⟦8dc4a7bc2⟧ Wang Wps File

    Length: 8782 (0x224e)
    Types: Wang Wps File
    Notes: ACTION ITEM LIST          
    Names: »0742A «

Derivation

└─⟦ecb9329a3⟧ Bits:30006006 8" Wang WCS floppy, CR 0041A
    └─ ⟦this⟧ »0742A « 

WangText

…00……00……00……00……00……1b……0a……86…1  …02…                            …02…     …02…         …02…         …02…                   

                                          



                    C̲ ̲A̲ ̲M̲ ̲P̲ ̲S̲ ̲ ̲A̲ ̲C̲ ̲T̲ ̲I̲ ̲O̲ ̲N̲ ̲ ̲I̲ ̲T̲ ̲E̲ ̲M̲ ̲ ̲L̲ ̲I̲ ̲S̲ ̲T̲

                                        

 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

NO. ACTION ACTI- CURR. DUE DISPOSITION
  ONEE DATE DATE
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲




  

















      C  A  M  P  S…01……01……01… A   C   T   I   O   N…01…
    …01…I  T  E  M  S…01……01……01…H A R D W A R E…01……01…*…01……01…I L S











                   DATE: 810327


 1                             Racks, center of gravity  (CSV)
  (tip-over!)                  H/W   810128    810301    Closed:
                                                         Intern
                                                         meddelelse
                                                         no.
                                                         71.

 2                             Power cables for Racks:
  -  number                    (BHB)
  -  type (Chield/unsh.)       H/W   810128    810301

 3                             Signal cables:
  -  cable dimensions
  -  IDF-dimensions,           (BHB)
     cable duct entries        H/W   810128    810301

 4                             Stabilizer Rack:
  -  layout
  -  dimensions                H/W   810204    810301    Delayed
                                                         untill
                                                         810501

 5                             Grounding of Equipment    H/W                 810128 810315
                               (BHB)

 6                             Milestone nb. 8)
  -  spec. of crating trans-
     port of CR80 modules and
     crates                    H/W   810128    810515
                               ED

 7                             Functional description,
  module level shall be
  included on H/W Milestone
  Tracking                     SRA   810225    810301    Closed.

 8                             Functional description,
  unit (Subassy) level based
  on CPS/SDS/001 sect. 5.1-5
  to be included on H/W 
  Milestone Tracking           SRA   810225    810301

 9                             Module level fault finding:
  ILS gets copy of "H/W - M&D
  source document" (Prel.)     SRA   810225    810315    Expected
                                                         due
                                                         date
                                                         810415.
                               GT



10                             "CAMPS H/W Milestone
  Tracking Form, Level II"
  is established on WANG       SRA   810225    810301    Closed.
  (will be currently 
  revised, revision dated)


  

















      C  A  M  P  S…01……01……01… A   C   T   I   O   N…01…
    …01…I  T  E  M  S…01……01……01…I L S…01……01…*…01……01…H A R D W A R E











                   DATE: 810327



 1                             Diameter of tube/cable
                               duct  
  for power/signal inlet       KM    810128    810301

 2                             Estimate of required opto
  cable based on approx. 6
  Main Sites                   KM    810219    810401

 3                             Issue of Problem Report
                               on
  Depot level repair option
  requirements                 FC    810225    810401    Input
                                                         to
                                                         CAMPS
                                                         Project
                                                         Office

 4                             ILS/CPS H/W discussion
  with ED.  Subject:                                     ILS
                                                         participates
  Component specification                                in
                                                         progress
                                                         meeting
  document on parts applied    ORF/  810225    810401    with
                                                         ED
  in CPS-system                FC


  

















      C  A  M  P  S…01……01……01… A   C   T   I   O   N…01…
       …01…I  T  E  M  S…01……01……01……01…*…01……01…H A R D W A R E











                   DATE: 810519







  DISTRIBUTION:  GJ, BHB, SRA, GT, CSV, JRD



1 H/W - M&D Source document    SRA/  810225    810315    Delayed
                                                         until
                               GT                        810307

2 * A-jourf]ring af schedule   GT/DL 810318    810401    Deleted
    (Remote Terminal)

3 * Requirement Spec. for      BHB   810318    810401    Closed.
                                                         Preliminary
    V28 (L)-adaptor                                      Req.
                                                         Spec.

