACTORY ACCEPTANCE TEST SPECIFICATIONS AND PROCEDURES.
5.16.1 P̲U̲ ̲#̲1̲/̲C̲U̲/̲T̲D̲X̲ ̲#̲2̲ ̲F̲u̲n̲c̲t̲i̲o̲n̲a̲l̲ ̲T̲e̲s̲t̲
a) CPU Test
b) MAP Test
c) RAM Test
d) Disk/FD/LTU/TDX
5.16.2 W̲a̲t̲c̲h̲d̲o̲g̲ ̲P̲r̲o̲c̲e̲s̲s̲o̲r̲ ̲F̲u̲n̲c̲t̲i̲o̲n̲a̲l̲ ̲T̲e̲s̲t̲
a) WDP Test
b) WDP V24 Interface Test
c) WDP CCBA Interface Test
d) PU #1 CCA Test
e) PU #2 CCA Test
f) CU CCA Test
g) TU1-10 BSM-X Test
5.17 I̲N̲V̲E̲N̲T̲O̲R̲Y̲ ̲C̲H̲E̲C̲K̲
a) As a final step of the installation procedure,
the CR installation team will conduct an inventory
check of all delivered CAMPS equipment to verify
that the equipment is complete.
b) This inventory inspection will be witnessed by
the customer.
c) The inventory is performed in accordance with the
updated inventory list prepared by CR.
d) The inventory check will also include delivery
to site of spare parts, test equipment, and documentation.
e) The results are recorded on the inventory list
and signed by both parties