CAMPS SITE PROVISIONAL ACCEPTANCE
TEST SPECIFICATION AND PROCEDURES, SITE 07…02……02… CAMPS…0e…
CAMPS SITE PROVISIONAL ACCEPTANCE
TEST SPECIFICATION AND PROCEDURES, SITE 07
CPS/TPR/
Hans Haureberg
Kurt Nybroe-Nielsen
SHAPE(5), KNN, KM, Config. Mgr., LU, QA,
GQAR, URH, PMS, Library (3)
…0f…
DRAFT
840709
…0f…
5154A/aml…02… CPS/TPR/
…02… HAU/840709…02……02… ii
CAMPS SITE PROVISIONAL ACCEPTANCE
TEST SPECIFICATION AND PROCEDURES, SITE 07…02……02… CAMPS
8407059 All Issue 1 of document
5154A/aml…02… CPS/TPR/
…02… HAU/840709…02……02… iii
CAMPS SITE PROVISIONAL ACCEPTANCE
TEST SPECIFICATION AND PROCEDURES, SITE 07…02……02… CAMPS
T̲A̲B̲L̲E̲ ̲O̲F̲ ̲C̲O̲N̲T̲E̲N̲T̲S̲
1 GENERAL .....................................
1.1 PURPOSE..................................
1.2 APPLICABLE DOCUMENTS .....................
1.3 TERMS AND ABBREVIATIONS ..................
1.4 DOCUMENT LAYOUT ..........................
2 SITE PROVISIONAL ACCEPTANCE PROCEDURES .....
2.1 GENERAL ..................................
2.2 SITE PROVISIONAL ACCEPTANCE (SPA) ........
2.3 TEST AND VERIFICATION METHODS ............
2.3.1 Examination/Inspection ...............
2.3.2 Analysis ............................
2.3.3 Test/Demonstration ...................
2.4 TEST PROCEDURE FORMS AND NOTATIONS .......
2.5 DATA RECORDING ...........................
2.6 TEST EVALUATION ..........................
2. ACCEPTANCE CRITERIAS .....................
2.7.1 Notice of Defects ....................
2.7.2 Discrepancy ..........................
2.7.3 Defects ..............................
2.7.4 Correction of Defects Notice ........
2.8 HARDWARE/SOFTWARE CONFIGURATION ..........
2.8.1 Hardware Configuration ...............
2.8.2 Software Configuration ...............
2.8.3 SHAPE/THN Supplied Equipment .........
2.9 SPA ACCEPTANCE ROTOCOL ..................
2.10 DATE OF THE SPA .........................
3 ON-SITE HARDWARE INSPECTION.................
3.1 GENERAL ..................................
3.2 TEST GROUPS ..............................
3.3 TEST METHOD ..............................
3.4 PERSONNEL REQUIREMENTS ...................
3.5 SCHDULE .................................
4 INVENTORY CHECK .............................
4.1 GENERAL ..................................
4.2 INVENTORY CHECK LIST .....................
4.3 CONTENTS OF THE INVENTORY LIST ..........
4.4 CHECKING PROCEDURE .......................
4.5 INVENTORY CHECK CONSTRAINTS ..............
4.6 PERSONNEL REQUIREMENTS ...................
4.7 RESPONSIBILITY ...........................
4.8 SCHEDULE ................................
5154A/aml…02… CPS/TPR/
…02… HAU/840709…02……02… iv
CAMPS SITE PROVISIONAL ACCEPTANCE
TEST SPECIFICATION AND PROCEDURES, SITE 07…02……02… CAMPS
T̲A̲B̲L̲E̲ ̲O̲F̲ ̲C̲O̲N̲T̲E̲N̲T̲S̲
5 ECO STATUS CHECK ............................
5.1 GENERAL..................................
5.2 ECO STATUS LEVEL .........................
5.3 CHECKING PROCEDURE .......................
5.4 PERSONNEL REQUIREMENTS ...................
6 ON-SITE HARDWARE VERIFICATION ..............
6.1 GENERAL ..................................
6.2 HARDWARE REQUIREMENTS ....................
6.3 SOFTWARE REQUIREMENTS ....................
6.4 PERSONNEL REQUIREMENTS ...................
6.5 TEST PROCEDURE ..........................
6.6 TEST SETUP ...............................
6.7 TEST GROUPS ..............................
6.8 SWITCH SETTINGS ..........................
6.9 TEST INITIALIZATION ......................
ON-SITE SOFTWARE VERIFICATION ...............
8 COMSEC ON-SITE VERIFICATION .................
8.1 GENERAL ..................................
8.2 PERSONNEL REQUIREMENTS ...................
8.3 VERIFICATION PROCEDURES .................
8.4 HARDWARE REQUIREMENTS ....................
8.5 SOFTWARE REQUIREMENTS ....................
8.6 ACCEPTANCE CRITERIA ......................
8.7 SCHEDULE .................................
9 UPDATE ATBB DRAWINGS .......................
9.1 GENERAL ..................................
9.2 ATBB DRAWINGS ............................
9.3 AB DRAWINGS ..............................
9.4 VERIFICATION ............................
10 OVERALL SPA SCHEDULE ........................
…86…1 …02… …02… …02… …02…
1 G̲E̲N̲E̲R̲A̲L̲
1.1 P̲U̲R̲P̲O̲S̲E̲
The purpose of the "CAMPS Site Provisional Acceptance
Test Specification and Procedures" is:
a. To provide a coherent outline of the necessary
activiies required for the "Site Provisional Acceptance"
(SPA).
b. To define the acceptance criterias for each individual
activity.
c. To define the responsibilities for conducting and
coordinating the test activities.
d. To define the personnel-, quipment-, and software
requirements for the test/inspection activities.
e. To provide the test procedures and the test forms
for each individual activity.
1.2 A̲P̲P̲L̲I̲C̲A̲B̲L̲E̲ ̲D̲O̲C̲U̲M̲E̲N̲T̲S̲
1. CONTRACT NO. CE 80-9009-INF.
2. CAMPS SYSTEM REQUIREMENTS SPEC.
CPS/210/SYS/0001
3. CAMPS ACCEPTANCE PLAN
CPS/PLN/012
4. CAMPS SYSTEM DESIGNSPEC.
CPS/SDS/001
5. CAMPS DOCUMENTATION PLAN
CPS/PLN/008
6. CAMPS H/W ASSEMBLY BREAKDOWN/HARDWARE TREE
CPS/SDS/017
7. CAMPS ACCEPTANCE TEST SPEC.
CPS/TSS/001
8. SYSTEM INTEGRATION AND TEST PLAN
CPS/TSP/005
9. CAMPS INVENTORY LIT
CPS/AUX/045
10. ATBB DRAWINGS
PAB/CPS/ATB/007
11.
12. CAMPS SITE PROVISIONAL ACCEPTANCE,
SITE 2-16
CPS/TCN/071
13. CAMPS INVENTORY CHECK PROCEDURE
SITE 2-16 CPS/TCN/072
14. CAMPS SITE LEVEL MAINTENANCE MANUAL
CPS/TCM/005
15. USER PROCEDURE AND ASSOCIATED FORMATS
CPS/230/ICD/0001
16. SUPERVISOR COMMANDS AND PROCEDURES
CPS/230/ICD/0002
1.3 T̲E̲R̲M̲S̲ ̲A̲N̲D̲ ̲A̲B̲B̲R̲E̲V̲I̲A̲T̲I̲O̲N̲S̲
ATBB As to be built
CR Christian Rovsing A/S
ECO Engineer Change Order
CAMPS Computer Aided Message Processing System
COMSEC Communication ecurity
PTP Paper Tape Puncher
PTR Paper Tape Reader
SHAPE Surpreme Headquaters Allied Powers Europe
SPA Site Provisional Acceptance
VDU Visual Display Unit
SRS System Requirement Specification
SDS System Design Specification
SA Site Provisional Acceptance
Specification and Procedures
M&D Maintenance and Diagnostics
DW Drawing
THN
1.4 D̲O̲C̲U̲M̲E̲N̲T̲ ̲L̲A̲Y̲O̲U̲T̲
The document is structured in the following sections:
Section 1: Introduction
- 2: SA Procedures
- 3: On-Site H/W Inspection
- 4: Inventory Check
- 5: ECO Status Check
- 6: Hardware Verification
- 7: Software Verification
- 8: COMSEC On-Site Verification
- 9: Updated ATBB Drawings
- 10: Overall SPA Schedue
Section 2 Describes the formal SPA procedure in conjunction
with the system verification.