4 Requirement Spec. for        CSV   810318    810401    Delayed
                                                         until
                                                         810518
  Monitor Module

5 * Requirement Spec.,         SRA   810318    810325    Closed.
                                                         CPS/SRS/003.
    CPS-WD (H/W)

6 * Requirement Spec.          SRA   810318              Deleted.
                                                         
                                                         Subject
    CPS - WD (System)                                    covered
                                                         in
                                                         1
                                                         above

7 Processor racks - V28        BHB   810406    810501    Delayed
                                                         until
                                                         810511
  Low level signal
  implementation.

8 Spec. for Modified
  Mains switch for CPS.        CSV   810429    810518

9 Change of ED agreement       BHB   810429    810522
  due to 8.

10                             Define V24-interfaces     BHB                 810518 810525
  in Remote terminal link.

11                             Misc. Cables/mechanical   CSV                 810518 810525
  items.  Procurement
  list and schedule, 2
  sites.

12                             Channel disable on        SRA                 810518 810526
  LTUX-s.  Solution TBD.




















      C  A  M  P  S…01……01……01… A   C   T   I   O   N…01…
     …01…I  T  E  M  S…01……01……01…E D…01……01……01…*…01……01…H A R D W A R E











                   DATE: 820215





  DISTRIBUTION:    GJ, BHB, GB, TW, TK, SRA, CSV, JRD,
  OE


1 *                            Standard Module Documenta-                    GB 810306 810422 Closed
  tion Schedule

2 *                            Investigate whether the   TK                  810306 Ref
                                                                                    7 Closed.
                                                                                      
                                                                                      Modifica-
  WPC is necessary for                                   tions
                                                         are
                                                         not
  WD functions or not.                                   required.

3 *                            Standard Module Develop-  GB                  810325  Closed.
  ment schedule.                                         New
                                                         issue
                                                         to
                                                         CPS
                                                         each
                                                         fortnight.

4 *                            Include Disk Controller   GB                  810325 810515 Closed.
  disable facility (Take
  ownership) in PSP

5 *                            Module Reliability Reports                    GB 810325 810422 Closed
                                                                                              810526

6 *                            CU, Power Supply Problems TW                  810325 810728 Max.
                                                                                           4
                                                                                           LTUs
                                                                                           in
                                                                                           CAMPS
                                                         configuration

7 *                            Investigate design of     GB                  810325 810410 Closed,
                                                                                           ref.
                                                                                           14
  special CAMPS Watchdog                                 
  panel

8 *                            Special Discount -        GB                  810326 810326 810326:
                                                                                           Closed
  Amendment to Order
  Agreement

9 *                            DSMT schedule/progress    GB                  810326 810410 Closed
                                                                                           

10*                            Proposal - MIL 188 C      GB                  810326 810403 Closed.
                                                                                           Preliminary
  Drivers/receivers                                      proposal.

11*                            LTUX Prom expansion -     GB                  810326 810422 Closed.
                                                                                           Intern
  cost estimate                                          
                                                         meddelelse
                                                         TK/810506

12*                            Update of DSMT  GB        810506               Closed.
                                                                              Is
                                                                              re-
  integration plan                                       placed
                                                         by
                                                         a
                                                         H/W
  (CDS/005/PLN/0004)                                     delivery
                                                         status
                                                         plus
                                                         a
                                                         delivery
                                                         schedule

13*                            Disable of commands       GB                  810518 810526 Closed
  CCA in PU



14*                            Proposals:
  CCB adapter (WDP)            TW/   810518    810804    Closed.
  Switch Unit (CU)             GB                        

15*                            CAMPS WD System Product
  Specification, CSD-MIC/005/  TK    810518    810609    Closed.
                                                         Transfer-
  PSP/0030                                               red
                                                         to
                                                         Milestone-
                                                         Tracking
                                                         form

16.                            Watchdog, F/W, Product
                               Spec. TK        810518    810804              Delayed
                                                                             until
                                                                             810811
  Define applicable                                      
  documents.

17*                            DSMT delivery schedule    GB                  810526 810604 Closed

18*                            CCA disable feature       TW                  810609 810707 Closed(issue
                                                                                           3)
  (ref. 13) included in PSP                              

19*                            Missing due dates in      TW                  810617 810707 Closed
                                                                                           810728
  Milestone Tracking Form

20*                            Standard baseline for
                                     GB        810617    810707              Closed
                                                                             810717
  TDX firmware spec.

