⟦aca10dd1d⟧ Wang Wps File

    Length: 51971 (0xcb03)
    Types: Wang Wps File
    Notes: DIVERSE TELEX  CAMPS      
    Names: »4742A «

Derivation

└─⟦ce4ce986f⟧ Bits:30006193 8" Wang WCS floppy, CR 0449A
    └─ ⟦this⟧ »4742A « 

WangText





           
          1984-01-16
   knn/vhn

to:  shnmo division
     att.: mr.
 david levy,
 contracting
 officer

cc.: ltc henning
 hofmann, camps
 program manager
 

fm:  christian
 rovsing a/s,
 denmark
     kurt nybroe-nielsen

our ref: cps/101/tlx/1105

subject: invoice
 status
-----------------------
This is the
 invoice status
 of not paid
 invoices as
 of today:

Invoice No.          Due                       Currency          D.Kr.
-----------          ---                       --------          -----
25945      820210    Us dllrs.  12,634.35      
30756      830223                                411,452.64
25958      821010                                  5,651.90
30963      830403    Us dllrs.  20,460.61
30611      830530                                 67,462.80
30619      830530    Us lbs     55,159.18
34569      830930                                266,328.59
31173      830930    Uk lbs     94,632.95
31170      830813                                259,602.30
34577      831130    Us dllrs.   3,680.26
35752      831130                                 50,494.33
35755      831120                              4,560,151.20
35756      831120    Us dllrs. 188,971.74
35757      840212    Us dllrs. 379,950.83
36805      840212    Uk lbs.   216,225.12
36806      840212                              3,491,003.18
36807      840212                              3,587,439.00
36808      840212    Us dllrs. 136,484.80
37320      840229    us dllrs.  37,861.68
37334      840229    us dllrs.  43,937.99
37335      840229                              1,475,708.07
37380      840229                                294,411.80
37381                Us dllrs.  39,578.42

kind regards,
christian rovsing a/s

kurt nybroe-nielsen





                     1983-11-11   jho/bko

to:  shnmo division
     att.: mr. david levy, contracting officer

cc.: ltc henning hofmann, camps program manager 

fm:  christian rovsing a/s, denmark
     kurt nybroe-nielsen

our ref: cps/101/tlx/1042

subject: unsettled invoices on camps project
--------------------------------------------
Listed below please find the invoices which are due for payment,
 but are still wholly or partly unsettled:

inv.date       inv.no.   due date       amount dkr.    unpaid
                                                       dkr.      ref.

311281 24921   150282      970,254,88     126,972,66   9118
310882 25958   101082      378,972,60       5,651,90   9009
300383 30611   300583       67,462,80      67,462,80   9009
231282 30756   230283      411,452,64     411,452,64   2321
310583 31162   310783      148,646,89          60,08   9009
130683 31170   130883      259,602,30     259,602,30   9009
310783 34569   300983    2,382,970,50   2,382,970,50   9009

inv.date       inv.no.   due date       amount dlrs.   unpaid
                                                       dlrs.     ref.

300682 25440   300882      105,225,10      20,004,57   9009
310882 25945   021082       80,938,35      12,634,35   9009
300383 30610   300583      179,385,26      89,692,63   9009
231282 30749   230283       69,591,04      69,591,04   9009
030283 30963   030483       20,460,61      20,460,61   9009
310583 31713   310783      179,385,26      35,877,06   9009
310783 34568   300983      421,375,05       3,227,70   9009

inv.date       inv.no.   due date       amount p.uk.   unpaid
                                                       p.uk.     ref.

201282 30613   200283       19,549,85      11,729,93   9009
300383 30619   300583      110,318,36     110,318,36   9009
310583 31167   310783      110,318,36      22,063,74   9009
310783 31173   300983       94,632,95      94,632,95   9009

inv.date       inv.no.   due date       amount dm.     unpaid
                                                       dm.       ref.

310783 31174   300983      326,464,40   326,464,40     9009

please explain why the overdue invoices have not yet been
 wholly paid.

kind regards,
christian rovsing a/s
kurt nybroe-nielsen

















                       1983-09-01   bhb/vhn

to:  shnmo division
     att.: mr. paul f. shey, contracting officer

cc.: ltc henning hofmann, camps program manager 

fm:  christian rovsing a/s, denmark
     kurt nybroe-nielsen

our ref: cps/101/tlx/0946

subject: camps hardware status
------------------------------
ref.:    a)  shape telex, camps log no. 1351
     b)  cr telex, cps/101/tlx/0942, 830825
     c)  cr telex, cps/101/tlx/0905, 830719
     d)  mom shape/cr no. 33, 830706
     e)  fat report, site 12, cps/trp/017, 830718

1 This telex provides comments to the questions regarding
  potential problems in the camps hardware raised by
  shape in ref a).

  in addition a general statement on the current hardware
  status on the camps site equipment is provided based
  on cr's experience during integration and test.

2 Head alignment problem in the disk units. (ref a, sect.
  1a)
  -----------------------------------------------------------
  The investigations indicated in CR telex, ref c, have
  been continued, and the problem has been resolved as
  follows:

2.1  The initial boot as used in the FAT test boots up
     a "boot module" containing all programs used in
     the test procedure.

  This boot operation is driven by the DAMU program located
  in PROM's on the MIA-module.

  The DAMU boot program is more sensible to read errors
  than the DAMOS handler used in operation (it is not
  able to adjust head position etc).

  By analysis of the current version of the DAMU program
  the following was detected:

  a) The DAMU is specified for 10 retries.

  b) The current version made only one try, but the error
     code indicated 10.

  A new updated release will be issued after test. The
  scheduled date for release is october 1, 1983.

  The new version DAMU will be issued as an ECO to the
  MIA-module.

2.2  The test disk pack used for test in the latest fat's
     has been generated on a disk drive, which is out
     of alignment after repair at cr.

  2.2.1    head alignment is done using a "ce-packet",
  i.e. a specially prepared disk with the cylinders placed
  precisely according to specifications.

  2.2.2   cr has several ce-packets available inhouse
  and tests have shown that one is beyond specified tolerances.

  2.2.3   our repair log shows that this defect ce-packet
  has been used for repair of the disk drive used for
  generating the fat-disk pack.

  2.2.4   the following actions have been initiated:

  a) re-adjustment of disk drive

  b) production of new fat-disk packs.

  c) check of disk drives in the sites 8,12 and 14 and
     all other camps disk drives available at cr, which
     are suspected to be out of alignment.

  d) elimination of all disk packs produced on misaligned
     disk drives.

  e) to ensure that feasible preventive field maintenance
     actions minimates the risk for incompatibilities
     between camps sites in the field

  ce-packet
  dmm boot programs

3 vdu failure rate for site 12 (ref a, sect 1b)
  ---------------------------------------------
3.1  shape's question regarding vdu failure rate has
     been raised based on the ncr-overview in the FAT-report,
     (ref e), appendix c.

