WangText
&…05…&…07…%…0e…%
%…06…$…0c…$…0f…$…01…$…07…#…0c…#…02…#…07…"…0b…"…0c…"…0d…"…01…"…02…"…07…!…08…!…09…!…0a…!…0f……86…1
…02…
…02… …02…
…02…PC/TPR/001
…02…BHE/831031…02……02…#
PROTOCOL
CONVERTER
TEST PROCEDURES…02…BHE/830729…02…
PC
PROTOCOL CONVERTER
ACCEPTANCE TEST PROCEDURES
CONTRACT SHNMO-82-9205-INF
PC/TPR/001
DJON LARSEN and B[RGE HERMANSEN
B[RGE HERMANSEN
SHAPE (12), GJ, DL, KPL, SN[, ALF,
EHO, PMO, BS, EV, BHE, GQAR, FILE (1)
2.1
831031 …0f… CR QA 830630
PC/TPR/001
…02…BHE/831031…02… ii
PROTOCOL CONVERTER
TEST PROCEDURES…02…BHE/830729 PC
…0f…
830210 All Initial issue of
Document
…02…PC/TPR/001
…02…BHE/831031…02… iii
PROTOCOL CONVERTER
TEST PROCEDURES…02…BHE/830729 …02… PC
T̲A̲B̲L̲E̲ ̲O̲F̲ ̲C̲O̲N̲T̲E̲N̲T̲S̲
Page
1. GENERAL .................................... 1
1.1 PURPOSE .................................. 1
1.2 REFERENCED DOCUMENTS ..................... 2
1.3 APPLICABLE DOCUMENTS ..................... 4
1.4 ABBREVIATIONS . .......................... 5
1.5 TERMS .................................... 7
1.6 DOCUMENT LAYOUT .......................... 8
1.6.1 Section 2 ............................ 8
1.6.2 Section 3 ............................ 8
1.6.3 Appendices A and B.................... 8
1.6.3.1 Test Overview .................... 9
1.6.3.2 Test Steps ....................... 9
2. TEST SPECIFICATION AND EVALUATION .......... 12
2.1 TEST OBJECT IDENTIFICATION ............... 14
2.1.1 In-Plant Verification ................ 14
2.1.2 On-Site Verification ................. 14
2.2 VERIFICATION METHODS AND CONSTRAINTS ..... 18
2.2.1 System Verification Conditions ....... 18
2.2.1.1 Conditions at FAT ................ 18
2.2.1.2 Conditions at PAT ................ 18
2.2.1.3 Conditions at PSAT ............... 18
2.2.2 Verification Method Terms ............ 19
2.2.3 Data Recording ....................... 19
Page
3. VERIFICATION STRUCTURE ..................... 20
3.1 TEST CONTROL ............................. 22
3.2 TEST GROUP DESCRIPTION ................... 24
3.2.1 Test Group 1 ......................... 30
3.2.2 Test Group 2 ......................... 30
3.2.3 Test Group 3 ......................... 30
3.2.4 Test Group 4 ......................... 31
3.2.5 Test Group 5 ......................... 31
3.3 TEST GROUPS .............................. 38
3.3.1 TEST GROUP NO. 1 ..................... 38
3.3.2 TEST GROUP NO. 2 ..................... 42
3.3.3 TEST GROUP NO. 3 ..................... 44
3.3.4 TEST GROUP NO. 4 ..................... 45
3.3.5 TEST GROUP NO. 5 ..................... 53
3.4 FUNCTION/TEST RELATIONSHIP ............... 54
A̲p̲p̲e̲n̲d̲i̲c̲e̲s̲
Appendix A: In-Plant Acceptance Test Procedures
Appendix B: On-Site Acceptance Test Procedures
1̲ ̲ ̲G̲E̲N̲E̲R̲A̲L̲
Test Procedures comprise a baseline for the Acceptance
Tests of the Protocol Converter to be developed under
SHNMO contract 82-9205-INF.
1.1 P̲U̲R̲P̲O̲S̲E̲
The purpose of this document is:
a) to identify:
1) the Test Object
2) the requirements to be verified
3) the system functions to be exercised
b) to define:
1) the verification methods and constraints
2) the verification evaluation criteria
c) to describe:
1) verification control
2) the detailed procedure for test execution
1.2 R̲E̲F̲E̲R̲E̲N̲C̲E̲D̲ ̲D̲O̲C̲U̲M̲E̲N̲T̲S̲
1. Protocol Converter contract SHNMO-82-9205-INF.
1982-04-29.
2. System Requirement Specification (SRS).
Appendix G of Reference 1. 1982-04-29.
3. SCARS II System Design Baseline Vol III A
Rev A, B, and C 1981-06-30, 1981-07-15, 1981-04-28.
Burroughs or
CPS/ICD/006, 1981-11-10 Christian Rovsing A/S
4. Functional Description for the SCARS, CAMPS, ACCIS
interface. 1981-02-05. As appendix E to Reference
3.
…02…5. Remote Terminal Supervisor (GRTS).
Honeywell DD40B rev. 0, July 1976.
6. DINDAC CCTC TR-01, 1978-06-30.
7. ACE Security Directive 70-1.
1979-08-31 with change 2 dated 1981-02-06.
8. CCITT ORANGE BOOK,Volume VIII. 1.2
V.24 and V.28 Recommendations
9. AMSG 720A. January 1977.
10. AMSG 719B. September 1976.
11. Not used
12. MIL-STD-188C. 1969-11-24.
13. WWMCCS ADP Telecom Standard Engineering Practices,
DCA November 1979.
14. Control wires and functions for WWMCCS-PC link
(delivery by SHAPE on or before 3. May 1982).
15. X25 LAP (CAMPS) Product Specification.
CSS-MIC/0422/PSP/1027. 1982-05-28. Chr. Rovsing
A/S.
16. DINDAC Interface Parameter Document.
Telex: CAMPS log. 631, PC log 002. SHAPE 1982-05-11.
17. Protocol Converter, System Specification,
PC/SDS/001, issue 2.3
18. DINDAC-RCI Protocol Notes, 1982-07-26,
(Handout from M. Novell, SHAPE)
19. Not used
20. PC Equipment Handbook
PC/HBK/001
21. PC Hardware Assembly Breakdown
PC/SDS/002
22. PC, Package Design Specification, issue 1.2
PC/PDS/001
23. Site Inventory Checklist
24. DSMT Hardware Test Report, CPS/TRP/004
25. CPU-SCM ADAPTER, CSA
Product Specification, CSD/005/PSP/0056
26. V28 L/L Adapter
Technical Manual, CPS/TCM/024
27. Site Inventory Checklist
28. TESTPROCEDURE, CCIS TESTMESSAGES
PC/AUX/004
1.3 A̲P̲P̲L̲I̲C̲A̲B̲L̲E̲ ̲D̲O̲C̲U̲M̲E̲N̲T̲S̲
a) Protocol Converter contract SHNMO-82-9205-INF.
1982-04-29.
b) System Requirement Specification (SRS).
Appendix G of Reference 1. 1982-04.29.
c) Protocol Converter, Acceptance Test Plan, issue
3
PC/TPL/001
d) CR Product Assurance Plan
PAD/PLN/0001
1.4 A̲b̲b̲r̲e̲v̲i̲a̲t̲i̲o̲n̲s̲
A Verification method A
ACE Allied Commands Europe
App Appendix
ATTN Symbol for the "BREAK"-key on the VDU
Aux No. Number of a testmessageas defined in
PC/AUX/004 document
B Verification method B
Baud "Information-Bits" per second
BD Bogus Data
BFD Bona Fide Data
bps Bits Per Second
C Verification method C
CAMPS Computer Aided Message Processing System
CCIS Command and Control Information System
CCITT International Telegraph and Telephone
Consultative Committee
COMSEC Communications Security
CPU Central Processing Unit
CR Christian Rovsing A/S
CR80 CR80 minicomputer (Christian Rovsing)
CSA CPU/SCM Adapter
cr "RETURN"-key on the VDU
D Verification method D
DINDAC autoDIN-wwmccs Direct Access
DN355 Honeywell front-end processor
Doc Document
DSMT
E1 Transmission format
ECO Engineering Change Order
EMI Electro Magnetic Interference
End Systems CCIS,CAMPS, or SCARS
EPROM Erasable Programmable Read-Only Memory
Equipm Equipment
FAT Factory Acceptance Test
Funct Functional
GRTS General Remote Terminal System
G.F.C. Group.Function.Case; Test Case number.
HBK PC/HBK/001 document
HDRTYP Header type
H/W Hardware
Info Information
Init Initialize S/W System
Instal Installation
I/O Input/Output
L Local mode
LIA-N Line Interface Adapter - Non switching
LTU Line Terminating Unit
L/L Low level / Long distance driving
M Maintenance mode
Mem Memory
Min Minute(s)
M&D Maintenance and Diagnostics
NATO North Atlantic Treaty Organization
No. Number
O Operational mode
OC Operator's Console
PAT Preliminary Acceptance Test
Para Paragraph
Pasw Password
PC Protocol Converter
PSAT Provisional Site Acceptance Test
PU Processor Unit, CR831
RAM Random Access Memory
RCI Remote Computer Interface (to Honeywell)
Ref Reference document -or- Refer to
Req Requirement
Rev. Revision
SCAMPS SCARS and/or CAMPS
SCARS Status & Control Alerting & Reporting
System
SCM System Control Mode
SDS System Specification, (ref. 17)
Sec Second(s)
SHAPE Supreme Headquarters Allied Powers Europe
SHNMO SHAPE Host Nation
Spec Special
SRS System Requirement Specification (ref.
2)
SS Reference document no. 3
SUSDUP Suspected Duplicate
SWELL Software Engineering Low Level Language
S/W Software
T Test mode
TRC Traffic Controller
V24 CCITT Recommendation (ref. 8)
V28 CCITT Recommendation (ref. 8)
V28 L V28 Low level interface, see Terms
VDU Visual Display Unit (Delta Data 7260TC)
Verif Verification
Vol. Volume (of document)
WWMCCS World Wide Military Command & Control
System
XXX Replaces 3 numbers
X.25 CCITT Recommendation (ref. 15)
1.5 T̲e̲r̲m̲s̲
Mode: Designates a system state with certain
capabilities.
Verification: Designates the task of verify the
fulfilment of certain requirements,
using one of the four methods defined
in sub-
section 2.2.2.
Acceptance Test: Designates the act whereby SHAPE
will acknowledge that CR has demonstrated,
that the requirements to PC has been
met, to a level set by the appropriate
Acceptance Test Procedure.
Operator: Designates the person, who operates
the PC-System Supervisor/maintenance
functions by means of the maintenance-VDU.
End-System: Designates any of the three systems
to which PC is connected, i.e. CAMPS
or SCARS in one end and CCIS in the
other end.
V28 L/L: Designates the V̲2̲8̲ recommendation implemented
with L̲o̲w̲ Voltage Levels and L̲o̲n̲g̲ distance
driving ability (up to 275 m). In practice
it is implemented as the MIL-STD-188C (ref.
12) with reversed polarity on data and
clock circuit lines.
1.6 D̲O̲C̲U̲M̲E̲N̲T̲ ̲L̲A̲Y̲O̲U̲T̲
1.6.1 S̲e̲c̲t̲i̲o̲n̲ ̲2̲
Section 2 of this document contains a general Test
Specification, naming the Test Object and the methods
of verification.
1.6.2 S̲e̲c̲t̲i̲o̲n̲ ̲3̲
Section 3 explains the structure of verification, naming
the Test Groups and containing an overview to the configurations
and Test Cases. Furthermore, it gives an equipment
overview and a list of requirements for each of five
Test Groups. At the end of section a Function/Test
Matrix is shown.
1.6.3 A̲p̲p̲e̲n̲d̲i̲c̲e̲s̲ ̲A̲ ̲a̲n̲d̲ ̲B̲
Together with the document two appendices are included,
each containing the step-by-step procedure to accomplish
the verification of the system.
o A̲p̲p̲e̲n̲d̲i̲x̲ ̲A̲,̲ describes the In-Plant Acceptance Test
procedures.
o A̲p̲p̲e̲n̲d̲i̲x̲ ̲B̲, describes the On-Site Acceptance Test
procedures.
Two kinds of Forms are used for the step-by-step Test
procedures, located in the appendices:
- Test overview
- Test steps
1.6.3.1 T̲e̲s̲t̲ ̲O̲v̲e̲r̲v̲i̲e̲w̲
The Test Overview Form is used to identify the Test
Cases required (see Figure 1.6-1). Each identified
Test Case is described in details on the Test Steps
Form.
