top - download
⟦98917a8c2⟧ Wang Wps File
Length: 992 (0x3e0)
Types: Wang Wps File
Notes: Spelunked
Names: »~ORPHAN32.11«
Derivation
└─⟦84647c47a⟧ Bits:30005817 8" Wang WCS floppy, CR 0014A
└─ ⟦this⟧ »~ORPHAN32.11«
WangText
be accomplished will be evaluated.
1.6.12 Elements of maintainability program plans shall be analysed to determine that
each task has been initiated towards achieving specified requirements.
1.6.13 Considerations will be given to optimizing the sstem from maintainability and
maintenance viewpoint and that it is supportable within the maintenance concept
as developed.
1.6.14 The model, analyses and calculations shall be refined and changed as necessary,
as system design progresses.
R̲ ̲&̲ ̲M̲ ̲P̲L̲A̲N̲ ̲S̲E̲C̲T̲I̲O̲N̲ ̲1̲.̲2̲
Two failure modes are evaluated for each component
and for each functional block (module).
1) The part is short-circuited
2) The part is open-circuitd.
The failures are subdivided in three categories
1) Catastrophic i.e. failure that are both sudden
and complete
2) Critical i.e. failure that causes loss of a unit
3) non critical failures which are divided in major
and minor break down.