3.2  this ncr-overview presents all problems encountered
     by the test engineer throughout the site integration
     period.

  this overview is included in the test report on shape's
  request.

  All updates and repair on the vdu's are handled by
  the repair group within the ils-department at cr, which
  is going to take over the responsibility for repair
  in the warranty period.

  The current work sharing between ils-repair and the
  camps integration team includes that final test is
  done by the integration team.

  For the site 12-vdu's the final test has been conducted
  in the site 12-integation period and, therefore, the
  observed problems have (correctly) been included in
  the FAT 12 report.

3.3  cr has analysed the reported VDU failures, and provides
     the following information for clarification: (reference:
     ref e, appendix c):

  8 vdu's failed

  ERR.NO.  VDU       Description
  ------   ---       -----------
  32       741275    Picture unstable. crt board failure.
  34       741676    ee prom malfunction part/pmm board
                     failure.
  35       741430    keyboard malfunction. keyboard/cable
                     failure
  39       741697    brightness/contrast malfunction.
                     crt system failure.
  48       741416    dmm board failure.
  49       741667    picture unstable. crt board failure.
  53       741426    dmm board failure.
  57       741652    wrong display - due to bad eprom.

  comments:

  unstable picture means a slight vertical wave on the
  screen and is due to an error in the crt circuit.

  dmm board failure means an error in the ram area of
  this board that is a ram-chip has failed.

  bad eprom. cr updates all vdu eproms during integration,
  occationally one of these proms passes chip verification,
  but fails when mounted in vdu.

3.4        cr is continuously monitoring the failure
           rate of the vdu's and the rest of the equipment
           after fat.

  our observations have not displayed any new trends
  regarding the reliability of the vdu's.

  the control check on the site 12 vdu's (ref b) shows
  that after an accumulated time of use of more than
  10.000 (ten thousand) hours, no vdu's had failed.

3.5        cr's conclusion at this point of time is that

  a)       no needs have been observed for changing cr's
           testing of the vdu's in order to improve reliability
           in use

  b)       no trends have been observed which call for
           further investigation.

4.         msp problems
  ------------
4.1        the ncr overview in the fat report for site
           12 identifies 2 msp's with printing problems:

  err.no   serial no description
  ------   --------- -----------
  55       72        bad printing. print head driver
                     board defective

  56       18        dots missing. failure in motherboard.
                     the boards have been returned to
                     tracor for repair.

5.         intermittend system dumps
  -------------------------
5.1        shape telex, ref a) states an internal shape
           document as reference. cr would appreciate
           to have the report available in order to check,
           if all the problems reported have been covered
           by internal problem reports at cr.

5.2        based on problems reported in the period of
           f.michel's stay at cr, several aspects seem
           to be involved:

  a) software is currently under test. specially is a
     lot of updates under test on channels supported
     by the tdx-system

  b) in a number of cases, the system is halted with
     an error code stating "sti-dma error"

5.3  a problem report has been established on the "sti-dma
     error". the following actions have been taken to
     eliminate the problem:

  a) an eco, (no 808) has been released
     this eco updates the sti-micro-f/w (ic's no: 1885
     to 1893) from rev.10 to rev.11.  the module is changed
     from rev. 3a to 3b.

     this eco reduced the frequency of the "sti-dma"
     error a factor 10 (ten)

  b) a reference system was dedicated troubleshooting
     of the problem

     the h/w of this system was checked intensely. the
     result of this check was that no hardware deficiencies
     were observed.

  c) a new release of tdx-system-f/w is almost through
     test and will be released shortly. this new release
     amongst other also includes some modifications,
     which eliminates identified potential sources of
     the sti-dma-error.

     after release from development will this new release
     f/w be installed on the reference system for further
     observations.

5.4  status today is that on no h/w-items have been observed
     qualified defects in relation to the sti-dma problem.
     the new release of the tdx-f/w will be handled as
     eco's for 3 modules: sti, tia, ltux-s.

6.   the trouble shooting of the sti-dma failure is being
     monitored very closely to ensure coordination of
     effords and availability and of the best qualified
     resources.

  current status based on the camps sites in use for
  integration at cr is that the sti-dma-error is the
  only pending malfunction problem, where the h/w design
  cannot be totally out of suspicion.

kind regards,

christian rovsing a/s

kurt nybroe-nielsen







                     1983-07-14   jho/vhn

to:  shnmo division
     att.: mr. paul f. shey, contracting officer

cc.: ltc henning hofmann, camps program manager 

fm:  christian rovsing a/s, denmark
     kurt nybroe-nielsen

our ref: cps/101/tlx/0897

subject: invoices due for payment
---------------------------------
the following invoices are due for payment:

invoice no.  due date  missing amount     payment covers
------------------------------------------------------------
24920   x  820301    dlrs.   33,100.07  7 vdu's
24921   x  820301    dkr.   126,972.66  7 vdu's
25440   x  820830    dlrs.   23,251.48  4 vdu's
30361      830220    pound   11,729.92  off-line modules
30749   x  830223    dlrs.   69,591.04  test spec
30756      830223    Dkr.   411,452.64  rspl/manuals
25945   x  820210    dlrs.   80,938.35  6 mmd, 18 omdt
30963   x  830403    dlrs.   20,460.61  printer nato
30618   x  830530    dlrs.   38,481.45  8 stat mux
30604   x  830530    dlrs.  152,960.34  ptrp spares
30607   x  830530    dlrs.   13,528.49  15 tables
30611   x  830530    Dkr.    67,462.80  FAT 5, 15
30610   x  830530    dlrs.  179,385.26  FAT 5, 15
30619   x  830530    pound  110,310.36  FAT 5, 15
30626   x  830628    dlrs.    7,020.06  cr spares
30627   x  830628    dkr.    84,765.02  cr spares

please inform us of the reasons for withhelding payment for each
 invoice marked with an (x). for all other invoices the reasons
 are known and a correspondence has taken place.

kind regards,
christian rovsing a/s

kurt nybroe-Nielsen











                    1983-04-19      knn/vhn

to:  CR corp
     att.: borge riis vestergaard

fm:  christian rovsing a/s
     kurt nybroe-nielsen

our ref.:    cps/110/tlx/0100

subject nicstare spare parts production
---------------------------------------
ref a)   crc/fax/029, 18. feb. 1983

we hereby forward the quotation requested in ref a.

the prices quoted should be those litton gets.

how we (cr corp/cr a/s) split the money is subject to
 negotiation.

we have two problems. one is to know the latest eco
 status of the subject modules and second how are we
 going to system test the spare part products.

as we know that modules have been modified since they
 left cr corp, litton must have the latest eco status.
 please send this to us.

as we do not intend to send spare parts to litton, which
 have not been system tested, we have to find away of
 establishing a system at cr a/s production division.
 how can you support us?