Section 3 Describes the test steps in the visual
inspection of the CAMPS H/W configuration.
Section 4 Describes the procedure for the inventory
chck.
Section 5 Describes the procedure for the ECO status
check.
Section 6 Describes the test steps of a demonstration
of all basic functional hardware capabilities.
Section 7 Describes the test steps of the on-site
software verification
ection 8 Describes the procedures of the COMSEC
on-site verification.
Section 9 Describes the hand over of the updated
ATBB drawings.
Section 10 Describes the SPA schedule for site 07.
2 S̲I̲T̲E̲ ̲P̲R̲O̲V̲I̲S̲I̲O̲N̲A̲L̲ ̲A̲C̲C̲E̲P̲T̲A̲N̲C̲E̲ ̲P̲R̲O̲C̲E̲D̲U̲R̲E̲S̲
2.1 G̲E̲N̲E̲R̲A̲L̲
The acceptance test activity is the conclusion of the
tasks contained in the equipment quality and assurance
provision.
prior to the acceptance test activity, a hierarchy
of tests and verifications have been exercised to prove
the equipment compliance with the contractual requirements.
2.2 S̲I̲T̲E̲ ̲P̲R̲O̲V̲I̲S̲I̲O̲N̲A̲L̲ ̲A̲C̲C̲E̲P̲T̲A̲N̲C̲E̲ ̲(̲S̲P̲A̲)̲
Site Provisional Acceptance is the ac whereby SHAPE
will acknowlegde by protocol that CR has fully demonstrated
that the Site is complete and ready for initial operation.
The SPA will take place when the following requirements
have been met:
a. Completion of the agreed on-site H/Wverification.
(Ref. section 6).
b. Completion of the agreed on-site S/W verification.
(Ref. section 7).
c. Verification of the site inventory.
(Ref. section 4).
d. Verification of the ECO status level.
(Ref. section 5).
e. ACE COMSEC onsite verification.
(Ref. section 8).
f. The ATBB drawings have been updated to "As Built"
drawings.
(Ref. section 9).
g. If applicable, availability of a mutually agreed
discrepancy list showing the agreed date for clearance
of each listed iscrepancy.
2.3 T̲E̲S̲T̲ ̲A̲N̲D̲ ̲V̲E̲R̲I̲F̲I̲C̲A̲T̲I̲O̲N̲ ̲M̲E̲T̲H̲O̲D̲S̲
The following definition apply for the verification
methods:
2.3.1 E̲x̲a̲m̲i̲n̲a̲t̲i̲o̲n̲/̲I̲n̲s̲p̲e̲c̲t̲i̲o̲n̲
This method is nonfunctional verification such asvisual
inspection of the physical characteristics of the item
or of the documentation associated with the item.
2.3.2 A̲n̲a̲l̲y̲s̲i̲s̲
This method is a nonfunctional verification, such as
reduction or translation of data, review of analytical
data, orreview of performances from a detailed test.
Data may be brought forward from previous tests.
2.3.3 T̲e̲s̲t̲/̲D̲e̲m̲o̲n̲s̲t̲r̲a̲t̲i̲o̲n̲
This method of testing is to functionally exercise
the equipment so that measurements and observations
of correct operationcan be made. Elements not directly
measured or observed are demonstrated by implication.
2.4 T̲E̲S̲T̲ ̲P̲R̲O̲C̲E̲D̲U̲R̲E̲ ̲F̲O̲R̲M̲S̲ ̲A̲N̲D̲ ̲N̲O̲T̲A̲T̲I̲O̲N̲S̲
All test procedures contained in section 3, 6, and
7 are described in the forms shown in Figure 2.4.1
- Test Overview and Figure 2.4.2 - Tet Steps.
For each function/inspection to be verified the test
overview form is used to identify the test cases required.
Each identified test case is described in details
on the test steps form.
the test steps form contains the detailed step b step
procedure for execution of the test cases.
The procedure for each test case is described by the
information in the columns of the test steps form:
- Case step No.
- Test station
- Action
- Expected result
Case step No. identifies thestep in the appropriate
test.
Test station identifies the site terminal No. from
which the test is controlled or on which the expected
output is presented.
Action describes the necessary action required to control
the test.
Expected result decribes the expected results from
execution of the described test action.
T̲E̲S̲T̲ ̲O̲V̲E̲R̲V̲I̲E̲W̲ T̲E̲S̲T̲ ̲N̲O̲.̲:̲
̲ ̲ ̲ ̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Test Case/
Reference Action SRS Reference
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Figure 2.4.1
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲ ̲N̲O̲.̲:̲
̲ ̲ ̲ ̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Case Test
Step No. Station Action Expected
Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:
̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲
SHAPE/CR
/
Figure 2.4.2
2.5 D̲A̲T̲A̲ ̲R̲E̲C̲O̲R̲D̲I̲N̲G̲
a. All test results or indications of compliance with
expected results shall be recorded in the test
steps form.
b. The test steps form shall be signed by atleast
one representative from SHAPE and one representative
from CR.
2.6 T̲E̲S̲T̲ ̲E̲V̲A̲L̲U̲A̲T̲I̲O̲N̲
Evaluation of the test results will be performed by
comparation of test results with expected results or
by assurance of compliance between requirements an
the referenced documentation.
2.7 A̲C̲C̲E̲P̲T̲A̲N̲C̲E̲ ̲C̲R̲I̲T̲E̲R̲I̲A̲S̲
2.7.1 N̲o̲t̲i̲c̲e̲ ̲o̲f̲ ̲D̲e̲f̲e̲c̲t̲s̲
a. If during the SPA procedure a problem is encountered,
the problem is either categorized as a discrepancy
or a defect.
b. SHAPE will deliver to CR in writin a "Notice of
Defects" listing the defects which prevented provisional
acceptance of the site.
2.7.2 D̲i̲s̲c̲r̲e̲p̲a̲n̲c̲y̲
a. Discrepancy as referred to in section 2.7.1 means
a noncompliance which does not prevent completion
of site provisional acceptace.
b. All discrepancies existing at the time of signing
the "Site Provisional Acceptance Protocol" will
be listed in the protocol together with dates for
correction of each discrepancy.
2.7.3 D̲e̲f̲e̲c̲t̲s̲
Defects as referred to in section 2.7.1 means any non-compliance
with the CAMPS contract No. CE80-9009-INF which prevents
the normal operation of the site.
2.7.4C̲o̲r̲r̲e̲c̲t̲i̲o̲n̲ ̲o̲f̲ ̲D̲e̲f̲e̲c̲t̲s̲ ̲N̲o̲t̲i̲c̲e̲
If a "Notice of Defect" has been issued, SHAPE will
deliver in writing a "Correction of Defects Notice"
when the listed defects have been corrected.
2.8 H̲A̲R̲D̲W̲A̲R̲E̲/̲S̲O̲F̲T̲W̲A̲R̲E̲ ̲C̲O̲N̲F̲I̲G̲U̲R̲A̲T̲I̲O̲N̲
2.8.1 H̲a̲r̲d̲w̲a̲r̲e̲ ̲C̲o̲n̲f̲i̲g̲u̲r̲a̲t̲i̲o̲
The tests will be conducted on all on-site installed
CAMPS hardware for main site 07 according to ref. 6.