1.6.3.2 T̲e̲s̲t̲ ̲S̲t̲e̲p̲s̲
The Test Step Form contains the procedure for execution
of the Test Cases (see Figure 1.6-2). The procedure
for each Test Case is described by the information
in the columns of the Test Step Form:
o STEP identifies the step in the appropriate verification.
o ACTION & INPUTS describes in a short form the action
required by the operator and the applied inputs.
o EXPECTED RESULTS column details the expected results.
o CHECK for checklisting the procedure.
FIGURE 1.6-1
TEST OVERVIEW FORM
FIGURE 1.6-2
TEST STEP FORM
2̲ ̲ ̲T̲E̲S̲T̲ ̲S̲P̲E̲C̲I̲F̲I̲C̲A̲T̲I̲O̲N̲ ̲A̲N̲D̲ ̲E̲V̲A̲L̲U̲A̲T̲I̲O̲N̲
Acceptance Testing of the Protocol Converter is performed
on two different locations, in seven Test Phases.
The PC shall pass the following Test Phases:
I̲N̲-̲P̲L̲A̲N̲T̲ FACTORY ACCEPTANCE TEST, F̲A̲T̲
1.PHASE: IN-PLANT FUNCTIONAL VERIFICATION
2.PHASE: IN-PLANT COMSEC VERIFICATION
O̲N̲-̲S̲I̲T̲E̲ PRELIMINARY ACCEPTANCE TEST P̲A̲T̲
3.PHASE: CCIS, FUNCTIONAL VERIFICATION
4.PHASE: SECURITY CERTIFICATION
O̲N̲-̲S̲I̲T̲E̲ PROVISIONAL SITE ACCEPTANCE TEST, P̲S̲A̲T̲
5.PHASE: FUNCTIONAL SITE ACCEPTANCE TEST,CAMPS
6.PHASE: FUNCTIONAL SITE ACCEPTANCE TEST,SCARS
7.PHASE: ON-SITE COMSEC VERIFICATION
CR has the overall responsibility of phases 1, 3, 5
and 6 while SHAPE is to conduct phases 2, 4 and 7.
FIGURE 2-1
TEST PLAN HIERARCHY
2.1 T̲E̲S̲T̲ ̲O̲B̲J̲E̲C̲T̲ ̲I̲D̲E̲N̲T̲I̲F̲I̲C̲A̲T̲I̲O̲N̲
2.1.1 I̲n̲-̲P̲l̲a̲n̲t̲ ̲V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲
At the Factory Acceptance Test the Test Object is the
Protocol Converter H/W and S/W in a simulated environment,
i.e. verification of all PC features using a PC-CAMPS
link, but also including features, which are not relevant
or feasible to verify at the On-Site Tests (e.g. design
concepts and bogus data flow). The FATs serve as a
validation of each PC system before installation on
site. The PC H/W and S/W systems are depicted in Figures
2.1-1 and 2.1-2.
2.1.2 O̲n̲-̲S̲i̲t̲e̲ ̲V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲
a) The Preliminary Acceptance Test is only performed
on site 1 (SHAPE). The Test Object of the PAT is
the PC-equipment connected to the CCIS system with
a CAMPS as supporting equipment, i.e. the purpose
is a "real-life" verification of the PC-CCIS link.
b) At the Provisional Site Acceptance Test the Test
Object is the CAMPS/SCARS-PC-CCIS links in order
to make the final functional test of the PC-system.
F̲I̲G̲U̲R̲E̲ ̲2̲.̲1̲-̲1̲ (Sheet 1 of 2)
PROTOCOL CONVERTER CONFIGURATION
F̲I̲G̲U̲R̲E̲ ̲2̲.̲1̲-̲1̲\ (Sheet 2 of 2)
PC RACK CONFIGURATION
F̲I̲G̲U̲R̲E̲ ̲2̲.̲1̲-̲2̲
PC SOFTWARE SYSTEM
2.2 V̲E̲R̲I̲F̲I̲C̲A̲T̲I̲O̲N̲ ̲M̲E̲T̲H̲O̲D̲S̲ ̲A̲N̲D̲ ̲C̲O̲N̲S̲T̲R̲A̲I̲N̲T̲S̲
2.2.1 S̲y̲s̲t̲e̲m̲ ̲V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲ ̲C̲o̲n̲d̲i̲t̲i̲o̲n̲s̲
2.2.1.1 C̲o̲n̲d̲i̲t̲i̲o̲n̲s̲ ̲a̲t̲ ̲F̲A̲T̲
The verification will be conducted on a Protocol Converter
at the CR-factory in Ballerup by a CR Test Engineer.
The input data from the CAMPS side is a representative
batch of messages varying in type, precedence and classification.
On the CCIS side where the link is simulated, the same
set of messages are to be used for the verification.
2.2.1.2 C̲o̲n̲d̲i̲t̲i̲o̲n̲s̲ ̲a̲t̲ ̲P̲A̲T̲
The Preliminary Site Acceptance Test at SHAPE will
concentrate upon verification of the PC-CCIS interface
and the function of the Protocol Converter. The verification
will use the built-in Test Messages present in the
Protocol Converter together with the SHAPE supplied
Test Messages from the CCIS-system.
(ref. 28).
2.2.1.3 C̲o̲n̲d̲i̲t̲i̲o̲n̲s̲ ̲a̲t̲ ̲P̲S̲A̲T̲
The Protocol Converter shall be connected to both the
CCIS-system and the CAMPS-system and a functional verification
of the PC shall be performed.
2.2.2 V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲ ̲M̲e̲t̲h̲o̲d̲ ̲T̲e̲r̲m̲s̲
The keeping of the requirements will be verified by
one of the following methods:
A N̲o̲t̲ ̲A̲p̲p̲l̲i̲c̲a̲b̲l̲e̲: No action will be taken.
B E̲x̲a̲m̲i̲n̲a̲t̲i̲o̲n̲: This method is a non-functional verification,
such as visual inspection of the physical characteristics
of the item or of the documentation associated
with the item.
C A̲n̲a̲l̲y̲s̲i̲s̲: This method is a non-functional verification,
such as deduction or translation of data, review
of analytical data, or performance of a detailed
analysis.
D T̲e̲s̲t̲/̲D̲e̲m̲o̲n̲s̲t̲r̲a̲t̲i̲o̲n̲: This method is a functional
verification, such as actual operation wherein
the element of verification is instrumented, measured,
or displayed directly (test) or where the element
of verification is logically obvious, as the result
of some other verification, but not itself displayed
(demonstration).
2.2.3 D̲a̲t̲a̲ ̲R̲e̲c̲o̲r̲d̲i̲n̲g̲
For the verification of the PC functions, it will be
necessary to maintain three detailed logs of activities:
o Messages sent and received on CAMPS/SCARS
o Messages sent and received on CCIS
o Messages sent and received on PC
These logs are to be verified by the supervisor after
the printing. This is applicable to Test Group 4 where
End-System are used.
3. V̲E̲R̲I̲F̲I̲C̲A̲T̲I̲O̲N̲ ̲S̲T̲R̲U̲C̲T̲U̲R̲E̲
The purpose of the verification is to provide a demonstration
of the PC functional capability. The verification is
divided into 5 separate Test Groups:
G̲R̲O̲U̲P̲ ̲N̲O̲.̲ N̲A̲M̲E̲
1 System and Start-up
2 Maintenance Mode
3 Local Mode
4 Operational Mode
5 Test Mode
In each Test Group, a set of system requirements is
to be verified using one of the verification methods.
The verification structure is a 4-level hierarchy:
o Test Group
o Test Function
o Test Case
o Test Step
See the Test Procedure Hierarchy in Figure 3-1.
F̲I̲G̲U̲R̲E̲ ̲3̲-̲1̲…01……01…TEST PROCEDURE HIERARCHY
3.1 T̲E̲S̲T̲ ̲C̲O̲N̲T̲R̲O̲L̲
The test control is related to the TEST STEP form.
An sample of this form is shown in Figure 3.1-1, when
it has been filled in.
Explanations to Figure 3.1-1:
a) G.F.C.: 2.2.2 - means that this is Test Group
2,
Function 2 and case 2.
b) TEST CASE: MAINTENANCE, DUMP, BD - is the title
of G.F.C.
c) STEP: - is a column containing
sequential numbering of
each step.
d) ACTION AND INPUT: - contains input.
e) EXPECTED RESULTS - contains output. (a) and (b)
are
repetition marks, - once stated
at the end of a line, it can
be
used for repetition of expec-
ted output.
f) CHECK - is a column where Shape shall
fill-in accepting marks:
r - right (approved)
n - note (discrepancy)
f - failure (defect)
g) COMMENTS: - is used for explanation of
marks when n or f has been
filled in.
h) Test Witnesses: - is signatures from CR and SHAPE
If corrective actions to the step-by-step proceeding
have to be taken, this must be analysed to decide on
extent of retest for agreement with SHAPE. "Corrective
action" in such cases may result in the detected fault
being corrected immediately, causing the test to be
repeated only in part thus not requiring SHAPE test
team members to significantly prelonging their engagement
in the test or the detected fault may cause corrective
action of longer duration (several days). In the latter
case, the Contractor will propose an appropriate postponement
of the test and provide new test dates at which a complete
acceptance test is to be performed as retest.
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲
G̲.̲F̲.̲C̲.̲: 2.2.2
T̲E̲S̲T̲ ̲C̲A̲S̲E̲: MAINTENANCE, DUMP, BD
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
^ ^ ^
STEP ^ ACTION AND INPUT
^ EXPECTED
RESULTS ^ CHECK
̲ ̲ ̲ ̲ ̲^̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲^̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲^̲ ̲ ̲ ̲ ̲ ̲ ̲
^ ^ ^
0 ^ ATTN (button) ^ (M)
- ^ r
1 ^ DUMP 00001 000G ^ PARAMETER
ERROR
(a) ^ n
^ ^ (M) -
(b) ^ r
2 ^ DUMP 0000G 0010 ^ (a) ^ r
^ ^ (b) ^ r
3 ^ DUMP 00001 ^
(a)
^ r
^
^ (b) ^ r
4 ^ DUMP 01 02 ^ (a) ^ f
^ ^ (b) ^ r
^ ^ ^
^ ^ ^
^ ^ ^
^ ^ ^
^ ^ ^
^
^ ^
^ ^ ^
^ ^ ^
^ ^ ^
^ ^ ^
̲ ̲ ̲ ̲ ̲^̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲^̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲^̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments: Test Witnesses:
n: - there is double CR: Jensen
space between
PARAMETER and ERROR
f: - PARAMETER ERROR is SHAPE: Schmith
not written at all
F̲I̲G̲U̲R̲E̲ ̲3̲.̲1̲-̲1̲
Example of a filled in
TEST STEP form.
3.2 T̲E̲S̲T̲ ̲G̲R̲O̲U̲P̲ ̲D̲E̲S̲C̲R̲I̲P̲T̲I̲O̲N̲
The verification of PC is partioned in five Test Groups:
G.F.C.1. Test of Hardware.
G.F.C.2. Test of Software - maintenance mode
G.F.C.3. Test of Software - local mode.
G.F.C.4. Test of Software - operational mode.
G.F.C.5. Test of Software - test mode.
The Test Groups are constructed with the purpose of
verifying the functions of PC. The Functional Verification
is performed in factory and on site. The On Site Verification
is divided into a Preliminary Acceptance Test(PAT)
and a Provisional Site Acceptance Test(PSAT). The Test
Cases for the FAT is stated in Appendix A. The Test
Cases for PAT and PSAT is stated in Appendix B.
The selection of Test Cases for each Verification has
been made under consideration of the unavoidability
of simulation of End-system and the feasibility of
construction of testmessages.
Figure 3.2-1 gives an overview of Tests, End-systems,
Testdocuments and Testlocations.
Figure 3.2-2 gives the relations between Group Function
Case and Appendix/Test.
After Figure 3.2-2 follows paragraphs 3.2.1 through.
3.2.5 which describes each Test Group and the environmental
prerequisite configuration.
T̲E̲S̲T̲ ̲ ̲ ̲ ̲C̲O̲N̲F̲I̲G̲U̲R̲A̲T̲I̲O̲N̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲D̲O̲C̲U̲M̲E̲N̲T̲ ̲ ̲ ̲ ̲ ̲L̲O̲C̲A̲T̲I̲O̲N̲
FAT CAMPS'- PC - CCIS' App. A In Plant
1,2,3
PAT CAMPS - PC - CCIS App. B On Site
1
PSAT CAMPS - PC - CCIS App. B On Site
1,2,3
PSAT SCARS - PC - CCIS App. B On Site
1
CAMPS' means simulated End-System.
