DataMuseum.dk

Presents historical artifacts from the history of:

CR80 Wang WCS documentation floppies

This is an automatic "excavation" of a thematic subset of
artifacts from Datamuseum.dk's BitArchive.

See our Wiki for more about CR80 Wang WCS documentation floppies

Excavated with: AutoArchaeologist - Free & Open Source Software.


top - download

⟦a61dfbc42⟧ Wang Wps File

    Length: 22643 (0x5873)
    Types: Wang Wps File
    Notes: CPS/210/SYS/0001          
    Names: »0604A «

Derivation

└─⟦468384ecf⟧ Bits:30006005 8" Wang WCS floppy, CR 0040A
    └─ ⟦this⟧ »0604A « 

WangText




…02…CPS/210/SYS/0001

…02…821101…02……02…
CAMPS
 SYSTEM
 REQUIREMENTS
…02…ISSUE
 3.11…02…CAMPS









            T̲A̲B̲L̲E̲ ̲O̲F̲ ̲C̲O̲N̲T̲E̲N̲T̲S̲…01…S̲e̲c̲t̲i̲o̲n̲ ̲4̲



   4  QUALITY ASSURANCE PROVISIONS ................. 
   353

     4.1  TEST AND VERIFICATION METHODS ............ 
     353
     4.2  VERIFICATIONS ............................ 
     353
       4.2.1  Hardware Verification ................ 
       354
         4.2.1.1  Prototype Verification ........... 
         354
         4.2.1.2  Preproduction Verification ....... 
         355
         4.2.1.3  Production Verification .......... 
         355
         4.2.1.4  DSMT (Prototype) System
                    Verification .....................
  355
         4.2.1.5  Factory Acceptance Verification .. 
         356
         4.2.1.6  COMSEC In Plant Verification ..... 
         356
         4.2.1.7  Availability Verification ........ 
         356
           4.2.1.7.1  MTBF  Verification ........... 
           357
             4.2.1.7.1.1  MTBFs of 3500 Hours or
                          Less ..................... 
             357
             4.2.1.7.1.2  MTBFs Greater than 3500
                          Hours .................... 
           359

           4.2.1.7.2  MTTR  Verification ........... 
           360
             4.2.1.7.2.1  MTTRs of 45 Minutes or
                          Less ..................... 
               360
             4.2.1.7.2.2  MTTRs Greater than 45
                          Minutes .................. 
         361

           4.2.1.7.3  R&M Unit or Module Test Plan . 
           362

       4.2.2  Software Verification ................ 
       362
         4.2.2.1  Software Development Verification  
         362
         4.2.2.2  In Plant Software Verification ... 
         363
         4.2.2.3  Software Functional Verification . 
         364
         4.2.2.4  Software Operational Verification  
         364

       4.2.3  System Verification .................. 
       365
         4.2.3.1  COMSEC On-Site Verification ...... 
         365
         4.2.3.2  Site Provisional Acceptance (SPA)  
         365




             4̲ ̲ ̲Q̲U̲A̲L̲I̲T̲Y̲ ̲A̲S̲S̲U̲R̲A̲N̲C̲E̲ ̲P̲R̲O̲V̲I̲S̲I̲O̲N̲S̲



         This section specifies the quality assurance provisions
         applicable to verification of equipment and software.



4.1…02…T̲E̲S̲T̲ ̲A̲N̲D̲ ̲V̲E̲R̲I̲F̲I̲C̲A̲T̲I̲O̲N̲ ̲M̲E̲T̲H̲O̲D̲S̲

         The unit test requirements will be met by one of the
         following methods:

…02…a.       E̲x̲a̲m̲i̲n̲a̲t̲i̲o̲n̲.̲ This method is a non-functional verification,
         such as visual inspection of the physical characteristics
         of the item or of the documentation associated with
         the item.

…02…b.       A̲n̲a̲l̲y̲s̲i̲s̲.̲ This method is a non-functional verification,
         such as deduction or translation of data, review of
         analytical data, or performance of a detailed analysis.

