⟦a3405bb73⟧ Wang Wps File

    Length: 15473 (0x3c71)
    Types: Wang Wps File
    Notes: Spelunked
    Names: »~ORPHAN69.08«

Derivation

└─⟦74592f894⟧ Bits:30006167 8" Wang WCS floppy, CR 0226A
    └─ ⟦this⟧ »~ORPHAN69.08« 

WangText

T…00……00……00……00…E…0a……00……00…E…0b…E…0d…E…0f…D…09…D…05…C…0b…C…00…C…05…B…0a…B…0f…B…07…A…0e…!…01…!…07… …0c… …02… …07……1f……0e……1f……0f……1f……05……1e……08……1e……0e……1e… …1d……08……1d……0e……1d……02……1d……07……1c……0c……1c……0d……1c…
…1c… …1b……09……1b……0e……1b… …1a……0a……1a……0f……1a……05……19……0b……19……02……18……08……18……0f……18……02……86…1                                             …02…           …02…   …02…   
…0e…
   2867A/ktd/226A…02…CPS/AUX/026

…02…HAU/811115…02……02…#
INSTALLATION PROCEDURES
SITE 01…02……02…CAMPS…0f…










                 CAMPS
                 INSTALLATION PROCEDURES
                 SITE 01  


                 CPS/AUX/026














                 Hans Haureberg




                 Gert Jensen







                 SHAPE (4), GJ, OE, KM, HAU (2), BHB, IJO, NPP,
                 onf. Mgmt., QA, PAB















                         Install. Mgr.    821115


         Issue 2    



         821115



   2867A/ktd/226A …02…CPS/AUX/026

 …02…HAU/821115…02……02…ii
INSTALLATION PROCEDURES
SITE 01…02……02…CAMPS












       82115                  All      Issue 1 of Document


…0e…
   2867A/ktd/226A …02…CPS/AUX/026

 …02…HAU/821115…02……02…iii
INSTALLATION PROCEDURES
SITE 01…02……02…CAMPS…0f…





                                      T̲A̲B̲L̲E̲ ̲O̲F̲ ̲C̲O̲N̲T̲E̲N̲T̲S̲




     TITLE PAGE  ....................................  
      i
     REVISION RECORD ................................  
     ii
     TABLE OF CONTENTS ..............................  iii
     ABBREVIATIONS..................................   vi

     1 INTRODUCTION .................................  
       1 
       1.1 SCOPE ....................................  
           1 
       1.2 DOCUMENT FORMAT ..........................  
           1 
       1.3 REFERENCES ..............................   2
           

     2 INSTALLATION PREPARATIONS ....................  
       3 
       2.1 SHIPMENT OF EQUIPMENT ....................  
           3 
         2.1.1 Disassembly and Packing ..............  
               3 
         2.1.2 Transportation to Site ...............  
               6 
         2.1.3 Receipt of Equpment at Site .........   7
               
           2.1.3.1 Receipt ..........................  
                   7
           2.1.3.2 Incoming Inventory/Inspection ....  
                   8
           2.1.3.3 Distribution of Equipment ........  
                   8