CCIS' means simulated End-System.
F̲i̲g̲u̲r̲e̲ ̲3̲.̲2̲-̲1̲
Configuration Test Overview.
…01… App. A App.B
G̲.̲F̲.̲C̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲C̲O̲N̲T̲E̲N̲T̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲F̲A̲T̲ ̲T̲I̲M̲E̲ ̲ ̲ ̲ ̲P̲A̲T̲,̲P̲S̲A̲T̲
1 HARDWARE X X
1.1 H/W X X
1.1.1 H/W configuration X X
1.1.2 Maintenance VDU X X
1.2 Design H/W X -
1.2.1 V28 L to CAMPS/SCARS X -
1.2.2 Mil-Std-188C to CCIS X -
1.2.3 Identical H/W, S/W X -
1.2.4 Power Input X -
1.2.5 EPROMS X -
1.3 Design S/W X X
1.3.1 Modes of Operation X X
1.3.2 PU initialization X X
1.3.3 Keyboard response time X 5.5.1
*)
*) 'Keyboard response time' is executed in normal
sequence in the FAT, but in PAT and PSAT this
testcase is to be moved to G.F.C. 5.5.1.
F̲i̲g̲u̲r̲e̲ ̲3̲.̲2̲-̲2̲ ̲(̲s̲h̲e̲e̲t̲ ̲1̲ ̲o̲f̲ ̲4̲)̲
G.F.C. Overview
…01… App. A App.B
G̲.̲F̲.̲C̲.̲ ̲ ̲ ̲ ̲ ̲ ̲C̲O̲N̲T̲E̲N̲T̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲F̲A̲T̲ ̲T̲I̲M̲E̲ ̲ ̲ ̲ ̲P̲A̲T̲,̲P̲S̲A̲T̲
2 MAINTENANCE MODE X X
2.1 CHECK X X
2.1.1 CR80-modules X X
2.1.2 Parameter errors X X
2.2 DUMP X X
2.2.1 Core-dump X X
2.2.2 Parameter errors X X
2.3 INIT X X
2.3.1 From M to L mode X X
3 LOCAL MODE X X
3.1 LOGON X X
3.1.1 Logon parameters X X
3.1.2 Parameter errors X X
3.2 MAINTENANCE X X
3.2.1 From L to M mode X X
F̲i̲g̲u̲r̲e̲ ̲3̲.̲2̲-̲2̲ ̲(̲s̲h̲e̲e̲t̲ ̲2̲ ̲o̲f̲ ̲4̲)̲
G.F.C. Overview
…01… App. A App.B
G̲.̲F̲.̲C̲.̲ ̲ ̲ ̲ ̲ ̲ ̲C̲O̲N̲T̲E̲N̲T̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲F̲A̲T̲ ̲T̲I̲M̲E̲ ̲ ̲ ̲ ̲P̲A̲T̲,̲P̲S̲A̲T̲
4 OPERATIONAL MODE X X
4.1 SHOW STATISTICS X X
4.1.1 Statistics X X
4.2 RESET STATISTICS X X
4.2.1 Reset Statistics X X
4.3 LOGOFF X X
4.3.1 From O to L mode X X
4.4 TEST X X
4.4.1 From O to T mode X X
4.5 TRANSMISSION X X
4.5.1 CAMPS/SCARS to CCIS X X
4.5.2 CCIS to CAMPS/SCARS X X
4.5.3 Transmission between
CAMPS/SCARS and CCIS X X
4.5.4 Transmission errors X X
1. Wrong type X X
2. Too long COMMENT X X
3. Too long DATA X X
4. Embedded message X X
4.6 PERFORMANCE X X
4.6.1 PC processing delay X X
4.6.2 PC throughput X X
F̲i̲g̲u̲r̲e̲ ̲3̲.̲2̲-̲2̲ ̲(̲s̲h̲e̲e̲t̲ ̲3̲ ̲o̲f̲ ̲4̲)̲
G.F.C. Overview
App. A App.B
G̲.̲F̲.̲C̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲C̲O̲N̲T̲E̲N̲T̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲F̲A̲T̲ ̲T̲I̲M̲E̲ ̲ ̲ ̲ ̲P̲A̲T̲,̲P̲S̲A̲T̲
5 TEST MODE X X
5.1 VERIFY X X
5.1.1 Verify End-Systems X X
5.1.2 Parameter errors X X
5.2 SHOW STATISTICS X X
5.2.1 Statistics X X
5.3 RESET STATISTICS X X
5.3.1 Reset Statistics X X
5.4 LOGOFF X X
5.4.1 From T to L X X
5.5 RESPONSE TIME - X
5.5.1 Keyboard response time - 1.3.3
…0e…*)…0f…
*)'Keyboard response time' is executed in PAT and
PSAT as G.F.C. 5.5.1, but described in G.F.C.
1.3.3.
F̲i̲g̲u̲r̲e̲ ̲3̲.̲2̲-̲2̲ ̲(̲s̲h̲e̲e̲t̲ ̲4̲ ̲o̲f̲ ̲4̲)̲
G.F.C. Overview
3.2.1 T̲e̲s̲t̲ ̲G̲r̲o̲u̲p̲ ̲1̲
Test Group 1 is concerning the start-up and all not
mode-specific features of the PC-system. See section
3.3.1.
The starting point for execution of this Test Group
is PC hardware and software destined for a site. Extra
equipment and special documents are stated in Figure
3.2.1-1.
3.2.2 T̲e̲s̲t̲ ̲G̲r̲o̲u̲p̲ ̲2̲
Test Group 2 is concerning the Maintenance Mode of
operation. This is described in section 3.3.2, which
provides overviews concerning:
o Check of modules
o Dump of memory
o Init to local mode
The starting point for execution of this Test Group
is the PC configuration started up to the state where
a push on the ATTN-button brings the system into Maintenance
Mode.
Extra equipment and special documents are stated in
Figure 3.2.2-1.
3.2.3 T̲e̲s̲t̲ ̲G̲r̲o̲u̲p̲ ̲3̲
Test Group 3 is concerning the Local Mode of operation.
This is described in section 3.3.3, which provides
overviews concerning:
o Logon to operational mode
o Maintenance mode return
The starting point for execution of this Test Group
is the PC configuration started up to the state where
a push on the ATTN-button brings the system into Local
Mode.
Extra equipment and special documents are started in
Figure 3.2.3-1.
3.2.4 T̲e̲s̲t̲ ̲G̲r̲o̲u̲p̲ ̲4̲
Test Group 4 is concerning the Operational Mode. This
is described in section 3.3.4, which provides overview
concerning:
o Show statistics
o Reset statistics
o Logoff to local mode
o Test mode entrance
The starting point for execution af this Test Group
is the PC configuration started up to the state where
a push on the ATTN-button shows that the system is
in Operational Mode.
Extra equipment and special documents are stated in
Figure 3.2.4-1.
Actions upon fault-categories is shown in figure 3.2.4-2.
Test of fault-types is shown in Figure 3.2.4-3
3.2.5 T̲e̲s̲t̲ ̲G̲r̲o̲u̲p̲ ̲5̲
Test Group 5 is concerning the Test Mode of operation.
This is described in section 3.3.5, which provides
overview concerning:
o Verify link by Test Messages
o Show statistics
o Reset statistics
o Logoff to local mode
The starting point for execution of this Test Group
is the PC configuration brought up to the state where
a push on the ATTN-button will show that the system
is in Test Mode.
Extra equipment and special documents are stated in
Figure 3.2.5-1.
G̲.̲F̲.̲C̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲N̲A̲M̲E̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲E̲x̲t̲r̲a̲ ̲E̲q̲u̲i̲p̲m̲.̲/̲S̲p̲e̲c̲.̲D̲o̲c̲.̲
1.1.1 H/W CONFIGURATION SITE INVENTORY CHECKLIST
- ,, - SITE INVENTORY LIST
REF. 27 and 23
1.1.2 MAINTENANCE VDU CSA PRODUCT SPECIFIC-
ATION REF. 25
1.2.1 V28 L CAMPS DSMT TEST
(V.28 L/L ADAPTER)
REF. 24
1.2.2 MIL-STD-188C V28 L/L ADAPTER
REF. 26
1.2.3 IDENTICAL H/W SITE INVENTORY LIST
AND S/W REF. 23
1.2.4 POWER INPUT CAMPS DSMT TEST
(POWER INPUT)
REF. 24
1.2.5 EPROM SDS (para 3.1.3)
1.3.1 MODES OF OPERATION EQUIPMENT HANDBOOK
REF. 20
1.3.2 PU INITIALIZATION STOPWATCH
1.3.3 KEYBOARDS OPERATION
RESPONSE TIME STOPWATCH
F̲i̲g̲u̲r̲e̲ ̲3̲.̲2̲.̲1̲-̲1̲
Extra equipment and special documents
for Test Group 1.
G̲.̲F̲.̲C̲.̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲N̲A̲M̲E̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲E̲x̲t̲r̲a̲ ̲E̲q̲u̲i̲p̲m̲.̲/̲S̲p̲e̲c̲.̲D̲o̲c̲.̲
̲
2.1.2 MAINTENANCE, CHECK EXTRA
ERROM
RAM
LTU
WITH EMBEDDED
FAULTS
2.2.1 MAINTENANCE, DUMP CORE MAP
F̲i̲g̲u̲r̲e̲ ̲3̲.̲2̲.̲2̲-̲1̲
Extra equipment and special documents
for Test Group 2.
G̲.̲F̲.̲C̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲N̲A̲M̲E̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲E̲x̲t̲r̲a̲ ̲E̲q̲u̲i̲p̲m̲.̲/̲S̲p̲e̲c̲.̲D̲o̲c̲.̲
NONE NONE NONE
F̲i̲g̲u̲r̲e̲ ̲3̲.̲2̲.̲3̲-̲1̲
Extra equipment and special documents
for Test Group 3.
G̲.̲F̲.̲C̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲N̲A̲M̲E̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲E̲x̲t̲r̲a̲ ̲E̲q̲u̲i̲p̲.̲/̲S̲p̲e̲c̲.̲D̲o̲c̲.̲
4.5.1 CAMPS/SCARS-CCIS CCIS-link
4.5.2 CCIS-CAMPS/SCARS CAMPS/SCARS-link
PC/AUX/004
REF.28
4.5.3 BETWEEN CCIS AND Prestored Testmessages
CAMPS/SCARS on both End-Systems
4.5.4 TRANSMISSION ERRORS STOPWATCH
4.6.1 PC DELAY
4.6.1 PC THROUGHPUT
F̲i̲g̲u̲r̲e̲ ̲3̲.̲2̲.̲4̲-̲1̲
Extra equipment and special documents
for Test Group 4.
C̲A̲T̲E̲G̲O̲R̲Y̲ ̲A̲C̲T̲I̲O̲N̲S̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Category Actions
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Transactions in both directions
are
Unrecoverable cancelled. PC close down with an
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲e̲r̲r̲o̲r̲ ̲m̲e̲s̲s̲a̲g̲e̲ ̲t̲o̲ ̲V̲D̲U̲.̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Recoverable Faulty Transactions is cancelled
in
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲b̲o̲t̲h̲ ̲d̲i̲r̲e̲c̲t̲i̲o̲n̲s̲.̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Protocol recovery. Increment of
Statistics Error Counter. Retransmission
̲
̲
̲
̲
̲
̲
̲
̲
̲
̲
̲
̲
̲
̲
̲
̲
̲
̲
̲
̲
̲
̲
̲r̲e̲g̲u̲e̲s̲t̲.̲
̲
̲
̲
̲
̲
̲
̲
̲
̲
̲
̲
̲
̲
̲
̲
̲
̲
̲
̲
̲
̲
̲
̲
̲
̲
̲
̲
̲
F̲i̲g̲u̲r̲e̲ ̲3̲.̲2̲.̲4̲-̲2̲
Actions upon fault-categories
T̲E̲S̲T̲ ̲O̲F̲ ̲F̲A̲U̲L̲T̲ ̲T̲Y̲P̲E̲S̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲T̲e̲s̲t̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
Category Type Pre-
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲t̲e̲s̲t̲ ̲ ̲ ̲F̲a̲t̲ ̲ ̲P̲A̲T̲
̲ ̲P̲S̲A̲T̲
1. Link-down X X X
X
Unrecoverable 2. Protocol-failure X
3. Sci-error X X X
X
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲4̲.̲ ̲P̲C̲-̲ ̲s̲y̲s̲t̲e̲m̲-̲e̲r̲r̲o̲r̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲X̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
5. Message control- error X X X
X
Recoverable 6. New-Transaction X X
X X
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲7̲.̲ ̲T̲r̲a̲n̲s̲a̲c̲t̲i̲o̲n̲ ̲l̲e̲n̲g̲h̲t̲ ̲e̲r̲r̲o̲r̲ ̲ ̲X̲ ̲ ̲ ̲ ̲ ̲ ̲X̲ ̲ ̲ ̲
̲X̲ ̲ ̲ ̲ ̲X̲ ̲
Statistics - X
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
F̲i̲g̲u̲r̲e̲ ̲3̲.̲2̲.̲4̲-̲3̲
Test of fault-types.
