MANAGEMENT PROPOSAL
Volume I
D̲I̲S̲C̲O̲N̲
S̲e̲c̲t̲i̲o̲n̲ ̲I̲I̲I̲
P̲R̲O̲G̲R̲A̲M̲ ̲P̲L̲A̲N̲
…0e…c…0f… Christian Rovsing A/S - 1982
This document contains information proprietary to Christian
Rovsing A/S. The information, whether in the form of
text, schematics, tables, drawings or illustrations,
must not be duplicated or used for purposes other than
evaluation, or disclosed outside therecepient company
or organisation without the prior, written permission
of Christian Rovsing A/S.
This restriction does not limit the recipient's right
ot use information contained in the document ig such
information is received from another source without
restriction provided such source is not in breach of
an obligation of confidentiality towards Christian
Rovsing A/S.…86…1 …02… …02… …02… …02…
…02…
S̲E̲C̲T̲I̲O̲N̲ ̲I̲I̲I̲
P̲R̲O̲G̲R̲A̲M̲ ̲P̲L̲A̲N̲
Christian Rovsing A/S will perform the following work
tasks as part of the DISCON project. The tasks are
ordered in accordance with the CISCO statement of work.
The program plan is split up in subsection:
1. The work Tasks
2. Compliance Statement on the SDRL and DID…86…1
…02… …02… …02… …02… …02…
1. W̲O̲R̲K̲ ̲T̲A̲S̲K̲S̲
T̲A̲S̲K̲ ̲1̲.̲ ̲-̲ ̲M̲A̲N̲A̲G̲E̲M̲E̲N̲T̲
CISCO SOW Task 1. Understood and agreed. Program
and technical Management will be the responsibility
of the Christian Rovsing A/S DISCON Program Manager.
T̲A̲S̲K̲ ̲2̲ ̲-̲ ̲D̲E̲S̲I̲G̲N̲,̲ ̲D̲E̲V̲E̲L̲O̲P̲M̲E̲N̲T̲ ̲A̲N̲D̲ ̲F̲A̲B̲R̲I̲C̲A̲T̲I̲O̲N̲ ̲
Christian Rovsing A/S understand the task as being:
1. Fabrication and Testing of unmodified CR80 modules
in accordance with the list of Off-the-Shelf equipment
(CISCO SPEC 3951.V01 Section 4.2). The fabrication
and test will be performed in accordance with the
method presently being used and approved by NATO
for the CAMPS programme. The delivered documentation
will be the existing module specifications, drawings
etc. (As applicable to the CAMPS Contract).
2. Design, Development, Fabrication and Testing of
modified CR80 codules as specified in CISCO SPEC
3951.V01 Section 4.3. The Design, Development and
first Article Test will be performed in accordance
with the standards used for Design, Development
and Test of the appropriate unmodified CR80 module.
The documentation will be an updated version of
the original documentation using the same standards.
Fabrication and Test will be as described in 1. above.
3. Compliance statement with CISCO SOW Task 2.
2.0 T̲a̲s̲k̲ ̲R̲e̲q̲u̲i̲r̲e̲m̲e̲n̲t̲
Understood and Agreed with the following proviso:
The term specification means the CISCO specification
updated with Christian Rovsing A/S ' compliance
statement (Part 1 of the technical Specification
and the Statements with this SOW
2.1 S̲o̲f̲t̲w̲a̲r̲e̲/̲F̲i̲r̲m̲w̲a̲r̲e̲
Understood and Agreed with the follwoing proviso:
1. The tasks only refer to module intergration
and text.
2. The operational software/firmware is understood
to be all the software/firmware normally embedded
in the module PROMS or to be down line loaded
from the system.
3. The Off-Line Software to support the module
level Software/firmware development is considered
a Christian Rovsing A/S in -house facility
and is not a deliverable item.
2.2 S̲o̲f̲t̲w̲a̲r̲e̲/̲F̲i̲r̲m̲w̲a̲r̲e̲ ̲E̲n̲g̲i̲n̲e̲e̲r̲i̲n̲g̲ ̲F̲a̲c̲i̲l̲i̲t̲y̲
Understood and Agreed with the proviso that the
items are not deliverable items under this contract.
