⟦8a5f4e3ce⟧ Wang Wps File

    Length: 9500 (0x251c)
    Types: Wang Wps File
    Notes: Telex NATO HQ             
    Names: »2921A «

Derivation

└─⟦739d3b0df⟧ Bits:30006175 8" Wang WCS floppy, CR 0316A
    └─ ⟦this⟧ »2921A « 

WangText








                     1983-05-13   jho/bko

to:  shnmo division
     att.: mr. paul f. shey, contracting officer

cc.: ltc henning hofmann, camps program manager 

cc : nato hq
   nato international staff
   att: director vagn loeppenthien

fm:  christian rovsing a/s, denmark
     kurt nybroe-nielsen

our ref: cps/101/tlx/0848

subject: nato hq phase ii quotation - updated proposal
------------------------------------------------------

ref a) minutes of meeting 6 april 1983, c3-mom
    b) cps/101/tlx/0826
    c) meeting 11 may 1983

this quotation replaces the quotation contained in ref.b,
 and is based on ref c).

the total costs of this quotation are:

             dkr. 3,241,984
             ==============

due to the camps schedule it is very important for cr
 to emphasize a fast response to this quotation as it is
 being given under the assumption that nato hq phase 1
 and 2 can be integrated at cr and later on installed at
 nato hq at the same time.


table of contents.
------------------
1. hardware
1.1      hw changes
1.2-     equipment matrix
1.4
2. software
3. labour
4. transport and installation
5. bidding provisions


ref.a) sections 4-6.

1. hardware
   --------
1.1      description of h/w changes

1.1.1    in the following the h/w changes to accommodate
         the phase ii-connectivity are described and constrains
         as presented in ref a), sect.4:

   a)    no of connected vdu's increased from 24 to 42.
         the additional 18 channels shall be for connection
         with opto cable and be operated at max 1200 bps.
         no requirement for further expansion

   b)    no of connected msp's unchanged, i.e. 8. no requirements
         for further expansion.

   c)    no of lsm-ports:
     o   -17 ports for connection of t-1000
     o   - 4 ports for other applications
         no requirements for further expansions.

   d)    connectivity unchanged for the following parts:
         -ptr/ptp
         -ocr
         -ccis
         -scars
         -nics tare
         no requirements for further expansions

1.1.2    proposed design

     the required connectivity cannot be accommodated
     within the 10 ctx-crates, which normally are placed
     in the racks d,e and f. the half (lower/upper as
     appropriate) of the front space has been reserved
     to allow access to the filter box.

     in order to obtain the required connectivity cr proposes
     to place one more ctx-crate (no.11) with associated
     fan unit in rack f immediately below the fan unit
     for ctx-crates 9, 10.

     the following major design parameters are affected:

     -access to the internal cables terminated on the
     filter box is constrained.

     -cooling of the crate is constrained due to position
     of the new fan unit above the door air intake.

     -no room is left above ctx-crate no. 11 for a thermal
     sensor for temperature alarm from the crate. the
     crate will thus not be subject to thermal survey.

     however, in view of the economical constraints related
     to the site, as explained to cr, cr feels that the
     proposed solution, as described below, should be
     acceptable to shape.

     The description below is referenced to camps system
     design spec., issue 1.3 pages 4.048.

     a)  additional 18 vdu's are connected to the following
         ctx-crates using optical modems.

         - ctx crate 4:          8 vdu's
         - ctx crate 6: (ltux 2) 4 vdu's
         - ctx crate 11          6 vdu's.-
         crate 11 has an expansion capacity of 2 vdu's.

   b)    17 t-1000 are connected to the following ctx-crates
         using existing 4-channel l/l adaptors.
         - ctx-crates 7,8 and 9
         expansion capacity: 3 channels

c)   4 lsp-channels for external hook-up are connected
     to ctx-crate no 6, ltux 1 using existing 4-channel
     adaptor.

1.2      equipment matrix
-----------------------

     in order to implement the proposed design, ref 1.2
     above, the following h/w is required:

     In this section is described the H/W for electrical
     interface to VDU's. This is modified by 1.3 below.


a) qty:  2 tdx outlets
         price each dkr 955
         total price 2 units                 dkr.    1,910.-

b) qty:  1 ctx crate, price                  dkr.   13,268.-

c) qty:  1 tdx power supply (cr8020) price   dkr.   31,014.-

d) qty:  1 bsm-x w-panel, price              dkr.   13,315.-

e) qty:  3 ltux-S, type 1,
         price each dkr.20.216, total
         3 units                             dkr.   60,648.-

f) qty:  1 4-channel l/l adaptors
         price each dkr.20.100
         total 1 unit                        dkr.   20,100.-

g) qty:  1 adaptor power supply price        dkr.   23,817.-

h) qty:  1 s-fan unit, price                 dkr.    4,398.-

i) qty:  2 bsm-x-outlet cables, price
         each dkr. 530.-, total price        dkr.    1,060.-

j) qty:  1 ccb cable, crt type 1, price      dkr.    
                                              634.-

k) qty:  2 power cables, price each
         dkr. 459,- total price              dkr.    
                                              918.-

l) qty:  2 pow distribution cable,price      dkr.    2,639.-

m) qty:  4 v24 signal cables price each
         dkr.556,- total price               dkr.    2,224.-

n) qty:  1 cable channel assy. price         dkr.    
                                              565.-

o) qty:  4 10-pin filtered connector
         price each: dkr. 1,460.- total 
         price                               dkr.    5,840.-

p) qty:  18 vdu, tempest, price each dkr.
         106,271. total price 18 units       dkr.1,912,878.-

   total price a) to p) above                dkr.2,095,228.-
                                             ---------------

