top - download
⟦909b8f565⟧ Wang Wps File
Length: 5024 (0x13a0)
Types: Wang Wps File
Notes: Air Canada
Names: »2063A «
Derivation
└─⟦4bc3ed402⟧ Bits:30006259 8" Wang WCS floppy, CR 0166A
└─ ⟦this⟧ »2063A «
WangText
AIR CANADA 1982-04-23
Proposal Note No. 4 Page #
To: CNCP (2)
OE, KM
FE, ALF, HBA, LS
CJK, HJJ, AA, HB
BC, JSL, JHN, MEC
UT
KHJ, BR
cc: AH, LSN, ASM
GJ, BC, HJJ
Fm: FR
Subject: A̲i̲r̲ ̲C̲a̲n̲a̲d̲a̲ ̲P̲r̲o̲p̲o̲s̲a̲l̲ ̲(̲2̲3̲0̲B̲)̲
1 N̲E̲X̲T̲ ̲S̲T̲A̲T̲U̲S̲ ̲M̲E̲E̲T̲I̲N̲G̲
All T̲I̲M̲E̲:̲ MONDAY MORNING, 0930
P̲L̲A̲C̲E̲:̲ PROPOSAL ROOM
All 2 S̲T̲A̲T̲U̲S̲ ̲M̲E̲E̲T̲I̲N̲G̲,̲ ̲A̲P̲R̲I̲L̲ ̲2̲2̲n̲d̲
All The status of the various chapters and sections was
reviewed in details.
Details/assignments are given in attachment 1.
All a. G̲e̲n̲e̲r̲a̲l̲
My general feeling is that we now are moving in
the right direction - obtaining the elements of
a winining Air Canada Proposal. However, we must
all contribute in this final period to ensure a
consistent and responsive proposal.
b. P̲r̲o̲b̲l̲e̲m̲ ̲A̲r̲e̲a̲s̲
All i D̲o̲c̲ ̲I̲,̲ ̲P̲r̲i̲c̲i̲n̲g̲. Committed to (and thus final
price estiamtes) to be given to FR no later
than Friday evening.
NOTE. Present estimates will be used where
revised input has not been provided
First price cut should be available during
Saturday.
Attachment 2 provides WBS 1-5, 7-10,13
assignments
2a provides WBS 6 assignments
All ii D̲O̲C̲ ̲I̲I̲,̲ ̲E̲x̲e̲c̲.̲ ̲S̲u̲m̲m̲a̲r̲y̲ Catchwords and ACDN uniques
to ALF before Saturday evening.
All iii D̲O̲C̲ ̲I̲I̲I̲,̲ ̲C̲o̲m̲p̲l̲i̲a̲n̲c̲e̲ (section 2.3)
A revised assignment was decided; refer attachment
3.
The importance of this section is reflected
by its new position.
A compliant replay must be available no later
than Saturday evening.
Catchword: minimised risk
All iv D̲O̲C̲ ̲I̲I̲,̲ ̲A̲b̲b̲r̲.̲ ̲a̲n̲d̲ ̲t̲e̲r̲m̲s̲ ̲(̲1̲0̲)̲ ̲
All ACDN unique terms and abbreviations to
be defined.
c. A̲c̲t̲i̲o̲n̲ ̲I̲t̲e̲m̲ ̲L̲i̲s̲t̲
All An Air Canada Action item list has been generated
which contains more specific assignments.
FR This list will be continuously updated and communicated.
A̲I̲R̲ ̲C̲A̲N̲A̲D̲A̲ ̲A̲C̲T̲I̲O̲N̲ ̲I̲T̲E̲M̲ ̲L̲I̲S̲T̲
1 ASM Get JH[ for section 6.2 and 6.3
2 FR Equipment: Configuration: TEXAS 8/0
307 SMD
EMH/LMH
3 CSK References to datagram service/virtual
connection at part of connection estab
session - application = service type
4 FR Ring V. Mayland mht WANG/OCR-B
5 FR 6.3 Transport Mechanisms
6 FR M`rsk Data APL L]rdag
7 FR RSPL (5%)
8 BR Get input financial incl Chad Murrin
9 JRV What about garbage collect in EMS.
When wrap-around even on 200 Mbytes
10 HBA 300 Mb. EMH + EMH
11 CSK Include two on IBM commitment
12 AH Prepare cover letter
13 FR Sow/PIF - migration of VIA
14 HBA LTU/V35 interface
15 LSN Clarify implementation team
16 MINIMIZED DISK
17 FR Presence in Canada May/June to expedite
things
18 FR Read, Read, Read
19 CSK 2.2 be commitments
20 FR Structure PIP such as to show to Ken
Taylor how we meet 4 83!
21 FR How to integrate AC people into team
22 CSK Dynamic reconfiguration as promised
23 FR Size of NCC a concern
24 CSK SNA/DCA what.
25 CSK Do we off load 3705?
DCP/40?
Replace?
26 AH Cover letter: our commitments in future
on IBM/UNIVAC/CCITT
27 CSK Could it be good to have IBM standardization
28 End-to-End aspects tobe addressed
29 MEC Test mode flags in Datagrams
30 JRV Test mode to be included in Chapter
4 Doc III
31 JRV Redundancy - all PUs
NMH however cold and shared with "NCP"/NCS
of Toronto Node
32 JRV FIKS Operator Commands from FIKS Req
Spec. Appendix ?
33 AH TWX AC on CRISP contact over and above
FR provided. Contact these
34 BR Lease draft?
35 AH Cover letter- CNCP offers lines and
facilities free of charge during test
period
36 FR Visit to see FIKS/LMENET. Plan to be
included in proposal
37 HBA Honeywell interface
38 BR CR papir med til Canada
39 FR Project Organisations Diagram
40 FR SOW and PIP
41 HBA Doc. III, Chap 5; include ATES and Hardware
monitor
42 OE/AH CV's to be collected (updates required?).
Person/capability matrix to be generated
43 CSK Doc. III, sec. 6.4. LMENET Host flow
(references) to be included.
44 CSK/
AA Doc III, sec. 6.6-6.7 (HAS/TAS) concluding
sections with references to LMENET spec
extracted appendices XX
45 FE Doc. III, sec. 6.9 (ENAS)
MEC to provide CCITT-type of X-75 network
gateway.
Plandata to provide telex interface
description
46 FE Doc. III, sec. 6.11 (NMS)
Include references to handbook: TOS
plus standard facilities for dev environment.
Volume Generator to be included
47 FE DOC II, 6.9 ENAS. Adat P-3 type of
facility - refer CAMPS specifics - to
be included as part of message preparation
facility (generalized MEDE/Electronic
Mail). To be Coordinated with JRV.