2.3 D̲r̲a̲w̲i̲n̲g̲s̲
a) For new/modified design refer to 2 above
b) Drawings will in the baseline be delivered
as agreed for the NATO CAMPS Project. Christian
Rovsing A/S will be pleased to make a quote
for supplying documentation in other standards.
c) Christian Rovsing A/S does not presently
follow the MIL-D-1000A level 3 standard,
the AFAD 72-700 standard, the MIL-STD-100B
standard.
Adaption to these standards are considered outside
the scope of this procurement.
2.4 T̲e̲c̲h̲n̲i̲c̲a̲l̲ ̲R̲e̲v̲i̲e̲w̲s̲
Understood and Agreed.
Reviews outside Copenhagen will be changed at cost.
2.5 A̲p̲p̲l̲i̲c̲a̲b̲l̲e̲ ̲D̲o̲c̲u̲m̲e̲n̲t̲s̲
a) MIL-D-1000A replaced by standards used
for and approved for the
NATO CAMPS program
b) MIL-STD-1388-1
c) MIL-STD-1388-2
d) MIL-STD-1528 replaced by existing Christian
Rovsing A/S in house procedures
e) AFAD 72-700 repalced by existing Christian
Rovsing A/S in-house procedures
f) MIL-STD-100B replaced by existing Christian
Rovsing A/S in house procedures.
T̲A̲S̲K̲ ̲3̲ ̲-̲ ̲Q̲U̲A̲L̲I̲T̲Y̲ ̲A̲S̲S̲U̲R̲A̲N̲C̲E̲/̲I̲N̲P̲E̲C̲T̲I̲O̲N̲ ̲
3.0 T̲a̲s̲k̲ ̲R̲e̲q̲u̲i̲r̲e̲m̲e̲n̲t̲s̲
Understood and Agreed with the following proviso:
AQAP 1 Allied Quality Assurance Program for development
and manufacturing of harware is used (
instead of MIL-Q-9858A and AS 1821-1975)
AQAP 6 is used for calibration (instead of MIL-S-4566A)
AQAP 13 Final is used for software development
The QA function in Christian Rovsing A/S is performed
by a Corporate level QA group that controls hardware
development and manufacturing as well as project
implementation activities. The QA manager reports
directly to senior corporate management.
3.1 C̲a̲l̲i̲b̲r̲a̲t̲i̲o̲n̲
AQAP 6 shall apply.
3.2 A̲p̲p̲l̲i̲c̲a̲b̲l̲e̲ ̲D̲o̲c̲u̲m̲e̲n̲t̲s̲
MIL-Q-9858A replaced by AQAP 1 and 13.
MIL-S-4566A replaced by AQAP 6
AS1821-1975 replaced by AQAP 1 and 13
T̲A̲S̲K̲ ̲4̲ ̲-̲ ̲T̲E̲S̲T̲
4.0 T̲a̲s̲k̲ ̲R̲e̲q̲u̲i̲r̲e̲m̲e̲n̲t̲s̲
Understood and Agreed.
4.1 T̲e̲s̲t̲ ̲a̲n̲d̲ ̲E̲v̲a̲l̲u̲a̲t̲i̲o̲n̲
4.1.1 Understood and Agreed.
The module test will be performed using standard Christian
Rovsing A/S (CAMPS approved) module level test procedures
(in-circuit testing, funtional testing, etc.)
4.1.2 P̲r̲o̲d̲u̲c̲t̲i̲o̲n̲ ̲T̲e̲s̲t̲s̲ ̲
Partly compliant.
Modules on the CISCO "Off-the -Shelf-List" have been
approved by NATO on the CAMPS project to have passed
the first article qualification. These tests have been
partly analyses, comparison with like equipment and
actual tests. It is assumed as baseline for costing
that no further qualification testing on the Off-the-Shelf
equipment is required.
If the buyer elects to perform testing then this effort
will be charged separately.
Modules on the modified equipment list will be tested
at Christian Rovsing A/S in accordance with standard
CAMPS approved in house practices (functional, in-circuit
test, temperature/humidity tests).
At system level the full CAMPS configuration inclusive
disc drives and terminals have been subjected to a
prolonged test at 40 degrees Celcius (for more than
48 hours).