2.8.2 S̲o̲f̲t̲w̲a̲r̲e̲ ̲C̲o̲n̲f̲i̲g̲u̲r̲a̲t̲i̲o̲n̲
The software required for conducting the tests will
be the complete CAMPS S/W system and the Maintenance
diagnostic package.
2.8.3 S̲H̲A̲P̲E̲/̲T̲H̲N̲ ̲S̲u̲p̲p̲l̲i̲e̲d̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲
a. Conductance of the S/W Verification Acceptance
Test requires the availability of the NICS TARE,
CRT, ACE CCIS, SCARS II, and the Point-to-Point
connections.
b. If one or more of the nterfaces are not available,
CR shall proceed with all of those components of
the system that are independent of the missing
interfaces.
c. In this case SHAPE will give Site Provisional Acceptance,
not withstanding the inability to test all interaces,
providing all other aspects of the test are completed.
2.9 S̲P̲A̲ ̲A̲C̲C̲E̲P̲T̲A̲N̲C̲E̲ ̲P̲R̲O̲T̲O̲C̲O̲L̲
a. The SPA Acceptance Protocol will be submitted by
SHAPE.
b. All comments or/and discrepancies reported in the
following sections will be recorded n the SPA Acceptance
Protocol:
1. Section 3: The test steps forms for test No.
1.
2. Section 4: The verification part or the inventory
list.
3. Section 5: The test steps frms for test No.
2.
4. Section 6: The test steps forms for test No.
3.
5. Section 7: The test steps forms for test No.
4.
6. Section 8: The result of the COMSEC on-site
verification.
c. Upon completion of the SPA procedure and when no
"Notice of Defects" has been issued, the SPA Acceptance
Protocol will be signed by at least one representative
from SHAPE and one representative from CR.
2.10 D̲A̲T̲E̲ ̲O̲F̲ ̲T̲H̲E̲ ̲S̲P̲A̲
a. he date of signature of the SPA Acceptance Protocol
marks the date of the SPA.
b. If SHAPE delivers a "Notice of Defects" then the
date on which SHAPE signs the "Correction of Defects
Notice" shall be the date of the SPA.
c. The date of the SPAmarks the time at which SHAPE
takes over the responsibility of the site and the
operation of the site can commerce.
3 O̲N̲-̲S̲I̲T̲E̲ ̲H̲A̲R̲D̲W̲A̲R̲E̲ ̲I̲N̲S̲P̲E̲C̲T̲I̲O̲N̲
3.1 G̲E̲N̲E̲R̲A̲L̲
The purpose of the on-site hardware inspection is to
check the overall physical condition of the installed
equipment.
3.2 T̲E̲S̲T̲ ̲G̲R̲O̲P̲S̲
This section has been subdivided into two test groups:
T̲e̲s̲t̲g̲r̲o̲u̲p̲ ̲D̲e̲s̲c̲r̲i̲p̲t̲i̲o̲n̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲N̲o̲.̲ ̲ ̲
CAMPS Equipment Area 1
User terminals 2
3.3 T̲E̲S̲T̲ ̲M̲E̲T̲H̲O̲D̲
a. All installed equipment is visual inspected for
damage, mechanical functions etc.
b. The installation of the equipment, positioning,
terminal location etc. are checked against the
updated as-to-be-built drawings.
c. During the inspection the system will be operating
in idle.
d. If during the inspection any comments are necessary,
these comments will be recorded in the test steps forms.
3.4 P̲E̲R̲S̲O̲N̲N̲E̲L̲ ̲R̲E̲Q̲U̲I̲R̲E̲M̲E̲N̲T̲S̲
The on-site hardware inspection will be conducted by
SHAPE and witnessed by CR.
3.5 S̲C̲H̲E̲D̲U̲L̲E̲
The on-site hardware inspection is the first step in
the CAMPS Site Provisional Acceptance Procedure.
The duration of test group No. 1 is scheduled to 1
day.
Tes group No. 2 will be performed together with the
inventory check of the user terminals.
T̲E̲S̲T̲ ̲O̲V̲E̲R̲V̲I̲E̲W̲ T̲E̲S̲T̲ ̲N̲O̲.̲:̲
̲0̲1̲ ̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲O̲n̲-̲S̲i̲t̲e̲ ̲H̲a̲r̲d̲w̲a̲r̲e̲ ̲I̲n̲s̲p̲e̲c̲t̲i̲o̲n̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Test Case/
Reference Action SRS Reference
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
1 CAMPS Equipment Area N/A
2 User Terminals N/A
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲ ̲N̲O̲.̲:̲
̲0̲1̲ ̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲O̲n̲-̲S̲i̲t̲e̲ ̲H̲a̲r̲d̲w̲a̲r̲e̲ ̲I̲n̲s̲p̲e̲t̲i̲o̲n̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲ ̲N̲/̲A̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Case Test
Step No. Station Action Expected
Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
1.1 N/A Verify by inspection that
the installed hardware No
physical
inside the CAMPS equipment defects
area ave no physical
defects.
1.2 N/A Verify by inspection that
the installation coincide Installation
with the updated ATBB coincide
drawings.
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:
̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲E̲S̲
SHAPE/CR
/
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲ ̲N̲O̲.̲:̲
̲0̲1̲ ̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲O̲n̲-̲S̲i̲t̲e̲ ̲H̲a̲r̲d̲w̲a̲r̲e̲ ̲I̲n̲s̲p̲e̲c̲t̲i̲o̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲ ̲N̲/̲A̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Case Test
Step No. Station Action Expected
Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
2.1 N/A Verify by inspection that
the user terminals No
physical
have no physical defects defects
2.2 N/A Verify b inspection that
the terminal locations Location
coincide with the coincide
updated ATBB drawings
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:
̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲
SHAPE/CR
/
4 I̲N̲V̲E̲N̲T̲O̲R̲Y̲ ̲C̲H̲E̲C̲K̲
4.1 G̲E̲N̲E̲R̲A̲L̲
The inventory check shall verify that all equipment
for site 07 has been delivered in accordance with the
contents of the property inventory lit.
(Ref. Doc. 9).
4.2 I̲N̲V̲E̲N̲T̲O̲R̲Y̲ ̲C̲H̲E̲C̲K̲ ̲L̲I̲S̲T̲
a. The inventory list has been subdivided into 9 groups:
1: Equipment Racks
(Racks, Modules, Disk Drives etc.)
2: Terminal Equipment
(VDU, MSP, and PTP/PTR)
3: Acillary Equipment
(Cbinets, Tables etc.)
4: Tools and test equipment
5: Installation material
6: Documents
7: Spare parts
8: Software deliverables
9: Verification
b. The inventory list includes the following data
elements:
1: Date of Printout/Site No.
2: Line item No.
3: Type No.
4: Description
5: True manufacturers part No.
6: Serial No.
7: True manufacturers code
8: NATO Stock No.
9. Configuration reference
10. Remarks
11. Delivered quantity
12. Received quantity
4.3 C̲O̲N̲T̲E̲N̲T̲S̲ ̲O̲F̲ ̲T̲H̲E̲ ̲I̲N̲V̲E̲N̲T̲O̲R̲Y̲ ̲L̲I̲S̲T̲
To ensure that all contracted items have been delivered
the inventory check list has been checked against the
following documents:
1. CAMPS HRDWARE ASSEMBLY
BREAKDOWN/HARDWARE TREE
2. TOOLS AND TEST EQUIPMENT LIST
3. THE SITE APPROVED SPARE PARTS LIST
4. SOFTWARE DELIVERABLES
5. DOCUMENTATION PLAN
4.4 C̲H̲E̲C̲K̲I̲N̲G̲ ̲P̲R̲O̲C̲E̲D̲U̲R̲E̲
a. All items with serial numbers are cheked against
the serial number in column 5 of the inventory
list.
b. In case of any discrepancy between the checked
item seral number and the serial number in the
inventory list, the inventory list shall be updated
with the new serial number of th checked item.
c. The quantity of received items are recorded in
column 11 (rec. qty.) of the inventory list and
compared with the quantity of delivered items (del.
qty.) in column 10.
d. Discrepancies between received and delivered items
will e recorded in the verification part of the
inventory list.
e. The verification part of the inventory lists is
signed by one representative from SHAPE and one
representative from CR.
