WangText
6…00……00……00……00…(…0a……00……00…(…0b…(…0f…(…02…(…06…'…0b…'…0c…'…00…' &…08…&…0b…&…0e…&…01…& &…07…%…0a…%…0d…%…02…%…07…$…0a…$…01…$
#…08…#…0d…#…01…#…07…"…0c…"…01…"
"…86…1 …02… …02… …02…
…02…CPS/TPR/005
…02…820419…02……02…
DSMT (PROTOTYPE) HARDWARE TEST SPECIFICATION
AND PROCEDURES…02…811218…02…CAMPS
3.5 T̲E̲S̲T̲G̲R̲O̲U̲P̲ ̲N̲O̲.̲ ̲5̲.
3.5.1 G̲E̲N̲E̲R̲A̲L̲ ̲D̲E̲S̲C̲R̲I̲P̲T̲I̲O̲N̲
The purpose of this tesgroup is to verify requirements
to system security as specified in CPS/210/SYS/0001
sec. 3.4.5.1 and 3.4.5.7.a.
Requirements to be verified are:
1. Special earthing arrangements (CPS/210/SYS/0001,
sec. 3.4.5.1c.)
2. Low level Keying (CPS/210/SYS/0001 sec. 3.4.5.1.d)
3. Waveshaping (CPS/210/SYS/0001 sec. 3.4.5.1m-n)
4. Detection of unassigned codes
(CPS/210/SYS/0001 sec. 3.4.5.7.a.1)
5. Access protection mechanisms
(CPS/210/SYS/0001 sec. 3.4.5.7.a.2)
6. System state/User state instructions
(CPS/210/SYS/0001 sec. 3.4.5.7.a.3)
7. Key switch (CPS/210/SYS/0001 sec. 3.4.5.7.a.5)
8. Read/Write memory erase
(CPS/210/SYS/001 sec. 3.4.5..7.a.6)
3.5.2 V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲ ̲C̲r̲o̲s̲s̲ ̲R̲e̲f̲e̲r̲e̲n̲c̲e̲ ̲I̲n̲d̲e̲x̲ ̲(̲V̲C̲R̲I̲)̲
The VCRI, table 3.5.2-1, identifies requirements to
be verified and for each requirement the verification
method.
3.5.3 R̲e̲f̲e̲r̲e̲n̲c̲e̲d̲ ̲D̲o̲c̲u̲m̲e̲n̲t̲s̲
1. CAMPS SYSTEM REQUIREMENT SPECIFICATION
(CPS/210/SYS/0001)
2. CAMPS SYSTEM DESIGN SPECIFICATION
(CPS/SDS/001)
3. ACCEPTANCE TEST PROCEDURE FOR V24/V28
(L/L) ADAPTER
TYPE 1 AND 2.
4. Techn. Manual for DELTA DATA VDU
5. Techn. Manual for TRACOR MSP
6. Techn. Manual for Adaptor power
supply
REQUIREMENT VERIFICATION
METHOD
N/A EXAM.
ANAL.
TEST
----------------------------------------------------------------
3.4.5 Security
3.4.5.1 TEMPEST Acceptance
3.4.5.1 c Special Earthing X
3.4.5.1 d Low Level Keying X
3.4.5.1 m Waveshaping X
3.4.5.7 System Design
Requirements
3.4.5.7 a H/W Design Requirements
3.4.5.7 a.1 Unassigned Codes X
3.4.5.7 a.2 Access Protection X
3.4.5.7 a.3 System/User State X
3.4.5.7 a.5 Key Switch X
3.4.5.7 a.6 Memory erase X
TABLE 3.5.2-1
3.5.4 T̲e̲s̲t̲ ̲P̲r̲o̲c̲e̲d̲u̲r̲e̲s̲
3.5.4.1 T̲e̲s̲t̲ ̲S̲e̲t̲ ̲U̲p̲
The starting point for execution of this procedure
is that the system is assembled in accordance with
the configuration document. One copy of each of the
documents mentioned in sec. 3.5.3 is present in the
testroom.