G̲.̲F̲.̲C̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲N̲A̲M̲E̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲E̲x̲t̲r̲a̲ ̲E̲q̲u̲i̲p̲m̲.̲/̲S̲p̲e̲c̲.̲D̲o̲c̲.̲
5.1.1 TEST, VERIFY CCIS-link
5.1.2 - ,, - CAMPS/SCARS-link
F̲i̲g̲u̲r̲e̲ ̲3̲.̲2̲.̲5̲-̲1̲
Extra equipment and special documents
for Test Group 5.
3̲.̲3̲ ̲ ̲T̲E̲S̲T̲ ̲G̲R̲O̲U̲P̲S̲
In the following five paragraphs the requirements is
specified for each of the five testgroups. The underlining
is for CR administrative use only and no significance
to requirement statement.
3.3.1 T̲E̲S̲T̲G̲R̲O̲U̲P̲ ̲N̲O̲.̲ ̲1̲ ̲
This Test Group shall demonstrate the start-up and
other not mode-specific features of the PC-System.
Req. VERIF.
N̲o̲ ̲ ̲ ̲ ̲R̲E̲Q̲U̲I̲R̲E̲M̲E̲N̲T̲ ̲T̲E̲S̲T̲G̲R̲O̲U̲P̲ ̲N̲O̲.̲ ̲1̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲M̲E̲T̲H̲O̲D̲ ̲ ̲G̲.̲F̲.̲C̲.̲
S̲R̲S̲ ̲2̲.̲2̲
One off-line converter will be available at each
site for back-up purposes. The off-line converter
may be brought on-line by manual replacement with
one of the on-line converters. T̲h̲e̲ ̲t̲i̲m̲e̲ ̲t̲o̲ ̲i̲n̲i̲t̲i̲a̲-̲
l̲i̲z̲e̲ ̲t̲h̲e̲ ̲o̲f̲f̲-̲l̲i̲n̲e̲ ̲c̲o̲n̲v̲e̲r̲t̲e̲r̲ ̲s̲h̲a̲l̲l̲ ̲n̲o̲t̲ ̲e̲x̲c̲e̲e̲d̲
1 3̲
̲m̲i̲n̲.̲
(Excluding
the
time
for
converter
replace- D 1.3.2
ment).
S̲R̲S̲ ̲2̲.̲3̲
PC to SCARS and CAMPS will use a full
duplex synchronous electrical level on a medium speed
2 circuit
u̲s̲i̲n̲g̲
̲C̲C̲I̲T̲T̲
̲V̲2̲4̲/̲V̲2̲8̲
̲a̲n̲d̲
̲N̲A̲T̲O̲
̲l̲e̲v̲e̲l̲
̲i̲n̲t̲e̲r̲f̲a̲c̲e̲ C 1.2.1
criteria. For the PC-CCIS interface, the electrical
level will provide a full d̲u̲p̲l̲e̲x̲ ̲M̲I̲L̲-̲S̲T̲D̲-̲1̲8̲8̲C̲ ̲l̲o̲w̲
3 l̲e̲v̲e̲l̲
̲i̲n̲t̲e̲r̲f̲a̲c̲e̲. C 1.2.2
S̲R̲S̲ ̲2̲.̲4̲
P̲r̲o̲v̲i̲s̲i̲o̲n̲ ̲o̲f̲ ̲t̲h̲r̲e̲e̲ ̲m̲o̲d̲e̲s̲ ̲o̲f̲ ̲o̲p̲e̲r̲a̲t̲i̲o̲n̲:
a. o̲f̲f̲-̲l̲i̲n̲e̲ ̲-̲ ̲t̲e̲s̲t̲/̲m̲a̲i̲n̲t̲e̲n̲a̲n̲c̲e̲
4 b.
o̲n̲-̲l̲i̲n̲e̲
̲t̲e̲s̲t̲
̲m̲e̲s̲s̲a̲g̲e̲
̲c̲r̲e̲a̲t̲i̲o̲n̲/̲r̲e̲c̲e̲p̲t̲i̲o̲n̲ C 1.3.1
c. o̲p̲e̲r̲a̲t̲i̲o̲n̲
Req. VERIF.
N̲o̲ ̲ ̲ ̲ ̲R̲E̲Q̲U̲I̲R̲E̲M̲E̲N̲T̲ ̲T̲E̲S̲T̲G̲R̲O̲U̲P̲ ̲N̲O̲.̲ ̲1̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲M̲E̲T̲H̲O̲D̲ ̲ ̲G̲.̲F̲.̲C̲.̲
S̲R̲S̲ ̲2̲.̲7̲
5 The protocol converter shall n̲o̲t̲ ̲d̲i̲s̲t̲u̲r̲b̲ the
end-to-end r̲e̲q̲u̲i̲r̲e̲m̲e̲n̲t̲s̲ ̲f̲o̲r̲ ̲m̲e̲s̲s̲a̲g̲e̲ ̲a̲c̲c̲o̲u̲n̲t̲a̲-̲ A
-
b̲i̲l̲i̲t̲y̲, and security, irrespective of the type
of format employed for the respective links.
S̲R̲S̲ ̲2̲.̲8̲
6 e) ̲P̲r̲o̲v̲i̲d̲e̲ ̲s̲e̲c̲u̲r̲i̲t̲y̲ ̲b̲y̲ physical, electrical and A
-
software means.
7 f) Each
converter
shall
have
i̲d̲e̲n̲t̲i̲c̲a̲l̲
̲H̲/̲W̲
̲a̲n̲d̲
S̲/̲W̲ control facilities. C 1.2.3
S̲R̲S̲ ̲2̲.̲9̲
8 a) T̲h̲e̲
̲d̲e̲s̲i̲g̲n̲
̲o̲f̲
̲e̲a̲c̲h̲
̲c̲o̲n̲v̲e̲r̲t̲e̲r̲
̲i̲n̲s̲t̲a̲l̲l̲e̲d̲
̲s̲h̲a̲l̲l̲
p̲r̲e̲v̲e̲n̲t̲ ̲i̲l̲l̲e̲g̲a̲l̲ ̲a̲c̲c̲e̲s̲s̲,̲ ̲c̲o̲r̲r̲u̲p̲t̲i̲o̲n̲ ̲a̲n̲d̲ ̲c̲o̲m̲-̲
A
-
p̲r̲o̲m̲i̲s̲e̲ ̲o̲f̲ ̲t̲h̲e̲ ̲d̲a̲t̲a̲ ̲i̲n̲ ̲t̲r̲a̲n̲s̲i̲t̲ ̲i̲n̲ ̲t̲h̲e̲ ̲c̲o̲n̲v̲e̲r̲-̲
t̲e̲r̲ ̲a̲n̲d̲ ̲d̲a̲t̲a̲ ̲i̲n̲ ̲t̲h̲e̲ ̲i̲n̲t̲e̲r̲c̲o̲n̲n̲e̲c̲t̲e̲d̲ ̲s̲y̲s̲t̲e̲m̲s̲.̲
9 b) The
contractor
shall
provide
H̲/̲W̲
̲a̲n̲d̲
̲S̲/̲W̲
which
satisfies ACE Directive 70-1 for t̲r̲a̲n̲s̲m̲i̲t̲t̲i̲n̲g̲ A
-
a̲n̲d̲ ̲p̲r̲o̲c̲e̲s̲s̲i̲n̲g̲ ̲c̲l̲a̲s̲s̲i̲f̲i̲e̲d̲ ̲i̲n̲f̲o̲r̲m̲a̲t̲i̲o̲n̲.
S̲R̲S̲ ̲2̲.̲1̲1̲
10 a) A̲
̲m̲a̲i̲n̲t̲e̲n̲a̲n̲c̲e̲
̲V̲D̲U̲
shall
be
provided
to
operate
the O̲N̲-̲l̲i̲n̲e̲ ̲a̲n̲d̲ ̲O̲F̲F̲-̲l̲i̲n̲e̲ ̲t̲e̲s̲t̲ ̲a̲n̲d̲/̲o̲r̲ C 1.3.1
m̲a̲i̲n̲t̲e̲n̲a̲n̲c̲e̲ modes as well as to provide an
I/O device for operator actions required
during system initialization. The m̲a̲i̲n̲t̲e̲n̲a̲n̲c̲e̲
11 V̲D̲U̲
shall
be
connected
to
the
converters
C 1.1.2
using a f̲i̲b̲e̲r̲o̲p̲t̲i̲c̲ ̲c̲o̲n̲n̲e̲c̲t̲i̲o̲n̲.
S̲R̲S̲ ̲3̲.̲1̲.̲1̲
12 The e̲q̲u̲i̲p̲m̲e̲n̲t̲ ̲t̲o̲ ̲b̲e̲ ̲p̲r̲o̲v̲i̲d̲e̲d̲ ̲i̲s̲ ̲s̲p̲e̲c̲i̲f̲i̲e̲d̲ ̲i̲n̲ ̲ B 1.1.1
a̲p̲p̲e̲n̲d̲i̲x̲ ̲E̲ to this contract specification.
Req. VERIF.
N̲o̲ ̲ ̲ ̲ ̲R̲E̲Q̲U̲I̲R̲E̲M̲E̲N̲T̲ ̲T̲E̲S̲T̲G̲R̲O̲U̲P̲ ̲N̲O̲.̲ ̲1̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲M̲E̲T̲H̲O̲D̲ ̲ ̲G̲.̲F̲.̲C̲.̲
S̲R̲S̲ ̲3̲.̲1̲.̲2̲
I̲n̲t̲e̲g̲r̲a̲t̲i̲o̲n̲ ̲o̲f̲ ̲S̲H̲A̲P̲E̲ ̲S̲u̲p̲p̲l̲i̲e̲d̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲
The equipment to be provided by the contractor shall
be used in conjunction with the following SHAPE
furnished equipment facilities:
13 a) P̲o̲w̲e̲r̲,
operating
environment B 1.2.4
b) Signal cables, including one reserve per
connection, to CAMPS, SCARS and CCIS
terminated at the converter installation. CR
will supply and mount c̲o̲n̲n̲e̲c̲t̲o̲r̲s̲ at PC end,
and test the connections.
S̲R̲S̲ ̲3̲.̲2̲.̲1̲
c) C̲o̲n̲v̲e̲r̲t̲e̲r̲ ̲-̲ ̲m̲a̲i̲n̲t̲e̲n̲a̲n̲c̲e̲ ̲V̲D̲U̲
14 A̲s̲y̲n̲c̲h̲r̲o̲n̲o̲u̲s̲
̲s̲t̲a̲n̲d̲a̲r̲d̲
̲t̲e̲l̲e̲t̲y̲p̲e̲
̲c̲o̲m̲p̲a̲t̲i̲b̲l̲e̲
̲i̲n̲t̲e̲r̲-̲
f̲a̲c̲e̲ shall be used. The physical connection is C 1.1.2
in form of a f̲i̲b̲e̲r̲ ̲o̲p̲t̲i̲c̲ ̲c̲a̲b̲l̲e̲.
S̲R̲S̲ ̲3̲.̲3̲.̲7̲
A̲l̲p̲h̲a̲b̲e̲t̲
15 The a̲l̲p̲h̲a̲b̲e̲t̲ ̲i̲s̲ ̲t̲h̲e̲ ̲N̲A̲T̲O̲ ̲7̲ ̲b̲i̲t̲ ̲c̲o̲d̲e̲ as specified
in
the CAMPS/SCARS/CCIS Intersystem specification, A
page 3-A-4-2. Parity bits shall be selectable to
odd, even or nil on all channels.
S̲R̲S̲ ̲3̲.̲4̲.̲1̲.̲2̲
16 b) The
r̲e̲s̲p̲o̲n̲s̲e̲
̲t̲i̲m̲e̲
for
the
keyboard
operation D l.3.3
will be w̲i̲t̲h̲i̲n̲ ̲5̲ ̲s̲e̲c̲.̲ ̲o̲n̲ ̲9̲5̲%̲ ̲o̲f̲ ̲c̲a̲s̲e̲s̲.
17 c) All
commands
to
the
system
shall
be
given
A
through a c̲o̲m̲m̲a̲n̲d̲ ̲l̲a̲n̲g̲u̲a̲g̲e̲.