                                                   qty.
Item                 description            unit price    p/n    a+b a+c d
no.                  d.kr.
-------------------------------------------------------------------
 1  av24 i/f         14.829     10.0119-8    1      2     
                                                          6
 2  32k ram          48.230     10.0142-2   10     14     22
 3  esccp i/f         9.225     10.0143-0    1      2     
                                                          6
 4  mbc              14.017     10.0111-2    1      2     
                                                          8
 5  comm-cpu         48.697     10.0112-0    1      2     15
 6  l3050 i/f        37.462     10.0120-1    1      2     
                                                          9
 7  PROM 4k          22.512     10.0115-5    1      2     12
 8  4k ram           25.116     10.0114-7    1      2     10
 9  power supply     27.889     10.0174-0    7     10     20
10  awr master        4.175     10.0132-5    5      6     
                                                          6
11  abe slave         5.367     10.0344-9    5      6     
                                                          7
12  k/a ltu          24.028     10.0122-8   45     50     42
13  sync ltu         26.730     10.0124-4   11     16     12
14  i/a ltu          24.751     10.0123-6    2      4     12
15  comm crate       21.430     10.0127-9    1      2     
                                                          5
16  mux crate        21.430     10.0145-7    1      2     
                                                          5
17  ltu crate        21.430     10.0128-7    5      6     
                                                          6
18  ls crate          1.539     10.0146-5    6      6     
                                                          6
19  ls crate cable
    set                 359     19.0020-5   30+30  36+36  5+5
                                                          
                                                          x1
                                19.0024-8
20  ls int.           2.030     15.0034-5    4      4     
                                                          5
21  ls ext.           2.030     15.0033-7   67     67     
                                                          6
22  mains filter      6.682     4.07002-00   1      2     
                                                          3
23  mux-cpu          50.980     10.0113-9    1      2     
                                                          5
24  rack, 3 bay      45.696     stanton     (2/3)  (1)    
                                                          0
                                                          
                                                          x2
25  fan assy.         4.398     4.13100-00   5      8     
                                                          8
26  power dist. pan.  2.002     nics tare    1      2     
                                                          0
                                type
27  power cable         643     10.0151-1    7     10     
                                                          5
28  abf cable set       466     10.0150-3   10     12     
                                                          6
29  com mux cable       374     10.0147-3    2      4     
                                                          5
30  cpu ctrl. cable     128     10.0148-1    2      4     
                                                          5
31  cpu ctrl. cable     512     10.0153-8    5      6     
                                                          5
32  l3050 cable         403     nics tare
                                type         2      4     
                                                          5
33  ground wires        217     var. type   25     40     15
34  blank panels
    (130)               130     var. type    5     30     
                                                          0
35  brackets            144     var. type   36     52     
                                                          0
36  not used
37  dual par. i/f    33.700     10.0125-2    0      0     
                                                          2
38  p.d. i/f         30.860     10.0126-0    0      0     
                                                          2
39  formatter cable   3.024     10.0154-6    0      0     
                                                          2
40  fuses            ?          var. types   0      0     lot
                                                          (tbd)
41  screws           ?          var. types   0      0     lot
                                                          (tbd)
42  washers          ?          var. types   0      0     lot
                                                          (tbd)
43  nuts             ?          var. types   0      0     lot
                                                          (tbd)
44  air filter           44     var. types   0      0     lot
                                                          (tbd)
45  not used
46  peripheral paris ?          var. types   0      0     lot
                                                          (tbd)

x1  (half of left/and half of right oriented cables)

x2) crc will supply this


latest news
-----------
gert called me and informed me of a price list from 23/6
 1980. i have not been able to find this. please send it
 by fax to me.

please indicate if the current price is ok, or out in the
 blue.

furthermore, we have identified the following problems.

-   we do not have complete documentation for all boards.
    (some was thrown out during clean-up/moving)

-   dual parallel i/f and floppy disk i/f are very difficult
    to produce as erik berthelsen is not with us any longer.

-   the 4-bit slice 2901 is no longer produced and we have
    not got these on stock.

-   the 3050 i/f is very difficult to produce if gotlob
    borup is not able to support us.

I am ready to forward new prices based on the 1980 pricelist.

kind regards,
christian rovsing a/s

kurt nybroe-nielsen









                     1984-02-02        JAL/dhh

To:      Tracor
  att: mr. Ben Medley

Fm:      Christian Rovsing A/S, Denmark
  Kurt Nybroe-Nielsen

our re. cps/108/tlx/0149

Subject: Paper-out status
-------------------------

One of the printers from last shipment, received in december
 1983 has been tested for the paper-out problem. Apparently
 the unknown status reports are not generated on this
 printer, but the problem concerning too many identical
 status reports still occur. In addition we have detected
 a false paper-out condition.

The detailed test set-up and test results are descriped
 in the following:

Test at printer 232 (received December 1983)

Testcases 9-10:
---------------
In printing a message then "paper out" occur. The key
 are turned OFF. Insert paper and push FORM FEED button.
 Turn key ON.

Testcase 10:
------------
A false "paper in" condition also occur.

Testcase 11-12:
---------------
Instead of the key, the suspend print button are used.

Testcase 13:
------------
Only FORM FEED button are used after inserting the paper.

Testcase 14-15:
---------------
Detection of false "paper out" condition in 2 situations.


Testcase 9
----------
DTE      DCE Comments

         Paper out, key OFF
9B
D3
0D
  7F
  85
9B
D3
0D
  7F
  85
  7F     Insert paper, push FORM FEED button
  01
9B
D3
0D
  7F
  01
  7F     Turn key ON
  80
  7F     Send too many status reports
  80
  7F
  80
  7F
  80
  7F
  80
  7F
  80
9B           From here printer react as expected
D3
0D
  7F
  80
9B
D3
0D
  7F
  80

Testcase 10
-----------
DTE      DCE

         Paper out
9B
D3
0D
  7F
  04
  7F     Turn key off
  05
  7F     Press line feed button (false paper in)
  01
9B
D3
0D
  7F
  01
  7F     Press LINE FEED button
  85
9B
D3
0D
  7F
  85
         Repeated many times
9B
D3
0D
  7F
  85
  7F     Inset paper, press FORM FEED button
  01
9B
D3
0D
  7F
  01
  7F     Turn key ON
  80
  7F     Send too many status reports
  80
  7F
  80
9B           From here printer react as expected
D3
0D

Testcase 11
-----------
DTE      DCE

         Paper out, SUSP. PRINT
9B
D3
0D
  7F
  04
  7F     Insert paper, FORM FEED
  80
9B
D3
0D
  7F
  80     Push suspend print button
  7F
  80     Send too many status reports
  7F
  80
  7F
  80
  7F
  80
  7F
  80
  7F
  80
9B           From here printer react as expected
D3
0D
  7F
  80

Testcase 12
-----------
DTE      DCE

         Paper out, SUSP. PRINT
9B
D3
0D
  7F
  04
  7F     Insert paper, FORM FEED
  80
9B
D3
0D
  7F
  80     Push suspend print button
  7F
  80     Send too many status reports
  7F
  80
  7F
  80
  7F
  80
9B           From here printer react as expected
D3
0D
  7F
  80

Testcase 13
-----------
DTE      DCE

         Paper out
9B
D3
0D
  7F
  04
  7F     Insert paper, FORM FEED
  80
  7F     Send too many status reports
  80
  7F
  80
  7F
  80
  7F
  80
9B           From here printer react as expected
D3
0D
  7F
  80

This test was excecuted 3 times with the same result.

