DataMuseum.dk

Presents historical artifacts from the history of:

CR80 Wang WCS documentation floppies

This is an automatic "excavation" of a thematic subset of
artifacts from Datamuseum.dk's BitArchive.

See our Wiki for more about CR80 Wang WCS documentation floppies

Excavated with: AutoArchaeologist - Free & Open Source Software.


top - download

⟦abfe1eb61⟧ Wang Wps File

    Length: 8920 (0x22d8)
    Types: Wang Wps File
    Notes: Spelunked
    Names: »~ORPHAN55.08«

Derivation

└─⟦3fbecbc6f⟧ Bits:30006206 8" Wang WCS floppy, CR 0307A
    └─ ⟦this⟧ »~ORPHAN55.08« 

WangText

…0a……00……00……00……00…7…0a……00……00…7…0b…7…0d…7…0e…7…02…6…0a…6…05…5…0d…4…01…3…08…3…0e…3…05…2…0b……86…1                                             …02…           …02…   …02…        

    1693A/rt      …02…CPS/TCM/005

…02…KJA/830912…02……02… 
CAMPS SITE LEVEL MAINTENANCE MANUAL
…02…Issue 1…02…CAMPS













                 CAMPS SITE LEVEL MAINTENANCE MANUAL



                 CPS/TCM/005

                 CTRL Documentation No:03
                 LINE ITEM No: 9.3











                 Kjeld Alfast




                 Kurt Nybroe-Nielsen 







                 SHPE (1), Conf. Mgmt., QA, BHB, 
                 KM, LU, ORP, PLN, CL, BSP, JJD, PBP, CLA, KJA.
                 KNN, Library (5), GQAR














                          ILS Manager    830912



             2


             830912
                          Conf. Mgm.     830912 …86…1          
                                                       …02…    
                           …02…  …02……02…   

    1693A/rt…02…CPS/TCM/005

…02…KJA/830912…02……02…ii
CAMPS MAINTENANCE MANUAL
…02…Issue 1…02…CAMPS














                 Her inds`ttes first aid


…0f…
    1693A/rt…02…CPS/TCM/005

…02…KJA/830912…02……02…iii
CAMPS SITE LEVEL MAINTENANCE MANUAL
…02…Issue 1…02… CAMPS…0e…














       820915                  All    Preliminary Issue of
                                     Document


Prelim. 830415    CPS LOG.1019    All    Issue 1 is based on
                                     SHAPE's comments in
                                     CPS LOG. 1019 and
                                     MM 31, Item 6.

Issue 1 830912    CPS LOG.1238    All    Issue 2 is based on
                 
                                       SHAPE's comments in
                                       in CPS Log.No.1238,830603
                                       and MOM 19 830906  …86…1
                                             …02…           …02…   …02… 
  

    1693A/rt     …02…CPS/TCM/005

…02…KJA/830912…02……02…iv 
CAMPS SITE LEVEL MAINTENANCE MANUAL
…02…Issue 1…02… CAMPS






                    T̲A̲B̲L̲E̲ ̲O̲F̲ ̲C̲O̲N̲T̲E̲N̲T̲S̲





   TITLE PAGE .......................................
       i
   FIRST AID FOR ELECTRICAL SHOCK ...................
      ii
   REVISION RECORD ................................. 
    iii
   TABLE OF CONTENTS ................................
      iv
   LIST OF ILLUSTRATIONS ............................
      ix
   LIST OF TABLES ...................................
       x
   ABBREVIATIONS ....................................
      xi

   1 INTROUCTION ................................... 1
     001
     1.1 SCOPE ......................................
         1 001
     1.2 MAINTENANCE MANUAL OVERVIEW ................
         1 001
     1.3 PHYSICAL DESCRIPTION AND LAYOUT ............
         1 002
     1.4 EQUIPMENT CONFIGURATIO .................... 1
         004

   2 OPERATING PROCEDURES ...........................
     2 001

   3 PREVENTIVE MAINTENANCE .........................
     3 001
     3.1 INTRODUCTION ...............................
         3 001
     3.2 PREVENTIVE MAINTENANCE SCHEDULE ........... 3
         002
     3.3 PREVENTIVE MAINTENANCE (PM) PROCEDURES .....
         3 003
       3.3.1 Daily Preventive Maintenance Schedule ..
             3 003
       3.3.2 Weekly Preventive Maintenance Schedule .
             3 003
       3.3.3 Monthly Preventive Maintenance Schedule.
             3 003
       3.3.4 TwoMonthly Preventive Maint. Schedule . 3
             004
       3.3.5 Quarterly Preventive Maint. Schedule ...
             3 004
       3.3.6 Biannually Preventive Maint. Schedule ..
             3 005
       3.3.7 Annually Preventive Maint. Schedule ....
             3 005
       3.3.8 Biennial Preventive Maint. Shedule .... 3
             006

     3.4 CHECK AND ADJUSTMENT PROCEDURES ............
         3 007
       3.4.1 Inspect S- and D-Fan Procedure .........
             3 007
         3.4.1.1 S-Fans .............................
                 3 007
         3.4.1.2 D-Fans .............................
                 3 008…86…1                              
                               …02…           …02…   …02…   

    1693A/rt     …02…CPS/TCM/005

…02…KJA/830912…02……02…v 
CAMPS SITE LEVEL MAINTENANCE MANUAL
…02…Issue 1 …02…CAMPS






     4 CORECTIVE MAINTENANCE ......................... 4
       001
       4.1 INTRODUCTION ...............................
           4 001
       4.2 SYSTEM BREAKDOWN ...........................
           4 004
         4.2.1 Processor Unit Subsystem ...............
               4 004
         4.2.2 Channel Unit Subsytem ................. 4
               006
         4.2.3 Watchdog Processor Unit Subsystem ......
               4 008
         4.2.4 TDX Subsystem ..........................
               4 010
         4.2.5 Distribution Equipment Subsystem .......
               4 012