4.5 I̲N̲V̲E̲N̲T̲O̲R̲Y̲ ̲C̲H̲E̲C̲K̲ ̲C̲O̲N̲S̲T̲R̲A̲I̲N̲T̲S̲
All internal cables and mechanical assemblies without
serial No., line item 0277 through 0370 in the inventory
list, will not be checked as some o the items are inaccessible
without demounting the racks.
4.6 P̲E̲R̲S̲O̲N̲N̲E̲L̲ ̲R̲E̲Q̲U̲I̲R̲E̲M̲E̲N̲T̲S̲
The inventory check will be conducted by CR and witnessed
by at least one representative from SHAPE or the THN
property section.
Both parties will record th results of the inventory
check in each copy of the inventory check list.
4.7 R̲E̲S̲P̲O̲N̲S̲I̲B̲I̲L̲I̲T̲Y̲
a. The marked up copies of the inventory lists shall
form the official record of all ewquipment and
other items that have been delivered.
b. Upon copletion of the SPA SHAPE/THN take over the
responsibility of the equipment concerning fire,
water, theft and other damage to the equipment.
4.8 S̲C̲H̲E̲D̲U̲L̲E̲
The duration of the inventory check is schedules to
2 days and will be performed together ith the ECO status
check.
The inventory check of the user terminals will be performed
together with the on-site hardware inspection.
5 E̲C̲O̲ ̲S̲T̲A̲T̲U̲S̲ ̲C̲H̲E̲C̲K̲
5.1 G̲E̲N̲E̲R̲A̲L̲
The ECO status check shall verify that all delivered
equipment has been updated to the latest baseline ECO
version.
5.2 E̲C̲O̲ ̲S̲T̲A̲T̲U̲S̲ ̲L̲E̲V̲E̲L̲
he latest ECO status level is found in the following
test steps forms which include the following data elements:
1. Description
2. Serial No.
3. ECO status
5.3 C̲H̲E̲C̲K̲I̲N̲G̲ ̲P̲R̲O̲C̲E̲D̲U̲R̲E̲
a. All items marked with an ECO status level in the
test stes form will be checked.
b. For plug-in modules where the ECO label is placed
inside the board, these modules will be demounted
after powering down the system.
c. The ECO level of the checked items are noted in
the test steps forms and compared ith the expected
ECO status level.
d. In case of any discrepancies, these will be recorded
in the test steps form.
5.4 P̲E̲R̲S̲O̲N̲N̲E̲L̲ ̲R̲E̲Q̲U̲I̲R̲E̲M̲E̲N̲T̲S̲
The ECO status check will be conducted by CR and witnessed
by at least one representative from SHAPE.
5.5 S̲C̲H̲E̲D̲U̲L̲E̲
The duration of the ECO status ehck is scheduled to
2 days. The ECO status check will be performed together
with the inventory check.
T̲E̲S̲T̲ ̲O̲V̲E̲R̲V̲I̲E̲W̲ T̲E̲S̲T̲ ̲N̲O̲.̲:̲
̲0̲2̲ ̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲E̲C̲O̲ ̲S̲t̲a̲t̲u̲s̲ ̲C̲h̲e̲c̲k̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Test Case/
Reference Action SRS Reference
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
1 Verify that the ECO status
level on all items mentioned
N/A
in the test steps forms
coincides with the latest
ECO update.
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲ ̲N̲O̲.̲:̲
̲0̲2̲ ̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲E̲C̲O̲ ̲S̲t̲a̲t̲u̲s̲ ̲C̲h̲e̲c̲k̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲N̲/̲A̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Case Test Serial Actual
Step No. Station No. ECO Status Expected
ECOStatus
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
1.1 MAINS SWITCH XX1 …0e… ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲…0f… 1/-
- XX2 …0e… ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲…0f… 1/-
- XX3 …0e… ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲…0f… 1/
- XX4 …0e… ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲…0f… 1/-
- XX5 …0e… ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲…0f… 1/-
- XX6 …0e… ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲…0f… 1/-
1.2 M-FAN X11 …0e… ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲…0f… 5/-
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲
T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲
SHAPE/CR
/
6 O̲N̲-̲S̲I̲T̲E̲ ̲H̲A̲R̲D̲W̲A̲R̲E̲ ̲V̲E̲R̲I̲F̲I̲C̲A̲T̲I̲O̲N̲
6.1 G̲E̲N̲E̲R̲A̲L̲
The purpose of the on-site hardware verification is
to verify that the installed hardware will be able
to support all required CAPS functions.
6.2 H̲A̲R̲D̲W̲A̲R̲E̲ ̲R̲E̲Q̲U̲I̲R̲E̲M̲E̲N̲T̲S̲
The tests and verification will be conducted on all
on-site installed CAMPS equipment.
6.3 S̲O̲F̲T̲W̲A̲R̲E̲ ̲R̲E̲Q̲U̲I̲R̲E̲M̲E̲N̲T̲S̲
The test drive software for the on-site hardware verification
will be the maintenance& diagnostic (M&D) software
package.
6.4 P̲E̲R̲S̲O̲N̲N̲E̲L̲ ̲R̲E̲Q̲U̲I̲R̲E̲M̲E̲N̲T̲S̲
The verification will be conducted by Cr and witnessed
by representatives from SHAPE.
6.5 T̲E̲S̲T̲ ̲P̲R̲O̲C̲E̲D̲U̲R̲E̲
a. The on-site hardware verification is based on the
sequences of tess described in the following test
steps forms.
b. Evaluation of the test results will be performed
by comparasion of the test results with expected
results.
c. The tests will be executed from the maintenance
position in the CAMPS room.
6.6 T̲E̲S̲T̲ ̲S̲E̲T̲U̲P̲
For some of the tests a loop-back adapter and the communication
tester is used to simulate the THN provided equipment
or communication links.
6.7 T̲E̲S̲T̲ ̲G̲R̲O̲U̲P̲S̲
his section has been subdivided into two test groups:
T̲e̲s̲t̲g̲r̲o̲u̲p̲ ̲d̲e̲s̲c̲r̲i̲p̲t̲i̲o̲n̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲N̲o̲.̲
PU#1/CU/TDX#1 TEST 3/1
PU#2/CU/TDX#2 TEST 3/2
6.8 S̲W̲I̲T̲C̲H̲ ̲S̲E̲T̲T̲I̲N̲G̲S̲
The switch settings will be the nomal switch settings
for the CAMPS on-line configuration.
Only the BSM-X switches auto/man/off are set to man
and the bus 1/bus 2 are set to bus 1 in test group
3/1 and to bus 2 in test group 3/2.
6.9 T̲E̲S̲T̲ ̲I̲N̲I̲T̲I̲A̲L̲I̲Z̲A̲T̲I̲O̲N̲
a. The system is poweed up and the test engineer and
the test witnesses are present in the CAMPS room.
b. The M&D software package is mounted in disk drive
No. 2 and the disk drive is activated.
c. A scratch floppy disk is inserted in each floppy
disk drive.