Testcase 14
-----------
DTE      DCE Comments

9B           Printer OK
D3
0D
  7F
  80
9B
D3
0D
  7F
  80
  7F     No real paper out (no touch the printer)
  04
  7F
  80
9B           Printer continue as expected
D3
0D
  7F
  80

Testcase 15
-----------
DTE      DCE ASCII   COMMENTS

                 Printer ok
9B
D3
0D
  7F
  80
0D           CR      Start printing
8A           LF
0D           CR
8A           LF
  7F             False paper out
20
  04
20
20
20
20
20
20                   Our program stopped sending data
                     to printer
9B
D3
0d
  7F
  04
9B
D3
0D
  7F
  04
9B
D3
0D
  7F             Hang in paper out situation until
  04
  7F             push LINE FEED button
  80
  7F
  80
9B
D3
0D
  7F
  80
0D                   Start printing again
8A


We hope those additional informations will help you solving
 the problem quickly.

Kind regards,
Christian Rovsing A/S

Kurt Nybroe-Nielsen






                                                                 1984-03-07
                                                                 
                                                                 
                                                                 
                                                                 
                                                                 
                                                                 
                                                                 
                                                                 
                                                                 
                                                                 JAL/dhh

to:      Delta Data, USA
         att. mr. Steve Miller

fm:      Christian Rovsing A/S, Denmark
         Jurt Nybroe-Nielsen

our ref. cps/104/tlx/0232

Subject: 7260 tc, status or prom 2.22
-------------------------------------

CR has retested the bugs mentioned on your telex 1. March 1982:

Bug 7.54 - Flow control
-----------------------
CR has verified that the VDU behaves like statet by Delta in
 the telex. But in our openion this behaviour is not convenient.
 The off condition of CTS circuit should not influence transmission
 from host to VDU.

Following test was carried out by CR: 
Mode:TTY. CTS circuit is in off condition. From the keyboard
 four chars are entered, then six chars are send from the host
 to the VDU. Until now no chars are processed by the VDU.

Now CTS is turned on. Now the characters are processed as follows:
 The first keyboard char - the six host chars - the remaining
 three keyboard chars. Is this behaviour correct? Is the host
 buffer priority higher than the priority of the keyboard buffer?
 - Please comment.

Bug 7.70 - missing key data when CTS disabled
---------------------------------------------
Mode:TTY. If the CTS curcuit is in off condition only ten key
 entries (PF-key and other keys) are allowed. Further keyboard
 entries are discarded by the VDU due to keyboard buffer overflow.
 please comment.

Bug 7.73 - clear to end of line
-------------------------------
The bug is corrected.

Bug 7.76 - buffer full/buffer wait state
----------------------------------------
CR has observed following:
When the keyboard is activated during host update of the VDu
 split the VDU stays in buffer full/buffer wait state. Perhaps
 bug no. 7.76 and bug no. 7.90 are identical - please comment.

Bug 7.79 - mandatory fields do not work
---------------------------------------
The bug is corrected.

Bug 7.86 - shift out sequence over more than one block
------------------------------------------------------
The bug is closed. It has not been possible to duplicate the
 error with monitor version 2.22.

hereafter the status is:


Bug.no.      Status     Description
-------------------------------------
7.01-7.52    closed
7.53         closed     delta manual update is missing
7.54         open       flow control
7.55-7.58    closed
7.59         open       arm status transmit (p.t. not used)
7.60-7.69    closed
7.70         open       missing key data when cts disabled
7.71-7.72    closed
7.73         closed     no clear to end of line (p.t. not used)
7.73         open       no clear to end of line (p.t.not used)
7.74         closed
7.75         closed
7.76         open       buffer full/buffer wait state
7.77         closed     insert 80 char field
7.78         closed
7.79         closed     mandatory fields do not work (not used p.t.)
7.80         open       interrupt type s (non deterministic)
7.81-7.82    closed
7.83         open       function keys during xmit
7.84         closed     insert line ending in col.80
7.85         open       vdu stays in xmit mode r
7.86         closed     shiftout sequence over more than one block
                        (oe 27 in the end of block one and 44 in
                        the beginning of block two)
7.87         withdrawn  vdu display is out of control when transmitting
                        124 lines of 69 characters ending in column
                        80.
7.88         withdrawn  loss of data for 12.000 char message.
7.89         closed     bell signal when compressing vdu memory.
7.90         open       keyboard activation during host update of
                        VDU split.
7.91         open       break from host to vdu
7.92         closed     protection of reset key
7.93         open       back-tab key

CR still expects a status on the remaining open bugs.

Kind regrads,
CHRISTIAN ROVSING A/S

Kurt Nybroe-Nielsen






                     1984-02-08           JAL/dhh

to:      Delta Data, USA
   att: mr. Steve Miller

fm:      Christian Rovsing A/S, Denmark
   Kurt Nybroe Nielsen

our ref: cps/104/tlx/0227

Subject: Delta 7260 tc, errors in prom version 2.22
---------------------------------------------------

In prom version 2.22 received 840203 some of the major
 bugs have been corrected, allthough the insert line function
 still is very slow.

Bug 7.91 still exist. The detailed test-sequence is described
 below:

Monitor version 2.22

Bug 7.91 - Break from host to VDU
---------------------------------

As statet before the acknowledgement phases in the VDU
 are not reset upon receiving a break sequence from the
 host.

