S̲ ̲T̲ ̲A̲ ̲T̲ ̲U̲ ̲S̲ ̲ ̲R̲ ̲E̲ ̲P̲ ̲O̲ ̲R̲ ̲T̲
DATE: 801204
PREPARED BY: KNN
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲
CURRENT ACTIVITIES/ PROBLEMS FUTURE ACTIVITIES
ACHIEVEMENTS
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲
DAMOS ED/SD Contract…02…Have got no response…02…Close no later
…02…from JH[…02…than 15/12
DAMOS addition…02…Closed except for…02…Close last issues
requirements…02…minor issues exists…02…(due 15/12)
…02…
Identity DAMOS
and "CAMOS"key
documents:
o Product spec.…02…- " -…02…- " -
o Verification…02…- " -…02…- " -
control req.
index (VCRI)…02…
o Test plan, spe-…02…No explicit Work it together
cification and test planning effort with JH[
proc.
Identify DAMOS and…02…None have been Work it together with
"CAMOS" key reviews identified JH[
KNN/JH[ specify JH[ has very little Continue effort
On-line diagnostic time
(due 15/2)
KNN/JH[ specify off-
line M&D - " - - " -
(due 15/1)
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲
S̲y̲s̲t̲e̲m̲ ̲d̲e̲s̲i̲g̲n̲
- section 5…02…Too little HW manpower…02…Complete section by
(subsystem…02…available to meet due…02…15/12
specification)…02…date
due 1/12
…02…
- section 4…02…Too little HW and sys.…02…Complete section by
(system over-…02…eng. manpower available 15/12
view) due 1/12…02…to meet due date
- section 3…02…Too little sys.eng.…02…Complete section by
(system environ-…02…manpower available to…02…15/12
ment) due 1/12…02…meet due date
…02…
- section 2 Complete section by
(req. summary) 21/11
- section 1 Complete section by
21/11
- SDS evaluation Internal SDS review
8/12-11/12 1980
- SDS updating 11/12-16/12 1980
- SDS typing 8/12 1980 - 51/1 1981
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
SW Test Plan System design Produce plan
(LI 4.6.2) delayed 6 weeks 1/12 1980-15/1 1981
(contract due
date 30/11)
SW Integration SW Test plan delayed Produce plan
Plan (LI 4.6.3) 6 weeks 15/1-1/3 1981
(Contract due
date 31/1 1981)
Milestone Tracking Completed 12/11 1980 Update it
List Level II (due
date 17/11)
Milestone Tracking
List Level III
(due date 1/1 1981…02……02…1/12 1980-1/1 1981
Established a com-
plete problem rep./
action item system.
This is currently
maintained by CAMPS
SW, but will be
given over to
CAMPS SYS ENG
a.s.a.p.…02……02…Maintain system
…02……02…until CAMPS SYS.
…02……02…ENG. takes it over.
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲…86…1
…02… …02…