As the test 5/8 requires part of the system to be powered
up following setup must be performed prior to the test
initialization.
The test 5/8 is performed via an Operator Console (OC)
which is a printer and keyboard.
The OC is connected to the system as follows:
1. Substitute the leftmost OPTO transceiver in
the rack C Adapter crate with a V24/V28(L/L)
adapter (1 channel), and connect the OC to
the V24 connector on the front panel of the
adaptor.
2. Remove the two V24 cables from J1 and J4 located
on the front panel of the WCA (rear crate of
the Watchdog Processor crate).
3. Connect the two V24 cables via a short extension
cable.
The OC is now connected to the V24 port on the MIA
in the rear crate of PU#1 (ref. fig. 3.5.4.1-1).
FIGURE 3.5.4.1-1
C̲o̲n̲n̲e̲c̲t̲i̲o̲n̲ ̲o̲f̲ ̲t̲h̲e̲ ̲O̲p̲e̲r̲a̲t̲o̲r̲ ̲C̲o̲n̲s̲o̲l̲e̲
Carry out/control the following:
a) OC Set up:
The communication part of the OC is set to:
1) Asynchronous communication
2) 7 bit character length
3) Even parity check/generation
4) 1 stop bit
5) 1200 Baud communication speed
b) Switch settings in PU#1 front crate modules:
1) The NRM/MAIN switch on the MAP module front
panel is set to MAIN.
2) The EN/DIS switch on the MAP module front panel
is set to DIS.
c) Switch settings in PU#1 rear crate modules:
1) The Baudrate select switches 1-4 (S1) on the
MAP Interface Adapter (MIA) Printed Circuit
Board (PCB) is set to #7 which corresponds
to a transmission speed of 1200 Baud:
Switch 1: OPEN
Switch 2: OPEN
Switch 3: OPEN
Switch 4: CLOSED
2) The EN/DIS switch on the Configuration Control
Adaptor (CCA) front panel is set to DIS.
d) Setting of power switches in Computer racks:
1) Power switch (2) on each Mains switch is set
to OFF.
2) Power switch (2) in the rear crate of PU#1
is set to "ON"
3) Power switch (2) in the rear crate of the CU
is set to "OFF"
4) Power switch (2) in the rear panel of the RACK
A 80D fan unit is set to "ON".
5) Power switch (2) in the rear crate of the Adaptor
Crate is set to "ON"
6) Power switch (1) in the rear panel of the RACK
B 80S Blower Unit is set to "ON"
7) Power switch (1) on each PU#1 CR80D Power supply
(2 front crate mounted modules) is set to "ON".
3.5.4.2 T̲e̲s̲t̲ ̲I̲n̲i̲t̲i̲a̲l̲i̲z̲a̲t̲i̲o̲n̲
The testengineers and the testwitnesses are in the
testroom and ready to perform and supervise the test.
3.5.4.3 T̲e̲s̲t̲ ̲S̲t̲e̲p̲s̲
The teststeps to be performed for testgroup no. 5 are
given in the following preceded by a testoverview.
T̲E̲S̲T̲ ̲O̲V̲E̲R̲V̲I̲E̲W̲ T̲E̲S̲T̲ ̲N̲O̲.̲:̲ ̲5̲)̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲S̲e̲c̲u̲r̲i̲t̲y̲ ̲r̲e̲q̲u̲i̲r̲e̲m̲e̲n̲t̲s̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲
Test Case/
Reference Action SRS Reference
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲
1 Special earthing arrange- sec. 3.4.5.1.c
ments.