To show that the phases in the Delta VDU are not reset
 following test sequence can be used:

1. Power off-on the VDU. Configurate the VDU to 2400 bps
 odd parity

2. Enter block mode as follows:
   a) host sends break to VDU for 256 ms
   b) host waits for 1 s
   c) host sends:
      0E 5D 80 80 80 80 80 80 80 80 80 80

3. host request key status:
   a) host to VDU:
      02 0E AB 76 83 B5 32
   b) VDU to host:
      86 B0 40 13
      02 40 4C 40 83 34 C4 04

4. From the keyboard following character sequence is entered:
   SOM 1 2 3 4 5 EOM

5. The entered character sequence is now readed from the
 host:
   a) host to VDU:
      02 0E B0 DC 40 B0 B0 B5 31 83 32 37
   b) VDU to host:
      86 31 40 13
      02 40 31 32 B3 34 B5 83 37 B0 13
   c) host to VDU:
      86 B0

6. host request key status:
   a) host to VDU
      02 0E AB 76 83 B5 32
   b) VDU to host
      86 B0 40 13
      02 40 4C 40 83 34 C4 04

7. Now the host resets the VDU as follows:
   a) host sends break to VDU for 256 ms
   b) host waits for 1 s
   c) host sends:
      0E 5D 80 80 80 80 80 80 80 80 80 80
      Because the VDU is already in block mode the last
   char
      sequence should be ignored - and so it is.

8. The host request key status:
   a) host to VDU
      02 0E AB 76 83 B5 32
   b) VDU to host:
      86 31 02 40 4C 40 83 34 C4 04
      This is wrong. The phase should be B0 and not 31.
   c) host to VDU:
      02 0E AB 76 83 B5 32
   d) VDU host:
      86 B0 02 40 4C 40 83 34 C4 04

8. From the keyboard following character sequence is entered:
   SOM 1 2 3 4 5 EOM

9. The entered character sequence is now readed from the
 host
   a) host to VDU:
      02 0E B0 DC 40 B0 B0 B5 31 83 32 37
   b) VDU to host:
      86 31 40 13
      02 40 31 32 B3 34 B5 83 37 B0 13
   c) host to VDU:
      86 B0
   d) VDU to host:
      02 40 31 32 B3 34 B5 83 37 B0 13
      The VDU retransmits the message because it expects
   an
      acknowledgement 1 from the host. This is wrong.
   The VDU
      should expect an acknowledgement with the phase
   0.
   e) VDU to host:
      85 04
   f) host to VDU
      86 B0

Hereafter the status of problems is as follows:

bug no.  status       description
-----------------------------------
7.01-7.52    closed
7.53     closed       delta manual update is missing
7.54     open         flow control 
7.55-7.58    closed
7.59     open         arm status transmit (p.t.not used)
7.60-7.69    closed
7.70     open         missing key data when cts disabled
7.71-7.72    closed
7.73     open         no clear to end of line (p.t.not used)
7.74     closed
7.75     closed
7.76     open         buffer full/buffer wait state
7.77     closed       insert 80 char field
7.78     closed
7.79     open         mandatory fields do not work (not used
                      p.t.)

7.80     open         interrupt type s (non deterministic)
7.81-7.82    closed
7.83     open         function keys during xmit
7.84     closed       insert line ending in col.80
7.85     open         vdu stays in xmit mode r
7.86     open         shiftout sequence over more than one
                      block (oe 27 in the end of block one
                      and 44 in the beginning of block two)
7.87     withdrawn    vdu display is out of control when transmitting
                      124 lines of 69 characters ending in
                      column 80.
7.88     withdrawn    loss of data for 12.00 char message.
7.89     closed       bell signal when compressing vdu memory.
7.90     open         keyboard activation during host update
                      of VDU split.
7.91     open         break from host to vdu
7.92     closed       protection of reset key

We look forward to receive a version where the remaining bugs
 has been corrected

Kind regards,
CHRISTIAN ROVSING A/S

Kurt Nybroe-Nielsen




         1984-01-18  jal/bko

to:      tracor, usa
         att: mr.t.m.rodgers

fm:      christian rovsing a/s, denmark
         kurt nybroe-nielsen

our ref: cps/108/tlx/0145

subject: errors on tracor printer
---------------------------------
on the tracor printer we have detected two problems concerning
 the paper out status.

the problems, which are probably due to bugs in the tracor printer
 firmware, are non-deterministic, but do normally occur after
 less than ten attempts. A detailed description of the problems
 are outlined below.

problem 1.
----------
the sequence of events is as follows:
1. printer status: paper out
2. the printer does not respond at status request
3. the key is turned off. the printer sends a asynchronous
   report:
 paper out, key off
4. at next status request the printer sends response:
   paper out.
 (no change at printer). then comes a synchron report:
 paper out, key off.
5. the next 3 status requests give same response.
6. then only a paper out response and after that no
   response.(see copy of com.tester).

the sequence on the com-tester is:

ltux mstp
dte  dce         comments
---------------------------
                 paper out
9b         esc   request paper status
d3         3
0d         cr
9b               no response to status
d3
0d
9b
d3
0d
.
.
.
.
9b
d3
0d               turn key off
     7f
     85          paper out, key off
9b
d3
0d
     7f
     04          paper out         )
     7f                            )erroneous answer !
     85          paper out, key off)
9b
d3
0d
     7f
     04
     7f
     85
9b
d3
0d
     7f
     04
     7f
     85
9b
d3
0d
     7f
     04
     7f
     85
9b
d3
0d
     7f
     04
9b
d3
0d
9b
d3
0d
9b
d3
0d
.
.
.
.

problem 2
---------
the sequence of events is as follows:

1.         printer status: paper out
2.         no response to status request
3.         insert paper and turn key off and on
4.         then printer sends many asynchrone reports:
           printer ok
5.         two of the reports are incorrect. the printer
           sends 2 consecutive del characters, which
           are erroneous

the sequence on the com-tester is:

char.      ltux  mstp
no.  dte   dce   comments
-------------------------
                 paper out, key on
0    9b          no response to printer status
     d3
     0d
     .
     .
     .
     .           
     .
     .
     .
81   9b          
     d3
     0d          insert paper, turn key off, turn key on
84         7f
           80
           7f
           80
           .
           .
           .
           .
           7f
           80
108        7f
           7f    ? ltux detect error
           80
111        7f
           7f    ?
           80
           7f
           80
           7f
           80
           7f
           80
           7f
           80
122        7f
           80    ltux close protocol rts,cts off
           7f    asy.rep:unexpected ̲device ̲action
           80
           7f
           80
           .
           .
           .
           .
           7f
           80
           7f    the printer sends 2 consecutive "del"
399        80    7fh characters. This is an error.

you are kindly requested to solve the 2 problems so the
 printers can be modified and the solution verified when
 you arrive at chr.rovsing a/s on 840123.

