Notes: ACTION ITEM LIST
Names: »0742A «
Derivation
└─⟦ecb9329a3⟧ Bits:30006006 8" Wang WCS floppy, CR 0041A
└─ ⟦this⟧ »0742A «
WangText
…00……00……00……00……00……1b……0a……86…1 …02… …02… …02… …02… …02…
C̲ ̲A̲ ̲M̲ ̲P̲ ̲S̲ ̲ ̲A̲ ̲C̲ ̲T̲ ̲I̲ ̲O̲ ̲N̲ ̲ ̲I̲ ̲T̲ ̲E̲ ̲M̲ ̲ ̲L̲ ̲I̲ ̲S̲ ̲T̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
NO. ACTION ACTI- CURR. DUE DISPOSITION
ONEE DATE DATE
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
C A M P S…01……01……01… A C T I O N…01…
…01…I T E M S…01……01……01…H A R D W A R E…01……01…*…01……01…I L S
DATE: 810327
1 Racks, center of gravity (CSV)
(tip-over!) H/W 810128 810301 Closed:
Intern
meddelelse
no.
71.
2 Power cables for Racks:
- number (BHB)
- type (Chield/unsh.) H/W 810128 810301
3 Signal cables:
- cable dimensions
- IDF-dimensions, (BHB)
cable duct entries H/W 810128 810301
4 Stabilizer Rack:
- layout
- dimensions H/W 810204 810301 Delayed
untill
810501
5 Grounding of Equipment H/W 810128 810315
(BHB)
6 Milestone nb. 8)
- spec. of crating trans-
port of CR80 modules and
crates H/W 810128 810515
ED
7 Functional description,
module level shall be
included on H/W Milestone
Tracking SRA 810225 810301 Closed.
8 Functional description,
unit (Subassy) level based
on CPS/SDS/001 sect. 5.1-5
to be included on H/W
Milestone Tracking SRA 810225 810301
9 Module level fault finding:
ILS gets copy of "H/W - M&D
source document" (Prel.) SRA 810225 810315 Expected
due
date
810415.
GT
10 "CAMPS H/W Milestone
Tracking Form, Level II"
is established on WANG SRA 810225 810301 Closed.
(will be currently
revised, revision dated)
C A M P S…01……01……01… A C T I O N…01…
…01…I T E M S…01……01……01…I L S…01……01…*…01……01…H A R D W A R E
DATE: 810327
1 Diameter of tube/cable
duct
for power/signal inlet KM 810128 810301
2 Estimate of required opto
cable based on approx. 6
Main Sites KM 810219 810401
3 Issue of Problem Report
on
Depot level repair option
requirements FC 810225 810401 Input
to
CAMPS
Project
Office
4 ILS/CPS H/W discussion
with ED. Subject: ILS
participates
Component specification in
progress
meeting
document on parts applied ORF/ 810225 810401 with
ED
in CPS-system FC
C A M P S…01……01……01… A C T I O N…01…
…01…I T E M S…01……01……01……01…*…01……01…H A R D W A R E
DATE: 810519
DISTRIBUTION: GJ, BHB, SRA, GT, CSV, JRD
1 H/W - M&D Source document SRA/ 810225 810315 Delayed
until
GT 810307
2 * A-jourf]ring af schedule GT/DL 810318 810401 Deleted
(Remote Terminal)
3 * Requirement Spec. for BHB 810318 810401 Closed.
Preliminary
V28 (L)-adaptor Req.
Spec.
4 Requirement Spec. for CSV 810318 810401 Delayed
until
810518
Monitor Module
5 * Requirement Spec., SRA 810318 810325 Closed.
CPS/SRS/003.
CPS-WD (H/W)
6 * Requirement Spec. SRA 810318 Deleted.
Subject
CPS - WD (System) covered
in
1
above
7 Processor racks - V28 BHB 810406 810501 Delayed
until
810511
Low level signal
implementation.
8 Spec. for Modified
Mains switch for CPS. CSV 810429 810518
9 Change of ED agreement BHB 810429 810522
due to 8.
10 Define V24-interfaces BHB 810518 810525
in Remote terminal link.
11 Misc. Cables/mechanical CSV 810518 810525
items. Procurement
list and schedule, 2
sites.
12 Channel disable on SRA 810518 810526
LTUX-s. Solution TBD.
C A M P S…01……01……01… A C T I O N…01…
…01…I T E M S…01……01……01…E D…01……01……01…*…01……01…H A R D W A R E
DATE: 820215
DISTRIBUTION: GJ, BHB, GB, TW, TK, SRA, CSV, JRD,
OE
1 * Standard Module Documenta- GB 810306 810422 Closed
tion Schedule
2 * Investigate whether the TK 810306 Ref
7 Closed.
Modifica-
WPC is necessary for tions
are
not
WD functions or not. required.
