DataMuseum.dk

Presents historical artifacts from the history of:

CR80 Wang WCS documentation floppies

This is an automatic "excavation" of a thematic subset of
artifacts from Datamuseum.dk's BitArchive.

See our Wiki for more about CR80 Wang WCS documentation floppies

Excavated with: AutoArchaeologist - Free & Open Source Software.


top - download

⟦9974c8175⟧ Wang Wps File

    Length: 1390 (0x56e)
    Types: Wang Wps File
    Notes: EXTERNAL MOM FIKS/040     
    Names: »5923A «

Derivation

└─⟦b3c9a9699⟧ Bits:30006142 8" Wang WCS floppy, CR 0015A
    └─ ⟦this⟧ »5923A « 

WangText






         
                                        850515    1              CR84,
                                                                 Ballerup


                           Minutes of Meeting held
                           at CR84 between FMK/CR84




         FMK:                                                    
                                                                 
         Frank Pedersen                 A̲l̲l̲a̲n̲ ̲P̲e̲t̲e̲r̲s̲e̲n̲
                                                 Peder
                                                 Bjorholm
         FP                             APE                      PBH
                       
                       









S̲u̲b̲j̲e̲c̲t̲:̲ ̲ ̲F̲I̲K̲S̲ ̲E̲X̲T̲E̲N̲S̲I̲O̲N̲ ̲1̲ ̲C̲O̲N̲T̲R̲A̲C̲T̲ ̲(̲F̲K̲8̲5̲1̲2̲)̲





          Agenda:
          Agenda:
          Agenda:
          Agenda:
          Agenda:


              Appointment of "Operational Requirement"
              
              to contract FK8512.



              The procedure used at preparation of
              the NICS TARE Interface contract (FK8510),
              was agreed also to be used at preparation
              of contract FK8512. I.e. the Technical
              Description in the concerned proposal
              shall form the basis for "Operational
              Requirement" (Appendix A to Contract
              No. FK8512).

              The proposal was looked over and the
              item to be changed/updated was settled.
              APE should see to that the "Operational
              Requirement" was produced in a fair copy,
              ready to be part of the final contract.
              The copy should be posted to S. Jensen,
              FMK's Handelsafdeling.










                                                  
    APE/850515