kind regards,
christian rovsing a/s

kurt nybroe-nielsen
















                     1983-12-14   jho/bko

to:  shnmo division
     att.: mr. david levy, contracting officer

cc.: ltc henning hofmann, camps program manager 

fm:  christian rovsing a/s, denmark
     kurt nybroe-nielsen

our ref: cps/101/tlx/1083

subject: unsettled invoices on camps project
--------------------------------------------

listed below please find the invoices which are due for
 payment, but are still wholly or partly unsettled:

shape overdue payments 83-12-13

Inv.Date       Inv.No.   Due Date       Unpaid Dkr.       Ref.   Items

300383 30611   300583       67,462.80   9009  FAT 5, 15
231282 30756   230283      411,452.64   9009  RSPL,Manuals
310583 31162   310783           60.08   9009  Spares 2
130683 31170   130883      259,602.30   9009  Test equipm.adv.pay
310783 34569   300983      266,328.59   9009  (Rerout.SW,Dev.Crs.
                                              (Spares 4
301083 35755   201183    4,560,151.20   9317  (Ref System
300983 35752   301183    1,416,016,44   9009  FAT 3 printers,
                                              re-
                         ------------         sync,spares
                   Dkr.  6,981,074.05   

Inv.Date       Inv.No.   Due Date       Unpaid Dlrs.      Ref.   Items

310882 25945   021082       12,634.35   9009  Discs,OMDT
300383 30610   300583       89,692.63   9009  FAT 15
231282 30749   230283       69,591.04   9009  Test Procedures
030283 30963   030483       20,460.61   9009  Printer
301083 35756   201183      188,971.74   9317  Ref System
300983 34577   301183       49,047.23   9009  (Printers, Resync,
                         ------------         (Spares, FAT
                                              3
               US dlrs.    430,397.60
               (eq dkr.  4,131,816.96)

Inv.Date       Inv.No.   Due Date       Unpaid P.UK.      Ref.   Items

201282 30361   200283       11,729.93   9009  Offline SW Pack
300383 30619   300583      110,318.36   9009  FAT 5, 15
310783 31173   300983       94,632.95   9009  SW Packs, FAT
                                              12
                         ------------
               US dlrs.    216,681.24
               eq dkr.   3,076,873.60         


Total:             Dkr. 14,189,764.61
                   ------------------

please explain why the overdue invoices have not yet been
 wholly paid.

Kind regards,
CHRISTIAN ROVSING A/S

Kurt Nybroe-Nielsen









                     1983-09-19   jho/bko

to:  shnmo division
     att.: mr. david levy, contracting officer

cc.: ltc henning hofmann, camps program manager 

fm:  christian rovsing a/s, denmark
     kurt nybroe-nielsen

our ref: cps/101/tlx/0963

subject: comments to amendment no. 8
------------------------------------
cr forwards the following comments to draft of camps
 contract amendment no.8:

1.    page purchase order, item 1
  ---------------------------
  the payment for message relay function dkr 1,000,000
  has not been included in the payment plan.

2.    page purchase order, item 6
  ---------------------------
  update instructions to item 6: required quantity of
  disc storage has not been included in the instructions
  of amendment 8.

3.    page purchase order, item 7
  ---------------------------
  please inform us when final installation is scheduled
  to take place, to be added to the installation schedule.

4.    page purchase order, item 8
  ---------------------------
  please reference the message or agreement to be included
  in the contract. this item has not been included in
  any of the change instructions.

5.    page purchase order, additional items
  -------------------------------------
  cr propose that the following additional items are
  included in amendment 8:

  a.  camps installation and spa schedule as agreed in
      camps log 1344 and cps/101/tlx/0937.

  b.  the rescheduling of the training payment plan as
      agreed in pmom 14, item 15.

6.    page 5, line 2 (editorial)
  --------------------------
  change dkr 3,231,984 to dkr 3,241,984.

7.    page 5, line "verona" (editorial)
  ---------------------------------
  change dkr 2,687,525 to dkr 2,685,525.

8.    page, line 4 (editorial)
  ------------------------
  change instruction 22 to instruction 23.

9.    page 7, line "3 extender board" (editorial)
  -------------------------------------------
  change dkr 23,586 to dkr 23,582.

10.   page, line 5
  ------------
  cr propose that "shall take place on 21 nov 83 at the
  earliest, and no later than 1 dec 83" is changed to
  (in accordance with pmom 18, para 8): "shall be completed
  no later than 14 december 83."

11.   page 9, column (2) (editorial)
  ------------------------------
  medeast - atbb drawing should read 1982-09

12.   installation and spa-dates
  --------------------------
  cr suggest that the columns installation start and
  spa are adjusted in accordance with the schedule agreed
  in camps log no 1344

location     installation   spa
             start
-------------------------------------
shape        06.04.83       84-06
northag/2ataf               20.06.83                             84-06
afcent/aafce 03.10.83       84-07
sonor        17.10.83       84-08
medeast      02.01.84       84-09
ncs          07.11.83       84-08
mednoreast   02.04.84       84-06
ukair        20.02.84       84-09
natohq       02.01.84       84-07
baltap       09.01.84       84-07
afnorth      27.02.84       84-08
lse/6ataf    20.02.84       84-07
centag/4ataf 09.04.84       84-06
comnon       21.05.84       84-08
afsouth      28.06.84       84-09
ls/5ataf     09.07.84       84-09

13.   new instruction 6.3
  -------------------
  In accordance with instruction 2 please add new instruction
  6.3: "para 16.4: in accordance with shape decision
  to implement a design software change, sub-article
  16.4 is cancelled in its entirety".

14.   Instruction 9
  -------------
  cr propose the following wording of new para 23.5 in
  accordance with pmom 18, para 9 and 12:
  "cr recognizes that shape is caused problems in the
  training area due to the slippage within the 240 hours
  in-plant software test:

  a.  cr compensate the problem in the following manner:
      rst3 and mt6 to 8 training courses are rescheduled
      as follows:
      rst3     84-week-3 to 84-week-19
      mt6      84-week-1 to 84-week-7
      mt7      84-week-8 to 84-week-14
      mt8(ncs) 84-week-21 to 84-week-27

  b.  on rst2 and rst3 courses up to 10 students are
      allowed, including possible attendance by depot
      level technicians according to separate contract.

  the above mentioned compensation shall be carried out
  at no charge within the existing contract price."

15.   page 12 (editorial)
  -------------------
  change in "total as of amend no 8, nato site per eqpt"
  dkr 4,001,569.00 to dkr 4,001,501.00.

16.   page 15 (editorial)
  -------------------
  change in item 8.1.e dkr 865,612.00 to dkr 865,341.00.
  change total dkr 39,832,459.00 to dkr 39,832,188.00.

17.   page 15 (editorial)
  -------------------
  change in instruction 13.2: item 8.4.5 to item 8.4.7.
  (l.i. 8.4.5 is assigned to codification).

18.   page 15 (editorial)
  -------------------
  change in line 8.4.6: dkr 865,612.00 to dkr 865,341.00.

19.   page 15 (editorial)
  -------------------
  change in instruction 13.2 dkr 38,506,847 to dkr 38,506,576.

20.   page 15
  -------

  change instruction 13.3 to "following letter-of-intent
  shape shall effect an advance payment of 30 percent
  calculated on the total value of line items 8.4.6 and
  8.4.7 dkr 1,729,602.30".