Req. VERIF.
N̲o̲ ̲ ̲ ̲ ̲R̲E̲Q̲U̲I̲R̲E̲M̲E̲N̲T̲ ̲T̲E̲S̲T̲G̲R̲O̲U̲P̲ ̲N̲O̲.̲ ̲1̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲M̲E̲T̲H̲O̲D̲ ̲ ̲G̲.̲F̲.̲C̲.̲
S̲R̲S̲ ̲3̲.̲4̲.̲3̲
18 a) A̲l̲l̲
̲p̲r̲o̲g̲r̲a̲m̲s̲
̲a̲r̲e̲
̲s̲t̲o̲r̲e̲d̲
̲i̲n̲
̲E̲P̲R̲O̲M̲S̲.
No
loading C 1.2.5
from external sources are therefore required.
19 b) I̲n̲i̲t̲i̲a̲l̲i̲z̲a̲t̲i̲o̲n̲
̲t̲i̲m̲e̲
̲s̲h̲a̲l̲l̲
̲n̲o̲t̲
̲e̲x̲c̲e̲e̲d̲
̲3̲
̲m̲i̲n̲.
D 1.3.2
including operator actions but excluding time
used for eventual manual replacement of on-line
converter by the redundant off-line converter
and patching VDU connection to the converter in
question.
S̲R̲S̲ ̲3̲.̲4̲.̲5̲
20 a) Reconfiguration
shall
be
performed
by
manual D 1.3.2
replacement of one on-line converter with the
redundant off-line converter, or part hereof,
followed by the initialization procedure described
under 3.4.3.
3.3.2 T̲E̲S̲T̲ ̲G̲R̲O̲U̲P̲ ̲N̲O̲.̲ ̲2̲
The purpose of this Test Group is to provide an examination
and a demonstration of the Maintenance
Mode capabilities. The fulfilment of the following
requirements is investigated.
Req. VERIF.
N̲o̲ ̲ ̲ ̲ ̲R̲E̲Q̲U̲I̲R̲E̲M̲E̲N̲T̲ ̲T̲E̲S̲T̲G̲R̲O̲U̲P̲ ̲N̲O̲.̲ ̲2̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲M̲E̲T̲H̲O̲D̲ ̲ ̲G̲.̲F̲.̲C̲.̲
S̲R̲S̲ ̲2̲.̲4̲
1 G̲u̲i̲d̲a̲n̲c̲e̲ ̲o̲f̲ ̲m̲a̲i̲n̲t̲e̲n̲a̲n̲c̲e̲ ̲a̲c̲t̲i̲v̲i̲t̲y̲ ̲i̲n̲ ̲m̲a̲i̲n̲t̲e̲n̲a̲n̲c̲e̲ D 2.1.1
m̲o̲d̲e̲
S̲R̲S̲ ̲3̲.̲4̲.̲1̲.̲2̲
The maintenance VDU provides an interactive
machine interface in:
2 - O̲f̲f̲-̲l̲i̲n̲e̲ ̲m̲a̲i̲n̲t̲e̲n̲a̲n̲c̲e̲ ̲m̲o̲d̲e̲; interactive D 2.1.1
isolaton of the faulty converter module.
S̲R̲S̲ ̲3̲.̲4̲.̲2̲
3 b) Fault finding shall be performed through this
VDU. The Maintenance Engineer shall have
facilities through commands to start software D 2.1.1
p̲r̲o̲g̲r̲a̲m̲s̲ ̲t̲o̲ ̲t̲e̲s̲t̲ ̲t̲h̲e̲ ̲i̲n̲d̲i̲v̲i̲d̲u̲a̲l̲ ̲r̲e̲p̲l̲a̲c̲e̲a̲b̲l̲e̲
m̲o̲d̲u̲l̲e̲ and pinpoint faulty modules.
S̲R̲S̲ ̲3̲.̲4̲.̲3̲
a) System initialization shall be performed as
follows:
4 - Power-on and c̲h̲e̲c̲k̲s̲u̲m̲m̲i̲n̲g̲ ̲o̲f̲ the program in D 2.1.1
E̲P̲R̲O̲M̲.
Req. VERIF.
N̲o̲ ̲ ̲ ̲ ̲R̲E̲Q̲U̲I̲R̲E̲M̲E̲N̲T̲ ̲T̲E̲S̲T̲G̲R̲O̲U̲P̲ ̲N̲O̲.̲ ̲2̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲M̲E̲T̲H̲O̲D̲ ̲ ̲G̲.̲F̲.̲C̲.̲
S̲R̲S̲ ̲3̲.̲4̲.̲6̲
5 b) The operation staff shall have the facility to D 2.1.1
execute maintenance programs on the converter
equipment in o̲f̲f̲-̲l̲i̲n̲e̲ ̲m̲a̲i̲n̲t̲e̲n̲a̲n̲c̲e̲ ̲m̲o̲d̲e̲. The
Execution of the programs shall be initiated from
the maintenance VDU.
6 c) Maintenance and d̲i̲a̲g̲n̲o̲s̲t̲i̲c̲ ̲o̲n̲ ̲o̲n̲e̲ ̲c̲o̲n̲v̲e̲r̲t̲e̲r̲ ̲ B 2.1.1
s̲h̲a̲l̲l̲ ̲n̲o̲t̲ ̲e̲f̲f̲e̲c̲t̲ ̲t̲h̲e̲ ̲f̲u̲n̲c̲t̲i̲o̲n̲i̲n̲g̲ ̲o̲f̲ ̲t̲h̲e̲ ̲o̲t̲h̲e̲r̲
c̲o̲n̲v̲e̲r̲t̲e̲r̲(̲s̲)̲.
7 d) The m̲a̲i̲n̲t̲e̲n̲a̲n̲c̲e̲ ̲p̲r̲o̲g̲r̲a̲m̲s̲ shall aim to l̲o̲c̲a̲t̲e̲ D 2.1.1
f̲a̲u̲l̲t̲s̲ to the smallest replaceable sub-assembly
(CR80 module).
8 f) The converter shall i̲n̲c̲l̲u̲d̲e̲ ̲a̲ ̲c̲h̲e̲c̲k̲s̲u̲m̲ ̲f̲a̲c̲i̲l̲i̲t̲y̲ D 2.3.1
for validation of the program code at full
package level. The checksum shall be displayed
on the VDU and also compared with a prestored
value.
3.3.3 T̲E̲S̲T̲G̲R̲O̲U̲P̲ ̲N̲O̲.̲ ̲3̲
This Test Group shall demonstrate the Local Mode activities.
Req. VERIF.
N̲o̲ ̲ ̲ ̲ ̲R̲E̲Q̲U̲I̲R̲E̲M̲E̲N̲T̲ ̲T̲E̲S̲T̲G̲R̲O̲U̲P̲ ̲N̲O̲.̲ ̲3̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲M̲E̲T̲H̲O̲D̲ ̲ ̲G̲.̲F̲.̲C̲.̲
S̲R̲S̲ ̲2̲.̲3̲
1 T̲h̲e̲
̲c̲o̲n̲v̲e̲r̲t̲e̲r̲
̲w̲i̲l̲l̲
̲b̲e̲
̲d̲e̲s̲i̲g̲n̲e̲d̲
̲i̲n̲
̲s̲u̲c̲h̲
̲a̲
̲w̲a̲y̲
̲t̲h̲a̲t̲
̲
i̲t̲ ̲c̲a̲n̲ ̲b̲e̲ ̲u̲s̲e̲d̲ ̲f̲o̲r̲ ̲a̲l̲l̲ ̲s̲i̲g̲n̲a̲l̲ ̲l̲i̲n̲e̲s̲ ̲i̲r̲r̲e̲s̲p̲e̲c̲t̲i̲v̲e̲ ̲
o̲f̲ ̲t̲h̲e̲ ̲s̲p̲e̲c̲i̲f̲i̲c̲s̲ ̲o̲f̲ ̲t̲h̲e̲ ̲s̲y̲s̲t̲e̲m̲s̲ ̲i̲n̲t̲e̲r̲c̲o̲n̲n̲e̲c̲t̲e̲d̲.̲ ̲
(̲C̲A̲M̲P̲S̲ ̲o̲r̲ ̲S̲C̲A̲R̲S̲)̲.̲ D 3.1.1
S̲R̲S̲ ̲3̲.̲3̲.̲1̲
2 f)
The
l̲o̲g̲-̲o̲n̲
̲s̲e̲q̲u̲e̲n̲c̲e̲
to
be
exchanged
with
CCIS
shall be performed v̲i̲a̲ ̲t̲h̲e̲ ̲M̲a̲i̲n̲t̲e̲n̲a̲n̲c̲e̲ ̲V̲D̲U̲.̲ D 3.1.1
S̲R̲S̲ ̲3̲.̲3̲.̲3̲
3 The
l̲o̲g̲-̲o̲n̲
̲p̲r̲o̲c̲e̲d̲u̲r̲e̲
to
CCIS
shall
d̲i̲s̲t̲i̲n̲g̲u̲i̲s̲h̲ D 3.1.1
b̲e̲t̲w̲e̲e̲n̲ ̲"̲C̲A̲M̲P̲S̲"̲ ̲a̲n̲d̲ ̲"̲S̲C̲A̲R̲S̲"̲
S̲P̲S̲ ̲3̲.̲4̲.̲3̲.̲ ̲a̲)̲
4 -
Initiate
log-on
to
CCIS. D 3.1.1
5 -
Open
channel
to
CAMPS/SCARS. D 3.1.1
3.3.4 T̲E̲S̲T̲G̲R̲O̲U̲P̲ ̲N̲O̲.̲ ̲4̲
In the Operational Mode Test Group, the following requirements
applies.
Req. VERIF.
N̲o̲ ̲ ̲ ̲ ̲R̲E̲Q̲U̲I̲R̲E̲M̲E̲N̲T̲ ̲T̲E̲S̲T̲G̲R̲O̲U̲P̲ ̲N̲O̲.̲ ̲4̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲M̲E̲T̲H̲O̲D̲ ̲ ̲G̲.̲F̲.̲C̲.̲
S̲R̲S̲ ̲2̲.̲7̲
Messages
and
data
routed
on
CAMPS/SCARS
-
CCIS
medium speed connections are to be transmitted
and
handled
in
accordance
with
t̲h̲e̲
̲s̲p̲e̲c̲i̲f̲i̲c̲a̲t̲i̲o̲n̲s̲
1 f̲o̲r̲
̲t̲h̲e̲
̲C̲A̲M̲P̲S̲/̲S̲C̲A̲R̲S̲
̲-̲
̲P̲C̲
̲l̲i̲n̲k̲
̲a̲n̲d̲
̲w̲i̲t̲h̲
̲t̲h̲e̲
̲s̲p̲e̲c̲i̲-̲ A
2 f̲i̲c̲a̲t̲i̲o̲n̲s̲
̲f̲o̲r̲
̲t̲h̲e̲
̲P̲C̲
̲-̲
̲C̲C̲I̲S̲
̲l̲i̲n̲k̲.̲
A
S̲R̲S̲ ̲2̲.̲8̲
The converter shall contain the following control
facilities:
a) Be transparent for the data that passes through
3 the
converter,
i.e.
i̲t̲
̲s̲h̲a̲l̲l̲
̲n̲o̲t̲
̲m̲o̲d̲i̲f̲y̲
̲t̲h̲e̲
̲m̲e̲s̲s̲a̲g̲e̲ D 4.5.1
i̲n̲f̲o̲r̲m̲a̲t̲i̲o̲n̲ ̲c̲o̲n̲t̲e̲n̲t̲.̲ 4.5.2
4 b)
A̲f̲t̲e̲r̲
̲a̲n̲y̲
̲f̲a̲i̲l̲u̲r̲e̲
̲i̲t̲
̲s̲h̲a̲l̲l̲
̲n̲o̲t̲
by
means
of
ge-
nerated acknowledgement and other signals provoke
accidental loss of transfer, i.e. p̲r̲o̲v̲o̲k̲e̲ ̲t̲h̲e̲ ̲t̲w̲o̲ D 4.5.4
c̲o̲n̲n̲e̲c̲t̲e̲d̲ ̲s̲y̲s̲t̲e̲m̲s̲ ̲t̲o̲ ̲b̲e̲l̲i̲e̲v̲e̲ ̲t̲h̲a̲t̲ ̲d̲a̲t̲a̲ ̲h̲a̲v̲e̲ ̲b̲e̲e̲n̲
t̲r̲a̲n̲s̲f̲e̲r̲r̲e̲d̲ ̲c̲o̲r̲r̲e̲c̲t̲l̲y̲.̲
5 c)
N̲o̲t̲
̲p̲e̲r̲m̲i̲t̲
̲d̲e̲a̲d̲
̲l̲o̲c̲k̲,̲
i.e.
where
the
converter
is in a permanent blocked state waiting for a A
message which will never arrive.