1.3      addition in the equipment of section 1.2 to include
         the optical interface to the 18 vdu's.

a) qty 18 om-2 (camac)
   price each dkr. 21,403 total price        dkr.  385,254

b) qty 18 om-1 (vdu)
   price each dkr. 21,403 total price        dkr.  385,254

c) qty 72 opto connectors
   price each dkr. 447.- total price         dkr.   32,184

   total price, additional equipment
   a) to c)                                  dkr.  802,692
                                             -------------

1.4      total h/w-price, i.e. total from sect 1.2 plus
         cost of change in sect. 1.3:                            

                                             dkr.2.897.920
                                             -------------

   the resultant equipment matrix (1.2 above modified
   by 1.3 above) is thus:

a) qty:  2 tdx outlets

b) qty:  1 ctx crate

c) qty:  1 tdx power supply (cr8020)

d) qty:  1 bsm-x w-panel

e) qty:  3 ltux-S, type 1,

f) qty:  1 4-channel l/l adaptors

g) qty:  1 adaptor power supply

h) qty:  1 s-fan unit

i) qty:  2 bsm-x-outlet cables

j) qty:  1 ccb cable, crt type 1

k) qty:  2 power cables

l) qty:  2 pow distribution cable

m) qty:  4 v24 signal cables

n) qty:  1 cable channel assy

o) qty:  4 10-pin filtered connectors

p) qty:  18 vdu, tempest

q) qty 18 om-2 (camac)

r) qty 18 om-1 (vdu),

s) qty 72 opto connectors


2. software
-------------
   this quotation does not have any software costs involved.
   however, with the current design there is a risk that
   3 out
   of 42 vdu's cannot be active all the time due to the
   memory constraints discussed in ref.a. these vdu's
   can also be traded off with a smaller connectivity
   of the low speed ports and channels.


3. labour
-----------
   system integration, integration tests, acceptance documentation,
   total:    dkr.  258,048.-
                                             ---------------

4. transport and installation
-------------------------------
   according to the camps schedule integration of nato
   hq phase 1 starts in july and is completed in september
   1983. to avoid additional transport and installation
   costs, the subject quotation should be accepted prior
   to may 20 1983.

   total (before 20 may 1983)                dkr.   86,016.-
                                             ===============

5. bidding provisions
-----------------------

   a)    contract terms
             the proposal is assumed to be an extension
             to the camps contract.

   b)    prices given are firm fixed prices

   c)    validity
             the price proposal is valid until may 20
             1983

   d)    no spares are included in the quotation.

   e)    payment plan

         1983:

   e1)   at acceptance of proposal 20 per cent at overall
         price

         1984:

   e2)   payment of peripheral equipment (vdu, om-1, om2)
         upon submission of qa certificate of conformity.
         The payment is 80 per cent of the contract value
         of the equipment in maximum 2 payments.

   e3)   payment by delivery of equipment at site. The
         payment is 70 per cent of the total price less
         the payment made of peripheral equipment (e2)

   e4)   payment at acceptance at site. The payment is
         10 per cent of the total price less the payment
         already made of the peripheral equipment (e2).

   e5)   overview payments d.kr.


                 peripherals    hw               total
-------------------------------------------------------------------
total            2,683,386.00   558,598.00       3,241,984.00
-------------------------------------------------------------------
20% advance        536,677.20   111,719.60         648,396.80
at cert.         2,146,708.80                    2,146,708.80
at del.                         391,018.60         391,018.60
at spa                           55,859.80          55,859.80


   f)    dollar payment

         of the quoted price d.kr. 2,741,510 represents
         cost incurred in us dlrs. therefore d.kr. 2,193,208
         may be payable in us dlrs 252,673.73 applying
         to the exchange rate 8.68.  the dollar payment
         will be connected to the advance payment and
         the payment for peripherals.

   f1)   overview dollar payment

                               paid in dlrs         paid in d.kr.

20% advance  dkr   648,396.80  dkr   438,641.60       209,755.20
                               (dlrs  50,534.75)
peripheral   dkr 2,146,708.80  dkr 1,754,566.40       392,142.40
                               (dlrs 202,138.98)
delivery     dkr   391,018.60                         391,018.60
spa          dkr    55,859.80                          55,859.80
------------------------------------------------------------------
total        dkr 3,241,984.00  dkr 2,193,208.00     1,048,776.00
                               (dlrs 252,673.73)


kind regards,

christian rovsing a/s