21.   page 16 editorial
  -----------------
  change in line 1: dkr 22,330,747 to dkr 3,430,000.

22.   page 16. new instruction
  ------------------------

  Add new instruction 13.5:

  shape shall pay the remaining 70 percent of dkr 865,341
  upon satisfactory acceptance of the tools and test
  equipment at cr factory and cr provision of:

  1.  subcontractor's and/or cr certificate of compliance

  2.  danish hmac qa certification

  3.  cr's presentation of a properly documented invoice

  4.  cr will limit the request for partial payment to
      a total of two (2) invoices up to dkr 605,738.70

23.   page 17 (editorials)
  -------------------

  in line 4 change dkr 324,984.00 to dkr 3,241,984.00.

  in line 5 change dkr 2,146,708.00 to dkr 2,146,708.80.

  in line 6 change dkr 391,618.60 to dkr 391,018.60.

  in line 7 change dkr 55,859.00 to dkr 55,859.80.

24.   page 18 (editorials)
  --------------------
  in item 2 change "ctx cable" to "ctx crate".
  in "total hardware" change dkr 2,897,020 to dkr 2,897,920.

25.   page 20 (editorial)
  -------------------
  change wording in ecp27 to: "and to increase integrity
  and maintainability..."

26.   page 20
  -------
  add wording in ecp28: "exercise message and statistics
  print".

27.   page 20
  -------
  in ecp21 add approval date 7/83.

28.   page 21
  -------
  in eco22 please delete "approval withheld pending update
  of icd/003, refer to shape tlx no 46" as eco22 has
  been approved in log 1124. add approval date 3/83.

29.   page 21
  -------
  in eco24 add approval date 7/83.

please state concurrence in above comments so a final
 amendment 8 can be completed.

kind regards,
CHRISTIAN ROVSING A/S

Kurt Nybroe-Nielsen







                       I S S U E     2




  Til:    BKO, DHH

  Fra:    VHN


  V̲e̲d̲r̲.̲:̲ ̲W̲A̲N̲G̲ ̲S̲y̲s̲t̲e̲m̲

  Jeg har oprettet dokument nr. 4742A til "store og f`le"
  telexer.

  Jeg vil foresl>, at vi, hver gang vi skal skrive oven
  i disse, g]r det i 4742A.

  Skriver I andre telexer, som I synes er slemme overflyttes
  de til 4742A.

  4744A er dokumentet til "slemme" tekster.



  Med venlig hilsen


  Vini






                     1984-01-17   KNB/dhh

to:  Harris corp.
     rochester n.y.
     att.: Mr. Paul Larue

fm:  christian rovsing a/s, denmark
     knud benkjer

our ref: xfx/101/tlx/0028

subject: SRD, ICD and PIP
-------------------------

1  Acknowledge receipt of 45 Discrepancy Notes on January
   16th. These DN's seem to represent Harris initial comments
   to the SRD. Please advise when CR will receive comments
   from NODECA.

2  As stated in the progress report, all comments to the
   SRD must be in out possession one week prior to the
   review meeting. CR reserves the right to postphone
   the planned review meeting 31. jan. thru 4. Feb. and
   adjust the master schedule accordingly, in case not
   all comments have been received on or before January
   23rd.

3  In general the SRD specifies w̲h̲a̲t̲ shall be implemented
   and the SDS describes h̲o̲w̲ this will be done. The ICD's
   in general details a w̲h̲a̲t̲ by specification of h̲o̲w̲'s
   and are therefore design documents.

   The difference between an ICD and a SDS is that the
   ICD addresses the design of an external interface to
   which the users may have special interests (ship/shore
   procedures, man/machine interface etc.).

   In order to understand some SRD specifications it is
   envisoned that a demonstration of h̲o̲w̲ will help to
   achieve approval.

   All ICD's are therefore scheduled to be present in
   draft versions for the SRD review meeting.

   No cross reference matrix IFB to ICD is planned or
   found needed. Where the IFB to SRD matrix instead of
   specification of a SRD paragraph calls out an ICD,
   the specific IFB paragraph contains design (e.g. ACP126
   to ACP127 conversion).

4  We have not received any comments to the following
   ICD's:

   -     ACP127 and ACP126 procedures
   -     NICS TARE I/F
   -     TRC I/F

   Comments should be in our possession 6th January (ref.
   progress report). Please note that review of above
   documents not is part of the SRD review meeting except
   as indicated in item 3 above.

5  Ref. your telex CFX-101 item 2:

   OEM ̲handbook with prior nato approval "as is" and other
   manuals including those identified during Rochester
   meetings 12 thru 14 December 1983 will be made available
   for Harris review during the SRD review meeting.

6  Ref. your telex CFX-101 item 3:

   A general revision of PAD/PLN/001 is ongoing and will
   be followed by a revision of all QA procedures. None
   of the existing QA procedures will therefore be signed
   by the Systems Division Manager. The MPF project and
   the QA department will regardless missing signatures
   live up to the delivered QA-plan. Suggest that revised
   QA-procedures are inspected by the Goverment Quality
   Assurance Representative (GQAR) during his normal visits
   at CR's facilities.

   Please advise if a meeting shall be arranged between
   our QA-department and Harris representatives during
   the SRD review.

7  We are in possession of the March 1983 version of the
   NICS TARE Technical Interface Criteria document. Still
   we have not received any of the missing documents detailed
   in the monthly progress report. The missing documentation
   is now critical and it is very hard to see how an impact
   on the master schedule can be avoided.

   Please submit status on missing documents.

Kind regards,

CHRISTIAN ROVSING A/S
Knud Benkjer






                     1984-01-17   KNB/dhh

to:  Harris corp.
     rochester n.y.
     att.: Mr. Paul Larue

fm:  christian rovsing a/s, denmark
     knud benkjer

our ref: xfx/101/tlx/0028

subject: SRD, ICD and PIP
-------------------------

1  Acknowledge receipt of 45 Discrepancy Notes on January
   16th. These DN's seem to represent Harris initial comments
   to the SRD. Please advise when CR will receive comments
   from NODECA.

2  As stated in the progress report, all comments to the
   SRD must be in out possession one week prior to the
   review meeting. CR reserves the right to postphone
   the planned review meeting 31. jan. thru 4. Feb. and
   adjust the master schedule accordingly, in case not
   all comments have been received on or before January
   23rd.

3  In general the SRD specifies w̲h̲a̲t̲ shall be implemented
   and the SDS describes h̲o̲w̲ this will be done. The ICD's
   in general details a w̲h̲a̲t̲ by specification of h̲o̲w̲'s
   and are therefore design documents.

   The difference between an ICD and a SDS is that the
   ICD addresses the design of an external interface to
   which the users may have special interests (ship/shore
   procedures, man/machine interface etc.).

   In order to understand some SRD specifications it is
   envisoned that a demonstration of h̲o̲w̲ will help to
   achieve approval.