6 d)
N̲o̲t̲
̲p̲e̲r̲m̲i̲t̲
̲c̲r̲i̲t̲i̲c̲a̲l̲
̲b̲l̲o̲c̲k̲i̲n̲g̲ A
S̲R̲S̲ ̲2̲.̲1̲1̲
7 The
c̲o̲n̲v̲e̲r̲t̲e̲r̲
̲s̲h̲a̲l̲l̲
̲b̲e̲
̲a̲b̲l̲e̲
̲t̲o̲
̲w̲o̲r̲k̲
̲w̲i̲t̲h̲o̲u̲t̲
̲t̲h̲e̲ A
m̲a̲i̲n̲t̲e̲n̲a̲n̲c̲e̲ ̲V̲D̲U̲:
Req. VERIF.
N̲o̲ ̲ ̲ ̲ ̲R̲E̲Q̲U̲I̲R̲E̲M̲E̲N̲T̲ ̲T̲E̲S̲T̲G̲R̲O̲U̲P̲ ̲N̲O̲.̲ ̲4̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲M̲E̲T̲H̲O̲D̲ ̲ ̲G̲.̲F̲.̲C̲.̲
S̲R̲S̲ ̲3̲.̲2̲.̲1̲
8 The
converter
shall
o̲p̲e̲r̲a̲t̲e̲
̲r̲e̲g̲a̲r̲d̲l̲e̲s̲s̲
̲o̲f̲
̲a̲n̲y̲
d̲i̲f̲f̲e̲r̲e̲n̲c̲e̲ ̲i̲n̲ ̲b̲a̲u̲d̲ ̲r̲a̲t̲e̲s̲ ̲s̲e̲t̲ ̲u̲p̲ ̲b̲e̲t̲w̲e̲e̲n̲ ̲t̲h̲e̲ D 4.5.3
c̲o̲n̲v̲e̲r̲t̲e̲r̲ ̲a̲n̲d̲ ̲i̲t̲s̲ ̲c̲o̲n̲n̲e̲c̲t̲e̲d̲ ̲s̲y̲s̲t̲e̲m̲s̲.̲
a) L̲i̲n̲k̲ ̲C̲A̲M̲P̲S̲/̲S̲C̲A̲R̲S̲ ̲t̲o̲ ̲c̲o̲n̲v̲e̲r̲t̲e̲r̲ ̲a̲t̲ ̲t̲h̲e̲ ̲c̲o̲n̲-̲
v̲e̲r̲t̲e̲r̲ ̲s̲i̲d̲e̲.̲
S̲R̲S̲ ̲3̲.̲2̲.̲2̲
9 a)
The
CAMPS/SCARS
-
converter
link
shall
operate
with synchronous transmission at rates of 2400, D 4.5.3
4800 and 9600 bps (selectable).
b) The CCIS to converter link shall operate with
synchronous transmission at rates of 2400, 4800, D 4.5.3
9600 bps (selectable).
10 H̲a̲l̲f̲
̲a̲n̲d̲
̲f̲u̲l̲l̲
̲d̲u̲p̲l̲e̲x̲
modes
of
operation
shall
be implemented in the CCIS - converter links at A
the electrical level. Half duplex mode shall
be implemented working to the Remote Compu-
ter protocol in CCIS.
S̲R̲S̲ ̲3̲.̲3̲.̲1̲
a) Transactions exchanged between systems to
be passed through the converter equipment A
11 shall
be
in
E̲1̲
̲f̲o̲r̲m̲a̲t̲
̲a̲s̲
̲s̲p̲e̲c̲i̲f̲i̲e̲d̲
̲i̲n̲
̲t̲h̲e̲
S̲S̲.̲ These transactions will be embedded with-
in the level 3 and 2 protocols as defined
in SS document for the CAMPS/SCARS - con-
verter link and, within the DINDAC and RCI
protocols for the converter - CCIS link.
b) The converter shall p̲a̲s̲s̲ ̲o̲n̲ ̲t̲h̲e̲ ̲f̲u̲l̲l̲ ̲E̲1̲
f̲o̲r̲m̲a̲t̲ ̲(̲h̲e̲a̲d̲e̲r̲ ̲a̲n̲d̲ ̲t̲e̲x̲t̲)̲ ̲u̲n̲m̲o̲d̲i̲f̲i̲e̲d̲,̲ i.e. the
12 converter
is
fully
transparent
with
respect D 4.5.1
to the transaction. There shall be a cha-
racter by character correspondance between 4.5.2
the user text received and the user text
transmitted by the converter. The user text
is the portion of the data field of frames
which is useful for the user.
Req. VERIF.
N̲o̲ ̲ ̲ ̲ ̲R̲E̲Q̲U̲I̲R̲E̲M̲E̲N̲T̲ ̲T̲E̲S̲T̲G̲R̲O̲U̲P̲ ̲N̲O̲.̲ ̲4̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲M̲E̲T̲H̲O̲D̲ ̲ ̲G̲.̲F̲.̲C̲.̲
S̲R̲S̲ ̲3̲.̲3̲.̲1̲
c) All transaction types that pass through the
converter are defined in the SCARS/CAMPS/CCIS
Intersystem Specification, i.e.:
- Messages in E1 format (̲n̲a̲r̲r̲a̲t̲i̲v̲e̲,̲ ̲D̲A̲T̲A̲ ̲a̲n̲d̲
D̲U̲P̲)
- V̲D̲U̲ ̲D̲i̲s̲p̲l̲a̲y̲s̲ ̲i̲n̲ ̲E̲1̲ ̲f̲o̲r̲m̲a̲t̲
13 - T̲e̲r̲m̲i̲n̲a̲l̲-̲t̲o̲-̲t̲e̲r̲m̲i̲n̲a̲l̲
̲c̲o̲m̲m̲e̲n̲t̲s̲
̲i̲n̲
̲E̲1̲
̲f̲o̲r̲m̲a̲t̲ D 4.5.1
- A̲C̲P̲ ̲1̲2̲7̲ ̲t̲y̲p̲e̲ ̲s̲e̲r̲v̲i̲c̲e̲ ̲m̲e̲s̲s̲a̲g̲e̲s̲ ̲i̲n̲ ̲E̲1̲ ̲f̲o̲r̲m̲a̲t̲ 4.5.2
- T̲r̲a̲n̲s̲a̲c̲t̲i̲o̲n̲ ̲a̲c̲k̲n̲o̲w̲l̲e̲d̲g̲e̲m̲e̲n̲t̲s̲
- F̲i̲n̲a̲l̲ ̲n̲u̲m̲b̲e̲r̲ ̲s̲e̲r̲i̲e̲s̲ ̲i̲n̲ ̲E̲1̲ ̲f̲o̲r̲m̲a̲t̲
- C̲h̲a̲n̲n̲e̲l̲ ̲c̲h̲e̲c̲k̲ ̲m̲e̲s̲s̲a̲g̲e̲s̲ ̲i̲n̲ ̲E̲1̲ ̲f̲o̲r̲m̲a̲t̲
The same DINDAC segment header f̲i̲e̲l̲d̲ ̲H̲D̲R̲T̲Y̲P̲
14 shall contain the same message types as defined A
in the SCARS/CAMPS/CCIS Intersystem Specification
section 6.1.2.5.
15 d) Transactions required for the lower level
protocols between the converter and its con- A
nected system shall be i̲n̲ ̲a̲c̲c̲o̲r̲d̲a̲n̲c̲e̲ ̲w̲i̲t̲h̲ ̲t̲h̲e̲
r̲e̲s̲p̲e̲c̲t̲i̲v̲e̲ interface p̲r̲o̲t̲o̲c̲o̲l̲s̲.̲
16 g) L̲o̲g̲-̲o̲f̲f̲ ̲m̲e̲s̲s̲a̲g̲e̲ ̲t̲o̲ ̲b̲e̲ ̲t̲r̲a̲n̲s̲m̲i̲t̲t̲e̲d̲ ̲t̲o̲ ̲C̲C̲I̲S̲
shall be embedded in the converter and may be D 4.5.4
e̲n̲v̲o̲k̲e̲d̲ from the maintenance VDU.
S̲R̲S̲ ̲3̲.̲3̲.̲2̲
b)D̲a̲t̲a̲ ̲a̲n̲d̲ ̲n̲a̲r̲r̲a̲t̲i̲v̲e̲ ̲m̲e̲s̲s̲a̲g̲e̲ will be l̲i̲m̲i̲t̲e̲d̲
t̲o̲ ̲1̲2̲0̲0̲0̲ ̲c̲h̲a̲r̲a̲c̲t̲e̲r̲s̲.̲ Display and terminal-to-
17 terminal comment transactions will be limited D 4.5.4
to one user page of 20 lines of 80 characters.
The protocol converter shall check transaction
length, trap transactions in excess of that
length, treat too long transactions to be in
error and reput errors by means of:
1. b̲u̲s̲t̲ ̲m̲e̲s̲s̲a̲g̲e̲ ̲t̲o̲ ̲C̲C̲I̲S̲
2. using CAMPS/SCARS standard "̲t̲o̲o̲ ̲l̲o̲n̲g̲
18
m̲e̲s̲s̲a̲g̲e̲
̲p̲r̲o̲c̲e̲d̲u̲r̲e̲s̲"̲ D 4.5.4
Req. VERIF.
N̲o̲ ̲ ̲ ̲ ̲R̲E̲Q̲U̲I̲R̲E̲M̲E̲N̲T̲ ̲T̲E̲S̲T̲G̲R̲O̲U̲P̲ ̲N̲O̲.̲ ̲4̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲M̲E̲T̲H̲O̲D̲ ̲ ̲G̲.̲F̲.̲C̲.̲
c) All transactions between the two intercon-
nected systems are a̲c̲k̲n̲o̲w̲l̲e̲d̲g̲e̲d̲ ̲e̲n̲d̲-̲t̲o̲-̲e̲n̲d̲.̲ ̲This
end-to-end acknowledgement is passed unmodified
through the converter. As a consequence the con-
19 verter shall not take responsibility for message A
continuity. Transactions shall be handled in
the converter o̲n̲ ̲a̲ ̲f̲i̲r̲s̲t̲-̲i̲n̲-̲f̲i̲r̲s̲t̲-̲o̲u̲t̲ ̲b̲y̲ ̲p̲r̲e̲-̲
c̲e̲d̲e̲n̲c̲e̲ ̲basis.
d) After transmission of the last frame/segment
20 of a message, the protocol converter shall c̲l̲e̲a̲r̲ A
t̲h̲e̲ ̲b̲u̲f̲f̲e̲r̲ ̲a̲r̲e̲a̲ used for storing the trans-
actions.
S̲R̲S̲ ̲3̲.̲3̲.̲4̲
F̲o̲r̲m̲a̲t̲ ̲C̲o̲n̲t̲r̲o̲l̲
The converter shall check the consistency of the
following headerfields.
21 a) A̲l̲l̲ ̲X̲2̲5̲ ̲l̲e̲v̲e̲l̲ ̲2̲ ̲f̲i̲e̲l̲d̲s̲ A
22 b) The C̲A̲M̲P̲S̲/̲S̲C̲A̲R̲S̲ ̲l̲e̲v̲e̲l̲ ̲3̲ ̲f̲i̲e̲l̲d̲s̲ as follows. A
- I Field Length
- Block Sequence Number
- Block Type
- Message Type
23 c) The CCIS DINDAC Header fields as follows:
A
- HDR CDN field (Channel Designator)
- HDR CSN field (Channel Sequence Number)
- HDR SEG field (Segment Number)
- HDR EOT field (End of Transmission)
- HDR PRC field (Transaction Precedence)
- HDR CLS field (Transaction Classification)
- HDR TYP field (Transaction Type)
- HDR KEY field (Program Keyword)
- HDR SUB field (Transaction Subject Code)
- HDR PRN field (Precedence of Next Transaction)
- HDR PSN field (Processing Sequence Number)
- HDR SIZ field (Length of Segment)
Req. VERIF.