       2.2 PREPARATION OF INSTALLATION AT SITE ......  
           9 
         2.2.1 Prparations by CR ...................   9
               
         2.2.2 Preparations by Site .................  10
               
       2.3 INSTALLATION OPERATIONS ..................  10

     3 INSTRUCTIONS TO SITE .........................  15
       
       3.1 TRANSPORTATION TO INSTALLATION SITE .....  15
           
       3.2 INSTALLATION PREPARATIONS AND SUPPORT ....  15
           
       3.3 SHIPMENT CONTAINERS ......................  17
           

     4 TOOLS AND TEST EQUIPMENT .....................  17
       

     5 INSTALLATION OF MAIN SITE EQUIPMENT ..........  20
       
       5.1 GENERAL .................................  20
           
       5.2 MECHANICAL RACK ASSEMBLY .................  21
           
         5.2.1 Unpacking of Racks ...................  21
               
         5.2.2 Transportation ot Installatioan Site .  23
               
         5.2.3 Removal of Upper Crates and D-Fans ...  23
               
       5.2.4 Removal of Mains Switches ............  25
             
         5.2.5 Mounting of Levellers ................  25
               
         5.2.6 Mounting of Gaskets ..................  25
               
         5.2.7 Levelling and Bolting of Racks .......  26
               
         5.2.8 Inspection/Repair of Gaskets ........  26
               …86…1                                       
                    …02…           …02…   …02…   
…0e…
   2867A/ktd/226A …02…CPS/AUX/026

 …02…HAU/821115…02……02…iv
INSTALLATION PROCEDURES
SITE 01…02……02…CAMPS…0f…





         5.2.9 Mountin of Power Line Filters
               Rack A, B and E ......................  27
               
         5.2.10 Remounting of Upper Crates and D-Fas  27
                
         5.2.11 Remounting of Mains Switches ........  27
                

       5.3 INSTALLATION OF EXTERNAL POWER CABLES
           AND MOUNTNG OF CONDUITS .................  28
           
         5.3.1 Frequency Stabilizer .................  28
               
         5.3.2 Power Cables Rack A ..................  29
               
         5.3.3 Power Cables Rack B ..................  29
               
         5.3.4 Power Cables Rack E ..................  29

       5.4 INSTALLATION OF EXTERNAL SIGNAL CABLES AND
           MOUNTING OF CONDUITS AT RACK C, D, AND F .  30
           
         5.4.1 Rack D, Sup./Maint./User Pos. Cables .  30
               
         5.4.2 Rack G NAEW Cables ...................  31
               
         5.4.3 Cable Bunch Rack C to Rack D ........  32
               
         5.4.4 Rack F (LSM/Other Cables) ............  32
               

       5.5 REMOUNTING OF RACKS ......................  33
           
         5.5.1 Mounting of Disk Drives ..............  33
               
         5.5.2 Mounting of Floppy Disk Station ......  33
               
         5.5.3 Mounting of odules ..................  33
               

       5.6 INSTALLATION AND TERMINATION OF INTERNAL
           SIGNAL CABLES ............................  34
           
         5.6.1 Internal Signal Cables ...............  34
               

       5.7 TERMINATION OF EXTERNAL SIGNAL CABLES ....  57
           
       5.8 CONECTION OF INTERNAL POWER CABLES ......  65
           
       5.9 POWER UP AND CHECK OUT ...................  73
           
         5.9.1 Groundings ...........................  73
               
         5.9.2 CAMPS PDB ............................  73
               
         5.9.3 Frequency Stabilizers and Disk Drivs.  74
               
         5.9.4 Mains Switch Rack A Switch 2 .........  75
               
         5.9.5 Mains Switch Rack B Switch 2 .........  77
               
         5.9.6 Mains Switch Rack B Switch 1 .........  77
               
         5.9.7 Mains Switch Rack C Switch 2 .........  78
               
         5.9.8 Mains Switch Rack DSwitch 1 .........  79
               
         5.9.9 Mains Switch Rack E Switch 2 .........  79
               
         5.9.10 Mains Switch Rack E Switch 1 .......  80
                
         5.9.11 Mains Switch Rack G Switch 1 ........  80
                
         5.9.12 Mains Switch Rack D Switch 2 ........  80
                
         5.9.13 Mains Switch Rack F Switch 2 ........  80
                
         5.9.14 Turn On .............................  81
                
         5.9.15 Verify Supply Vltage on PU Crates ..  81
                
         5.9.16 Verify Supply Voltage on CU Crate ...  81
                


…0e…
   2867A/ktd/226A …02…CPS/AUX/026

 …02…HAU/821115…02……02…v
INSTALLATION PROCEDURES
SITE 01…02……02…CAMPS…0f…





       5.10 INSPECTIONOF SWITCH SETTINGS AND STATUS
            LEDS ..................................... 
           81 
         5.10.1  Switch Settings ..................... 
                 82 
         5.10.2  Led Indicators ...................... 
                 82 

