top - download
⟦9ccb1f80f⟧ Wang Wps File
Length: 1344 (0x540)
Types: Wang Wps File
Notes: Spelunked
Names: »~ORPHAN53.08«
Derivation
└─⟦84647c47a⟧ Bits:30005817 8" Wang WCS floppy, CR 0014A
└─ ⟦this⟧ »~ORPHAN53.08«
WangText
…02…19800820…02……02…#
…02……02…CAMPS
…02…to: E-Division/ASM
From: CAMPS, S-Division/GJ
S̲u̲b̲j̲e̲c̲t̲:̲ ̲C̲o̲n̲t̲r̲a̲c̲t̲ ̲f̲o̲r̲ ̲d̲e̲l̲i̲v̲e̲r̲y̲ ̲o̲f̲ ̲S̲u̲b̲s̲y̲s̲t̲e̲m̲s̲ ̲t̲o̲ ̲C̲A̲M̲P̲S̲
1̲ ̲ ̲I̲N̲T̲R̲O̲D̲U̲C̲T̲I̲O̲N̲
This paper gives some preliminary information on he
project status and the plans in the CAMPS project.
We consider J]rgen Larsen to be our contact person
within E-Division on matters concerning the Subsystem
delivery contract.
Please supply a plan supporting the delivery schedule.
2 E̲Q̲U̲I̲P̲M̲E̲N̲T̲ ̲M̲A̲T̲R̲I̲X̲
2.1 In order to get the CAMPS system configuration settled
and fixed, following activities are conducted:
2.1.1 Negotiations with the purchaser.
2.1.2 Analysis on the CR80D system specifications and the
CAMPS requirements.
2.2 A development contract between CAMPS and E-Division
for a DSMT/S-system is planned to be settled before
1. sept. 80. The DSMT/S-system contains the CR80D standard
subsystems. Tis contract will contain the development
up to First Article Qualification Test for the following
Subsystems:
a. Processor Units.
b. I/O-unit with disk controllers and LTU's (see section
2.3).
2.3 Appendix A contains a list of items which are