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲ ̲N̲O̲.̲:̲
̲3̲/̲1̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲1̲/̲C̲U̲/̲T̲D̲X̲#̲1̲ ̲T̲E̲S̲T̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Case Test
Step No. Station Action Expected
Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
1.1 MP Connect PU#1 as follows:
PU#1 (ENTER)
ENPU (ENTER)
ENTO (ENTER) Ref. 1.1
page ̲ ̲ ̲
1.2 MP Enable the disk controllers
and set parity as follows:
IR 1A23 (CR) IR
1A25
(CR)
IR 1A26 (CR) Ref. 1.2
page ̲ ̲ ̲
1.3 MP Boot the CPU test
program as follows:
BA 1025 (CR)
BM 140 (CR)
BO XX (CR) Ref. 1.3
page ̲ ̲ ̲
1.4 MP Write:
REPORTLEVEL = (CR)
ACTIVATE CPU 0 (CR)
ACTIVATE CPU 1 (CR)
ACTIVATE CPU 2 (CR)
TEST CPU 0 1 2 (CR) Ref. 1.4
page ̲ ̲ ̲
1.5 MP Quit the CPU test
as follows:
QUIT (CR) Ref. 1.5
page ̲ ̲ ̲
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲ ̲N̲O̲.̲:̲
̲3̲/̲1̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲1̲/̲C̲U̲/̲T̲D̲X̲#̲1̲ ̲T̲E̲S̲T̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Case Test
Step No. Station Action Expected
Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
2.1 MP Boot the MAP test
as follows:
BA 1025 (CR)
BM 140 (CR)
BO XX (CR) Ref. 2.1
page ̲ ̲ ̲
2.2 MP Write:
REPORTLEVEL = 0 (CR)
TEST ALL (CR) Ref 2.2
page ̲ ̲ ̲
2.3 MP Quit the MAP test
as follows:
QUIT (CR) Ref. 2.3
page ̲ ̲ ̲
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲ ̲N̲O̲.̲:̲
̲3̲/̲1̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲1̲/̲C̲U̲/̲T̲D̲X̲#̲1̲ ̲T̲E̲S̲T̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Case Test
Step No. Station Action Expected
Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
3.1 MP Boot the RAM test
as follows:
BA 1025 (CR)
BM 140 (CR)
BO XX (CR) Ref. 3.1
page ̲ ̲ ̲
3.2 MP Write:
REPORTLEVEL = 0 (CR)
TEST ALL (CR) Ref 3.2
page ̲ ̲ ̲
3.3 MP Quit the RAM test
as follows:
QUIT (CR) Ref. 3.3
page ̲ ̲ ̲
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲ ̲N̲O̲.̲:̲
̲3̲/̲1̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲1̲/̲C̲U̲/̲T̲D̲X̲#̲1̲ ̲T̲E̲S̲T̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Case Test
Step No. Station Action Expected
Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
4.1.1 MP Boot the DISK test
as follows:
BA 1025 (CR)
BM 140 (CR)
BO XX (CR) Ref. 4.1.1
page ̲ ̲ ̲
4.1.2 N/A Depress the "START"
pushbutton on disk
drive #2 and wat
until the "START" and
"READY" indicators are
"OFF".
Replace the test
software disk pack in
Disk Drive #2 with a
scratch disk pack.
Push the drive back
into rack B.
Activate the "START"
puhbutton on Drive #2
and wait until the
"READY" indicator stays
"ON".
Depress the WRITE
PROTECT pushbutton.
(WRITE PROTECT
indicator "OFF"). N/A
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲ ̲N̲O̲.̲:̲
̲3̲/̲1̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲1̲/̲C̲U̲/̲T̲D̲X̲#̲1̲ ̲T̲E̲S̲T̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Case Test
Step No. Station Action Expected
Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
4.2.3 MP Activate the disk drive
01 Disk Test as follows:
DO DISK 1 (CR) Ref. 4.1.2
page ̲ ̲ ̲
4.2.1 MP Activate the disk drive
01 Disk-RW Test
as follows:
DO DISK ̲RW1 (CR Ref. 4.2.1
page ̲ ̲ ̲
4.3.1 MP Activate the disk drive
on Disk-Format Test
as follows:
DO DISK ̲FORMAT (CR) Ref. 4.3.1
page ̲ ̲ ̲
5.1.1 MP Activate the disk drive
02 Disk Test as follows:
DO DISK2 (CR) Ref. 5.1.1
page ̲ ̲ ̲
5.2.1 MP Activate the disk drive
02 Disk-RW Test as
follows:
DO DISK ̲RW (CR) Ref. 5.2.1
page ̲ ̲ ̲
5.3.1 MP Activate the disk drive
02 Disk-Format Test
as follows:
DO DISK ̲FORMT2 (CR) Ref. 5.3.1
page ̲ ̲ ̲
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲ ̲N̲O̲.̲:̲
̲3̲/̲1̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲1̲/̲C̲U̲/̲T̲D̲X̲#̲1̲ ̲T̲E̲S̲T̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Case Test
Step No. Station Action Expected
Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
6.1.1 MP Activate the disk drive 03
Disk Test as follows:
DO DISK 3 (CR) Ref. 6.1.1
page ̲ ̲ ̲
6.2.1 MP Activate the disk drive 03
Disk-RW Test
as follows:
DO DISK ̲RW1 (CR Ref. 4.2.1
page ̲ ̲ ̲
6.3.1 MP Activate the disk drive 03
Disk-Format Test
as follows:
DO DISK ̲FORMAT3 (CR) Ref. 6.3.1
page ̲ ̲ ̲
6.3.2 MP Quit the dist test
as follows:
QUIT (CR) Ref. 6.3.2
age ̲ ̲ ̲
6.3.3 N/A Depress the "START"
pushbutton on disk
drive #2 and wait
until the "START" and
"READY" indicators are
"OFF".
Replace the scratch
disk pack in
Disk Drive #2 with the
test software dsk pack.
Push the drive back
into rack B.
Activate the "START"
pushbutton on Drive #2
and wait until the
"READY" indicator stays
"ON".
Activate the WRITE
PROTECT pushbutton.
(WRITE PROTECT
indicator "ON"). N/A
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲ ̲N̲O̲.̲:̲
̲3̲/̲1̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲1̲/̲C̲U̲/̲T̲D̲X̲#̲1̲ ̲T̲E̲S̲T̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Case Test
Step No. Station Action Expected
Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
7.1.1 MP Boot the FD drive tests
as follows:
BA 1025 (CR)
BM 140 (CR)
BO XXX (CR) Ref. 7.1.1
page ̲ ̲ ̲
7.1.2 MP Activate the FD drive 00
FD Test as follows:
DO FO (CR) Ref. 7.1.2.
page ̲ ̲ ̲
7.2.1 MP Activate the FD drive 00
FD-RW Test as follows:
DO FD ̲RWO (CR) Ref. 7.2.1
page ̲ ̲ ̲
7.3.1 MP Activate the FD drive 00
FD-format test as
follows:
DO FD ̲FORMA 0 (CR) Ref. 7.3.1
page ̲ ̲ ̲
8.1.1 MP Activate the FD drive 01
FD test as follows:
DO FD1 (CR) Ref. 8.1.1
page ̲ ̲ ̲
8.2.1 MP Activate the FD drive 01
FD-RW test as follows:
DO FD ̲RW1 Ref. 82.1
page ̲ ̲ ̲
7 O̲N̲-̲S̲I̲T̲E̲ ̲S̲O̲F̲T̲W̲A̲R̲E̲ ̲V̲E̲R̲I̲F̲I̲C̲A̲T̲I̲O̲N̲
TBD
8 C̲O̲M̲S̲E̲C̲ ̲O̲N̲-̲S̲I̲T̲E̲ ̲V̲E̲R̲I̲F̲I̲C̲A̲T̲I̲O̲N̲
8.1 G̲E̲N̲E̲R̲A̲L̲
The COMSEC on-site verification shall verify that the
installed equipment will meet the NATO security requirements.
8.2 P̲E̲R̲S̲O̲N̲N̲E̲ ̲R̲E̲Q̲U̲I̲R̲E̲M̲E̲N̲T̲S̲
The COMSEC on-site verification will be conducted by
and under the responsibility of the national COMSEC
authorities CR will assist in operating the system.
