⟦a3405bb73⟧ Wang Wps File
Length: 15473 (0x3c71)
Types: Wang Wps File
Notes: Spelunked
Names: »~ORPHAN69.08«
Derivation
└─⟦74592f894⟧ Bits:30006167 8" Wang WCS floppy, CR 0226A
└─ ⟦this⟧ »~ORPHAN69.08«
WangText
T…00……00……00……00…E…0a……00……00…E…0b…E…0d…E…0f…D…09…D…05…C…0b…C…00…C…05…B…0a…B…0f…B…07…A…0e…!…01…!…07… …0c… …02… …07……1f……0e……1f……0f……1f……05……1e……08……1e……0e……1e… …1d……08……1d……0e……1d……02……1d……07……1c……0c……1c……0d……1c…
…1c… …1b……09……1b……0e……1b… …1a……0a……1a……0f……1a……05……19……0b……19……02……18……08……18……0f……18……02……86…1 …02… …02… …02…
…0e…
2867A/ktd/226A…02…CPS/AUX/026
…02…HAU/811115…02……02…#
INSTALLATION PROCEDURES
SITE 01…02……02…CAMPS…0f…
CAMPS
INSTALLATION PROCEDURES
SITE 01
CPS/AUX/026
Hans Haureberg
Gert Jensen
SHAPE (4), GJ, OE, KM, HAU (2), BHB, IJO, NPP,
onf. Mgmt., QA, PAB
Install. Mgr. 821115
Issue 2
821115
2867A/ktd/226A …02…CPS/AUX/026
…02…HAU/821115…02……02…ii
INSTALLATION PROCEDURES
SITE 01…02……02…CAMPS
82115 All Issue 1 of Document
…0e…
2867A/ktd/226A …02…CPS/AUX/026
…02…HAU/821115…02……02…iii
INSTALLATION PROCEDURES
SITE 01…02……02…CAMPS…0f…
T̲A̲B̲L̲E̲ ̲O̲F̲ ̲C̲O̲N̲T̲E̲N̲T̲S̲
TITLE PAGE ....................................
i
REVISION RECORD ................................
ii
TABLE OF CONTENTS .............................. iii
ABBREVIATIONS.................................. vi
1 INTRODUCTION .................................
1
1.1 SCOPE ....................................
1
1.2 DOCUMENT FORMAT ..........................
1
1.3 REFERENCES .............................. 2
2 INSTALLATION PREPARATIONS ....................
3
2.1 SHIPMENT OF EQUIPMENT ....................
3
2.1.1 Disassembly and Packing ..............
3
2.1.2 Transportation to Site ...............
6
2.1.3 Receipt of Equpment at Site ......... 7
2.1.3.1 Receipt ..........................
7
2.1.3.2 Incoming Inventory/Inspection ....
8
2.1.3.3 Distribution of Equipment ........
8
2.2 PREPARATION OF INSTALLATION AT SITE ......
9
2.2.1 Prparations by CR ................... 9
2.2.2 Preparations by Site ................. 10
2.3 INSTALLATION OPERATIONS .................. 10
3 INSTRUCTIONS TO SITE ......................... 15
3.1 TRANSPORTATION TO INSTALLATION SITE ..... 15
3.2 INSTALLATION PREPARATIONS AND SUPPORT .... 15
3.3 SHIPMENT CONTAINERS ...................... 17
4 TOOLS AND TEST EQUIPMENT ..................... 17
5 INSTALLATION OF MAIN SITE EQUIPMENT .......... 20
5.1 GENERAL ................................. 20
5.2 MECHANICAL RACK ASSEMBLY ................. 21
5.2.1 Unpacking of Racks ................... 21
5.2.2 Transportation ot Installatioan Site . 23