…02…c.       T̲e̲s̲t̲ ̲D̲e̲m̲o̲n̲s̲t̲r̲a̲t̲i̲o̲n̲.̲ This method is a functional verification,
         such as actual operation wherein the element of verification
         is instrumented, measured, or displayed directly (test)
         or where the element of verification is logically obvious,
         as the result of some other verification, but not itself
         displayed (demonstration).



4.2…02…V̲E̲R̲I̲F̲I̲C̲A̲T̲I̲O̲N̲

         a)  The verification efforts are divided into hardware,
             software and system verification.

         b)  The verification will be divided into two classes
             which are

…02…         I   - Internal verification
…02…         II  - External verification

         c)  Only class II verifications shall be approved by
             SHAPE.



         d)  Class I verifications shall be approved by CR's
             internal QA only, but may be inspected by SHAPE's
             QAR.

         e)  The verification efforts shall be divided into
             the verification type defined below.



         f)  H̲A̲R̲D̲W̲A̲R̲E̲ ̲V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲


…02…         C̲l̲a̲s̲s̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲ ̲T̲y̲p̲e̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

         …02…I…02…Prototype Verification
…02……02…I        Preproduction Verification
         …02…I…02…Production Verification
         …02…II…02…DSMT (Prototype) System Verification
         …02…II…02…Factory Acceptance Verification
         …02…II…02…COMSEC In-Plant Verification
         …02…II…02…Availability Verification

         g)…02…S̲O̲F̲T̲W̲A̲R̲E̲ ̲V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲


         …02…C̲l̲a̲s̲s̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲ ̲T̲y̲p̲e̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

         …02…I…02…Software Development Verification
         …02…II…02…In Plant Software Verification
         …02…II…02…Software Functional Verification
         …02…II…02…Software Operational Verification

         h)  S̲Y̲S̲T̲E̲M̲ ̲V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲


             C̲L̲A̲S̲S̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲ ̲t̲y̲p̲e̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
             ̲ ̲ ̲

             II     Comsec On-site Verification
             II     Site Provisional Acceptance (SPA)


4.2.1…02…H̲a̲r̲d̲w̲a̲r̲e̲ ̲V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲


4.2.1.1…02…P̲r̲o̲t̲o̲t̲y̲p̲e̲ ̲V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲

         The Prototype Verification is an internal verification
         (class I).  The verification methods used are examination
         and test.  The purpose of the prototype verification
         is


         to verify that the prototype meets the basic requirements
         of its product specification.  This is only applicable
         to new design of units, modules and subsystems or modifications
         to existing design.



4.2.1.2…02…P̲r̲e̲p̲r̲o̲d̲u̲c̲t̲i̲o̲n̲ ̲V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲

         The preproduction verification (First Article Qualification
         Test) is an internal verification (class I).  The verification
         methods used are examination and test.  This verification
         shall verify that the preproduction item meets all
         the requirements of its product specification.  This
         verification is only applicable to new design of units,
         modules and subsystems or modifications to existing
         design.



4.2.1.3…02…P̲r̲o̲d̲u̲c̲t̲i̲o̲n̲ ̲V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲

         The production verification which is internal (class
         I) is the verification to be performed on each unit,
         module and subsystem following manufacture to ensure
         that all items are in accordance with product specification
         prior to system integration.



4.2.1.4…02…D̲S̲M̲T̲ ̲(̲P̲r̲o̲t̲o̲t̲y̲p̲e̲)̲ ̲S̲y̲s̲t̲e̲m̲ ̲V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲

         a)  When the hardware of DSMT System has been integrated
             and the system software completed, a DSMT (Prototype)
             Acceptance Verification of the integrated system
             will be performed.

         b)  This is an external verification (class II). Upon
             SHAPE approval of the results of the tests, the
             manufactured systems are baselined.





4.2.1.5…02…F̲a̲c̲t̲o̲r̲y̲ ̲A̲c̲c̲e̲p̲t̲a̲n̲c̲e̲ ̲V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲

         a)  When a CAMPS has been integrated at the factory,
             a test will be carried out to verify that all hardware
             fulfils the functional specifications.  The test
             is a subset of the DSMT (Prototype) System Verification.
             The subset of test procedures will be identical
             to the performance test procedures used for the
             DSMT (Prototype) tests, except for the exclusion
             of the environmental tests.

         b)  This test is according to contract document para.
             17.4 This is an external verification (class II).