   All ICD's are therefore scheduled to be present in
   draft versions for the SRD review meeting.

   No cross reference matrix IFB to ICD is planned or
   found needed. Where the IFB to SRD matrix instead of
   specification of a SRD paragraph calls out an ICD,
   the specific IFB paragraph contains design (e.g. ACP126
   to ACP127 conversion).

4  We have not received any comments to the following
   ICD's:

   -     ACP127 and ACP126 procedures
   -     NICS TARE I/F
   -     TRC I/F

   Comments should be in our possession 6th January (ref.
   progress report). Please note that review of above
   documents not is part of the SRD review meeting except
   as indicated in item 3 above.

5  Ref. your telex CFX-101 item 2:

   OEM ̲handbook with prior nato approval "as is" and other
   manuals including those identified during Rochester
   meetings 12 thru 14 December 1983 will be made available
   for Harris review during the SRD review meeting.

6  Ref. your telex CFX-101 item 3:

   A general revision of PAD/PLN/001 is ongoing and will
   be followed by a revision of all QA procedures. None
   of the existing QA procedures will therefore be signed
   by the Systems Division Manager. The MPF project and
   the QA department will regardless missing signatures
   live up to the delivered QA-plan. Suggest that revised
   QA-procedures are inspected by the Goverment Quality
   Assurance Representative (GQAR) during his normal visits
   at CR's facilities.

   Please advise if a meeting shall be arranged between
   our QA-department and Harris representatives during
   the SRD review.

7  We are in possession of the March 1983 version of the
   NICS TARE Technical Interface Criteria document. Still
   we have not received any of the missing documents detailed
   in the monthly progress report. The missing documentation
   is now critical and it is very hard to see how an impact
   on the master schedule can be avoided.

   Please submit status on missing documents.

Kind regards,

CHRISTIAN ROVSING A/S
Knud Benkjer



                     1984-03-14   URH/dhh

to:  shnmo division
     att.: mr. david levy, contracting officer

cc.: ltc henning hofmann, camps program manager 

fm:  christian rovsing a/s, denmark
     kurt nybroe-nielsen

our ref: cps/101/tlx/1164

subject: CAMPS in-plant software test specification and
         procedures CPS/TPR/007, issue 4
-----------------------------------------------------------------
Ref. CAMPS log 1643

i. CR provides the following answers to SHAPE's comments
   contained in above ref.

   1.1   CR agrees
   1.2   CR agrees
   1.3   The remaining parameters are left at their default
         values which are:
         a.  send continuity messages to NICS TARE every
             5 mins.
         b.  expect continuity messages from NICS TARE
             every 6 mins: yes
         c.  service message generated if more than 140
             identical consecutive characters received
             : yes
         d.  expect flash receipt within 20 mins.

   4     If no. 3-letter group is following format line
         12b prosign "sic" then format line 12b is considered
         present but garbled.

   5     1+2: will be added as appendicies to the subject
         document

   5     3+4: no changes will be made, ref. iii below.

ii 1     according to CR's files CPS/TPR/008 is approved
         cat. 1 by SHAPE. However, CR agrees to delete
         all references to CPS/TPR/008 in the subject
         document.

   2     according to the data base all users have release
         capabilities, however, the associated release
         terminal for terminals SEC, OPA and OPC is VDU
         OPB.

   3-8   CR agrees

iii      CR agrees to include a demonstration of CSSI
         support software during the functional software
         test at SHAPE. The procedure will be included
         in CPS/TPR/008. The demonstration shall be performed
         in less than one working day.

   In the subject document paras 2.1.3 and 2.1.4, references
   to SRS para 3.5.11.3 are deleted. References to SRS
   para 3.5.11.5 are changed to: "part of 3.5.11.5 a)
   and 3.5.11.5.2".

iv Based on findings during the latest dry runs CR kindly
   requests the following further updates to the subject
   document:

   1     p. 48, case 7.3 last line should read: "add SCD's
         OPA and OPO to the coordination list "p. 129,
         case 7.3 last line should read: "add SCD's OPO
         and OSA to the coordination list" p. 209, case
         7.3. "add SCD's OSA and OPA to the coordination
         list". Reason: the third SCD in the message points
         to a MSP.

   2     p. 59, 140 and 220, step 13.7: "and release it"
         shall be deleted. Reason: release terminal cannot
         be reached.

   2a    p 248, test msg. no 309: specat pp shall be changed
         to ee dk. reason: vdu opc does not have specat
         pp capabilities.

   3     p. 63, 144, 224, step 18.3-4: the referenced
         testmessage shall be numbered "-2". Reason: "-1"
         has already been used.

   4     p. 85, 165 and 246, test msg.no, X07: special
         handling DD shall be deleted. Reason: this msg.
         is used for demonstration of exempt on info PLA's,
         however, the release terminal does not have specat
         DD capabilities.

   5     p. 113, 193 and 274, test msg. no. X35: local
         distribution SCD shall be changed to: DPD. Reason:
         the device associated to SCD NMP is not included
         in the test setup.

   6     p. 325, 380, and 438, step 6.2: No warning report
         is generated for controlled lines. Reason: On
         controlled lines end of message is indicated
         in the level 2 protocol and detection of a halted
         message is done on level 2 and not on a missing
         eotf.

   7     p. 326, 381, and 439, step 10.2, result: the
         message is also routed to the MSO for RI assignment.
         Reason: the garbled fl. 10 is interpreted as
         an unrecogniseable PLA.

   8     p. 332, step 29.2: Add: "29.2 a VDU SEC SIOF".
         Reason: Distribution to the quiet hours terminal
         only takes place if the destination terminal
         is signed off.

   9     P. 379 and 437, step 4.2, result: the message
         is queued at the destination user VDU. Reason:
         on controlled lines start of message is indicated
         in the level 2 protocol and a missing SOTF does
         not prevent normal automatic message processing.
         No warning report is generated.

   10    P. 383, step 18.2, result: the message is queued
         at VDU OPA. Reason: messages from scars shall
         not be relayed based on t-instructions. ref.
         srs para 3.2.2.5.1.

   11    p. 444, steps 25.3 and 25.4 shall be deleted.
         reason: flash receipt is generated automatically
         by the tds.

   12    p. 434 and 444-445, case 26: this testcase shall
         be deleted. reason: the tds automatically generates
         flash receipts and, therefore, this situation
         cannot be simulated.

   13    p. 320, 325, 375, 380, 433, and 438, case 7:
         this testcase shall be deleted. Reason: too long
         lines are an unacceptable deviation for uncontrolled
         lines only. ref: icd/003 para. 4.2.2.2.

v  you are kindly requested to review the requested updates
   and submit your comments/indicaton of approval.

kind regards,
christian rovsing a/s

kurt nybroe-nielsen