4.1.2.1 P̲r̲e̲v̲i̲o̲u̲s̲ ̲Q̲u̲a̲l̲i̲f̲i̲c̲a̲t̲i̲o̲n̲s̲
c. Compliant. NATO Approval.
4.1.2.2 Further tests to be charged separately.
4.1.3 C̲l̲i̲m̲a̲t̲i̲c̲ ̲E̲n̲v̲i̲r̲o̲n̲m̲e̲n̲t̲a̲l̲ ̲t̲e̲s̲t̲s̲
Partly compliant. We propose that the climatic test
should take place on a per system basis rather than
on a per module basis.
4.1.4 E̲l̲e̲c̲t̲r̲o̲n̲a̲g̲n̲e̲t̲i̲c̲ ̲E̲n̲v̲i̲r̲o̲n̲m̲e̲n̲t̲a̲l̲ ̲T̲e̲s̲t̲
CISCO is responsible for the electromagnetic shielding
of the equipment. This test is therefore not applicable
to Christian Rovsing A/S.
4.1.5 T̲e̲s̲t̲ ̲C̲o̲n̲d̲u̲c̲t̲
Understood and Agreed.
4.1.6 T̲e̲s̲t̲ ̲C̲o̲n̲s̲t̲r̲a̲i̲n̲t̲s̲
4.1.6.1 T̲e̲s̲t̲ ̲S̲u̲r̲v̲e̲i̲l̲l̲a̲n̲c̲e̲
Understood and Agreed.
4.1.6.2 T̲e̲s̲t̲ ̲P̲r̲o̲c̲e̲d̲u̲r̲e̲s̲
Understood and Agreed.
4.1.6.3 C̲a̲l̲i̲b̲r̲a̲t̲i̲o̲n̲ ̲
Understood and Agreed except that AQAP 6 is used insteasd
of MIL-C-4566A (or MIL-S-4566A).
4.1.6.4 D̲o̲c̲u̲m̲e̲n̲t̲ ̲A̲p̲p̲r̲o̲v̲e̲d̲ ̲
Understood and Agreed.
4.1.7 R̲e̲f̲u̲r̲b̲i̲s̲h̲m̲e̲n̲t̲
Understood and Agreed.
4.1.8 S̲y̲s̲t̲e̲m̲ ̲T̲e̲s̲t̲ ̲S̲u̲p̲p̲o̲r̲t̲
Understood and Agreed.
4.2 T̲e̲s̲t̲ ̲R̲e̲s̲u̲l̲t̲s̲ ̲
Understood and Agreed
4.3 A̲p̲p̲l̲i̲c̲a̲b̲l̲e̲ ̲D̲o̲c̲u̲m̲e̲n̲t̲s̲
MIL-C-4562A replaced AQAP 6.
CISCO Spec with agreed modifications.
T̲A̲S̲K̲ ̲5̲ ̲-̲ ̲C̲O̲N̲F̲I̲G̲U̲R̲A̲T̲I̲O̲N̲ ̲M̲A̲N̲A̲G̲E̲M̲E̲N̲T̲
5.0 T̲a̲s̲k̲ ̲R̲e̲q̲u̲i̲r̲e̲m̲e̲n̲t̲
Understood and Agreed.
The Configuration Management will be performed
by the SD configuration management group under
the supervision of the QA function.
5.1 D̲e̲f̲i̲n̲i̲t̲i̲o̲n̲
5.1.1 N̲e̲w̲ ̲D̲e̲s̲i̲g̲n̲
Understood and Agreed.
Remark: This is previously been referred to as
modification to existing modules and will be considered
as such.
5.1.2 E̲x̲i̲s̲t̲i̲n̲g̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲/̲S̲o̲f̲t̲w̲a̲r̲e̲
Understood and Agreed.
5.1.3 F̲i̲r̲s̲t̲ ̲A̲r̲t̲i̲c̲l̲e̲
Understood and Agreed.
5.2 R̲e̲q̲u̲i̲r̲e̲m̲e̲n̲t̲s̲
5.2.1 P̲r̲o̲c̲e̲d̲u̲r̲e̲s̲
Understood and Agreed.