21                             Watchdog system S/W       TK                  810607 810707 Ref.
                                                                                           16
  interface spec.

22*                            Ammendment 1 formal       GB                  810607 810727 Closed
  closing

23*                            Production of sites       TW/                 810607 810820 GB
                                                                                           informs
                                                                                           that
                                                                                           
  1 and 2 according to         GB                        site
                                                         1
                                                         will
                                                         be
                                                         de-
  agreement? Please confirm.                             livered
                                                         811016
                                                         and
                                                         site
                                                         2
                                                         811113.

24*                            CCB Termination TW        810723              810728 Closed.
                                                                                    No
                                                                                    ter-
                                                         mination
                                                         needed

25*                            DSMT testprocedure        GB                  810728 810804 Closed.
                                                                                           Transfer-
  drafts. Due dates for                                  red
                                                         to
                                                         Milestone
  CAMPS review.                                          Tracking
                                                         form.

26*                            Delivery of CTX crates    TW                  810804 810811 Closed.
                                                                                           Delivered
  to SD-CAMPS                                            within
                                                         14
                                                         days
                                                         Latest
                                                         810825.



27*                            Revision of due dates
                               in    TW        810929    811013              Closed.
                                                                             Milestone
  Milestone Tracking Form                                Tracking
                                                         Form
                                                         upda-
                                                         ted.

28*                            Info. on status concer-   TW                  810929 811006 Main
                                                                                           Switch
                                                                                           in
                                                                                           PRO.
  ning: Main Switch, CUCP,                               No
                                                         activity
                                                         on
  CCBA and cables                                        others.

29*                            Answers to OED ammend-    TW                  811013 811020 Ammendment
                                                                                           accepted.
  ments concerning: CUCP                                 PSPs
                                                         are
                                                         on
                                                         the
                                                         way.
  and CCBA.                                              

30*                            Answers to OED ammend-    TW                  811013 811020 Ammendment
                                                                                           accepted.
  ments concerning: Main                                 Add:
                                                         Cable
                                                         between
  Switch, Power Cables                                   BSM-X
                                                         and
                                                         TDX
                                                         Ctrl.
  and signal cables.                                     

31*                            Disk Ctrl. change from    GB/                 811015 811027 Change
                                                                                           16K
                                                                                           chips
                                                                                           to
  16K RAM to 32K RAM           TW                        32K
                                                         chips
                                                         and
                                                         move
                                                         4
                                                         straps.
                                                         The
                                                         chips
                                                         
                                                         are
                                                         mounted
                                                         in
                                                         sockets

32*                            H/W development status    GB                  811118 811124 Closed
                                                                                           811201.

33                             80S-fan retrofit          TW                  811201 811222 

34*                            Identification of exist-  TW                  811208 811222 Closed
  ing module documentation





















      C  A  M  P  S…01……01……01… A   C   T   I   O   N…01…
     …01…I  T  E  M  S…01……01……01…H A R D W A R E…01……01……01…*…01……01…E D











                   DATE: 810611





  DISTRIBUTION:    GJ, BHB, GB, TK, GT, SRA, CSV, JRD,
  OE


1 *                            DSMT peripherals:         BHB                 810325 810501 Closed
  1 lineprinter                                          Intern
                                                         Meddelelse
  3 disk drives                                          Nrs.
                                                         77
                                                         og
                                                         78
  3 VDU (min)
  1 paper tape reader
  1 paper tape puncher

2 *                            More than two TARE        BHB                 810325 810526 Closed
  channels pr. LTU?

3 *                            Mil 188C driver/receiver- BHB                 810326 810330 Closed.
                                                                                           Preliminary
                                                                                           
  + basic requirements                                   Requirement
                                                         Spec.

4 Request for quotation        BHB   810427    810510    Delayed
                                                         until
                                                         810616
  MIL 188C driver/receiver

5 *                            Amendment to order        BHB                 810427 810501 Closed
  Agreement - Acceptance

6 *                            Qualification test        BHB                 810506 810514 Closed
                                                                                           810526
  Requirements in                                        

7 *                            Equipment Matrix,         BHB                 810518 810519 Closed
  including
  Amendment 1