5.2.3 Removal of Upper Crates and D-Fans ... 23
5.2.4 Removal of Mains Switches ............ 25
5.2.5 Mounting of Levellers ................ 25
5.2.6 Mounting of Gaskets .................. 25
5.2.7 Levelling and Bolting of Racks ....... 26
5.2.8 Inspection/Repair of Gaskets ........ 26
…86…1
…02… …02… …02…
…0e…
2867A/ktd/226A …02…CPS/AUX/026
…02…HAU/821115…02……02…iv
INSTALLATION PROCEDURES
SITE 01…02……02…CAMPS…0f…
5.2.9 Mountin of Power Line Filters
Rack A, B and E ...................... 27
5.2.10 Remounting of Upper Crates and D-Fas 27
5.2.11 Remounting of Mains Switches ........ 27
5.3 INSTALLATION OF EXTERNAL POWER CABLES
AND MOUNTNG OF CONDUITS ................. 28
5.3.1 Frequency Stabilizer ................. 28
5.3.2 Power Cables Rack A .................. 29
5.3.3 Power Cables Rack B .................. 29
5.3.4 Power Cables Rack E .................. 29
5.4 INSTALLATION OF EXTERNAL SIGNAL CABLES AND
MOUNTING OF CONDUITS AT RACK C, D, AND F . 30
5.4.1 Rack D, Sup./Maint./User Pos. Cables . 30
5.4.2 Rack G NAEW Cables ................... 31
5.4.3 Cable Bunch Rack C to Rack D ........ 32
5.4.4 Rack F (LSM/Other Cables) ............ 32
5.5 REMOUNTING OF RACKS ...................... 33
5.5.1 Mounting of Disk Drives .............. 33
5.5.2 Mounting of Floppy Disk Station ...... 33
5.5.3 Mounting of odules .................. 33
5.6 INSTALLATION AND TERMINATION OF INTERNAL
SIGNAL CABLES ............................ 34
5.6.1 Internal Signal Cables ............... 34
5.7 TERMINATION OF EXTERNAL SIGNAL CABLES .... 57
5.8 CONECTION OF INTERNAL POWER CABLES ...... 65
5.9 POWER UP AND CHECK OUT ................... 73
5.9.1 Groundings ........................... 73
5.9.2 CAMPS PDB ............................ 73
5.9.3 Frequency Stabilizers and Disk Drivs. 74
5.9.4 Mains Switch Rack A Switch 2 ......... 75
5.9.5 Mains Switch Rack B Switch 2 ......... 77
5.9.6 Mains Switch Rack B Switch 1 ......... 77
5.9.7 Mains Switch Rack C Switch 2 ......... 78
5.9.8 Mains Switch Rack DSwitch 1 ......... 79
5.9.9 Mains Switch Rack E Switch 2 ......... 79
5.9.10 Mains Switch Rack E Switch 1 ....... 80
5.9.11 Mains Switch Rack G Switch 1 ........ 80
5.9.12 Mains Switch Rack D Switch 2 ........ 80
5.9.13 Mains Switch Rack F Switch 2 ........ 80
5.9.14 Turn On ............................. 81
5.9.15 Verify Supply Vltage on PU Crates .. 81
5.9.16 Verify Supply Voltage on CU Crate ... 81
…0e…
2867A/ktd/226A …02…CPS/AUX/026
…02…HAU/821115…02……02…v
INSTALLATION PROCEDURES
SITE 01…02……02…CAMPS…0f…
5.10 INSPECTIONOF SWITCH SETTINGS AND STATUS
LEDS .....................................