3 * Standard Module Develop- GB 810325 Closed.
ment schedule. New
issue
to
CPS
each
fortnight.
4 * Include Disk Controller GB 810325 810515 Closed.
disable facility (Take
ownership) in PSP
5 * Module Reliability Reports GB 810325 810422 Closed
810526
6 * CU, Power Supply Problems TW 810325 810728 Max.
4
LTUs
in
CAMPS
configuration
7 * Investigate design of GB 810325 810410 Closed,
ref.
14
special CAMPS Watchdog
panel
8 * Special Discount - GB 810326 810326 810326:
Closed
Amendment to Order
Agreement
9 * DSMT schedule/progress GB 810326 810410 Closed
10* Proposal - MIL 188 C GB 810326 810403 Closed.
Preliminary
Drivers/receivers proposal.
11* LTUX Prom expansion - GB 810326 810422 Closed.
Intern
cost estimate
meddelelse
TK/810506
12* Update of DSMT GB 810506 Closed.
Is
re-
integration plan placed
by
a
H/W
(CDS/005/PLN/0004) delivery
status
plus
a
delivery
schedule
13* Disable of commands GB 810518 810526 Closed
CCA in PU
14* Proposals:
CCB adapter (WDP) TW/ 810518 810804 Closed.
Switch Unit (CU) GB
15* CAMPS WD System Product
Specification, CSD-MIC/005/ TK 810518 810609 Closed.
Transfer-
PSP/0030 red
to
Milestone-
Tracking
form
16. Watchdog, F/W, Product
Spec. TK 810518 810804 Delayed
until
810811
Define applicable
documents.
17* DSMT delivery schedule GB 810526 810604 Closed
18* CCA disable feature TW 810609 810707 Closed(issue
3)
(ref. 13) included in PSP
19* Missing due dates in TW 810617 810707 Closed
810728
Milestone Tracking Form
20* Standard baseline for
GB 810617 810707 Closed
810717
TDX firmware spec.
21 Watchdog system S/W TK 810607 810707 Ref.
16
interface spec.
22* Ammendment 1 formal GB 810607 810727 Closed
closing
23* Production of sites TW/ 810607 810820 GB
informs
that
1 and 2 according to GB site
1
will
be
de-
agreement? Please confirm. livered
811016
and
site
2
811113.
24* CCB Termination TW 810723 810728 Closed.
No
ter-
mination
needed
25* DSMT testprocedure GB 810728 810804 Closed.
Transfer-
drafts. Due dates for red
to
Milestone
CAMPS review. Tracking
form.
26* Delivery of CTX crates TW 810804 810811 Closed.
Delivered
to SD-CAMPS within
14
days
Latest
810825.
27* Revision of due dates
in TW 810929 811013 Closed.
Milestone
Milestone Tracking Form Tracking
Form
upda-
ted.
28* Info. on status concer- TW 810929 811006 Main
Switch
in
PRO.
ning: Main Switch, CUCP, No
activity
on
CCBA and cables others.
29* Answers to OED ammend- TW 811013 811020 Ammendment
accepted.
ments concerning: CUCP PSPs
are
on
the
way.
and CCBA.
30* Answers to OED ammend- TW 811013 811020 Ammendment
accepted.
ments concerning: Main Add:
Cable
between
Switch, Power Cables BSM-X
and
TDX
Ctrl.
and signal cables.
31* Disk Ctrl. change from GB/ 811015 811027 Change
16K
chips
to
16K RAM to 32K RAM TW 32K
chips
and
move
4
straps.
The
chips
are
mounted
in
sockets
32* H/W development status GB 811118 811124 Closed
811201.
33 80S-fan retrofit TW 811201 811222
34* Identification of exist- TW 811208 811222 Closed
ing module documentation
C A M P S…01……01……01… A C T I O N…01…
…01…I T E M S…01……01……01…H A R D W A R E…01……01……01…*…01……01…E D
DATE: 810611
DISTRIBUTION: GJ, BHB, GB, TK, GT, SRA, CSV, JRD,
OE
1 * DSMT peripherals: BHB 810325 810501 Closed
1 lineprinter Intern
Meddelelse
3 disk drives Nrs.
77
og
78
3 VDU (min)
1 paper tape reader
1 paper tape puncher
2 * More than two TARE BHB 810325 810526 Closed
channels pr. LTU?
3 * Mil 188C driver/receiver- BHB 810326 810330 Closed.
Preliminary
+ basic requirements Requirement
Spec.
4 Request for quotation BHB 810427 810510 Delayed
until
810616
MIL 188C driver/receiver
5 * Amendment to order BHB 810427 810501 Closed
Agreement - Acceptance
6 * Qualification test BHB 810506 810514 Closed
810526
Requirements in
7 * Equipment Matrix, BHB 810518 810519 Closed
including
Amendment 1