4.2.1.6…02…C̲O̲M̲S̲E̲C̲ ̲I̲n̲-̲P̲l̲a̲n̲t̲ ̲V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲

         The CAMPS equipment will be tested by Purchaser at
         the factory. The purchaser will liaise directly with
         the national COMSEC authorities where appropriate.
         Refer to section 3.4.5.1.



4.2.1.7  A̲v̲a̲i̲l̲a̲b̲i̲l̲i̲t̲y̲ ̲V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲

         a)  The availability and reliability performance characteristics
             specified in section 3.4.4 shall be demonstrated
             by performing availability measurements/calculations,
             in which the values of the module/unit MTBFs and
             MTTRs are verified by:

             1)  Testing/analysis in accordance with sections
                 4.2.1.7.1, 4.2.1.7.2 and 4.2.1.7.3 or,



             2)  Provision of acceptable evidence of conformity
                 to requirements, i.e. evidence supported by
                 prior observation of system or module performance
                 over a length of time sufficient to have the
                 same degree of confidence as the test procedure
                 that the required availability can be archived.

             3)  Availability/reliability/maintainability observations
                 which the contractor wishes to submit in lieu
                 of testing shall be provided as part of the
                 R&M Plan for agreement by the purchaser.

         b)  The set of units and modules, taken together, shall
             make up the CAMPS equipment of the R&M model(s)
             used for verification of system availability. A
             definition of the terms module and unit is given
             in section 3.4.4.7 l and m.

         c)  The R&M Characteristics shall be considered acceptable
             if it is verified that the reliability performance
             requirements specified in section 3.4.4. are met.
             Demonstration that the specified availability requirements
             have been met shall be accomplished prior to acceptance
             of the first site.



4.2.1.7.1    M̲T̲B̲F̲ ̲V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲



4.2.1.7.1.1  M̲T̲B̲F̲s̲ ̲o̲f̲ ̲3̲5̲0̲0̲ ̲H̲o̲u̲r̲s̲ ̲o̲r̲ ̲L̲e̲s̲s̲

         a)  Tests shall be performed to measure the MTBF of
             all units and modules having a predicted MTBF value
             of 3500 hours or less. The contractor need not
             test all the individual units of a module being
             tested unless the unit has a MTBF value less than
             3500 hours and is part of another module which
             is not being tested.

         b)  R&M testing shall be conducted in accordance with
             an approved unit or module test plan. The overall
             system test programme shall be planned so that
             reliability data is obtained from as many functional
             tests as possible. In this manner the performance
             of reliability testing, per se, will be reduced
             to the minimum necessary for the demonstration
             of system compliance with the R&M availability
             requirements.



         c)  The R&M Test Programme shall make provisions for
             the accumulation of sufficient testing time on
             each type of module. The accumulated testing time
             shall be equivalent to at least three multiples
             of either:

             1)  the predicted MTBF value of the module with
                 an MTBF of 3500 hours or less, or

             2)  the largest predicted unit MTBF value for units
                 having a predicted MTBF value less than 3500
                 hours and forming part of a module with a MTBF
                 value greater than 3500 hours.

         d)  The R&M test programme shall provide for demonstrating
             that unit and module MTBF values are equal to or
             greater than the respective predicted values, to
             a lower confidence limit value in accordance with
             the following schedule:

             1)  70% lower confidence limit value at the time
                 of Factory Acceptance Verification (site 1)

             2)  80% lower confidence limit value at the time
                 of SPA (Site 1)

         e)  The lower confidence limit values of MTBF shall
             be determined from the test data using the following
             equation:


                                    2T…0f…M…0e…                    
             
               MTBF…0f…LCL…0e…       …0f…=…0e…   …0e… ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲…0f…             
                                       2                   
          
                                          ,f               
         

            where
                   T…0f…M…0e…         =   the total cumulative module
                              or
                                  unit operating time obtained
                                  from the test programme
                     2  
                      ,…0f…f…0e…      =   chi-square value with    
                                  probability and f degrees
                                  freedom

                              =    (̲1̲0̲0̲-̲L̲C̲L̲)̲
                                      100



                   LCL        =    Specified Lower Confidence
                                     Level, expressed as a percentage

                   f          =    2x(N…0f…p…0e… + 1)

                   N…0f…p…0e…         =    the actual number of va-
                                     lid module or
                                     unit failures observed
                                     during the period T…0f…M…0e….