8.3 V̲E̲R̲I̲F̲I̲C̲A̲T̲I̲O̲N̲ ̲P̲R̲O̲C̲E̲D̲U̲R̲E̲S̲
Test specifications and procedures shall b delivered
by SHAPE/ACE COMSEC
8.4 H̲A̲R̲D̲W̲A̲R̲E̲ ̲R̲E̲Q̲U̲I̲R̲E̲M̲E̲N̲T̲S̲
All on-site installed CAMPS equipment.
8.5 S̲O̲F̲T̲W̲A̲R̲E̲ ̲R̲E̲Q̲U̲I̲R̲E̲M̲E̲N̲T̲S̲
The complete CAMPS software system.
8.6 A̲C̲C̲E̲P̲T̲A̲N̲C̲E̲ ̲C̲R̲I̲T̲E̲R̲I̲A̲
The verification of the equipment compliance with reqirements
stated in the SRS section 3.5.2.10 (ref. doc. 2) will
establish the acceptance criteria.
8.7 S̲C̲H̲E̲D̲U̲L̲E̲
The verification is planned to take place during the
on-site software verification.
9 U̲P̲D̲A̲T̲E̲D̲ ̲A̲T̲B̲B̲ ̲D̲R̲A̲W̲I̲N̲G̲S̲
9.1 G̲E̲N̲E̲R̲A̲L̲
As a part of the SPA procedure CR will hand over a
copy of the updated As-To-Be-Built drawings.
9.2 A̲T̲B̲B̲ ̲D̲R̲A̲W̲I̲N̲G̲S̲
a. The ATBB drawins have been updated during the installation
period to reflect the As-Built situation at time
of SPA.
b. In cases where the SPA is performed immediately
after the termination of the installation period
the ATBB drawings will be handed over in a pe and
ink updated version.
9.3 A̲B̲ ̲D̲R̲A̲W̲I̲N̲G̲S̲
The final version of the updated ATBB drawings, the
As-Built (AB) drawings, will be supplied as an appendex
to the installation manual not later than 6 weeks after
the SPA.
9.4 V̲E̲R̲I̲F̲I̲C̲A̲T̲I̲O̲N̲
The upated ATBB drawings have been verified during
the on-site hardware inspection ref. section 3.
10 O̲V̲E̲R̲A̲L̲L̲ ̲S̲P̲A̲ ̲S̲C̲H̲E̲D̲U̲L̲E̲
The duration of the SPA procedure for site 07 is scheduled
to 10 working days as shown in the below overall task
schedule:
D̲a̲y̲:̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲1̲2̲ ̲3̲ ̲4̲ ̲5̲ ̲6̲ ̲7̲ ̲8̲ ̲9̲ ̲1̲0̲ ̲
̲ ̲ ̲
Hardware inspection ^ ̲^̲ ̲^̲ ̲
Inventory Check ^ ̲^̲ ̲^
ECO Status Check ^ ̲^̲ ̲^ ̲ ̲ ̲ ̲ ̲
Hardware Verification ^ ̲^̲ ̲^̲ ̲^ ̲ ̲ ̲ ̲ ̲
Software Vrification ^ ̲^̲ ̲^̲ ̲^
On-Site COMSEC Verification ^ ̲^̲ ̲^̲ ̲^ ̲
ATBB Drawings ^ ̲^
Acceptance Protocol ^ ̲^
The date of the site 07 SPA will be in accordance with
the agreed CMPS installation schedule.
T̲E̲S̲T̲ ̲O̲V̲E̲R̲V̲I̲E̲W̲ T̲E̲S̲T̲ ̲N̲O̲.̲:̲
̲3̲/̲1̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲O̲N̲-̲S̲I̲T̲E̲ ̲H̲A̲R̲D̲W̲A̲R̲E̲ ̲V̲E̲R̲I̲F̲I̲C̲A̲T̲O̲N̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Test Case/
Reference Action
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
1. CPU TEST
2. MAP TEST
3. RAM TEST
4.1 DISK DRIVE 01 DISK TEST
4.2 DISK DRIVE O1 DISK -RN-TEST
4.3 DISK DRIVE O1 DISK-FORMAT TEST
5.1 DISK DRIVE O2 DISK TEST
5.2DISK DRIVE O2 DISK-RN TEST
5.3 DISK DRIVE O2 DISK-FORMAT TEST
6.1 DISK DRIVE O3 DISK TEST
6.2 DISK DRIVE O3 DISK-RN TEST
6.3 DISK DRIVE O3 DISK-FORMAT TEST
7.1 FLOPPY DISK DRIVE OO FD TEST
7.2 FLOPPY DISK DRIVE OO FD-RN TEST
7.3 FLOPPY DISK DRIVE O FD-FORMAT TEST
8.1 FLOPPY DISK DRIVE O1 FD TEST
8.2 FLOPPY DISK DRIVE O1 FD-RW TEST
8.3 FLOPPY DISK DRIVE O1FD-FORMAT TEST
T̲E̲S̲T̲ ̲O̲V̲E̲R̲V̲I̲E̲W̲ T̲E̲S̲T̲ ̲N̲O̲.̲:̲
̲3̲/̲1̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲O̲N̲-̲S̲I̲T̲E̲ ̲H̲A̲R̲D̲W̲A̲R̲E̲ ̲V̲E̲R̲I̲F̲C̲A̲T̲I̲O̲N̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Test Case/
Reference Action
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
9.1 LTU # 1 (CCIS) LOOP-TEST
9.2 LTU # 2 (SCARS) LOOP-TEST
9.3 LTU # 3 (TARE 1) LOOP-TEST
9.4 LTU # 4 (TARE 2) LOOP-TEST
1O.1 LTUX-S LINE PORT ID O1 (VDU 15) DU TEST
1O.2 LTUX-S LINE PORT ID O2 (VDU 19) VDU TEST
1O.3 LTUX-S LINE PORT ID O3 (VDU 23) VDU TEST
l0.4 LTUX-S LINE PORT ID O4 (VDU 27) VDU TEST
l0.5 LTUX-S LINE PORT ID 05 (VDU 21) VDU TEST
lo.6 LTUX-S LINE PORT ID 06 (VDU 25) VDU TEST
l0.7 LTUXS LINE PORT ID 07 (VDU 29) VDU TEST
l0.8 LTUX-S LINE PORT ID 08 (VDU 31) VDU TEST
l0.9 LTUX-S LINE PORT ID 09 (VDU 16) VDU TEST
l0.l0 LTUX-S LINE PORT ID l0 (VDU 10) VDU TEST
10.ll LTUX-S LINE PORT ID 11 (VDU 24) VDU TEST
10.12 LTUX-S LINE PORT ID 2 (VDU 28) VDU TEST
10.13 LTUX-S LINE PORT ID 13 (VDU 22) VDU TEST
10.14 LTUX-S LINE PORT ID 14 (VDU 26) VDU TEST
10.15 LTUX-S LINE PORT ID 15 (VDU 30) VDU TEST
10.16 LTUX-S LINE PORT ID 16 (VDU 32) VDU TEST
T̲E̲S̲T̲ ̲O̲V̲E̲R̲V̲I̲E̲W̲ T̲E̲S̲T̲ ̲N̲O̲.̲:̲
̲3̲/̲1̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲O̲N̲-̲S̲I̲T̲E̲ ̲H̲A̲R̲D̲W̲A̲R̲E̲ ̲V̲E̲R̲I̲F̲C̲A̲T̲I̲O̲N̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Test Case/
Reference Action
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
10.17 LTUX-S LINE PORT ID 17 (VDU 17) VDU TEST
10.18 LTUX-S LINE PORT ID 25 (MSP 47) VDU TEST
10.19 LTUX-S LINE PORT ID 26 (MSP 48) MSP TEST
10.20 LTUX-S LINEPORT ID 27 (MSP 51) MSP TEST
10.21 LTUX-S LINE PORT ID 28 (MSP 53) MSP TEST
10.22 LTUX-S LINE PORT ID 29 (MSP 49) MSP TEST
10.23 LTUX-S LINE PORT ID 30 (MSP 52) MSP TEST
10.24 LTUX-S LINE PORT ID 31 (MSP 54) MSP TEST
1l.l LTUX-S LINE PORT ID 33 (LS) LOOP TEST
11.2 LTUX-S LINE PORT ID 34 (LSM) LOOP TEST
11.3 LTUX-S LINE PORT ID 35 (LSM) LOOP TEST
11.4 LTUX-S LINE PORT ID 36 (LSM) LOOP TEST
11.5 LTUX-S LINE PORT ID 37 (LSM) LOOP TEST