       5.11 INSTALLATION OF DELTA VDU ................ 
       87 
         .11.1 Power Plug Connections ..............  87
               
         5.11.2  Termination of Opto Cables .......... 
                 87 
         5.11.3  Mounting of Keyboard and Keys ....... 
                 88 

       5.12  INSTALLATION OF TRACOR MSP .............. 
             89 
         5.12.1  Power Plug Connections .............  89
                 
         5.12.2  Termination of Opto Cables .......... 
                 89 

       5.13  INSTALLATION OF PTP/PTR ................. 
             90 

       5.14  TEST OF SUP/USER TERMINALS .............. 
             90 
         5.14.1  Test of Delta VDU ................... 
                 90 
         5.14.2  Operatioal Test ....................  91
                 
         5.14.3  Test of Tracor MSP .................. 
                 92 
         5.14.4  Operational Test .................... 
                 92 

       5.15  TEST OF PTP/PTR ......................... 
             92 

       5.16  H/W TEST PROCESSOR/LINE TERM. UNITS ..... 
             93
         5.16.1  PU #1(CU/TDX #2 Functional Test ..... 
                 93 
         5.16.2  Watchdog Processor Functional Test .. 
                 93 

       5.17  INVENTORY CHECK ......................... 
             93 


…0e…
   2867A/ktd/226A …02…CPS/AUX/026

 …02…HAU/821115…02……02…vi
INSTALLATION PROCEDURES
SITE 01…02……02…CAMPS…0f…





                      A̲B̲B̲R̲E̲V̲I̲A̲T̲I̲O̲N̲S̲


         A̲B̲B̲R̲E̲V̲I̲A̲T̲I̲O̲N̲S̲:̲

         ATBB           As To Be Built
         BPJF           Black Patch Jack Field
         CAMPS          Computer Aided Message Processing System
         CR             Christian Rovsing A/S
         DIAG           Diagram 
         Doc            Document
         DWG            Drawing
         EMI            Electromagnetic Interference
         H/W            Hardware
         IDF            Itermediate Distribution Frame
         ILLUS          Illustrations
         J-Box          Junction Box
         LED            Light Emitting Diode
         LIA-N          Line Interface Adapte
         LSM            Low Speed Medium
         LTU            Line Termination Unit
         LTUX-S         Line Termination Unit/TDX Bus
         L/L ADP        Low Level Adapter
MMD              Mini Module Drive
         MSP            Medium Speed Printer
         M&D            Maintenance and Diagnostic
         PDB            Power Distribution Board
         PDP            Power Distribution Panel
         PLF            Power Line Filter
         PTP            Paper Tape Puncher
         PTR            Paper Tape Reader
         STAT.MUX       Statistical Multipleer
         Sup.Term.      Supervisor Terminal
         TARE           Telegraph Automatic Relay Equipment
         TDX            Telecommunication Data Exchange
         VDU            Visual Display Unit
         W-NUMBER       Cable Identification Number


                     1  I̲N̲T̲R̲O̲D̲U̲C̲T̲I̲O̲N̲



1.1      S̲C̲O̲P̲E̲

         This document describes how CR will perform the installation
         of the CAMPS equipment and gives instructions to site
         concerning receipt of equipment ad arrrangements to
         be made by the site concerning CR's presence during
         installation



1.2      D̲O̲C̲U̲M̲E̲N̲T̲ ̲F̲O̲R̲M̲A̲T̲

         a)  The document is structured in the following sections:

             -   Section 1: Introduction
             -   Section 2: Installation Preparations
             -   Section : Instruction to Site
             -   Section 4: Installation Tools and Test
                            Equipment
             -   Section 5: Installation of Main Site Equipment

         b)  Section 2 provides a short description of how the
             equipment is packed and indicates to the site the
             siz of arriving shipment in form of quantity, size,
             and weight of containers in the shipment. A description
             of the preparations to be made by CR and the Site
             is also provided in this section.

         c)  Section 3 contains the instructions to Site concerningthe
             coming installation.

         d)  Section 4 lists the tools and test equipment used
             during installation.


         e)  Section 5 contains a step-by-step instruction of
             how to install and interconnect the CAMPS major
             assemblies with reference to the As-To-Be-Built
             drawings. Procedures for power p and installation
             check-out are included. Section 5 will be updated
             after installation has been accomplished and incorporated
             in the installation manual to be delivered after
             provisional site acceptance.