       4.3 TROUBLESHOOTING TREE .......................
            015
         4.3.1 Troubleshooting Trees, Overview ........
               4 015
         4.3.2 System Troubleshooting Tree ............
               4 019
         4.3.3 Offline Troubleshooting Tree ...........
               4 025
           4.3.3.1 Processor Unit Test Procedures .....
                   4 035
           4.3.3.2 Channel nit Test Procedures ....... 4
                   071
           4.3.3.3 Watchdog Test Procedures ...........
                   4 147
           4.3.3.4 TDX Test Procedures ................
                   4 165
           4.3.3.5 Distribution Equipment Test Procedur
                   4 205
           4.3.3.6 Peripheral Equipment Test Procedures
                       

       4.4 REPLACEMENT PROCEDURES .....................
           4 235
         4.4.1 Processor Unit .........................
               4 238
           4.4.1.1 PU Module Replacement Procedure ....
                   4 238
           4.4.1.2 PU Power Supply Replacement 
                   Procedure ......................... 4
                   239
           4.4.1.3 PU Crate Replacement Procedures ....
                   4 240
           4.4.1.4 PU Fan Replacement Procedure .......
                   4 242
           4.4.1.5 Thermostat Replacement Procedure ...
                   4 243

         4.4.2 Channel Unit ...........................
               4 245
           4.4.21  CU Module Replacement Procedure ....
                   4 245
           4.4.2.2 CU Power Supply Replacement 
                   Procedure ..........................
                   4 246
           4.4.2.3 CU Crate Replacement Procedures ....
                   4 247
           4.4.2.4 MMD Replacement Procedure ..........
                   4 249
         4.4.2.5 SMD Replacement Procedure .......... 4
                 254
           4.4.2.6 Floppy Disk Station Replacement
                   Procedure ..........................
                   4 261

         4.4.3 Watchdog Unit ..........................
               4 262
           4.4.3.1 WD Module Replacement Procedure.... 4
                   262
           4.4.3.2 WD Crate Replacement Procedure .....
                   4 263

         4.4.4 TDX & Dist.Equip.Adapter Subsystem .....
               4 264
           4.4.4.1 TDX/Adapter Module Replacement 
                   Procedure ..........................
                   4 264
           4.4.4.2 TDX/Adapter Crate eplacement 
                   Procedure ..........................
                   4 265
           4.4.4.3 TDX Fan Replacement Procedure ......
                   4 266
           4.4.4.4 TDX Outlet Replacement Procedure ...
                   4 267



   1693A/rt     …02…CPS/TCM/005

…02…KJA/830912…02……02…vi
CAMPS SITE LEVEL MAINTENANCE MANUAL
…02…Issue 1…02… CAMPS





         4.4.5Mains Switch ........................... 4
         269
           4.4.5.1 Mains Switch Replacement Procedures 
                   4 269

         4.4.6 Frequency Stabilizer ...................
               4 270
           4.4.6.1 Frequency Stabilizer Replacement 
                   Procedure ......................... 4
                   270

         4.4.7 Rack ...................................
               4 271 
           4.4.7.1 Gasket Replacement Procedure .......
                   4 271 

       4.5 CONTROLS, INDICATORS AND SWITCH SETTINGS ...
           4 273
         4.5.1 Processor Unit Subsystem ...............
               4 273
         4.5.2 Chanel Unit Subsystem ................. 4
               274
         4.5.3 Watchdog Unit Subsystem ................
               4 274
         4.5.4 TDX Adapter Unit Subsystem .............
               4 275
         4.5.5 Distribution Equipment Subsystem .......
               4 275
         4.5.6 Mains Switch .......................... 4
               277
         4.5.7 Visual Display Unit (VDU) ..............
               4 277
         4.5.8 Medium Speed Printer (MSP) .............
               4 277

       4.6 ONLINE ERROR REPORTING .....................
           4 401
       4.7 OFFLINE M&D TEST PROGRAMS ..................
           4 403
         47.1  Introduction ...........................
               4 403
         4.7.2 User Interface .........................
               4 406
           4.7.2.1 Input ..............................
                   4 406
             4.7.2.1.1 Initial Format .................
                       4 407
             4.7.2.1.2 CPU Test ...................... 4
                       411
             4.7.2.1.3 MAP Test .......................
                       4 413
             4.7.2.1.4 RAM Test .......................
                       4 415
             4.7.2.1.5 Disk Test ......................
                       4 417
             4.7.2.1.6 FD Test ........................
                       4 425
             4.7.2..7  LTU Test .......................
                       4 432
             4.7.2.1.8 TDX Test .......................
                       4 440
           4.7.2.2 Output .............................
                   4 454

       4.8 BUILT-IN-TEST (BIT) PROGRAMS ...............
           4 549…86…1                                      
                 …02…           …02… …02… …02…   

    1693A/rt     …02…CPS/TCM/005

…02…KJA/830912…02……02…vii
CAMPS SITE LEVEL MAINTENANCE MANUAL
…02…Issue 1 …02…CAMPS






     5 S/ MAINTENANCE PROCEDURES ..................... 5
       001
       5.1 INTRODUCTION ...............................
           5 001
       5.2 REPORTING AND REGISTRATION .................
           5 001
       5.3 PERFORMING S/W MODIFICATIONS ...............
           5 002
         5.3.1 Load of ModifiedS/W ................... 5
               002
         5.3.2 Step-by-step Maintenance ...............
               5 003


     6 FAILURE REPORTING SYSTEM .......................
       6 001
       6.1 LOGBOOK ....................