4.2.1.7.1.2  M̲T̲B̲F̲s̲ ̲G̲r̲e̲a̲t̲e̲r̲ ̲T̲h̲a̲n̲ ̲3̲5̲0̲0̲ ̲H̲o̲u̲r̲s̲

         a)  The contractor shall justify the use of MTBF values
             greater than 3500 hours for individual units and
             for modules, without redundant units, by means
             of analytical calculations. Such calculations shall
             use values taken from actual test data on "like"
             or similar equipment or from a component analysis,
             utilizing values taken from recognized sources,
             e.g. reliability and maintainability handbooks
             maintained by National Government and by Industry.

         b)  The preliminary and final R&M Programme Plans shall
             identify those units and modules which have predicted
             MTBF values greater than 3500 hours, and which
             will have the MTBF values justified rather than
             tested. The list shall include the predicted value
             of MTBF for such units and modules. The list may
             be changed as the programme progresses provided
             notification is given at least 60 days in advance
             of starting or cancelling any planned tests. The
             change process contemplated for this list is the
             same as that provided in the contract for all items
             (data) under Configuration Control except:

             1)  The contractor's proposals will not include
                 any consideration of the cost impact for contractor's
                 proposed change.

             2)  Such proposals, once mutually agreed for all
                 project impacts other than cost, will be contractually
                 implemented at no change in contract price.

             3)  These change proposals shall be treated as
                 "critical documents" within the meaning of
                 Contract Special Provision No. 11, Approval
                 and Submittal of Documentation.



             The analytical calculations for all units, and
             modules in this category shall be submitted to
             the purchaser for approval at least 60 days prior
             to the start of any acceptance testing.



4.2.1.7.2    M̲T̲T̲R̲ ̲V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲



4.2.1.7.2.1  M̲T̲T̲R̲s̲ ̲o̲f̲ ̲4̲5̲ ̲M̲i̲n̲u̲t̲e̲s̲ ̲o̲r̲ ̲L̲e̲s̲s̲

         a)  Tests shall be performed to measure the MTTR of
             all types of units and modules with a predicted
             MTTR value of 45 minutes or less.

             The contractor need not test individual units of
             a module that is being tested unless the unit is
             also a part of another module that is not being
             tested.

         b)  The tests shall be carried out in accordance with
             an approved R&M Unit or Module Test Plan. The overall
             test programme shall be planned so that data related
             to maintainability is obtained from as many functional
             tests as possible. In this manner the performance
             of maintainability testing, per se, will be reduced
             to the minimum  necessary for the demonstration
             of system compliance with the R&M availability
             requirements.


         c)  The MTTR measurements shall include corrective
             and preventive maintenance actions, the time to
             localise the failure to a particular module, time
             to replace the failed module, verify the repair
             action and restoring the system to operational
             configuration exclusive of any software load requirements.
             The MTTR does not include the repair time of the
             failed module. The R&M test programme shall provide
             for demonstrating that unit and module MTTR values
             are less than or equal to the respective predicted
             MTTR values to an upper confidence limit value
             in accordance with the following schedule:

             1)  70% upper confidence limit value at the time
                 of Factory Acceptance Verification (Site 1).

