DataMuseum.dk

Presents historical artifacts from the history of:

CR80 Wang WCS documentation floppies

This is an automatic "excavation" of a thematic subset of
artifacts from Datamuseum.dk's BitArchive.

See our Wiki for more about CR80 Wang WCS documentation floppies

Excavated with: AutoArchaeologist - Free & Open Source Software.


top - download

⟦a557df336⟧ Wang Wps File

    Length: 6889 (0x1ae9)
    Types: Wang Wps File
    Notes: Tilbud Low Rate Multiplex 
    Names: »1609A «

Derivation

└─⟦121503e5a⟧ Bits:30006255 8" Wang WCS floppy, CR 0116A
    └─ ⟦this⟧ »1609A « 

WangText




…02…

…02… OE/820121…02……02…#
Intern Meddelelse
…02……02…





Til:     GB,KM[,GJ,KHJ,BR,AH,ASM,KJL

Fra:     OE (5)

Vedr.:   T̲i̲l̲b̲u̲d̲ ̲p̲>̲ ̲L̲o̲w̲ ̲R̲a̲t̲e̲ ̲M̲u̲l̲t̲i̲p̲l̲e̲x̲e̲r̲


1.       I̲N̲T̲R̲O̲D̲U̲K̲T̲I̲O̲N̲

         Det er besluttet, at CR skal give tilbud p> et udviklings-
         og produktionsprogram for en multiplexerenhed til HARRIS
         Tactical Satellite Terminals Operation (TSTO).  Tidligere
         korrespondance fremg>r af vedlagte bilag 1.


2.       T̲I̲D̲S̲P̲L̲A̲N̲ ̲F̲O̲R̲ ̲T̲I̲L̲B̲U̲D̲

         Tidsplanen for afgivelse af tilbud fremg>r af bilag
         2.  If]lge aftale mellem AH og HARRIS TSTO skal vi
         have f]lgende klar inden d. 18. februar, hvor HARRIS
         TSTO afl`gger os et bes]g:

         1.  Preliminary Technical design (som kan pr`senteres
             for HARRIS' tekniske personale).

         2.  En Not-To-Exceed Price (NTE).

         Den tekniske l]sning samt prisen skal tilsammen g]re
         CR konkurrencedygtig i forhold til vore konkurrenter,
         som har afgivet tilbud til HARRIS.

         Den 24. februar afg]res det, om HARRIS f>r hovedkontrakten.
          Hvis dette er tilf`ldet, og vi sk]nnes konkurrencedygtige,
         vil CR udarbejde selve tilbuddene if]lge planen i bilag
         2.

         Hvis HARRIS ikke f>r kontrakten, kan vi eventuelt give
         tilbud til det firma, som f>r den.


3.       A̲N̲S̲V̲A̲R̲S̲F̲O̲R̲D̲E̲L̲I̲N̲G̲

         a)  Den forel]bige plan for gennemf]relse af et eventuelt
             projekt er f]lgende:

             A̲k̲t̲i̲v̲i̲t̲e̲t̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲A̲n̲s̲v̲a̲r̲l̲i̲g̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
             ̲ ̲ ̲ ̲ ̲ ̲

             Udvikling                 Development Div.
             Test                      Development Div.
                 Produkion                 Production Div.
             Logistics                 System Div.
             Program Mgmt.             System Div.
             Configuration Mgmt        System Div.


         b)  Ansvarlige personer m.h.t. de syv tilbudssektioner
             er som f]lger:

             V̲o̲l̲u̲m̲e̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲A̲n̲s̲v̲a̲r̲l̲i̲g̲
             ̲ ̲ ̲ ̲

             I       Technical Approach                 GB
             II      Manufacturing and Production       KM[
             III     Test                               GB
             IV      Logistics                          OE
             V       Program Control                    GJ
             VI      Configuration Mgmt                 GJ
             VII     Cost                               BR +
                     FR


             OE er Proposal Manager.