81
5.10.1 Switch Settings .....................
82
5.10.2 Led Indicators ......................
82
5.11 INSTALLATION OF DELTA VDU ................
87
.11.1 Power Plug Connections .............. 87
5.11.2 Termination of Opto Cables ..........
87
5.11.3 Mounting of Keyboard and Keys .......
88
5.12 INSTALLATION OF TRACOR MSP ..............
89
5.12.1 Power Plug Connections ............. 89
5.12.2 Termination of Opto Cables ..........
89
5.13 INSTALLATION OF PTP/PTR .................
90
5.14 TEST OF SUP/USER TERMINALS ..............
90
5.14.1 Test of Delta VDU ...................
90
5.14.2 Operatioal Test .................... 91
5.14.3 Test of Tracor MSP ..................
92
5.14.4 Operational Test ....................
92
5.15 TEST OF PTP/PTR .........................
92
5.16 H/W TEST PROCESSOR/LINE TERM. UNITS .....
93
5.16.1 PU #1(CU/TDX #2 Functional Test .....
93
5.16.2 Watchdog Processor Functional Test ..
93
5.17 INVENTORY CHECK .........................
93
…0e…
2867A/ktd/226A …02…CPS/AUX/026
…02…HAU/821115…02……02…vi
INSTALLATION PROCEDURES
SITE 01…02……02…CAMPS…0f…
A̲B̲B̲R̲E̲V̲I̲A̲T̲I̲O̲N̲S̲
A̲B̲B̲R̲E̲V̲I̲A̲T̲I̲O̲N̲S̲:̲
ATBB As To Be Built
BPJF Black Patch Jack Field
CAMPS Computer Aided Message Processing System
CR Christian Rovsing A/S
DIAG Diagram
Doc Document
DWG Drawing
EMI Electromagnetic Interference
H/W Hardware
IDF Itermediate Distribution Frame
ILLUS Illustrations
J-Box Junction Box
LED Light Emitting Diode
LIA-N Line Interface Adapte
LSM Low Speed Medium
LTU Line Termination Unit
LTUX-S Line Termination Unit/TDX Bus
L/L ADP Low Level Adapter
MMD Mini Module Drive
MSP Medium Speed Printer
M&D Maintenance and Diagnostic
PDB Power Distribution Board
PDP Power Distribution Panel
PLF Power Line Filter
PTP Paper Tape Puncher
PTR Paper Tape Reader
STAT.MUX Statistical Multipleer
Sup.Term. Supervisor Terminal
TARE Telegraph Automatic Relay Equipment
TDX Telecommunication Data Exchange
VDU Visual Display Unit
W-NUMBER Cable Identification Number
1 I̲N̲T̲R̲O̲D̲U̲C̲T̲I̲O̲N̲
1.1 S̲C̲O̲P̲E̲
This document describes how CR will perform the installation
of the CAMPS equipment and gives instructions to site
concerning receipt of equipment ad arrrangements to
be made by the site concerning CR's presence during
installation
1.2 D̲O̲C̲U̲M̲E̲N̲T̲ ̲F̲O̲R̲M̲A̲T̲
a) The document is structured in the following sections:
- Section 1: Introduction
- Section 2: Installation Preparations
- Section : Instruction to Site
- Section 4: Installation Tools and Test
Equipment
- Section 5: Installation of Main Site Equipment
b) Section 2 provides a short description of how the
equipment is packed and indicates to the site the
siz of arriving shipment in form of quantity, size,
and weight of containers in the shipment. A description
of the preparations to be made by CR and the Site
is also provided in this section.
c) Section 3 contains the instructions to Site concerningthe
coming installation.
d) Section 4 lists the tools and test equipment used
during installation.
e) Section 5 contains a step-by-step instruction of
how to install and interconnect the CAMPS major
assemblies with reference to the As-To-Be-Built
drawings. Procedures for power p and installation
check-out are included. Section 5 will be updated
after installation has been accomplished and incorporated
in the installation manual to be delivered after
provisional site acceptance.
1.3 R̲E̲F̲E̲R̲E̲N̲C̲E̲S̲
1. CAMPS Hardware Assemly
Breakdown/Hardware Tree
Doc. No. CPS/SDS/017
2. CAMPS Site Level Maintenance Manual
Doc. No. CPS/TCM/005
3. Inventory List
Doc. No. TBD
4. OPTO-Cable Termination Procedure
Doc. No. CPS/TCN/029
5. Site Survey Procedure and Check2̲8̲6̲7̲A̲…00…CPS/AUX/026
…00…ktd …00…HAU
…00…Inst. Proc. (Site 1)…00…0̲5̲…00…1̲0̲…00…8̲2̲…00…1̲6̲…00…2̲3̲…00… ̲ ̲ ̲ ̲…00…2̲7̲…00… ̲ ̲ ̲7̲3̲0̲…00…21…00…12…00…82…00…14…00…17…00…
…00…00…00… 6…00…2̲1̲…00…1̲2̲…00…8̲2̲…00…1̲4̲…00…1̲8̲…00…22…00…12…00…82…00…08…00…11…00…0226A…00…100…00… ̲ ̲ ̲8̲…00…28…00… 1480…00…
̲1̲5̲4̲21…00……15……00……00…@…05…T…00……93……00……07……10……05…'…10……11… …90…*̲J̲…15……05……00……00……00……00……00……00……01…B
V̲…01…T…00……00……00……00…B…0a……00……00…B…0b…B…0d…B…0f…A…09…!…05… …0b… …00… …05……1f……0a……1f……0f……1f……07……1e……0e……1e……01……1e……07……1d……0c……1d……02……1d……07……1c……0e……1c……0f……1c……05……1b……08……1b……0e……1b… …1a……08……1a……0e……1a……02……1a……07……19……0c……19……0d……19…
…19… …18……09……18……0e……18… …17……0a……17……0f……17……05……16……0b……16……02……15……08……15……0f……15……02……86…1 …02…
…02… …02…
…0e…
2867A/ktd/226A…02…CPS/AUX/026
…02…HAU/811115…02……02…#
INSTALLATION PROCEDURES
SITE 01…02……02…CAMPS…0f…
CAMPS
INSTALLATION PROCEDURES
SITE 01
CPS/AUX/026
Hans Haureberg
Gert Jensen
SHAPE (4), GJ, OE, KM, HAU (2), BHB, IJO, NPP,
onf. Mgmt., QA, PAB
Install. Mgr. 821115
Issue 2
821115
2867A/ktd/226A …02…CPS/AUX/026
…02…HAU/821115…02……02…ii
INSTALLATION PROCEDURES
SITE 01…02……02…CAMPS
82115 All Issue 1 of Document
…0e…
2867A/ktd/226A …02…CPS/AUX/026
…02…HAU/821115…02……02…iii
INSTALLATION PROCEDURES
SITE 01…02……02…CAMPS…0f…
T̲A̲B̲L̲E̲ ̲O̲F̲ ̲C̲O̲N̲T̲E̲N̲T̲S̲
TITLE PAGE ....................................