1.3      R̲E̲F̲E̲R̲E̲N̲C̲E̲S̲

         1.  CAMPS Hardware Assemly
             Breakdown/Hardware Tree
             Doc. No. CPS/SDS/017

         2.  CAMPS Site Level Maintenance Manual
             Doc. No. CPS/TCM/005

         3.  Inventory List
             Doc. No. TBD

         4.  OPTO-Cable Termination Procedure
             Doc. No. CPS/TCN/029

         5.  Site Survey Procedure and Check2̲8̲6̲7̲A̲…00…CPS/AUX/026
                          …00…ktd                 …00…HAU          
                   …00…Inst. Proc. (Site 1)…00…0̲5̲…00…1̲0̲…00…8̲2̲…00…1̲6̲…00…2̲3̲…00… ̲ ̲ ̲ ̲…00…2̲7̲…00… ̲ ̲ ̲7̲3̲0̲…00…21…00…12…00…82…00…14…00…17…00…
                …00…00…00…     6…00…2̲1̲…00…1̲2̲…00…8̲2̲…00…1̲4̲…00…1̲8̲…00…22…00…12…00…82…00…08…00…11…00…0226A…00…100…00… ̲ ̲ ̲8̲…00…28…00… 1480…00…
             ̲1̲5̲4̲21…00……15……00……00…@…05…T…00……93……00……07……10……05…'…10……11…                                            …90…*̲J̲…15……05……00……00……00……00……00……00……01…B
V̲…01…T…00……00……00……00…B…0a……00……00…B…0b…B…0d…B…0f…A…09…!…05… …0b… …00… …05……1f……0a……1f……0f……1f……07……1e……0e……1e……01……1e……07……1d……0c……1d……02……1d……07……1c……0e……1c……0f……1c……05……1b……08……1b……0e……1b…  …1a……08……1a……0e……1a……02……1a……07……19……0c……19……0d……19…
…19…         …18……09……18……0e……18…    …17……0a……17……0f……17……05……16……0b……16……02……15……08……15……0f……15……02……86…1                                             …02…
                       …02…   …02…   
…0e…
   2867A/ktd/226A…02…CPS/AUX/026

…02…HAU/811115…02……02…#
INSTALLATION PROCEDURES
SITE 01…02……02…CAMPS…0f…










                 CAMPS
                 INSTALLATION PROCEDURES
                 SITE 01  


                 CPS/AUX/026














                 Hans Haureberg




                 Gert Jensen







                 SHAPE (4), GJ, OE, KM, HAU (2), BHB, IJO, NPP,
                 onf. Mgmt., QA, PAB















                         Install. Mgr.    821115


         Issue 2    



         821115



   2867A/ktd/226A …02…CPS/AUX/026

 …02…HAU/821115…02……02…ii
INSTALLATION PROCEDURES
SITE 01…02……02…CAMPS












       82115                  All      Issue 1 of Document


…0e…
   2867A/ktd/226A …02…CPS/AUX/026

 …02…HAU/821115…02……02…iii
INSTALLATION PROCEDURES
SITE 01…02……02…CAMPS…0f…





                                      T̲A̲B̲L̲E̲ ̲O̲F̲ ̲C̲O̲N̲T̲E̲N̲T̲S̲




     TITLE PAGE  ....................................  
      i
     REVISION RECORD ................................  
     ii
     TABLE OF CONTENTS ..............................  iii
     ABBREVIATIONS..................................   vi