             2)  80% upper confidence limit value at the time
                 of SPA (Site 1).



         d)  The upper confidence limit values of MTTR shall
             be determined from the test data by the following
             equation:
                            ̲                    
             MTTR…0f…UCL…0e…  =  X + (t  …0f…,f…0e…)  .  ̲S̲ ̲      
                                                 
                                           …0e…N…0f…  

             where
                             
                ̲              
             X      = the observed statistical mean of
                        the measured maintenance action
                        periods:

                ̲                         
                       X                 
             X  =    ̲ ̲i̲
                             
                       N              
                                    


         Where X…0f…i…0e… are the individual observations and N is the
         number of test measurements.

             t  …0f…,f   = Students t-value with probability   and
                       f   degrees of freedom,

                 = (̲1̲0̲0̲-̲U̲C̲L̲)̲
                     100

             UCL = Specified Upper Confidence Limit expressed
                 as
                   a percentage.

             f   = (N-1),

             S   = Observed standard deviation of the measured
                 
                   maintenance action periods:
                                  ̲              
                 S…0e…2…0f… =    (X…0f…i…0e… - X)…0e…2…0f…/(N - 1)

4.2.1.7.2.2  M̲T̲T̲R̲s̲ ̲G̲r̲e̲a̲t̲e̲r̲ ̲T̲h̲a̲n̲ ̲4̲5̲ ̲M̲i̲n̲u̲t̲e̲s̲

         a)  The preliminary and final R&M Programme Plans shall
             identify those units and modules that have MTTR
             values greater than 45 minutes, together with the
             predicted MTTR values. Reasons for assigning a
             MTTR value in excess of 45 minutes to a unit or
             module shall be given and shall explain the maintenance
             procedures involved in restoring such a unit or
             module to service when a malfunction occurs.


             Justifying analyses to prove that the overall availability
             requirements can be met with units having MTTR
             values in excess of 45 minutes shall be provided.

         b)  The list of units and modules having MTTR values
             greater than 45 minutes may be changed as the programme
             progresses provided notification is given at least
             60 days in advance of starting any testing or cancelling
             any planned tests. The change process contemplated
             for this list is the same as that provided in the
             contract for all items (data) under Configuration
             Control except:

             1)  The contractor's proposals will not include
                 any consideration of the cost impact for contractor's
                 proposed change.

             2)  Such proposals, once mutually agreed for all
                 project impacts other than cost, will be contractually
                 implemented at no change in contract price.

             3)  These change proposals shall be treated as
                 "critical documents" within the meaning of
                 Contract Special Provision No. 11, Approval
                 and Submittal of Documentation.



4.2.1.7.3    R̲&̲M̲ ̲U̲n̲i̲t̲ ̲o̲r̲ ̲M̲o̲d̲u̲l̲e̲ ̲T̲e̲s̲t̲ ̲P̲l̲a̲n̲s̲

         The MTBF and MTTR for each unit and module shall be
         part of a R&M Unit and module test plan which in detail
         will specify how the MTBF and/or MTTR is to be verified
         either by test, analysis or presentation of evidence
         of conformity.



4.2.2    S̲o̲f̲t̲w̲a̲r̲e̲ ̲V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲



4.2.2.1  S̲o̲f̲t̲w̲a̲r̲e̲ ̲D̲e̲v̲e̲l̲o̲p̲m̲e̲n̲t̲ ̲V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲

         The software development verification is an internal
         verification (class I) performed during the development
         of the software.



         All software and parts thereof shall be thoroughly
         tested at each step of development and integration.



4.2.2.2  I̲n̲ ̲P̲l̲a̲n̲t̲ ̲S̲o̲f̲t̲w̲a̲r̲e̲ ̲V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲

         In plant software verification (class II) shall be
         performed as outlined in the software test plan.

         The software test will be performed in the factory
         with a simulated environment specified in section 3.5.11.5.2.
         The status information on request refer section 3.2.3.6
         shall not be used during acceptance test of busy hour
         performance. The test criteria requires an accumulated
         test time of 240 hours with the following allowable
         errors:

         a)  C̲a̲t̲e̲g̲o̲r̲y̲ ̲1̲

             a total of 1 error allowed of the following types:

             - Loss of a message or other transaction.
             - Corruption of a message or other transaction.
             - A message or transaction being missent.
             - Misapplication of security rules.
             - Failure of accounting procedures.

         b)\C̲a̲t̲e̲g̲o̲r̲y̲ ̲2̲

             A total of 2 errors allowed of the following types:

             1)  loss of service to more than 25% of all 
                 channels and user connecting points.