i
REVISION RECORD ................................
ii
TABLE OF CONTENTS .............................. iii
ABBREVIATIONS.................................. vi
1 INTRODUCTION .................................
1
1.1 SCOPE ....................................
1
1.2 DOCUMENT FORMAT ..........................
1
1.3 REFERENCES .............................. 2
2 INSTALLATION PREPARATIONS ....................
3
2.1 SHIPMENT OF EQUIPMENT ....................
3
2.1.1 Disassembly and Packing ..............
3
2.1.2 Transportation to Site ...............
6
2.1.3 Receipt of Equpment at Site ......... 7
2.1.3.1 Receipt ..........................
7
2.1.3.2 Incoming Inventory/Inspection ....
8
2.1.3.3 Distribution of Equipment ........
8
2.2 PREPARATION OF INSTALLATION AT SITE ......
9
2.2.1 Prparations by CR ................... 9
2.2.2 Preparations by Site ................. 10
2.3 INSTALLATION OPERATIONS .................. 10
3 INSTRUCTIONS TO SITE ......................... 15
3.1 TRANSPORTATION TO INSTALLATION SITE ..... 15
3.2 INSTALLATION PREPARATIONS AND SUPPORT .... 15
3.3 SHIPMENT CONTAINERS ...................... 17
4 TOOLS AND TEST EQUIPMENT ..................... 17
5 INSTALLATION OF MAIN SITE EQUIPMENT .......... 20
5.1 GENERAL ................................. 20
5.2 MECHANICAL RACK ASSEMBLY ................. 21
5.2.1 Unpacking of Racks ................... 21
5.2.2 Transportation ot Installatioan Site . 23
5.2.3 Removal of Upper Crates and D-Fans ... 23
5.2.4 Removal of Mains Switches ............ 25
5.2.5 Mounting of Levellers ................ 25
5.2.6 Mounting of Gaskets .................. 25
5.2.7 Levelling and Bolting of Racks ....... 26
5.2.8 Inspection/Repair of Gaskets ........ 26
…86…1
…02… …02… …02…
…0e…
2867A/ktd/226A …02…CPS/AUX/026
…02…HAU/821115…02……02…iv
INSTALLATION PROCEDURES
SITE 01…02……02…CAMPS…0f…
5.2.9 Mountin of Power Line Filters
Rack A, B and E ...................... 27
5.2.10 Remounting of Upper Crates and D-Fas 27
5.2.11 Remounting of Mains Switches ........ 27
5.3 INSTALLATION OF EXTERNAL POWER CABLES
AND MOUNTNG OF CONDUITS ................. 28
5.3.1 Frequency Stabilizer ................. 28
5.3.2 Power Cables Rack A .................. 29
5.3.3 Power Cables Rack B .................. 29
5.3.4 Power Cables Rack E .................. 29
5.4 INSTALLATION OF EXTERNAL SIGNAL CABLES AND
MOUNTING OF CONDUITS AT RACK C, D, AND F . 30
5.4.1 Rack D, Sup./Maint./User Pos. Cables . 30
5.4.2 Rack G NAEW Cables ................... 31
5.4.3 Cable Bunch Rack C to Rack D ........ 32
5.4.4 Rack F (LSM/Other Cables) ............ 32
5.5 REMOUNTING OF RACKS ...................... 33
5.5.1 Mounting of Disk Drives .............. 33
5.5.2 Mounting of Floppy Disk Station ...... 33
5.5.3 Mounting of odules .................. 33
5.6 INSTALLATION AND TERMINATION OF INTERNAL
SIGNAL CABLES ............................ 34
5.6.1 Internal Signal Cables ............... 34
5.7 TERMINATION OF EXTERNAL SIGNAL CABLES .... 57
5.8 CON