2 Low level keying sec. 3.4.5.1.d
3 Waveshaping sec. 3.4.5.1.m-n
4 Detection of unassigned sec. 3.4.5.7.a.1
codes
5 Access protection mechanisms sec. 3.4.5.7.a.2
6 System/User state instruc- sec. 3.4.5.7.a.3
tions
7 Key Switch sec. 3.4.5.7.a.5
8 Read/Write memory erase sec. 3.4.5.7.a.6
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲
̲N̲O̲.̲:̲
̲5̲/̲1̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲S̲p̲e̲c̲i̲a̲l̲ ̲E̲a̲r̲t̲h̲i̲n̲g̲ ̲A̲r̲r̲a̲n̲g̲e̲m̲e̲n̲t̲s̲
S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲3̲.̲4̲.̲5̲.̲1̲ ̲c̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Case Test
Step No. Station Action Expected Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
1.1 N/A Examine ref. 2
(Secs. 5.5.5.2.4,
5.2.2.6, and
5.1.4.1.9), ref. 3
and ref. 6. Conformance with
the requirements.
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲
T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲
TEST QA QAR
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲
̲N̲O̲.̲:̲
̲5̲/̲2̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲ ̲o̲f̲ ̲L̲o̲w̲ ̲L̲e̲v̲e̲l̲ ̲K̲e̲y̲i̲n̲g̲
S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲3̲.̲4̲.̲5̲.̲1̲ ̲d̲ ̲a̲n̲d̲ ̲3̲.̲4̲.̲5̲.̲1̲ ̲n̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Case Test
Step No. Station Action Expected Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
2.1 N/A Examine ref. 3 for
verification of
low level keying Conformance with
the requirements
in SRS
Reference
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲
T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲
TEST QA QAR
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲
̲N̲O̲.̲:̲
̲5̲/̲3̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲ ̲o̲f̲ ̲W̲a̲v̲e̲s̲h̲a̲p̲i̲n̲g̲
S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲3̲.̲4̲.̲5̲.̲1̲ ̲m̲ ̲a̲n̲d̲ ̲3̲.̲4̲.̲5̲.̲1̲ ̲n̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Case Test
Step No. Station Action Expected Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
3.1 N/A Examine ref. 3 for
verification of
waveshaping Conformance with
the requirements
in SRS
Reference
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲
T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲
TEST QA QAR
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲
̲N̲O̲.̲:̲
̲5̲/̲4̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲ ̲o̲f̲ ̲H̲/̲W̲ ̲D̲e̲s̲i̲g̲n̲,̲ ̲D̲e̲t̲e̲c̲t̲i̲o̲n̲ ̲o̲f̲ ̲u̲n̲a̲s̲s̲i̲g̲n̲e̲d̲
̲c̲o̲d̲e̲s̲.̲
S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲3̲.̲4̲.̲5̲.̲7̲ ̲a̲.̲1̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Case Test
Step No. Station Action Expected Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
4.1 N/A Examine ref. 2
sec. 5.1.4.1.3.1 Conformance with
the requirements
in SRS
Reference
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲
T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲
TEST QA QAR
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲
̲N̲O̲.̲:̲
̲5̲/̲5̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲ ̲o̲f̲ ̲H̲/̲W̲ ̲D̲e̲s̲i̲g̲n̲,̲ ̲A̲c̲c̲e̲s̲s̲ ̲p̲r̲o̲t̲e̲c̲t̲i̲o̲n̲.̲
S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲3̲.̲4̲.̲5̲.̲7̲ ̲a̲.̲2̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Case Test
Step No. Station Action Expected Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
5.1 N/A Examine ref. 2
sec. 5.1.4.1.4.1 Conformance with
the requirements
in SRS
Reference
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲
T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲
TEST QA QAR
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲
̲N̲O̲.̲:̲
̲5̲/̲6̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲ ̲o̲f̲ ̲H̲/̲W̲ ̲D̲e̲s̲i̲g̲n̲,̲ ̲S̲y̲s̲t̲e̲m̲ ̲s̲t̲a̲t̲e̲/̲U̲s̲e̲r̲ ̲s̲t̲a̲t̲e̲.̲