5.2.2 C̲o̲n̲f̲i̲g̲u̲r̲a̲t̲i̲o̲n̲ ̲I̲d̲e̲n̲t̲i̲f̲i̲c̲a̲t̲i̲o̲n̲
5.2.2.1 E̲n̲g̲i̲n̲e̲e̲r̲i̲n̲g̲ ̲D̲a̲t̲a̲
Understood and Agreed.
5.2.2.2 I̲n̲c̲o̲r̲p̲o̲r̲a̲t̲i̲o̲n̲ ̲o̲f̲ ̲A̲u̲x̲i̲l̲i̲a̲r̲y̲ ̲E̲n̲g̲i̲n̲e̲e̲r̲i̲n̲g̲ ̲D̲r̲a̲w̲i̲n̲g̲ ̲C̲h̲a̲n̲g̲e̲
̲P̲a̲g̲e̲s̲.
Understood and Agreed.
5.2.2.3 P̲r̲o̲p̲r̲i̲e̲t̲a̲r̲y̲ ̲D̲a̲t̲a̲
All data is delivered with limited rights.
5.2.2.4 I̲t̲e̲m̲ ̲I̲d̲e̲n̲t̲i̲f̲i̲c̲a̲t̲i̲o̲n̲
Non-compliance
Marking in accordance with other than Christian Rovsing
A/S standard markings, is considered outside the scope
of this procurement.
5.3 C̲o̲n̲f̲i̲g̲u̲r̲a̲t̲i̲o̲n̲ ̲C̲o̲n̲t̲r̲o̲l̲
5.3.1 G̲e̲n̲e̲r̲a̲l̲
Understood and Agreed.
5.3.2 C̲h̲a̲n̲g̲e̲ ̲C̲r̲i̲t̲e̲r̲i̲a̲
Understood and Agreed.
5.3.3 C̲h̲a̲n̲g̲e̲ ̲N̲u̲m̲b̲e̲r̲s̲ ̲
Understood and Agreed.
5.3.4 D̲e̲v̲a̲t̲i̲o̲n̲s̲ ̲a̲n̲d̲ ̲W̲a̲i̲v̲e̲r̲s̲
Understood and Agreed
5.3.5 D̲e̲l̲i̲v̲e̲r̲y̲ ̲D̲a̲t̲a̲ ̲P̲a̲c̲k̲a̲g̲e̲
Understood. See comments to SDRL 006.
5.4 A̲u̲d̲i̲t̲s̲
5.4.1 G̲e̲n̲e̲r̲a̲l̲
Understood and Agreed.
5.4.2 F̲i̲r̲s̲t̲ ̲A̲r̲t̲i̲c̲l̲e̲
This is understood only to be a visual examination
of the equipment in order to verify its compliance
with the documentation.
5.4.3 I̲d̲e̲n̲t̲i̲c̲a̲l̲i̲t̲y̲
Comply
5.5 A̲p̲p̲l̲i̲c̲a̲b̲l̲e̲ ̲D̲o̲c̲u̲m̲e̲n̲t̲s̲
DEF (AUST) 3927 Not applicable
DOD-STD-480 Applicable
MIL-STD 130 Not Applicable…86…1 …02…
…02… …02… …02…
T̲A̲S̲K̲ ̲6̲ ̲-̲ ̲I̲N̲T̲E̲G̲R̲A̲T̲E̲D̲ ̲L̲O̲G̲I̲S̲T̲I̲C̲S̲ ̲S̲U̲P̲P̲O̲R̲T̲ ̲
6.0 T̲a̲s̲k̲ ̲R̲e̲q̲u̲i̲r̲e̲m̲e̲n̲t̲s̲
Understood and Agreed.
6.1 M̲a̲i̲n̲t̲e̲n̲a̲n̲c̲e̲ ̲C̲o̲n̲c̲e̲p̲t̲
Understood
6.1.1 F̲i̲r̲s̲t̲ ̲L̲e̲v̲e̲l̲ ̲M̲a̲i̲n̲t̲e̲n̲a̲n̲c̲e̲ ̲
Understood.
6.1.2 S̲e̲c̲o̲n̲d̲ ̲L̲e̲v̲e̲l̲ ̲M̲a̲i̲n̲t̲e̲n̲a̲n̲c̲e̲
Understood.
