…0e… 3779A/lbe …02… CPS/AUX/065
…02… SPN/830601…02……02…#
CAMPS INSTALLATION PROCEDURES
SITE 10…02……02… CAMPS…0f…
5.9 P̲O̲W̲E̲R̲ ̲U̲P̲ ̲A̲N̲D̲ ̲C̲H̲E̲C̲K̲ ̲O̲U̲T̲
Before powering up, verify that a̲l̲l̲ ̲s̲w̲i̲t̲c̲h̲e̲s̲ on a̲l̲l̲
e̲q̲u̲i̲p̲m̲e̲n̲t̲ are i̲n̲ ̲p̲o̲s̲i̲t̲i̲o̲n̲ ̲o̲f̲f̲ or O.
5.9.1 G̲r̲o̲u̲n̲d̲i̲n̲g̲s̲
a) Measure with an Ohm-meter that no shor circuit
exists between the safety group (cabinets) and
the lines of circuit no. 1 through 9 and 1a through
3a.
b) Remount the lids of the power line filters by the
30 screws.
c) Measure with an Ohm-meter if the "Equipment Frame
Ground" (cabines) is isolated from the "Signal
Ground" (5V return).
The "Signal Ground" (GND) is found on the CCA-panel,
refer to Figure 5.9.1.
d) Start the powering up in the below sequence, starting
at the CAMPS power distribution board (PDB):
5.9.2 C̲A̲M̲S̲ ̲P̲D̲B̲
T̲U̲R̲N̲ ̲O̲N̲: Main circuit breaker
T̲U̲R̲N̲ ̲O̲N̲: Miniature circuit breakers
C̲H̲E̲C̲K̲O̲U̲T̲: No fuses in the CAMPS PDB blown due to
short circuit in the installation.
Figure 5.9.1
Front Layout for CCA…86…1 …02… …02… …02… …02… …02… …02… …02… …02…
5.9.3 F̲r̲e̲q̲u̲e̲n̲c̲y̲ ̲S̲t̲a̲b̲i̲l̲i̲z̲e̲r̲s̲ ̲a̲n̲d̲ ̲D̲i̲s̲k̲ ̲D̲r̲i̲v̲e̲s̲
To examine that the 3 disk drives are supplied from
3 separate phases via the frequency stabilizers proceed
in the below sequence:
a F̲r̲e̲q̲u̲e̲n̲c̲y̲ ̲S̲t̲a̲b̲i̲l̲i̲z̲e̲r̲ ̲#̲1̲/̲D̲i̲s̲k̲ ̲#̲1̲ ̲(̲M̲M̲D̲)̲ ̲R̲A̲C̲K̲ ̲A̲
1) T̲U̲R̲N̲ ̲O̲N̲: Input power switch on front of
the stabilizer (A1A3)(see CAMPS
H/W Breakdown page 344).
Set the rotary switch on the by-pass
panel to position "frequency stabilizer".
2) C̲H̲E̲C̲K̲: Input power and fault lamp lit. Wait
2-3 seconds for fault lamp to extinguish.
"Power out" lamp lit.
3) T̲U̲R̲N̲ ̲O̲N̲: Power switch 1 (left hand) on the
front of the main switch located
in the bottom of rack A.
4) C̲H̲E̲C̲K̲: "Power on" lamp lit onmain switch.
5) T̲U̲R̲N̲ ̲O̲N̲:̲ Rear power switch disk drive No.
1 located in rack A.
6) C̲H̲E̲C̲K̲: Disk running and "ready" lamp in
front of disk lit (wait for
30 sec.).
7) T̲U̲R̲N̲ OFF: Miniature circuit breaker (CAMPS
PDB) corresponding to powr circuit
no. 1 for freq. stab. 1 and disk
1 (see ATBB drawing 120).
8) C̲H̲E̲C̲K̲: Disk 1 and freq. stab. 1 powered
down.
9) Leave the miniature circuit breaker in position
OFF.
b) F̲r̲e̲q̲u̲e̲n̲c̲y̲ ̲S̲t̲a̲b̲i̲l̲i̲z̲e̲r̲ ̲#̲2̲ ̲a̲n̲d̲ ̲D̲i̲s̲k̲ ̲#̲2̲ ̲(̲S̲M̲D̲)̲
Repeat step 5.9.3a-1 through a-4 for frequency
stab. #2 (A1A5) and disk drive #2 (rack B).
5) T̲U̲R̲N̲ ̲O̲N̲:̲ Rear switches "AC power" nd "power
supply".
6) C̲H̲E̲C̲K̲:̲ Disk running. (No ready lamp if
no disk pack mounted).
Proceed by repeating step 5.9.3a-7 thru a-9 for
circuit no. 2.
c) F̲r̲e̲q̲u̲e̲n̲c̲y̲ ̲S̲t̲a̲b̲i̲l̲i̲z̲e̲r̲ ̲#̲3̲ ̲a̲n̲d̲ ̲D̲i̲s̲k̲ ̲#̲3̲ ̲(̲M̲M̲D̲)̲
Repeat step 5.9.3 a-1 through a-9 for frequncy
stab. #3 (A1A7), circuit no. 3, and disk drive
#3 (rack C).
d) Turn on the 3 miniature circuit breakers in the
CAMPS PDB one by one.
e) Check that all frequency stabilizers and disks
are operating.
f) By-pass the freq. stab. by positionin