     1 INTRODUCTION .................................  
       1 
       1.1 SCOPE ....................................  
           1 
       1.2 DOCUMENT FORMAT ..........................  
           1 
       1.3 REFERENCES ..............................   2
           

     2 INSTALLATION PREPARATIONS ....................  
       3 
       2.1 SHIPMENT OF EQUIPMENT ....................  
           3 
         2.1.1 Disassembly and Packing ..............  
               3 
         2.1.2 Transportation to Site ...............  
               6 
         2.1.3 Receipt of Equpment at Site .........   7
               
           2.1.3.1 Receipt ..........................  
                   7
           2.1.3.2 Incoming Inventory/Inspection ....  
                   8
           2.1.3.3 Distribution of Equipment ........  
                   8

       2.2 PREPARATION OF INSTALLATION AT SITE ......  
           9 
         2.2.1 Prparations by CR ...................   9
               
         2.2.2 Preparations by Site .................  10
               
       2.3 INSTALLATION OPERATIONS ..................  10

     3 INSTRUCTIONS TO SITE .........................  15
       
       3.1 TRANSPORTATION TO INSTALLATION SITE .....  15
           
       3.2 INSTALLATION PREPARATIONS AND SUPPORT ....  15
           
       3.3 SHIPMENT CONTAINERS ......................  17
           

     4 TOOLS AND TEST EQUIPMENT .....................  17
       

     5 INSTALLATION OF MAIN SITE EQUIPMENT ..........  20
       
       5.1 GENERAL .................................  20
           
       5.2 MECHANICAL RACK ASSEMBLY .................  21
           
         5.2.1 Unpacking of Racks ...................  21
               
         5.2.2 Transportation ot Installatioan Site .  23
               
         5.2.3 Removal of Upper Crates and D-Fans ...  23
               
       5.2.4 Removal of Mains Switches ............  25
             
         5.2.5 Mounting of Levellers ................  25
               
         5.2.6 Mounting of Gaskets ..................  25
               
         5.2.7 Levelling and Bolting of Racks .......  26
               
         5.2.8 Inspection/Repair of Gaskets ........  26
               …86…1                                       
                    …02…           …02…   …02…   
…0e…
   2867A/ktd/226A …02…CPS/AUX/026

 …02…HAU/821115…02……02…iv
INSTALLATION PROCEDURES
SITE 01…02……02…CAMPS…0f…





         5.2.9 Mountin of Power Line Filters
               Rack A, B and E ......................  27
               
         5.2.10 Remounting of Upper Crates and D-Fas  27
                
         5.2.11 Remounting of Mains Switches ........  27
                

       5.3 INSTALLATION OF EXTERNAL POWER CABLES
           AND MOUNTNG OF CONDUITS .................  28
           
         5.3.1 Frequency Stabilizer .................  28
               
         5.3.2 Power Cables Rack A ..................  29
               
         5.3.3 Power Cables Rack B ..................  29
               
         5.3.4 Power Cables Rack E ..................  29

       5.4 INSTALLATION OF EXTERNAL SIGNAL CABLES AND
           MOUNTING OF CONDUITS AT RACK C, D, AND F .  30
           
         5.4.1 Rack D, Sup./Maint./User Pos. Cables .  30
               
         5.4.2 Rack G NAEW Cables ...................  31
               
         5.4.3 Cable Bunch Rack C to Rack D ........  32
               
         5.4.4 Rack F (LSM/Other Cables) ............  32
               

       5.5 REMOUNTING OF RACKS ......................  33
           
         5.5.1 Mounting of Disk Drives ..............  33
               
         5.5.2 Mounting of Floppy Disk Station ......  33
               
         5.5.3 Mounting of odules ..................  33
               

       5.6 INSTALLATION AND TERMINATION OF INTERNAL
           SIGNAL CABLES ............................  34
           
         5.6.1 Internal Signal Cables ...............  34
               

       5.7 TERMINATION OF EXTERNAL SIGNAL CABLES ....  57
           
       5.8 CON