6.1.3 T̲h̲i̲r̲d̲ ̲L̲e̲v̲e̲l̲ ̲M̲a̲i̲n̲t̲e̲n̲a̲n̲c̲e̲
Understood.
6.2 S̲p̲a̲r̲e̲ ̲P̲a̲r̲t̲s̲ ̲P̲r̲o̲v̲i̲s̲i̲o̲n̲i̲n̲g̲ ̲D̲a̲t̲a̲
Understood and Agreed. All documents to be
entered under a Proprietary Information Agreement.
6.3 T̲o̲o̲l̲s̲ ̲a̲n̲d̲ ̲T̲e̲s̲t̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲ ̲L̲i̲s̲t̲
Understood and agreed with the proviso that
the list covers up to module level maintenance
and not the system level maintenance which
is a CISCO responsibility.
6.4 T̲e̲c̲h̲n̲i̲c̲a̲l̲ ̲M̲a̲n̲u̲a̲l̲s̲ ̲
Christian Rovsing A/S will be pleased to supply technical
O&M Manuals for the system. As the system concept is
not yet known we cannot provide a sample of the O&M
Manual. However, for illustration purposes we have
included a draft copy of the CAMPS users manual. The
cost quotation for these tasks are budgettary prices.
T̲A̲S̲K̲ ̲7̲ ̲-̲ ̲D̲A̲T̲A̲ ̲M̲A̲N̲A̲G̲E̲M̲E̲N̲T̲
Understood. Compliance statements are provided in
Section 2. SDRL -DID compliance.
The signed Data Rights Form is provided in the contractual
Volume.…86…1 …02… …02… …02…
…02…
T̲A̲S̲K̲ ̲8̲ ̲-̲ ̲S̲U̲R̲V̲I̲V̲A̲L̲I̲T̲Y̲/̲V̲U̲L̲N̲E̲R̲A̲B̲I̲L̲I̲T̲Y̲ ̲
8.0 T̲a̲s̲k̲ ̲R̲e̲q̲u̲i̲r̲e̲m̲e̲n̲t̲s̲
No EMP design considerations have been made in the
design of the CR80 Modules.
Christian Rovsing A/S will be pleased to quote for
EMP design analysis but it is considered outside the
scope of this procurement.…86…1 …02… …02… …02…
…02…
T̲A̲S̲K̲ ̲9̲ ̲-̲ ̲M̲A̲I̲N̲T̲E̲N̲A̲N̲C̲E̲ ̲S̲U̲P̲P̲O̲R̲T̲
9.0 T̲a̲s̲k̲ ̲R̲e̲q̲u̲i̲r̲e̲m̲e̲n̲t̲s̲
9.1 G̲e̲n̲e̲r̲a̲l̲
Understood. Details of compliance deferred to Section
SDRL.
9.2 T̲h̲i̲r̲d̲ ̲L̲e̲v̲e̲l̲ ̲M̲a̲i̲n̲t̲e̲n̲a̲n̲c̲e̲
9.2.1 M̲o̲d̲u̲l̲e̲ ̲R̲e̲p̲a̲i̲r̲ ̲C̲o̲s̲t̲ ̲(̲R̲a̲n̲g̲e̲)̲
Price for each repair based on a lot of 20 modules
shipped to seller is 17.500 Dkr.
9.2.2 M̲o̲d̲u̲l̲e̲ ̲C̲o̲m̲p̲l̲e̲m̲e̲n̲t̲
The system is not known to Christian Rovsing A/S.
9.2.3 M̲o̲d̲u̲l̲e̲ ̲M̲T̲B̲F̲'̲s̲
Refer to 9.2.2.
Typical module MTBFs are provided in the CR80 Handbook.
9.2.4 M̲o̲d̲u̲l̲e̲ ̲R̲e̲p̲a̲i̲r̲ ̲T̲i̲m̲e̲s̲
The Standard repair time at the factory is: 6 weeks.…86…1
…02… …02… …02… …02…
T̲A̲S̲K̲ ̲1̲0̲ ̲-̲ ̲R̲E̲L̲I̲A̲B̲I̲L̲I̲T̲Y̲ ̲P̲R̲O̲G̲R̲A̲M̲ ̲
10.0 T̲a̲s̲k̲ ̲R̲e̲q̲u̲i̲r̲e̲m̲e̲n̲t̲s̲
Understood.
