top - download
⟦b25b9374f⟧ Wang Wps File
Length: 954 (0x3ba)
Types: Wang Wps File
Notes: Spelunked
Names: »~ORPHAN47.04«
Derivation
└─⟦b22bdc4b4⟧ Bits:30006159 8" Wang WCS floppy, CR 0248A
└─ ⟦this⟧ »~ORPHAN47.04«
WangText
circuit exists between the safety group (cabinets) and the lines of circuit no. 1
through 9 and 1a through 3a.
b) Remount the lids of the power line filters by the 30 screws.
c) Start the powering up in the below sequence, starting at the CAMP power distribution
board (PDB):
5.9.2 C̲A̲M̲P̲S̲ ̲P̲D̲B̲
T̲U̲R̲N̲ ̲O̲N̲: Main circuit breaker
T̲U̲R̲N̲ ̲O̲N̲: Miniature circuit breakers
C̲H̲E̲C̲K̲O̲U̲T̲: No fuses in the CAMPS PDB blown due to short circuit in the installation.
5.9.3 F̲r̲e̲q̲u̲e̲n̲c̲y̲ ̲S̲t̲a̲b̲i̲l̲i̲z̲e̲r̲s̲ ̲a̲n̲d̲ ̲D̲i̲s̲k̲ ̲D̲r̲i̲v̲e̲s̲
To examine that the 3 disk drives are supplied from
3 separate phases via the frequency stabilizers proceed
in the below sequence:
a F̲r̲e̲q̲u̲e̲n̲c̲y̲ ̲S̲t̲a̲b̲i̲l̲i̲z̲e̲r̲ ̲#̲1̲/̲D̲i̲s̲k̲ ̲#̲1̲ ̲(̲M̲M̲D̲)̲ ̲R̲A̲C̲K̲ ̲A̲
1) T̲U̲R̲N̲ ̲O̲N̲: Input power switch on front of
the stabilizer (A1A3)(see CAMPS
H/W Breakdown page 214).
Set the rotary switch on the by-pass
panel to position "frequency stabilizer".
2) C̲H̲E̲C̲K̲: