⟦a1688dc0e⟧ Wang Wps File

    Length: 3019 (0xbcb)
    Types: Wang Wps File
    Notes: CAMPS QA Requirements     
    Names: »0882A «

Derivation

└─⟦3eaaffc64⟧ Bits:30006034 8" Wang WCS floppy, CR 0057A
    └─ ⟦this⟧ »0882A « 

WangText







                                                          Page
  #





           C̲A̲M̲P̲S̲ ̲Q̲U̲A̲L̲I̲T̲Y̲ ̲A̲S̲S̲U̲R̲A̲N̲C̲E̲ ̲R̲E̲Q̲U̲I̲R̲E̲M̲E̲N̲T̲S̲



         1)  INTRODUCTION

         2)  REQUIREMENTS








































ISSUE 2
21 MAY 1981


                     1̲ ̲ ̲I̲N̲T̲R̲O̲D̲U̲C̲T̲I̲O̲N̲



         This document identifies the Quality Assurance Requirements
         relevant to CAMPS. The application of the QA procedures
         to CAMPS software and hardware shall be explained in
         the CAMPS QA plan and related documents.

         The overall philosophy is that an independent QA authority
         will firstly ensure that the contractors QA system
         is implemented in accordance with AQAP 1 for HW and
         draft AQAP13 for applications software. Secondly the
         QAR will witness the achievement of the specific milestones
         detailed in the QA plan.

         The QAR will liaise with CR via CR QA department and
         will report directly to the SHAPE contracts administration
         branch.



                     2̲ ̲ ̲R̲E̲Q̲U̲I̲R̲E̲M̲E̲N̲T̲S̲



2.1      G̲E̲N̲E̲R̲A̲L̲

         The CAMPS Contract General Provisions CE-80-9009-INF,
         part II, sect. I allow inspections of the CAMPS software
         and hardware as and when required by SHAPE or their
         authorised QA representatives.



2.1.1    H̲A̲R̲D̲W̲A̲R̲E̲

         The QA requirements are defined in AQAP 1 (Edition
         2) and are further specified in the latest approved
         System Requirements Specification (CPS/210/SYS/0001).





2.1.2    S̲O̲F̲T̲W̲A̲R̲E̲

         The QA requirements are defined in draft AQAP 13 (JAN
         81). This is applicable to all software exclusive of
         that defined in article 12 of the Special Provisions
         of Contract CE-80-9009-INF sub para 12.4.3. The software
         which is not subject to AQAP 13 will be  verified at
         the Development System for Maintenance and Test (DSMT)
         test which is a formal acceptance test for the system
         software.

         On completion of this test the system software comes
         under full CAMPS QA/Configuration Control.

         The documentation of the system and support software
         shall be in accordance with the latest approved CAMPS
         System Requirements Specification (CPS/210/SYS/0001).




2.2      S̲P̲E̲C̲I̲F̲I̲C̲ ̲R̲E̲Q̲U̲I̲R̲E̲M̲E̲N̲T̲S̲



2.2.1    H̲A̲R̲D̲W̲A̲R̲E̲

         The existing CAMPS QA plan CPS/QAP/001 (30/9/80) has
         been approved for hardware QA.



2.2.2    S̲O̲F̲T̲W̲A̲R̲E̲

         The CAMPS QA plan CPS/QAP/001 (30/9/80) shall be expanded
         to include specific software QA activities in accordance
         with this document. The plan shall define the software
         life-cycle and the specific activities in each phase
         as tentatively indicated in table 1 and 2 and figure
         1 and 2. The updated plan shall be approved by SHAPE
         and the QAR.

         For each QA activity the following shall be described:

         -   The QA activities relevant to the milestones



         -   The responsibilities of the CR QAD

         -   The input documents and items required

         -   The output documents and items to be produced