10.1 R̲e̲l̲i̲a̲b̲i̲l̲i̲t̲y̲ ̲A̲n̲a̲l̲y̲s̲i̲s̲/̲P̲r̲e̲d̲i̲c̲t̲i̲o̲n̲s̲ ̲
Understood.
10.1.1 N̲e̲w̲ ̲D̲e̲s̲i̲g̲n̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲
Non Compliant.
Christian Rovsing A/S uses MIL-HDBK-217D for reliability
predictions . The "B" version do not include VLSI's.
10.1.2 O̲f̲f̲-̲t̲h̲e̲ ̲S̲h̲e̲l̲f̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲
10.2 M̲a̲n̲u̲f̲a̲c̲t̲u̲r̲i̲n̲g̲ ̲C̲o̲n̲t̲r̲o̲l̲s̲ ̲a̲n̲d̲ ̲M̲o̲n̲i̲t̲o̲r̲i̲n̲g̲
Understood. Christian Rovsing A/S will use
existing manufacturing controls and monitoring
methods.
10.3 A̲p̲p̲l̲i̲c̲a̲b̲l̲e̲ ̲D̲o̲c̲u̲m̲e̲n̲t̲s̲ ̲
MIL-STD-721B is not in use at Christian Rovsing
A/S
MIL-HDBK-217B replaced by MIL-HDBK-217D
RADC-TR-75-22 not applicable.
T̲A̲S̲K̲ ̲1̲1̲ ̲-̲ ̲M̲A̲I̲N̲T̲A̲I̲N̲A̲B̲I̲L̲I̲T̲Y̲ ̲P̲R̲O̲G̲R̲A̲M̲
11.0 T̲a̲s̲k̲ ̲R̲e̲q̲u̲i̲r̲e̲m̲e̲n̲t̲s̲
11.1 B̲I̲T̲E̲
Not applicable to Christian Rovsing A/S (system level
responsibility)
11.2 D̲a̲t̲a̲ ̲F̲i̲l̲e̲
Compliant.
11.3 M̲a̲i̲n̲t̲a̲i̲n̲a̲b̲i̲l̲i̲t̲y̲ ̲D̲e̲m̲o̲n̲s̲t̲r̲a̲t̲i̲o̲n̲
Understood and Agreed.…86…1 …02… …02… …02…
…02…
T̲A̲S̲K̲ ̲1̲2̲ ̲-̲ ̲T̲R̲A̲I̲N̲I̲N̲G̲
12.0 T̲a̲s̲k̲ ̲R̲e̲q̲u̲i̲r̲e̲m̲e̲n̲t̲s̲
12.1 G̲e̲n̲e̲r̲a̲l̲
Understood.
12.2 T̲r̲a̲i̲n̲i̲n̲g̲ ̲R̲e̲q̲u̲i̲r̲e̲m̲e̲n̲t̲s̲ ̲
12.2.1 F̲o̲r̲m̲a̲l̲ ̲T̲r̲a̲i̲n̲i̲n̲g̲
a) O̲p̲e̲r̲a̲t̲o̲r̲ ̲T̲r̲a̲i̲n̲i̲n̲g̲ ̲
Duration: 3 weeks
Conduct: once.
b) T̲e̲c̲h̲n̲i̲c̲i̲a̲n̲ ̲T̲r̲a̲i̲n̲i̲n̲g̲
Duration Level 1: 1 week
Duration Level 2: 2 weeks
Duration Level 3: 10 weeks
Conduct(each) : Once
c) S̲o̲f̲t̲w̲a̲r̲e̲ ̲T̲r̲a̲i̲n̲i̲n̲g̲
Duration : 2 weeks
Conduct : Once
12.2.2 T̲r̲a̲i̲n̲i̲n̲g̲ ̲A̲i̲d̲s̲/̲D̲o̲c̲u̲m̲e̲n̲t̲a̲t̲i̲o̲n̲ ̲
Compliant.
