⟦b18fbeee5⟧ Wang Wps File

    Length: 2617 (0xa39)
    Types: Wang Wps File
    Notes: CPS/QAR/003               
    Names: »0836A «

Derivation

└─⟦0cd3644ba⟧ Bits:30006012 8" Wang WCS floppy, CR 0051A
    └─ ⟦this⟧ »0836A « 

WangText




…02…CPS/QAR/003

…02…SVO/810402…02……02…#
QA REPORT
…02……02…








         QA has made some observations on the CAMPS which we
         find necessary to report:






                     1̲ ̲ ̲S̲Y̲S̲T̲E̲M̲ ̲D̲E̲S̲I̲G̲N̲



         The System Design specification issued by CAMPS (CPS/SDS/001)
         has been evaluated by QA.  Two aspects of the spec.
         have been attended to:

         a)  The Design/Requireemnt compliancy

         b)  The format and content of the document

…02…ad. a)   QA has n̲o̲t̲ found any discrepancy between the requirement
         and the system design.

…02…ad. b)   QA has had several remarks to the document and most
         of them have lead to changes:  Two open points although
         remain, and these are considered severe enough to deny
         QA approval of the document.

…02…The points are:

…02……02…1)       In section 4.8.1.2 a data structure is given the name
         "Item".  QA finds it very confusing that a word which
         normally has a very general meaning is defined as designator
         for a very specific item.  It is difficult if not impossible
         to distinguish where in the text the word refers to
         an item of general nature and where to an "Item".

…02……02…2)       Section 2.4 is according to the standard (CPS/STD/002)
         supposed to contain Design and Construction characteristics
         - instead only a reference to the requirement is found.
          Stating the intention to fulfil the requirement can
         not be considered a proper design.








               2̲.̲ ̲ ̲C̲O̲N̲F̲I̲G̲U̲R̲A̲T̲I̲O̲N̲ ̲M̲A̲N̲A̲G̲E̲M̲E̲N̲T̲



         Several changes have been issued to the CAMPS System
         Requirement Specification and to CAMPS plans.  These
         documents should be under configuration management
         meaning that the change control procedure outlined
         in the Configuration Management Plan should be followed.
          This means that the processing of DN's /ECO's shall
         be managed by the Configuration Manager and shall be
         approved by a Change Control Board.

         There is although no evidence of the existence of a
         CCB and CM tells on inquiry that DN's are not presented
         to him for processing.

         QA finds it mandatory that improvements take place
         in this area very quickly.



                  3̲.̲ ̲ ̲I̲N̲F̲O̲R̲M̲A̲T̲I̲O̲N̲ ̲F̲L̲O̲W̲ ̲



         According to CAMPS Quality Assurance Plan  para 2f.
         it is the responsibility of the project management
         to inform QA about activities in the project.  Very
         little information is although given except on direct
         inquiry or via rumors; making it rather difficult for
         QA to follow the progress of the project.

         It is recommended that regular status meetings are
         resumed as participation in such meetings gives much
         better information.