DataMuseum.dk

Presents historical artifacts from the history of:

CR80 Wang WCS documentation floppies

This is an automatic "excavation" of a thematic subset of
artifacts from Datamuseum.dk's BitArchive.

See our Wiki for more about CR80 Wang WCS documentation floppies

Excavated with: AutoArchaeologist - Free & Open Source Software.


top - download

⟦909b8f565⟧ Wang Wps File

    Length: 5024 (0x13a0)
    Types: Wang Wps File
    Notes: Air Canada                
    Names: »2063A «

Derivation

└─⟦4bc3ed402⟧ Bits:30006259 8" Wang WCS floppy, CR 0166A
    └─ ⟦this⟧ »2063A « 

WangText






AIR CANADA                                          1982-04-23
Proposal Note No. 4                               Page  #





         To: CNCP (2)
             OE, KM
             FE, ALF, HBA, LS
             CJK, HJJ, AA, HB
             BC, JSL, JHN, MEC
             UT
             KHJ, BR

         cc: AH, LSN, ASM
             GJ, BC, HJJ

         Fm: FR

         Subject:    A̲i̲r̲ ̲C̲a̲n̲a̲d̲a̲ ̲P̲r̲o̲p̲o̲s̲a̲l̲ ̲(̲2̲3̲0̲B̲)̲

         1   N̲E̲X̲T̲ ̲S̲T̲A̲T̲U̲S̲ ̲M̲E̲E̲T̲I̲N̲G̲
All          T̲I̲M̲E̲:̲   MONDAY MORNING, 0930
             P̲L̲A̲C̲E̲:̲  PROPOSAL ROOM

All      2   S̲T̲A̲T̲U̲S̲ ̲M̲E̲E̲T̲I̲N̲G̲,̲ ̲A̲P̲R̲I̲L̲ ̲2̲2̲n̲d̲

All      The status of the various chapters and sections was
         reviewed in details.

         Details/assignments are given in attachment 1.

All      a.  G̲e̲n̲e̲r̲a̲l̲

             My general feeling is that we now are moving in
             the right direction - obtaining the elements of
             a winining Air Canada Proposal.  However, we must
             all contribute in this final period to ensure a
             consistent and responsive proposal.

         b.  P̲r̲o̲b̲l̲e̲m̲ ̲A̲r̲e̲a̲s̲

All          i   D̲o̲c̲ ̲I̲,̲ ̲P̲r̲i̲c̲i̲n̲g̲.  Committed to (and thus final
                 price estiamtes) to be given to FR no later
                 than Friday evening.
                 NOTE.   Present estimates will be used where
                         revised input has not been provided

                 First price cut should be available during
                 Saturday.
                 Attachment 2  provides WBS 1-5, 7-10,13
                               assignments
                            2a  provides WBS 6 assignments

All          ii  D̲O̲C̲ ̲I̲I̲,̲ ̲E̲x̲e̲c̲.̲ ̲S̲u̲m̲m̲a̲r̲y̲ Catchwords and ACDN uniques
                 to ALF before Saturday evening.

All          iii D̲O̲C̲ ̲I̲I̲I̲,̲ ̲C̲o̲m̲p̲l̲i̲a̲n̲c̲e̲ (section 2.3)
             A revised assignment was decided; refer attachment
             3.


                 The importance of this section is reflected
                 by its new position.

                 A compliant replay must be available no later
                 than  Saturday evening.
                 Catchword: minimised risk

All          iv  D̲O̲C̲ ̲I̲I̲,̲ ̲A̲b̲b̲r̲.̲ ̲a̲n̲d̲ ̲t̲e̲r̲m̲s̲ ̲(̲1̲0̲)̲ ̲

                 All ACDN unique terms and abbreviations to
                 be defined.

         c.  A̲c̲t̲i̲o̲n̲ ̲I̲t̲e̲m̲ ̲L̲i̲s̲t̲

All          An Air Canada Action item list has been generated
             which contains more specific assignments.