N̲o̲ ̲ ̲ ̲ ̲R̲E̲Q̲U̲I̲R̲E̲M̲E̲N̲T̲ ̲T̲E̲S̲T̲G̲R̲O̲U̲P̲ ̲N̲O̲.̲ ̲4̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲M̲E̲T̲H̲O̲D̲ ̲ ̲G̲.̲F̲.̲C̲.̲
S̲R̲S̲ ̲3̲.̲3̲.̲5̲
P̲r̲e̲c̲e̲d̲e̲n̲c̲e̲ ̲a̲n̲d̲ ̲P̲r̲e̲e̲m̲p̲t̲i̲o̲n̲
24 a) The converter shall n̲o̲t̲ ̲p̲r̲e̲e̲m̲p̲t̲ ̲t̲r̲a̲n̲s̲a̲c̲t̲i̲o̲n̲s̲.̲ A
25 b)
T̲r̲a̲n̲s̲a̲c̲t̲i̲o̲n̲s̲
̲p̲r̲e̲e̲m̲p̲t̲e̲d̲
̲
by
either
CAMPS,
SCARS or CCIS s̲h̲a̲l̲l̲ ̲b̲e̲ ̲p̲a̲s̲s̲e̲d̲ ̲u̲n̲m̲o̲d̲i̲f̲i̲e̲d̲
through the converter, i.e. the converter is
not required to recognize that a message is A
preempted.
26 c) The converter shall a̲d̲j̲u̲s̲t̲ ̲f̲o̲r̲ ̲d̲i̲f̲f̲e̲r̲e̲n̲c̲e̲s̲
between the precedence parameter in the DINDAC A
segment header and the CAMPS/SCARS level 3
header.
S̲R̲S̲ ̲3̲.̲3̲.̲6
P̲e̲r̲f̲o̲r̲m̲a̲n̲c̲e̲ ̲S̲e̲c̲t̲i̲o̲n̲ ̲(̲P̲r̲o̲t̲o̲c̲o̲l̲ ̲C̲o̲n̲v̲e̲r̲t̲e̲r̲)̲
a)T̲h̲r̲o̲u̲g̲h̲p̲u̲t̲
27 Each converter shall be able to support c̲o̲n̲t̲i̲n̲o̲u̲s̲
u̲n̲i̲d̲i̲r̲e̲c̲t̲i̲o̲n̲a̲l̲ ̲d̲a̲t̲a̲ ̲t̲r̲a̲n̲s̲f̲e̲r̲ ̲between the connec- D 4.5.1
ted systems at up to the f̲u̲l̲l̲ ̲l̲i̲n̲e̲ ̲s̲p̲e̲e̲d̲
(̲9̲6̲0̲0̲ ̲b̲a̲u̲d̲)̲.̲
The protocol converter shall be capable of mee-
ting this requirement concurrently providing
28 full d̲u̲p̲l̲e̲x̲ ̲o̲p̲e̲r̲a̲t̲i̲o̲n̲ ̲b̲e̲t̲w̲e̲e̲n̲ ̲t̲h̲e̲ ̲p̲r̲o̲t̲o̲c̲o̲l̲ ̲c̲o̲n̲-̲ A
v̲e̲r̲t̲e̲r̲ ̲a̲n̲d̲ ̲C̲A̲M̲P̲S̲ ̲o̲r̲ ̲S̲C̲A̲R̲S̲ ̲a̲n̲d̲ ̲h̲a̲l̲f̲ ̲o̲r̲ ̲f̲u̲l̲l̲
d̲u̲p̲l̲e̲x̲ ̲o̲p̲e̲r̲a̲t̲i̲o̲n̲ ̲(̲i̲f̲ ̲i̲m̲p̲l̲e̲m̲e̲n̲t̲e̲d̲)̲ ̲t̲o̲ ̲C̲C̲I̲S̲.̲
29 b)T̲h̲e̲ ̲d̲e̲l̲a̲y̲ ̲i̲n̲t̲r̲o̲d̲u̲c̲e̲d̲ ̲b̲y̲ ̲t̲h̲e̲ ̲p̲r̲o̲c̲e̲s̲s̲i̲n̲g̲ ̲o̲f̲
t̲h̲e̲ ̲c̲o̲n̲v̲e̲r̲t̲e̲r̲ ̲s̲h̲a̲l̲l̲ ̲b̲e̲,̲ ̲i̲n̲ ̲n̲o̲r̲m̲a̲l̲ ̲c̲o̲n̲d̲i̲t̲i̲o̲n̲s̲,̲
l̲e̲s̲s̲ ̲t̲h̲a̲n̲ ̲o̲n̲e̲ ̲s̲e̲c̲o̲n̲d̲ ̲i̲n̲ ̲b̲o̲t̲h̲ ̲d̲i̲r̲e̲c̲t̲i̲o̲n̲s̲.̲ D 4.6.1
It will be measured as the time elapsed be-
tween the last information frame received
by the converter and the last information
frame transmitted by the converter and from
which is deducted the transmission transfer
time, the link turn around time and the time
that the frames are buffered up in the proto-
col converter due to unavailability of the
halfduplex PC-CCIS link.
Req. VERIF.
N̲o̲ ̲ ̲ ̲ ̲R̲E̲Q̲U̲I̲R̲E̲M̲E̲N̲T̲ ̲T̲E̲S̲T̲G̲R̲O̲U̲P̲ ̲N̲O̲.̲ ̲4̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲M̲E̲T̲H̲O̲D̲ ̲ ̲G̲.̲F̲.̲C̲.̲
S̲R̲S̲ ̲3̲.̲3̲.̲8̲
T̲r̲a̲f̲f̲i̲c̲ ̲C̲o̲n̲t̲r̲o̲l̲
30 a)If the converter d̲e̲t̲e̲c̲t̲s̲ ̲a̲n̲ ̲u̲n̲r̲e̲c̲o̲v̲e̲r̲a̲b̲l̲e̲
protocol/transaction f̲a̲u̲l̲t̲ then it shall close D 4.5.4
down the links using p̲r̲o̲t̲o̲c̲o̲l̲ ̲f̲u̲n̲c̲t̲i̲o̲n̲s̲ ̲t̲o̲
b̲e̲ ̲a̲g̲r̲e̲e̲d̲ ̲d̲u̲r̲i̲n̲g̲ ̲t̲h̲e̲ ̲d̲e̲s̲i̲g̲n̲ ̲p̲h̲a̲s̲e̲.̲
31 b)The converter shall make a c̲o̲u̲n̲t̲ ̲o̲f̲ ̲a̲l̲l̲ ̲r̲e̲-̲
t̲r̲a̲n̲s̲m̲i̲s̲s̲i̲o̲n̲ requests at level 2 of the CAMPS/
SCARS side at RCI and DINDAC at the CCIS D 4.1.1
side. The accumulated values shall be avail-
able for display and subsequent reset at the
maintenance VDU.
S̲R̲S̲ ̲3̲.̲4̲.̲2̲ ̲A̲s̲s̲i̲s̲t̲a̲n̲c̲e̲ ̲f̲a̲c̲i̲l̲i̲t̲i̲e̲s̲ ̲a̲n̲d̲ ̲f̲u̲n̲c̲t̲i̲o̲n̲s̲
32 a) A
maintenance
VDU
shall
be
available
at
each
D 4.5.4
site for connection to a converter through
manual patching.
S̲R̲S̲ ̲3̲.̲4̲.̲4̲
Recovery after two types of failure is defined:
33 a)R̲e̲c̲o̲v̲e̲r̲y̲ ̲a̲f̲t̲e̲r̲ ̲p̲r̲o̲t̲o̲c̲o̲l̲ ̲f̲a̲i̲l̲u̲r̲e̲s̲ where the
the recovery procedure is defined as part of A
the protocol specification, e.g. transmission
errors.
34 b)R̲e̲c̲o̲v̲e̲r̲y̲ ̲a̲f̲t̲e̲r̲ ̲a̲l̲l̲ ̲o̲t̲h̲e̲r̲ ̲e̲r̲r̲o̲r̲s̲,̲ e.g. link
failure and dropouts, CAMPS, SCARS or CCIS A
failure, power failure, converter failure.
35 In case a) the recovery shall take place in
accordance with the protocol specification D 4.1.1
and m̲o̲d̲i̲f̲y̲ ̲P̲C̲ ̲e̲r̲r̲o̲r̲ counters.
In case b) the converter shall stop all exe-
36 cution and wait for m̲a̲n̲u̲a̲l̲ ̲f̲a̲u̲l̲t̲ ̲f̲i̲n̲d̲i̲n̲g̲ D 4.5.4
and initialization of its operation. If
f̲e̲a̲s̲i̲b̲l̲e̲,̲ the PC shall g̲e̲n̲e̲r̲a̲t̲e̲ ̲a̲ ̲l̲o̲g̲-̲o̲n̲
p̲r̲o̲c̲e̲d̲u̲r̲e̲ ̲t̲o̲ ̲C̲C̲I̲S̲.̲
Req. VERIF.
N̲o̲ ̲ ̲ ̲ ̲R̲E̲Q̲U̲I̲R̲E̲M̲E̲N̲T̲ ̲T̲E̲S̲T̲G̲R̲O̲U̲P̲ ̲N̲O̲.̲ ̲4̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲M̲E̲T̲H̲O̲D̲ ̲ ̲G̲.̲F̲.̲C̲.̲
S̲R̲S̲ ̲3̲.̲4̲.̲5̲
37 b)C̲l̲o̲s̲e̲-̲d̲o̲w̲n̲ ̲o̲f̲ ̲a̲ ̲c̲o̲n̲v̲e̲r̲t̲e̲r̲ ̲s̲h̲a̲l̲l̲ ̲b̲e̲ ̲i̲n̲i̲t̲i̲a̲-̲
t̲e̲d̲ ̲b̲y̲ ̲t̲h̲e̲ ̲s̲u̲p̲e̲r̲v̲i̲s̲o̲r̲y̲ ̲p̲e̲r̲s̲o̲n̲n̲e̲l̲ ̲o̲n̲ ̲e̲a̲c̲h̲ ̲o̲f̲
t̲h̲e̲ ̲i̲n̲t̲e̲r̲c̲o̲n̲n̲e̲c̲t̲e̲d̲ ̲s̲y̲s̲t̲e̲m̲s̲,̲ or by a log-off D 4.3.1
command on the PC maintenance VDU.
S̲R̲S̲ ̲3̲.̲4̲.̲7̲.̲2̲ ̲F̲u̲n̲c̲t̲i̲o̲n̲a̲l̲ ̲r̲e̲q̲u̲i̲r̲e̲m̲e̲n̲t̲s̲
38 a) The converter equipment shall support the
requirements stated in the FD document (reference D 4.6.2
1) for the CAMPS/SCARS - CCIS interconnestions.
S̲R̲S̲ ̲3̲.̲4̲.̲7̲.̲4̲
F̲a̲l̲l̲b̲a̲c̲k̲ ̲P̲r̲o̲c̲e̲d̲u̲r̲e̲s̲
The converter is not required to provide a
39 fallback capability for the computer systems. D 4.5.4
When a l̲i̲n̲k̲ with it is b̲r̲o̲k̲e̲n̲, the c̲o̲n̲v̲e̲r̲t̲e̲r̲
w̲i̲l̲l̲ ̲r̲e̲f̲l̲e̲c̲t̲ ̲t̲h̲a̲t̲ ̲s̲t̲a̲t̲e̲ to the other end of
the link through use of the proper protocol
features.
S̲R̲S̲ ̲3̲.̲4̲.̲7̲.̲5̲
I̲n̲f̲o̲r̲m̲a̲t̲i̲o̲n̲ ̲E̲x̲c̲h̲a̲n̲g̲e̲ ̲P̲r̲o̲t̲o̲c̲o̲l̲ ̲a̲n̲d̲ ̲P̲r̲o̲c̲e̲d̲u̲r̲e̲s̲
40 a) The converter shall m̲a̲t̲c̲h̲ ̲t̲h̲e̲ ̲d̲i̲f̲f̲e̲r̲e̲n̲t̲ ̲d̲a̲t̲a̲ 4.5.1
e̲x̲c̲h̲a̲n̲g̲e̲ ̲p̲r̲o̲t̲o̲c̲o̲l̲s̲ implemented in the CAMPS, D 4.5.2
SCARS and CCIS systems.
41 b) The
link
between
CAMPS/SCARS
and
the
con- 4.5.1
verter shall o̲p̲e̲r̲a̲t̲e̲ ̲i̲n̲ ̲a̲c̲c̲o̲r̲d̲a̲n̲c̲e̲ ̲w̲i̲t̲h̲ ̲t̲h̲e̲ D 4.5.2
SCARS/CAMPS/CCIS Intersystem Specification.