12.2.3 S̲c̲h̲e̲d̲u̲l̲e̲
Understood and Agreed.
12.3 T̲r̲a̲i̲n̲i̲n̲g̲ ̲P̲r̲o̲p̲o̲s̲a̲l̲
Understood. See training proposal.…86…1 …02…
…02… …02… …02…
T̲A̲S̲K̲ ̲1̲3̲ ̲-̲ ̲P̲r̲e̲s̲e̲r̲v̲a̲t̲i̲o̲n̲,̲ ̲P̲a̲c̲k̲a̲g̲i̲n̲g̲s̲,̲ ̲P̲a̲c̲k̲i̲n̲g̲ ̲a̲n̲d̲ ̲M̲a̲r̲k̲i̲n̲g̲
13.1 G̲e̲n̲e̲r̲a̲l̲.
Understood.
13.2 P̲r̲e̲s̲e̲r̲v̲a̲t̲i̲o̲n̲ ̲a̲n̲d̲ ̲P̲a̲c̲k̲a̲g̲i̲n̲g̲
Compliant with the proviso that Christian Rovsing A/S
will pack all modules in "level C" packaging.
13.3 M̲a̲r̲k̲i̲n̲g̲
Non-Compliant. Marking will be in accordance with standard
Christian Rovsing A/S procedures.…86…1 …02… …02…
…02… …02…
T̲A̲S̲K̲ ̲1̲4̲ ̲-̲ ̲T̲r̲a̲n̲s̲p̲o̲r̲t̲a̲t̲i̲o̲n̲
14.0 T̲a̲s̲k̲ ̲R̲e̲q̲u̲i̲r̲e̲m̲e̲n̲t̲s̲ ̲
Understood and Agreed.…86…1 …02… …02… …02…
…02…
T̲A̲S̲K̲ ̲1̲5̲ ̲-̲ ̲S̲o̲f̲t̲w̲a̲r̲e̲
15.0 T̲a̲s̲k̲ ̲R̲e̲q̲u̲i̲r̲e̲m̲e̲n̲t̲s̲
Understood.
15.1 S̲o̲f̲t̲w̲a̲r̲e̲ ̲d̲e̲f̲i̲n̲i̲t̲i̲o̲n̲
Partly Compliant.
Like the CR80 hardware the software has been under
constant development since thes issue of the CR80 Handbook.
The present software may therefore differ in some aspects
from the CR80 Handbook discription. New software specifications
wil be provided at contract award.
15.2 T̲e̲n̲d̲e̲r̲i̲n̲g̲ ̲R̲e̲q̲u̲i̲r̲e̲m̲e̲n̲t̲s̲
Understood.
See attached standard and SDRL 015.
15.3 S̲o̲f̲t̲w̲a̲r̲e̲ ̲S̲u̲p̲p̲o̲r̲t̲
Understood and Agreed.
15.4 S̲o̲f̲t̲w̲a̲r̲e̲ ̲D̲e̲v̲e̲l̲o̲p̲m̲e̲n̲t̲ ̲F̲a̲c̲i̲l̲i̲t̲y̲
LTU software is written in Z80 assembly language. This
can be compiled on a PDP11/34 (with a Boston System
Office package (BSO) under RSX 11 M). The output is
in INTEL HEX-format and this output is transmitted
to the cr80 via a serial V24 commucication link. The
HEX code is stored on a diskfile in the CR80 for subsequent
load into the LTUs. The BSO PACKAGE INCLUDE THE Z80
compiler, and editor, and a simulator for debugging
and test of the code.
Any other system that can compile Z80 assembler and
produce Intel HEX code can be used (Intel.-, Zylog-,
or Textronix Development System).
15.5 D̲o̲c̲u̲m̲e̲n̲t̲a̲t̲i̲o̲n̲ ̲
Understood and Agreed.
2. S̲D̲R̲L̲ ̲-̲C̲o̲m̲p̲l̲i̲a̲n̲c̲e̲ ̲S̲t̲a̲t̲e̲m̲e̲n̲t̲s̲
S̲D̲R̲L̲-̲0̲0̲1̲: S̲p̲a̲r̲e̲ ̲P̲a̲r̲t̲s̲ ̲P̲r̲o̲v̲i̲s̲i̲o̲n̲i̲n̲g̲ ̲D̲a̲t̲e̲.̲
Partly compliant. Assembly drawings will
be in existing CAMPS format. (DEF(AUST)
5085 not known to seller).