4.       U̲D̲A̲R̲B̲E̲J̲D̲E̲L̲S̲E̲ ̲A̲F̲ ̲T̲I̲L̲B̲U̲D̲D̲E̲T̲

4.1      W̲B̲S̲

     OE  OE udarbejder en WBS struktur for hver af de 6 discipliner
         svarende til volumes I til VI.  Denne struktur skal
         danne basis for pristilbuddet.  De tilbudsansvarlige
         kan `ndre i strukturen, s>ledes at den endelige WBS
         reflekterer de aktuelle arbejdsopgaver (Work Packages).
          Hver WP har 3 elementer:

         1.  Cost (mandm>neder og omkostninger)
         2.  Schedule
         3.  Work Package Description


4.2      N̲T̲E̲ ̲P̲R̲I̲C̲E̲

         Baseret p> den endelige WBS udarbejder hver tilbudsansvarlig
         en pris opdelt i de elementer, som kr`ves if]lge RFQ.

     OE  OE vil udarbejde en "pricing structure".
 
         Priselementerne inds`ttes i PROPTOOL systemet.


4.3      T̲i̲l̲b̲u̲d̲ ̲V̲o̲l̲.̲ ̲I̲-̲V̲I̲I̲

         Efter de prelimin`re dr]ftelser med HARRIS i februar
         besluttes det, om vi skal g> videre og lave selve tilbudsteksten.
          Denne skal i s> fald bygges over work package descriptions
         lavet tidligere.


5.       K̲I̲C̲K̲-̲O̲F̲F̲ ̲M̲[̲D̲E̲

    alle Der indkaldes til kick-off m]de

               onsdag d. 82-01-27 kl. 10.00

         i LSN's m]delokale.

         Det foruds`ttes, at de tilbudsansvarlige har l`st hele
         tilbudsmaterialet.



6.       U̲D̲B̲U̲D̲S̲M̲A̲T̲E̲R̲I̲A̲L̲E̲T̲

     OE  Der trykkes i ]jeblikekt 10 kopier af udbudsmaterialet,
         som vil blive udleveret snarest.  P> nuv`rende tidspunkt
         har GB, OE og AH en kopi.



7.       B̲I̲L̲A̲G̲ ̲3̲

         Dette er OE's notater gjort under genneml`sning af
         udbudsmaterialet.


S̲E̲C̲T̲I̲O̲N̲ ̲ ̲ ̲ ̲P̲a̲g̲e̲
                     R̲F̲Q̲

   1      5      Rights in Computer Software

   1      3      Validity of bid: 90 days

   1      4      Progress payment

   1      5      PROPOSAL FORMAT (10 copies ea):
                 VOLUME I     TECHNICAL APPROACH
                    "   II    MANUFACTURING & PRODUCTION
                    "   III   TEST
                    "   IV    LOGISTICS
                    "   V     PROGRAM CONTROL
                    "   VI    CONFIGURATION MGMT
                    "   VII   COST

   1      6      Fabrication Requirements are SCA-2262 (see
                 applicable docu.)

   1      7      T̲E̲C̲H̲N̲I̲C̲A̲L̲ ̲A̲P̲P̲R̲O̲A̲C̲H̲
                 a.  INDEX (table of Contents) shall be a compliance
                     matrix

   1      9      M̲A̲N̲U̲F̲A̲C̲T̲U̲R̲I̲N̲G̲ ̲A̲N̲D̲ ̲P̲R̲O̲D̲U̲C̲T̲I̲O̲N̲
                 a.  INCLUDES QA
                     REQUIREMENTS MIL-Q-9858A
                           "      MIL-S-52779A

   1     13      T̲E̲S̲T̲S̲
                 Requirements in section 4 of SCA-2262.

   1     15      L̲O̲G̲IS̲T̲I̲C̲S̲
                 a.  Logistics Support Analysis (LSA)

   1     17      P̲R̲O̲G̲R̲A̲M̲ ̲C̲O̲N̲T̲R̲O̲L̲
                 a.  WBS structure to be used (p. 18)

   1     19      C̲O̲N̲F̲I̲G̲U̲R̲A̲T̲I̲O̲N̲ ̲M̲A̲N̲A̲G̲E̲M̲E̲N̲T̲
                 a.  MIL-STD-1456 (Requirement)

   1     25      C̲O̲S̲T̲ ̲P̲R̲O̲P̲O̲S̲A̲L̲
                 a.  DD633 must be used.
                 b.  Comments to Terms and Conditions.