42 c) The
converter
-
CCIS
link
s̲h̲a̲l̲l̲
̲o̲p̲e̲r̲a̲t̲e̲ 4.5.1
w̲i̲t̲h̲ ̲C̲C̲I̲S̲,̲ ̲R̲C̲I̲ ̲a̲n̲d̲ ̲D̲I̲N̲D̲A̲C̲ ̲p̲r̲o̲t̲o̲c̲o̲l̲s̲.̲ D 4.5.2
43 d) The
converter
shall
act
as
a
"t̲r̲a̲n̲s̲p̲a̲-̲ D 4.5.1
r̲e̲n̲t̲ ̲b̲o̲x̲"̲ ̲w̲h̲e̲n̲ ̲t̲h̲e̲r̲e̲ ̲a̲r̲e̲ ̲n̲o̲ ̲p̲r̲o̲t̲o̲c̲o̲l̲/̲t̲r̲a̲n̲s̲-̲ 4.5.2
a̲c̲t̲i̲o̲n̲ ̲e̲r̲r̲o̲r̲s̲.̲
Req. VERIF.
N̲o̲ ̲ ̲ ̲ ̲R̲E̲Q̲U̲I̲R̲E̲M̲E̲N̲T̲ ̲T̲E̲S̲T̲G̲R̲O̲U̲P̲ ̲N̲O̲.̲ ̲4̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲M̲E̲T̲H̲O̲D̲ ̲ ̲G̲.̲F̲.̲C̲.̲
44 e) When
protocol/transaction
errors
occur
the converter will detect the errors and
r̲e̲a̲c̲t̲ ̲t̲h̲r̲o̲u̲g̲h̲ ̲t̲h̲e̲ ̲d̲e̲f̲i̲n̲e̲d̲ ̲p̲r̲o̲t̲o̲c̲o̲l̲ ̲c̲a̲p̲a̲-̲ D 4.5.4
b̲i̲l̲i̲t̲i̲e̲s̲.̲
f) The r̲e̲c̲o̲v̲e̲r̲a̲b̲l̲e̲ ̲p̲r̲o̲t̲o̲c̲o̲l̲/̲transaction
errors are:
- i̲n̲c̲o̲n̲s̲i̲s̲t̲e̲n̲c̲y̲ in the level 2 or 3 header
of the CAMPS/SCARS protocol.
- i̲n̲c̲o̲n̲s̲i̲s̲t̲e̲n̲c̲y̲ in the RCI protocol or
DINDAC segment header for the CCIS
protocol.
45 g) Unrecoverable
protocol/transaction
errors
can
by definition not be corrected in the conver-
ter. These errors shall be t̲r̲a̲p̲p̲e̲d̲ in the con- D 4.5.4
verter and the two interconnected systems
notified through the d̲e̲f̲i̲n̲e̲d̲ ̲p̲r̲o̲t̲o̲c̲o̲l̲ ̲f̲a̲c̲i̲-̲
l̲i̲t̲i̲e̲s̲.̲
S̲R̲S̲ ̲3̲.̲4̲.̲7̲.̲6̲
46 S̲e̲r̲v̲i̲c̲e̲ ̲m̲e̲s̲s̲a̲g̲e̲s̲ ̲b̲e̲t̲w̲e̲e̲n̲ ̲t̲h̲e̲ ̲i̲n̲t̲e̲r̲c̲o̲n̲n̲e̲c̲t̲e̲d̲
s̲y̲s̲t̲e̲m̲s̲ ̲w̲i̲l̲l̲ ̲b̲e̲ ̲p̲a̲s̲s̲e̲d̲ ̲t̲h̲r̲o̲u̲g̲h̲ ̲t̲h̲e̲ ̲c̲o̲n̲v̲e̲r̲t̲e̲r̲ 4.5.1
t̲r̲a̲n̲s̲p̲a̲r̲e̲n̲t̲l̲y̲ ̲l̲i̲k̲e̲ ̲m̲e̲s̲s̲a̲g̲e̲s̲.̲ No special actions D 4.5.2
shall be taken by the converter (for definition
of these service messages, refer to SCARS/CAMPS/
CCIS Intersystem Specification.
S̲R̲S̲ ̲3̲.̲4̲.̲7̲.̲7̲.̲
47 S̲e̲r̲v̲i̲c̲e̲ ̲m̲e̲s̲s̲a̲g̲e̲s̲ ̲b̲e̲t̲w̲e̲e̲n̲ a system and the con-
verter shall be exchanged in accordance with
the respective e̲x̲c̲h̲a̲n̲g̲e̲ ̲p̲r̲o̲t̲o̲c̲o̲l̲s̲ ̲a̲n̲d̲ ̲p̲r̲o̲c̲e̲-̲
d̲u̲r̲e̲s̲ on the two links of the converter A
3.3.5 T̲E̲S̲T̲G̲R̲O̲U̲P̲ ̲N̲O̲.̲ ̲5̲
The Test Group for Test Mode shall fulfil the following
requirements.
Req. VERIF.
N̲o̲ ̲ ̲ ̲ ̲R̲E̲Q̲U̲I̲R̲E̲M̲E̲N̲T̲ ̲T̲E̲S̲T̲G̲R̲O̲U̲P̲ ̲N̲O̲:̲ ̲5̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲M̲E̲T̲H̲O̲D̲ ̲ ̲G̲.̲F̲.̲C̲.̲
S̲R̲S̲ ̲2̲.̲4̲
1 C̲r̲e̲a̲t̲i̲o̲n̲
̲o̲f̲
̲a̲
̲p̲r̲e̲s̲t̲o̲r̲e̲d̲
̲s̲e̲t̲
̲o̲f̲
̲t̲e̲s̲t̲m̲e̲s̲s̲a̲g̲e̲s̲
̲t̲o̲
̲b̲e̲
t̲r̲a̲n̲s̲m̲i̲t̲t̲e̲d̲ ̲t̲o̲ ̲C̲A̲M̲P̲S̲/̲S̲C̲A̲R̲S̲ ̲A̲N̲D̲ ̲C̲C̲I̲S̲.̲ D 5.1.1
2 R̲e̲c̲e̲p̲t̲i̲o̲n̲
̲o̲f̲
̲t̲e̲s̲t̲m̲e̲s̲s̲a̲g̲e̲s̲
̲a̲n̲d̲
̲c̲o̲m̲p̲a̲r̲i̲s̲o̲n̲
̲w̲i̲t̲h̲
̲t̲h̲e̲
a̲b̲o̲v̲e̲ ̲m̲e̲n̲t̲i̲o̲n̲e̲d̲ ̲s̲e̲t̲ ̲o̲f̲ ̲t̲e̲s̲t̲m̲e̲s̲s̲a̲g̲e̲s̲.̲ D 5.1.1
S̲R̲S̲ ̲3̲.̲3̲.̲1̲
3 e)
For
use
during
test
mode,
t̲e̲s̲t̲
̲m̲e̲s̲s̲a̲g̲e̲s̲
̲s̲h̲a̲l̲l̲
b̲e̲ ̲e̲m̲b̲e̲d̲d̲e̲d̲ ̲i̲n̲ ̲t̲h̲e̲ ̲c̲o̲n̲v̲e̲r̲t̲e̲r̲ for transmission to D 5.1.1
either of the interconnected systems and for
reception and check.
S̲R̲S̲ ̲3̲.̲4̲.̲1̲.̲2̲
4 -
d̲i̲s̲p̲l̲a̲y̲
̲o̲f̲
̲a̲c̲c̲u̲m̲u̲l̲a̲t̲e̲d̲
̲c̲o̲u̲n̲t̲e̲r̲s̲
̲o̲n̲
̲a̲n̲
̲e̲r̲r̲o̲r̲
category basis and log-on/log-off. D 5.2.1
- g̲e̲n̲e̲r̲a̲t̲i̲o̲n̲ ̲a̲n̲d̲ ̲t̲r̲a̲n̲s̲m̲i̲s̲s̲i̲o̲n̲ ̲o̲f̲ ̲t̲e̲s̲t̲ ̲m̲e̲s̲s̲a̲g̲e̲s̲, D 5.1.1
5
reception
and
validation
of
test
messages
and display of test results.
S̲R̲S̲ ̲3̲.̲4̲.̲6̲
6 The
converter
shall
include
t̲e̲s̲t̲
̲m̲e̲s̲s̲a̲g̲e̲s̲
for
test of the links to CAMPS/SCARS and CCIS D 5.1.1
i̲n̲ ̲o̲n̲-̲l̲i̲n̲e̲ ̲t̲e̲s̲t̲ ̲m̲o̲d̲e̲.̲
3.4 F̲U̲N̲C̲T̲I̲O̲N̲/̲T̲E̲S̲T̲ ̲R̲E̲L̲A̲T̲I̲O̲N̲S̲H̲I̲P̲
This section shows the Function/Test Matrix which contains
the relations between the System Requirements, the
Test Groups and the Verification Methods. See Figure
3.4-1.
F̲U̲N̲C̲T̲I̲O̲N̲/̲T̲E̲S̲T̲ ̲M̲A̲T̲R̲I̲X̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
FUNCTION/VERIFICATION METHOD T̲E̲S̲T̲
̲G̲R̲O̲U̲P̲ ̲N̲O̲.̲
1 2
3 4 5
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
2. Technical Overview
2.1 System Overview, Location, Purpose
2.2 Connectivity and Mode of Operation D
2.3 Circuit Usage Flexibility C D
2.4 Facilities and Functions C D D
2.5 Installation
2.6 Equipment Configuration
2.7 Message and Data Handling
2.8 Control C D
2.9 Security
2.10 Software
2.10.1 Software
Design
2.10.2 System Software
2.10.3 Application
Software
2.11 Supervisor and Control Function C
2.12 Implementation and Testing
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
F̲I̲G̲U̲R̲E̲ ̲3̲.̲4̲-̲1̲ (Sheet 1 of 4)
F̲U̲N̲C̲T̲I̲O̲N̲/̲T̲E̲S̲T̲ ̲M̲A̲T̲R̲I̲X̲ (continued)
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
FUNCTION/VERIFICATION METHOD T̲E̲S̲T̲
̲G̲R̲O̲U̲P̲ ̲N̲O̲.̲
1 2
3 4 5
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
3. Technical Requirements
3.1 Equipment to be Provided
3.1.1 General B
3.1.2 Integration of SHAPE Supplied Equipment B
3.1.3 Performance and Interface Characteris-
tics of SHAPE Supplied Equipment
3.1.4 Quantities of Equipment to be Supplied
by SHAPE
3.1.5 Interchange Circuits -
Electrical Characteristics
3.1.6 Equipment to be Provided by CR
3.2 Communication Links between Systems
3.2.1 Mode of Operation C D
3.2.2 Baud Rates D
3.3 Transaction Interchange Requirements
3.3.1 Messages, Types and Formats D D
D
3.3.2 Transaction Characteristics D
3.3.3 Format Definition Parameters D
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
F̲I̲G̲U̲R̲E̲ ̲3̲.̲4̲-̲1̲ (Sheet 2 of 4)
F̲U̲N̲C̲T̲I̲O̲N̲/̲T̲E̲S̲T̲ ̲M̲A̲T̲R̲I̲X̲ (continued)
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
FUNCTION/VERIFICATION METHOD T̲E̲S̲T̲
̲G̲R̲O̲U̲P̲ ̲N̲O̲.̲
1 2
3 4 5
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
3.3.4 Format Control
3.3.5 Precedence and Preemption
3.3.6 Converter Performance Requirements D
3.3.7 Alphabet
3.3.8 Traffic Control D
3.4 Converter Requirements
3.4.1 Converter Characteristics
3.4.1.1 Configuration
3.4.1.2 Interactive
Operation D D D
3.4.2 Assistance Facilities and Functions D
3.4.3 System Initialization CD D D
3.4.4 Recovery D
3.4.5 Reconfiguration D D
3.4.6 Maintenance Requirements BD D
3.4.7 Interface Characteristics
3.4.7.1 General
3.4.7.2 Functional
Requirements D
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
F̲I̲G̲U̲R̲E̲ ̲3̲.̲4̲-̲1̲ (Sheet 3 of 4)
F̲U̲N̲C̲T̲I̲O̲N̲/̲T̲E̲S̲T̲ ̲M̲A̲T̲R̲I̲X̲ (continued)
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
FUNCTION/VERIFICATION METHOD T̲E̲S̲T̲
̲G̲R̲O̲U̲P̲ ̲N̲O̲.̲
1 2
3 4 5
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
3.4.7.3 Interface
Security
Configuration
3.4.7.4 Fallback
Procedures D
3.4.7.5 Information
Exchange
Protocol
and Procedures D
3.4.7.6 Service
Messages
between
CAMPS/SCARS D
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
F̲I̲G̲U̲R̲E̲ ̲3̲.̲4̲-̲1̲ (Sheet 4 of 4)