top - download
⟦9c834569d⟧ Wang Wps File
Length: 1388 (0x56c)
Types: Wang Wps File
Notes: Spelunked
Names: »~ORPHAN41.02«
Derivation
└─⟦468384ecf⟧ Bits:30006005 8" Wang WCS floppy, CR 0040A
└─ ⟦this⟧ »~ORPHAN41.02«
WangText
its to a site will be made during the training period, to familiarize the student
with site installations etc.
After training the RST must be qualified to conduct OJT and supervise maintenance
as well as undertake all the tasks as described in cotractor's maintenance plan.
3.7.4.7.3 T̲r̲a̲i̲n̲i̲n̲g̲ ̲M̲a̲t̲e̲r̲i̲a̲l̲
Upon customers approval of the training program contractor shall provide each student
with a complete set of training material. Additional sets (two) shall be delivered
to customer for iformation.
3.7.4.8 D̲e̲p̲o̲t̲ ̲L̲e̲v̲e̲l̲ ̲T̲r̲a̲i̲n̲i̲n̲g̲ ̲(̲O̲p̲t̲i̲o̲n̲a̲l̲)̲
Training of customer's personnel in depot level repair of the CAMPS hardware modules
will be carried out by contractor at customer's request. This option should be exercised
when the final Deot Level repair method has been selected i.e. use of customer's
universal test equipment (ATE) or contractor supplied CAMPS Module Test Equipment.
ANNEX A 1 of 3 pages
D̲o̲c̲u̲m̲e̲n̲t̲a̲t̲i̲o̲n̲ ̲Q̲u̲a̲n̲t̲i̲t̲y̲ ̲R̲e̲q̲u̲i̲r̲e̲m̲e̲n̲t̲s̲
The contractor is to provide training documentation
in the following quantities:
P̲r̲e̲l̲i̲m̲i̲n̲a̲r̲y̲ ̲V̲e̲r̲s̲i̲o̲n̲…02…P̲u̲r̲c̲h̲a̲s̲e̲r…02…N̲C̲S̲…02…O̲p̲t̲i̲o̲n̲a̲l̲ ̲s̲i̲t̲e̲…02…T̲o̲t̲a̲l̲ ̲
1. Preliminary ver-
sion of all do-
cumentation list-
ed below 6 months
before commence-
ment of the first
course…02……02……02…2…02…2…02…0…02…4
F̲i̲n̲