FR           This list will be continuously updated and communicated.


         A̲I̲R̲ ̲C̲A̲N̲A̲D̲A̲ ̲A̲C̲T̲I̲O̲N̲ ̲I̲T̲E̲M̲ ̲L̲I̲S̲T̲

         1       ASM    Get JH[ for section 6.2 and 6.3

         2       FR     Equipment: Configuration: TEXAS 8/0
                                                  307 SMD
                                                  EMH/LMH

         3       CSK    References to datagram service/virtual
                        connection at part of connection estab
                        session - application = service type

         4       FR     Ring V. Mayland mht WANG/OCR-B

         5       FR     6.3 Transport Mechanisms

         6       FR     M`rsk Data APL L]rdag

         7       FR     RSPL (5%)

         8       BR     Get input financial incl Chad Murrin

         9       JRV    What about garbage collect in EMS.
                        When wrap-around even on 200 Mbytes

         10      HBA    300 Mb. EMH + EMH

         11      CSK    Include two on IBM commitment

         12      AH     Prepare cover letter

         13      FR     Sow/PIF - migration of VIA

         14      HBA    LTU/V35 interface

         15      LSN    Clarify implementation team

         16             MINIMIZED DISK

         17      FR     Presence in Canada May/June to expedite
                        things

         18      FR     Read, Read, Read

         19      CSK    2.2 be commitments

         20      FR     Structure PIP such as to show to Ken
                        Taylor how we meet 4  83!

         21      FR     How to integrate AC people into team

         22      CSK    Dynamic reconfiguration as promised

         23      FR     Size of NCC a concern



         24      CSK    SNA/DCA what.

         25      CSK    Do we off load 3705?
                                    DCP/40?
                 Replace?

         26      AH     Cover letter: our commitments in future
                        on IBM/UNIVAC/CCITT

         27      CSK    Could it be good to have IBM standardization

         28             End-to-End aspects tobe addressed

         29      MEC    Test mode flags in Datagrams

         30      JRV    Test mode to be included in Chapter
                        4 Doc III

         31      JRV    Redundancy - all PUs
                        NMH however cold and shared with "NCP"/NCS
                        of Toronto Node

         32      JRV    FIKS Operator Commands from FIKS Req
                        Spec. Appendix ?

         33      AH     TWX AC on CRISP contact over and above
                        FR provided.  Contact these

         34      BR     Lease draft?

         35      AH     Cover letter- CNCP offers lines and
                        facilities free of charge during test
                        period

         36      FR     Visit to see FIKS/LMENET.  Plan to be
                        included in proposal

         37      HBA    Honeywell interface

         38      BR     CR papir med til Canada

         39      FR     Project Organisations Diagram

         40      FR     SOW and PIP

         41      HBA    Doc. III, Chap 5; include ATES and Hardware
                        monitor

         42      OE/AH  CV's to be collected (updates required?).
                         Person/capability matrix to be generated



         43      CSK    Doc. III, sec. 6.4.  LMENET Host flow
                        (references) to be included.

         44      CSK/
                 AA     Doc III, sec. 6.6-6.7 (HAS/TAS) concluding
                        sections with references to LMENET spec
                        extracted appendices XX

         45      FE     Doc. III, sec. 6.9 (ENAS)
                        MEC to provide CCITT-type of X-75 network
                        gateway.
                        Plandata to provide telex interface
                        description

         46      FE     Doc. III, sec. 6.11 (NMS)
                        Include references to handbook:  TOS
                        plus standard facilities for dev environment.
                        Volume Generator to be included

         47      FE     DOC II, 6.9 ENAS.  Adat P-3 type of
                        facility - refer CAMPS specifics - to
                        be included as part of message preparation
                        facility (generalized MEDE/Electronic
                        Mail).  To be Coordinated with JRV.