S̲D̲R̲L̲-̲0̲0̲2̲: T̲o̲o̲l̲s̲ ̲a̲n̲d̲ ̲T̲e̲s̲t̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲
Compliant.
S̲D̲R̲L̲-̲0̲0̲3̲: T̲e̲c̲h̲n̲i̲c̲a̲l̲ ̲O̲&̲M̲ ̲M̲a̲n̲u̲a̲l̲
Operations and Maintenance Manual to be
developed when the system set-up is known.
S̲D̲R̲L̲-̲0̲0̲4̲: D̲r̲a̲w̲i̲n̲g̲s̲
Partly compliant.
Equipment drawings will be furnished in
the standard applicable for the CR80 modules
under the NATO CAMPS contract.
S̲D̲R̲L̲-̲0̲0̲5̲: D̲e̲v̲i̲a̲t̲i̲o̲n̲ ̲a̲n̲d̲ ̲W̲a̲i̲v̲e̲r̲s̲
Compliant.
S̲D̲R̲L̲-̲0̲0̲6̲: D̲e̲l̲i̲v̲e̲r̲y̲ ̲D̲a̲t̲a̲ ̲P̲a̲c̲k̲a̲g̲e̲
Compliant.
S̲D̲R̲L̲-̲0̲0̲7̲: E̲q̲u̲i̲p̲m̲e̲n̲t̲ ̲S̲h̲i̲p̲p̲i̲n̲g̲ ̲D̲a̲t̲a̲ ̲
The Equipment Shipping Data is attached
to this proposal.
S̲D̲R̲L̲-̲0̲0̲8̲: M̲a̲i̲n̲t̲e̲n̲a̲n̲c̲e̲ ̲D̲a̲t̲a̲
a) All modules as defined in CISCO spec.
are replaceable.
b) Module MTBFs are quoted in the CR80
Handbook.
c) Estimated module repair turnaround time
(if shipped to Christian Rovsing A/S
for repair) is equal to 6 weeks.
d) Estimated cost to repair defective complex
module: 17.500 Dkr.
S̲D̲R̲L̲-̲0̲0̲9̲: M̲a̲i̲n̲t̲a̲i̲n̲a̲b̲i̲l̲i̲t̲y̲ ̲F̲a̲u̲l̲t̲ ̲C̲a̲n̲d̲i̲d̲a̲t̲e̲ ̲L̲i̲s̲t̲ ̲
Understood and Agreed.
S̲D̲R̲L̲-̲0̲1̲0̲: M̲a̲i̲n̲t̲a̲i̲n̲a̲b̲i̲l̲i̲t̲y̲ ̲D̲a̲t̲a̲ ̲
Understood and Agreed.
S̲D̲R̲L̲-̲0̲1̲1̲: R̲e̲l̲i̲a̲b̲i̲l̲i̲t̲y̲ ̲D̲a̲t̲a̲ ̲R̲e̲p̲o̲r̲t̲
Understood and Agreed.
S̲D̲R̲L̲-̲0̲1̲2̲: P̲r̲o̲g̲r̲e̲s̲s̲ ̲R̲e̲p̲o̲r̲t̲s̲ ̲
Understood and Agreed.
S̲D̲R̲L̲-̲0̲1̲3̲: Q̲u̲a̲l̲i̲t̲y̲ ̲P̲r̲o̲g̲r̲a̲m̲ ̲P̲l̲a̲n̲
Understood and Agreed
SDRL-014: E̲M̲P̲ ̲P̲r̲o̲t̲e̲c̲t̲i̲o̲n̲ ̲P̲l̲a̲n̲
No EMP Protection Plan is available
SDRL-015 S̲o̲f̲t̲w̲a̲r̲e̲
Christian Rovsing A/S will supply existing
documentation on the standard software
in the form accepted by NATO for CAMPS.
Christian Rovsing A/S will be pleased to
provide a quote for any modification required
by CISCO.