12.1 LTUX-S LINE PORT ID 40 (DTP/PTR) PTP/PTR TEST
13.1 LTUXS LINE PORT ID 21 (OCR) LOOP-TEST
13.2 LTUX-S LINE PORT ID49 (CRT OCR) LOOP-TEST
14.1 LTUX-S LINE PORT ID 18 (CRT VDU) LOOP-TEST
14.2 LTUX-S LINE PORT ID 19 (CRT VDU) LOOP-TEST
14.3 LTUX-S LINE PORT ID 20 (CRT VDU) LOOP-TEST
14.4 LTUX-S LINE PORT I 21 (CRT VDU) LOOP-TEST
T̲E̲S̲T̲ ̲O̲V̲E̲R̲V̲I̲E̲W̲ T̲E̲S̲T̲ ̲N̲O̲.̲:̲
̲3̲/̲1̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲O̲N̲-̲S̲I̲T̲E̲ ̲H̲A̲R̲D̲W̲A̲R̲E̲ ̲V̲E̲R̲I̲F̲C̲A̲T̲I̲O̲N̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Test Case/
Reference Action
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
l4.5 LTUX-S LINE PORT ID 82 (CRT VDU) LOOP-TEST
14.6 LTUX-S LINE PORT ID 83 (CRT VDU) LOOP-TEST
14.7 LTUX-S LINE PORT ID 84 (CRT VDU) LOOP-TEST
15.1 LTUX-S LNE PORT ID 85 (CRT MSP) LOOP-TEST
15.2 LTUX-S LINE PORT ID 86 (CRT MSP) LOOP-TEST
15.3 LTUX-S LINE PORT ID 87 (CRT MSP) LOOP-TEST
15.4 LTUX-S LINE PORT ID 88 (CRT MSP) LOOP-TEST
15.5 LTUX-S LINE PORT ID 32 (CRT MSP) LOOP-TEST
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲ ̲N̲O̲.̲:̲
̲3̲/̲1̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲1̲/̲C̲U̲/̲T̲D̲X̲#̲1̲ ̲T̲E̲S̲T̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Case Test
Step No. Station Action Expected
Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
8.3.1 MP ACTIVATE THE FD DRIVE 01
FD-FORMAT TEST AS FOLLOWS
DO FD-FORMAT 1 REF. 8.3.1
PAGE
8.3.2 MP QUIT THE FD DRIVE TEST
AS FOLLOWS:
QUIT (CR) REF. 15 PAGE
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲ ̲N̲O̲.̲:̲
̲3̲/̲1̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲1̲/̲C̲U̲/̲T̲D̲X̲#̲1̲ ̲T̲E̲S̲T̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Case Test
Step No. Station Action Expected
Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
9.1.1 N/A CONNECT THE V-24
LOOP-BACK ADAPTER
TO J30 IN THE
IDF FILTER BOX N/A
9.1.2 MP BOOT THE LTU-LOOP TEST
AS FOLLOWS
BA 1025 (R)
BM 140 (CR)
BO XXX (CR) REF. 9.1.1
PAGE
9.1.3 MP TEST THE CCIS LTU
PORT ID 11AS FOLLOWS:
DO OPEN 11 ̲2 (CR)
DO SC ̲LOOP (CR)
DO CLOSE 11 ̲2 (CR) REF. 9.1.2
9.2.1 N/A CONNECT THE V-24
LOOP-BACK ADAPTER
TO J-31 IN THE
IDFFILTER BOX N/A
9.2.2 mp TEST THE SCARS LTU
PORT ID 21 AS FOLLOWS
DO OPEN 21 ̲2 (CR)
DO SC ̲LOOP (CR)
DO CLOSE 21-2 (CR) REF. 9.2.1
PAGE
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲ ̲N̲O̲.̲:̲
̲3̲/̲1̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲1̲/̲C̲U̲/̲T̲D̲X̲#̲1̲ ̲T̲E̲S̲T̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Case Test
Step No. Station Action Expected
Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
9.3.1 N/A CONNECT THE V-24
LOOP-BACK ADAPTER
TO J 26IN THE
IDF FILTER BOX N/A
9.3.2 mp TEST THE TARE 1LTU
PORT ID31 AS FOLLOWS:
DO OPEN 31 ̲2 (CR)
DO SC ̲LOOP (CR)
DO CLOSE 31-̲2 (CR) RF. 9.3.1 PAGE
9.4.1 N/A CONNECT THE V-24
LOOP-BACK ADAPTER
TO J27IN THE
IDF FILTER BOX N/A
9.4.2 MP TEST THE TARE2 LTU
PORT ID 33 AS FOLLOWS:
DO OPEN 33 ̲4 (CR)
DO SC ̲LOOP (CR)
DO CLOSE 33 ̲4 (CR) REF. 9.4.1 PAGE
9.4.3 MP QUIT TH LTU TEST
AS FOLLOWS:
QUIT (CR) REF. 1.5 PAGE
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲ ̲N̲O̲.̲:̲
̲3̲/̲1̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲1̲/̲C̲U̲/̲T̲D̲X̲#̲1̲ ̲T̲E̲S̲T̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Case Test
Step No. Station Action Expected
Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
10.1.1 N/A CHECK THAT FILL BSM-X
SWITCHES ARE IN POSSITION
MANUAL AND BUS 1 N/A
10.1.2 MP BOOT THE TDX TEST AS
BA 1025 (CR)
BM 140 (CR)
BO XXX (CR) REF. 10.1.2
PAGE
10.1.3 MP TES LTUX-S LINE PORT
ID 1AS FPLLOWS:
DO;OPEN 1 (CR)
DO VDU (CR)
DO CLOSE (CR) REF. 10.1.3
PAGE
10.2.1 MP REPEAT 10.1.3 FOR
LTUX-S LINE PORT ID2 REF. 10.2.1
PAGE
10.3.1 MP REPEAT 10.1.3 FOR
LTUX-S LINE PORT ID3 REF. 10.3.1
PAGE
10.4.1 MP REPEAT 10.1.3 FOR
LTUX-S LINE PORT ID4 REF. 10.4.1
PAGE
10.5.1 MP REPEAT 10.1.3 FOR
LTUX-S LINE PORT ID5 REF. 10.5.1
PAGE
10.6.1 MP REPEAT 10.1.3 FOR
LTUX-S LINE PORT ID6 REF. 10.6.1
PAGE
10.7.1 MP REPEAT 10.1.3 FOR
LTUX-S LIN PORT ID7 REF. 10.7.1
PAGE
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲ ̲N̲O̲.̲:̲
̲3̲/̲1̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲1̲/̲C̲U̲/̲T̲D̲X̲#̲1̲ ̲T̲E̲S̲T̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Case Test
Step No. Station Action Expected
Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
10.8.1 MP REPEAT 10.1.3 FOR
LTUX-S LINE PORT ID8 REF. 10.8.1
PAGE
10.9.1 MP REPEAT 10.1.3 FOR
LTUX-S LINE PORT ID 9 REF. 10.9.1
PAGE
10.10.1 MP REPEAT 10.1.3 FOR
LTUX-S LINE PORT ID 10 REF. 10.10.1
PAGE
1011.1 MP REPEAT 10.1.3 FOR
LTUX-S LINE PORT ID 11 REF. 10.11 1
PAGE
1o.12.1 MP REPEAT 10.1.3 FOR
LTUX-S LINE PORT ID !" REF. 10.12.1
PAGE
10.13.1 MP REPEAT 10.1.3 FOR
LTUX-S LINE PORT ID 13 REF. 10.13.1
PAGE
10.14.1 MP REPEAT 10.1.3 FR
LTUX-S LINR PORT ID 14 REF. 10.14.1
10.15.1 MP REPEAT 10.1.3 FOR
LTUX-S LINE PORT ID 15 REF. 10.15.1
PAGE
10.16.1 MP REPEAT 10 1.3 FOR
LTUX-S LINE PORT ID 16 REF. 10.16.1
