⟦978fbe17e⟧ Wang Wps File

    Length: 5460 (0x1554)
    Types: Wang Wps File
    Notes: WBS, Tilbud, Index        
    Names: »0465A «

Derivation

└─⟦4bcf3d88d⟧ Bits:30005999 8" Wang WCS floppy, CR 0048A
    └─ ⟦this⟧ »0465A « 

WangText















                   A̲ ̲T̲e̲c̲h̲n̲i̲c̲a̲l̲ ̲P̲r̲o̲p̲o̲s̲a̲l̲



   1.  SCOPE

   2.  EXECUTIVE SUMMARY

   3.  SECURITY FILTER STUDY
     3.1 STUDY OBJECTIVE
     3.2 STATEMENT OF PROBLEM
     3.3 STUDY APPROACH
       3.3.1 Instalment of Requirements
       3.3.2 Technology, Methodology and Preliminary trade
       off
               Studies
               - Format Specification
               - Format Verification
               - Kernels (KSOS, DAMOS)
               - Trusted Processes
               - Audit
               - Conf. MGNT
               - MISC (Data base Encryption)
               - Mechanical and Electrical Switches

       3.3.3 Security Filter Architecture and Modelling

               - Identify a number of Filter architectures
                 o Dedicated filter           make examples
 of
                 o shared filter
                 o sdtored modules            CR80, PDP
 etc.

               - Develop model and perform calculations
                 o Estimate MTBF
                 o    -     risk
                 o Availab. Anal.
                 o COMSEC Req.
                 o Evaluate all figures corresponding
 to req.

               - Preliminary comparison with requirement.
                 o Messages (analysis of Message Formats/(Contents)
                 o RISK
                 o Technology
                 o Prel. Perf. anal.



       3.3.4 Phase I report
               - List of contents
               - Review and decision on config. to be
 specified
                 and costed.

       3.3.5 Final studies and Trade-ef/s
               - Sensitivity analysis
                 o Cost/security
                 o Cost/availability
                 o Tempest
                 o Transmission Delays.
                 o Buffering of start   long messages

       3.3.6 HW Specification and sizing

       3.3.7 SW Specification and Sizing

       3.3.8 System, Costing

       3.3.9 Phase II Report.





               B̲ ̲M̲a̲n̲a̲g̲e̲m̲e̲n̲t̲ ̲P̲r̲o̲p̲o̲s̲a̲l̲



   1  SCOPE

   2  PROJECT ORGANIZATION

   3  RELEVANT EXPERIENCE

   4  PROJECT IMPLEMENTATION PLAN

     4.1 TASK BREAKDOWN

     4.2 TASK ASSIGNMENTS AT SCHEDULE
           - Subcarts rule + resp.

     4.3 KEY PERSONNEL


…02……02……02……02……02…Requirement…02…Phase
…02……02……02……02……02……02…Report

         WP1 F̲u̲n̲c̲t̲i̲o̲n̲a̲l̲ ̲D̲e̲s̲c̲r̲i̲p̲t̲i̲o̲n̲ ̲o̲f̲ ̲F̲i̲l̲t̲e̲r̲

         1.  Restate the requirements to the
             Filter as seen from the "user"      I.3          Special
                                                              Delivery

         2.  Restate the requirements to
             special studies

         WPL PIP                                 I.3          Special
                                                              Deliveries
         WP3 QA-Plan                             I.3          
                                                              
                                                              -
                                                              
                                                              
                                                              

         WP4 Preliminary Filter Studies          III          I
         4.0 Study of Certifications
             Techniques and Methodes

         WP4.1   Investigate differences in
                 electrical isolation between
                 available mechanical switches
                 and electronic switches         2.4

         WP4.2   study of cost impact if         2.4.1        I
                 the systems shall be
                 electrically isolated from 
                 each other at least to the
                 same extend as can be achieved
                 by mechanical switches when no 
                 data exchange between the
                 systems take place

         WP4.3   Study cost impact if the        2.4.2        I
                 filter must never be 
                 electrically connected to
                 both systems at the same
                 time.

         WP5     Make Draft Functional
                 Specification of Filter                      I



         WP5.1   Make a model of the filter      2.1          I
                 (System Design)

         WP5.2   Make an assignment of the
                 functional properties           2.1          I
                 of the filter as re-
                 quired by 2.9.2 of the
                 IFB.  Compare with
                 - COMSEC requirements
                 - Required functional
                   properties stated in
                   2.I.2 of IFB

         WP5.    Make a phase I report                        I

         WP5.3   Study the interfaces and their
                 parameters, including the
                 operator interface                           I


         WP6     Make Final Studies and Trade
                 Offs'                                        II

         WP6.1   Examine the feasibility of
                 using software and HW
                 modules commercially
                 available (3 suppliers)         2.5          II

         WP6.2   Examine to which extend
                 common SW and HW for all
                 filters will be cost
                 effective taking into
                 account the diff. in
                 interfaces, maintenance
                 cost etc.

         WP6.3   Examine the impact on price     2.7          II
                 and security when two or more
                 comm-lines share the same
                 filter or if two or more 
                 filters share the same HW modu-
                 les
                 (cp.terminal, backround
                 storage etc.)

         WP6.4   Cost estimate for procure-
                 ment of filters to the ACBA
                 CCIS interfaces.  Sensitivity
                 analysis for price vs. security
                 and price vs. availability      2.2          II

         WP6.5   Cost effectiveness comparison   2.3
                 between the designed filter
                 and any of the alternatives
                 of the IFB.

         WP6.6   Cost and technical problems
                 in verifying the security
                 filter, esp.

                 - SW
                 - Introduction of new legal
                   messages
                 - HW repair



         WP.6.7  Study impact of using remote
                 terminals (options).

         WP7     Make a revision of the system   2.9
                 design and prepare a detailed   +
                 design spec. for HW and SW      2.9.1

         WP7.1   Update the draft model from
                 phase I report

         WP7.2   Make HW module description

         WP7.3    -   SW    -        -

         WP8     Preparation of phase II report               II