DataMuseum.dk

Presents historical artifacts from the history of:

CR80 Wang WCS documentation floppies

This is an automatic "excavation" of a thematic subset of
artifacts from Datamuseum.dk's BitArchive.

See our Wiki for more about CR80 Wang WCS documentation floppies

Excavated with: AutoArchaeologist - Free & Open Source Software.


top - download

⟦845a23372⟧ Wang Wps File

    Length: 4503 (0x1197)
    Types: Wang Wps File
    Notes: Spelunked
    Names: »~ORPHAN71.08«

Derivation

└─⟦74592f894⟧ Bits:30006167 8" Wang WCS floppy, CR 0226A
    └─ ⟦this⟧ »~ORPHAN71.08« 

WangText

…00……00……00……00……00…G…0a……00……00…G…0b…G…0d…G…0f…F…09……1b……0d……1b……06……1a……0e……1a…
…19……0a……19……0d……19……02……19…
…19… …19……07……18……0d……18……02……17……08……17……09……17……0f……17… …16……0a……16……00……16……06……15……0c……15……00……15……02……14……08……14……0c……14……00……14……06……86…1                                             …02…           …02…   …02…        

1473A/ktd/226A…02…CPS/AUX/...

…02…HAU/......…02……02…#
INSTALLATION PROCEDURES
SITE ..…02……02…CAMPS











                 INSTALLATION PROCEDURES
                 SITE ....


                 CPS/AUX/...














                 Hans Haureberg




                 Gert Jensen







                 SHAPE (5), GJ, OE, KM, HAU, BHB, IJO, NPP,
                 Conf. Mgmt.,QA















                          ILS Manager     ......


         Preliminary



         ......



1473A/ktd/111A …02… CPS/AUX/...

 …02… HAU/......…02……02…ii
INSTALLATION PROCEDURES
SITE ..…02……02… CAMPS












         .....                  All      Preliminary Issue of
                                        Document



1473A/ktd/111A …02… CPS/AUX/...

 …02… HAU/......…02……02…iii
INSTALLATION PROCEDURES
SITE ..…02……02… CAMPS





                                      T̲A̲B̲L̲E̲ ̲O̲F̲ ̲C̲O̲N̲T̲E̲N̲T̲S̲




_…01……00……00……00……00……00…G…02……00……00…G
G…05…G…07……1b……09……1b……05……1a……0e……1a……06……19……0b……19……00……19……05……18……0a……18……0b……18……0c……18……0f……18……05……17……0a……17……00……17……01……17……07……16……0c……16……02……15……08……15……0e……15…   …14……08……14……0a……14……00……14…  …13……08……13……0e……86…1                                             …02…  
               …02…   …02…        

1473A/ktd/226A…02…CPS/AUX/...

…02…HAU/......…02……02…#
INSTALLATION PROCEDURES
SITE ..…02……02…CAMPS











                 INSTALLATION PROCEDURES
                 SITE ....


                 CPS/AUX/...














                 Hans Haureberg




                 Gert Jensen







                 SHAPE (5), GJ, OE, KM, HAU, BHB, IJO, NPP,
                 Conf. Mgmt.,QA, PAB















                          ILS Manager     ......


         Preliminary



         ......



1473A/ktd/111A …02… CPS/AUX/...

 …02… HAU/......…02……02…ii
INSTALLATION PROCEDURES
SITE ..…02……02… CAMPS












         .....                  All      Preliminary Issue of
                                        Document



1473A/ktd/111A …02… CPS/AUX/...

 …02… HAU/......…02……02…iii
INSTALLATION PROCEDURES
SITE ..…02……02… CAMPS





                                      T̲A̲B̲L̲E̲ ̲O̲F̲ ̲C̲O̲N̲T̲E̲N̲T̲S̲




     TITLE PAGE  ....................................  
      i
     REVISION RECORD ................................  
     ii
     TABLE OF CONTENTS ..............................  iii
     ABBREVIATIONS .................................  vii

     1 INTRODUCTION .................................  
       1 
       1.1 SCOPE ....................................  
           1 
       1.2 DOCUMENT FORMAT ..........................  
           1 
       1.3 REFERENCES ..............................   2
           

     2 INSTALLATION PREPARATIONS ....................  
       3 
       2.1 SHIPMENT OF EQUIPMENT ....................  
           3 
         2.1.1 Disassembly and Packing ..............  
               3 
         2.1.2 Transportation to Site ...............  
               6 
         2.1.3 Receipt of Equipent at Site .........   7
               

       2.2 PREPARATION OF INSTALLATION AT SITE ......  
           8 
         2.2.1 Preparations by CR ...................  
               8 
         2.2.2 Preparations by Site .................  
               8 
       2.3 INSTALLATION OPERATIONS ..................  
           9

     3 INSRUCTIONS TO SITE .........................  13
       
       3.1 RECEIPT OF THE EQUIPMENT BY SITE .........  13
           
         3.1.1 Incoming Inventory/Inspection  .......  13
               
         3.1.2 Transportation to Installation Site ..  13
               
         3.1.3 Distribution of Equipment ...........  15
               
         3.1.4 Signing for Receipt of Equipment .....  16
               
       3.2 INSTALLATION PREPARATIONS AND SUPPORT ....  16
           
       3.3 SHIPMENT CONTAINERS ......................  17
           

     4 TOOLS AND TEST EQUIPMENT .....................  18
       

     5 INSTALLATION OFMAIN SITE EQUIPMENT ..........  21
       
       5.1 GENERAL ..................................  21
           
       5.2 MECHANICAL RACK ASSEMBLY .................  22
           
         5.2.1 Unpacking of Racks ...................  22
               
         5.2.2 Transportation ot Installatioan Site .  24
         5.2.3 Removal of Upper Crates and D-Fans ...  24
               
         5.2.4 Removal of Mains Switches ............  26
               
         5.2.5 Mounting of Levellers ................  26
               
         5.2.6 Mounting of Gaskets ..................  26
               
         5.2.7 Levelling and Bolting of R