             2)  loss of service to more than 50% of all
                 operating positions or system reporting
                 facilities.

             3)  Loss of ability to recover the system.

         c)  C̲a̲t̲e̲g̲o̲r̲y̲ ̲3̲

             a total of 3 errors allowed of the following types:

             1)  errors not included in 1 and 2 above.



         d)  The software Test Plan shall specify the tests
             which will provide the reliability prediction to
             calculate the probability that the MDSD of:

             1)  category 1 SW errors is    240 hours

             2)  category 2 SW errors is    120 hours

             3)  category 3 SW errors is     80 hours



4.2.2.3…02…S̲o̲f̲t̲w̲a̲r̲e̲ ̲F̲u̲n̲c̲t̲i̲o̲n̲a̲l̲ ̲V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲

         a)  At the first site (SHAPE) CR shall conduct a formal
             functional test (class II) to verify basic system
             functions and interfaces.  The test will be supervised
             by CR test engineers and SHAPE operational staff
             will assist in operating the system.

         b)  NICS-TARE, ACE CCIS, and SCARS II are planned to
             be available, however, in the event one or more
             of the interfaces are not available, the contractor
             shall proceed with all of those components of the
             system that are independent of the missing interfaces.

         c)  In this event SHAPE will give Site Provisional
             Acceptance, not withstanding the inability to test
             all interfaces, providing all other aspects of
             the test are satisfactorily completed.


4.2.2.4…02…S̲o̲f̲t̲w̲a̲r̲e̲ ̲O̲p̲e̲r̲a̲t̲i̲o̲n̲a̲l̲ ̲V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲

         a)  Immediately after successful completion of the
             Software Functional Verification at the SHAPE site,
             an Operational Test (class II) shall take place
             in order to verify the reliability of the software
             system. The status information on request shall
             (refer section 3.2.3.6) not be used during busy
             hour test performance.

         b)  The operational test will take place under CR control
             but SHAPE personnel will operate the system in
             a live operational mode in accordance with agreed
             test plans and procedures.



         c)  The acceptance test criteria shall be that the
             CAMPS system shall be able to execute the basic
             software functions according to the approved System
             Requirements Specification for 1 period of 15 days
             and 2 periods of 20 calendar days in a live operational
             mode without any software failures.

             The initial 5 days of the test period shall be
             used for training of SHAPE's operational staff.

         d)  Any software failure, which concept will be defined
             in the acceptance test plan, shall require a complete
             retest cycle.  The duration of the test or retest
             may be shortened at SHAPE's discretion.



4.2.3…02…S̲y̲s̲t̲e̲m̲ ̲V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲


4.2.3.1…02…C̲O̲M̲S̲E̲C̲ ̲O̲N̲-̲S̲i̲t̲e̲ ̲V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲

         a)  When the CAMPS computer equipment and peripherals
             have been installed on-site, a COMSEC verification
             will be performed by the national COMSEC authorities.

         b)  Purchaser will supervise the verification and Christian
             Rovsing A/S test engineers will assist in operating
             the system.  The COMSEC on-site verification is
             a formal verification (class II). The verification
             shall take place in conjunction with the SPA.


4.2.3.2…02…S̲i̲t̲e̲ ̲P̲r̲o̲v̲i̲s̲i̲o̲n̲a̲l̲ ̲A̲c̲c̲e̲p̲t̲a̲n̲c̲e̲ ̲(̲S̲P̲A̲)̲

         a)  Site provisional acceptance is the act whereby
             SHAPE will acknowledge by protocol that CR has
             fully demonstrated that a site is complete and
             ready for initial operation and will take place
             when the following requirements have been met:

             1)  Completion of an agreed on-site acceptance
                 test.

             2)  Verification of the site inventory.

             3)  If applicable, availability of a mutually agreed
                 discrepancy list showing the agreed date for
                 clearance of each listed discrepancy.