PAGE
10.17.1 MP REPEAT 10.1.3 FOR
LTUX-S LINE PORT ID 17 REF. 1017.1
PAGE
10.17.1 MP QUIT THE TDX TEST
AS FOLLOWS
QUIT (CR) REF. 1.5 PAGE
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲ ̲N̲O̲.̲:̲
̲3̲/̲1̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲1̲/̲C̲U̲/̲T̲D̲X̲#̲1̲ ̲T̲E̲S̲T̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Case Test
Step No. Station Action Expected
Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
10.18.1 MP BOOT THE TDX TEST
AS FOLLOWS:
BA 1025
BM 140
BO XXX REF. 10.18.1
PAGE
10.18.2 MP TEST LTUX-S LINE
PORT ID 47 AS
FOLLOWS:
DO OPEN 47
DO MSP
DO CLOSE REF. 10.18.2
PAGE
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲ ̲N̲O̲.̲:̲
̲3̲/̲1̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲1̲/̲C̲U̲/̲T̲D̲X̲#̲1̲ ̲T̲E̲S̲T̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Case Test
Step No. Station Action Expected
Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
10.19.1 MP REPEAT 10.18.2 FOR
LTUX-S LINE PORT ID 48 REF. 10.19.1
PAGE
10.20.1 MP REPEAT 10.18.2 FOR
LTUX-S LINE PORT ID 51 REF. 10.20.1
PAGE
10.21.1 MP REPEAT 10.18.2 FOR
LTUX-S LINE PORT ID 53 REF. 1.21.1
PAGE
10.22.1 MP REPEAT 10.18.2 FOR
LTUX-S LINE PORT ID 49 REF. 10.22.1
PAGE
10.23.1 MP REPEAT 10.18.2 FOR
LTUX-S LINE PORT ID 52 REF. 10.23.1
P
10.24.1 MP REPEAT 10.18.2 FOR
LTUX-S LINE PORT ID 54 REF. 10.24.1
PAGE
10.24.2 MP QUT THE IDX TEST
AS FOLLOWS:
QUIT (CR) REF. 1.5 PAGE
11.1.1 MP BOOT THE TDX TEST
AS FOLLOWS:
BA 1025 (CR)
BM 140 (CR)
BO XXX (CR) REF. 10.1.2
PAGE
11.1.2 N/A CONNECT THE V-24
LOOP-BACK ADAPTER
TO J /7 IN THE
IDF FILTERBOX N/A
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲ ̲N̲O̲.̲:̲
̲3̲/̲1̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲1̲/̲C̲U̲/̲T̲D̲X̲#̲1̲ ̲T̲E̲S̲T̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Case Test
Step No. Station Action Expected
Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
11.1.3 MP TEST LTUX-S LINE
PORT ID 33 AS FOLLOWS:
DO TDX. LOOP43 (CR) REF. 11.1.2
PAGE
11.2.1 N/A REPEAT 11.1.2 FOR
J2 N/A
11.2.2 MP REPEAT 11.1.3 FOR
LTUX-S LINE PORT ID 34 REF. 11.2.1
PAGE
11.3.1 N/A EPEAT 11.1.2 FOR
J3 N/A
11.3.2 MP REPEAT 11.1.3 FOR
LTUX-S LINE PORT ID 35 REF. 11.3.1
PAGE
11.4.1 N/A REPEAT 11.1.2 FOR
J4 N/A
11.4.2 MP REPEAT 11.1.2 FOR
LTUX-S LINE PORT ID 36 REF. 11.4.1
PAGE
11.5.1 N/A REPEAT 11.1.2 FOR
J5 N/A
1.5.2 MP REPEAT 11.1.3 FOR
LTUX-SMLINE PORT ID37 REF. 11.5.1
PAG…86…1
…02…
…02…
…02…
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲ ̲N̲O̲.̲:̲
̲3̲/̲1̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲1̲/̲C̲U̲/̲T̲D̲X̲#̲1̲ ̲T̲E̲S̲T̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Case Test
Step No. Station Action Expected
Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
12.1.1 MP TEST LTUX-S LINE PORT
ID39AS FOLLOWS: REF. 12.1.1
DO OPEN39 (CR)
DO PTP (CR)
DO CLOSE (CR)
12.1.2 PTP/ A PIECE OF TAPE IS
PTR PUNCHED, TEAR IS OF AND
FEED IT INTO THE
REAER WITH HE LOAD/
RUNSWITCH IN POSSITION
LOAD N/A
12.1.3 MP TEST LTUX-S LINE PORT
ID 40 AS FOLLOWS:
DO OPEN40 (CR)
DO PTR (CR) REF. 12.1.2
PAGE
12.1.4 PTP/ THE LOAD/RUN SWITCH
PTR IS SET TO RUN
12.1.5 MP DO CLOSE (CR) REF. 12.1.3PAGE
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲ ̲N̲O̲.̲:̲
̲3̲/̲1̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲1̲/̲C̲U̲/̲T̲D̲X̲#̲1̲ ̲T̲E̲S̲T̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Case Test
Step No. Station Action Expected
Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
12.1.1 MP TEST LTUX-S LINE PORT
ID39AS FOLLOWS: REF. 12.1.1
DO OPEN39 (CR)
DO PTP (CR)
DO CLOSE (CR)
12.1.2 PTP/ A PIECE OF TAPE IS
PTR PUNCHED, TEAR IS OF AND
FEED IT INTO THE
REAER WITH HE LOAD/
RUNSWITCH IN POSSITION
LOAD N/A
12.1.3 MP TEST LTUX-S LINE PORT
ID 40 AS FOLLOWS:
DO OPEN40 (CR)
DO PTR (CR) REF. 12.1.2
PAGE
12.1.4 PTP/ THE LOAD/RUN SWITCH
PTR IS SET TO RUN
12.1.5 MP DO CLOSE (CR) REF. 12.1.3PAGE
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲ ̲N̲O̲.̲:̲
̲3̲/̲1̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲1̲/̲C̲U̲/̲T̲D̲X̲#̲1̲ ̲T̲E̲S̲T̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Case Test
Step No. Station Action Expected
Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
13.1.1 N/A PROGRAM THE COMM.
TESTER ACCORDING TO
13.1.1 PAGE N/A
13.1.2 N/A CONNECT THE COMM:
TESTER TO J32
IN THE IDF FILTER BOX N/A
13.1.3 N/A SET THE COMM. TESTER
IN DTE SIM MODE N/A
13.1.4 MP TEST TUX-S LINE PORT
ID21 AS FOLLOWS:
DO OPEN 21 (CR)
DO OCR ̲ COM (CR) REF. 13.1.1
PAGE
13.1.5 N/A WHEN THE COMMAND
" MI TDX.READ (PER,
4,5129" APPEARES ON
THE MP,PRESS START
ON THE COMM. TESTER REF. 13.1.2
PAGE
13.1.6 MP CONTINUE ENTRING ON
MP:
DO CLOSE REF. 13.1.2
PAGE
13.1.7 MP QUIT THE TDX TEST
AS FOLLOWS:
QUIT (CR) REF. 1.5 PAGE
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲ ̲N̲O̲.̲:̲
̲3̲/̲1̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲1̲/̲C̲U̲/̲T̲D̲X̲#̲1̲ ̲T̲E̲S̲T̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