   1     26      Proposal Evaluation Criteria
                 (check for important contents)

   1     36      Cost Categories requested


S̲E̲C̲T̲I̲O̲N̲ ̲ ̲ ̲ ̲P̲a̲g̲e̲
                     RFQ  cont'd

   1     37      Data and Services
                 a.  that each SDRL item must be costed in price
                     proposal
                 b.  some of the SDRL items must be delivered
                     with the proposal
   1     42      Terms and Conditions


S̲E̲C̲T̲I̲O̲N̲  P̲a̲g̲e̲
                     S̲O̲W̲

   2      2      Production 250 + 326 for shelters

   2      7      Seller's technical - management database must
                 conform 100% with WBS.

   2     11      Maintainability predictions must be performed.

   2     11      Safety Assessment Report

   2     12      Configuration Inspection Record

   2     16      First Article Testing 24-28 Month ARO

   2     17      4 Resident Customer personnel


                     A̲P̲P̲E̲N̲D̲I̲X̲ ̲A̲ ̲t̲o̲ ̲S̲O̲W̲

   2     85      Nuclear Radiation Susceptability Testing
               - Gamma dose
               - neutron susceptability (analysis)

   2     86      TEMPEST Testing
 
   2     86      Thermal Survey "hot spots"

   2     85      First Article Testing (20 units)

   2     88        "      "       "     "     "


S̲E̲C̲T̲I̲O̲N̲ ̲ ̲ ̲ ̲P̲a̲g̲e̲
                     U̲n̲i̲t̲ ̲S̲p̲e̲c̲i̲f̲i̲c̲a̲t̲i̲o̲n̲
 
                 G̲E̲N̲E̲R̲A̲L̲ ̲D̲E̲S̲C̲R̲I̲P̲T̲I̲O̲N̲ ̲(̲s̲u̲b̲s̲e̲c̲t̲i̲o̲n̲ ̲3̲)̲

   3     12      Input/Output device

   3     13      Nonvolatile memory 12 hours retention

   3     24      Voice Interface

   3     49      Alarms

   3     53      MTBF MIN 8000 HRS (predicted)

   3     54      MTTR 20 mins/1 hour

   3     55      No preventive maintenance

   3     58      EMP transient protection

   3     59      Nuclear Radiation Survivability

   3     60      Forced Cooling from rack

   3     62      -32…0e…o…0f…C to +65…0e…o…0f…C

   3     62      Cooling Air 145…0e…0…0f…F max.

   3     66      Derating of parts MIL-M-38510 B


                 Q̲A̲ ̲P̲R̲O̲V̲I̲S̲I̲O̲N̲S̲ ̲(̲s̲u̲b̲s̲e̲c̲t̲i̲o̲n̲ ̲4̲)̲

   3     81      Reliability Demonstration

   3     82      Burn-in
 
   3     83      Maintainability Demonstration


   4             S̲U̲B̲C̲O̲N̲T̲R̲A̲C̲T̲ ̲D̲A̲T̲A̲ ̲R̲E̲Q̲.̲ ̲L̲I̲S̲T̲ ̲(̲S̲R̲D̲L̲)̲

                 Dette projekt kr`ver mere "papir" end det nogensinde
                 tidligere er set.


   5             D̲A̲T̲A̲ ̲I̲T̲E̲M̲ ̲(̲D̲I̲)̲

                 Dette er en detaljeret listning af krav for
                 de enkelte dokumenter anf]rt i SRDL.


S̲E̲C̲T̲I̲O̲N̲ ̲ ̲ ̲ ̲P̲a̲g̲e̲

   6      7      Schedule of deliverable data

   7             G̲E̲N̲E̲R̲A̲L̲ ̲P̲R̲O̲V̲I̲S̲I̲O̲N̲S̲

   8             C̲E̲R̲T̲I̲F̲I̲C̲A̲T̲I̲O̲N̲S̲

   9             F̲I̲N̲A̲N̲C̲I̲A̲L̲ ̲Q̲U̲E̲S̲T̲I̲O̲N̲A̲I̲R̲E̲