S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲3̲.̲4̲.̲5̲.̲7̲ ̲a̲.̲3̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Case Test
Step No. Station Action Expected Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
6.1 N/A Examine ref. 2
sec. 5.1.4.1.4.1 and
Sec. 5.1.4.1.3.1 Conformance with
the requirements
in SRS
Reference
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲
T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲
TEST QA QAR
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲
̲N̲O̲.̲:̲
̲5̲/̲7̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲ ̲o̲f̲ ̲H̲/̲W̲ ̲D̲e̲s̲i̲g̲n̲,̲ ̲T̲e̲r̲m̲i̲n̲a̲l̲ ̲K̲e̲y̲ ̲S̲w̲i̲t̲c̲h̲.̲
S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲3̲.̲4̲.̲5̲.̲7̲ ̲a̲.̲5̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Case Test
Step No. Station Action Expected Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
7.1 N/A Examine ref. 4 Conformance with
the requirements
7.2 N/A Examine ref. 5 Conformance with
the requirements
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲
T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲
TEST QA QAR
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲
̲N̲O̲.̲:̲
̲5̲/̲8̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲ ̲o̲f̲ ̲H̲/̲W̲ ̲D̲e̲s̲i̲g̲n̲,̲ ̲R̲e̲a̲d̲/̲w̲r̲i̲t̲e̲ ̲m̲e̲m̲o̲r̲y̲ ̲e̲r̲a̲s̲e̲.̲
S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲3̲.̲4̲.̲5̲.̲7̲ ̲a̲.̲6̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Case Test
Step No. Station Action Expected Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
8.1 N/A Power Up the OC.
The rightmost power OC print out:
switch on RACK A and C 07 MAP/BIT:OK
Mains switch is set *
to "ON".
8.2 OC Enter from the OC:
M 91 E800 0002(CR)003F
M 90 0FC0 0001(CR)0001
M E1 0000 0100(CR)A5A5
M 60 0000 0100(CR) 256 words equal
to A5A5 is dumped
on the OC.
8.3 N/A The rightmost power
switch on RACK A
Mains switch is set
to "OFF". Wait until
all power indicators are
off.
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲
T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲
TEST QA QAR
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲
̲N̲O̲.̲:̲
̲5̲/̲8̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲ ̲o̲f̲ ̲H̲/̲W̲ ̲D̲e̲s̲i̲g̲n̲,̲ ̲R̲e̲a̲d̲/̲w̲r̲i̲t̲e̲ ̲m̲e̲m̲o̲r̲y̲ ̲e̲r̲a̲s̲e̲.̲
S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲3̲.̲4̲.̲5̲.̲7̲ ̲a̲.̲6̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Case Test
Step No. Station Action Expected Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
8.4 N/A The rightmost power OC print out:
switch on RACK A 07 MAP/BIT:OK
Mains switch is set *
to "ON".
8.5 OC Enter from the OC:
M 91 E800 0002(CR)003F
M 90 0FC0 0001(CR)0001
M E1 0000 0100(CR)A5A5
M 60 0000 0100(CR) Some words different
from A5A5 are
dumped on the
OC terminated
with a parity
error indication
(P).
8.6 N/A The rightmost power
switch on RACK A
Mains switch is set
to "OFF". Wait until
all power indicators are
off.
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲
T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲
TEST QA QAR
3.5.4.4 T̲e̲s̲t̲ ̲T̲e̲r̲m̲i̲n̲a̲t̲i̲o̲n̲
Power Down the DSMT system as Follows:
a) The Power Switch on the RACK C Mains Switch is
set to "OFF".
b) Power Down the OC.
c) Disconnect the OC from the leftmost V24/V28(L/L)
adaptor in the Adaptor crate of rack C, and replace
this adaptor with the originally mounted OPTO transceiver.
d) Disconnect the two V24 cables (at the WDP rear
crate), remove the short extension cable and reconnect
the two cables to J1 and J4 respectively.
3.6 T̲E̲S̲T̲ ̲G̲R̲O̲U̲P̲ ̲N̲O̲.̲ ̲6̲
3.6.1 G̲e̲n̲e̲r̲a̲l̲ ̲D̲e̲s̲c̲r̲i̲p̲t̲i̲o̲n̲
This testgroup will give a verfification of the following
requirements:
a) CR produced Equipment
b) Subcontractor Produced Equipment
c) Products from Other Suppliers
d) Special Requirements for the CAMPS System
1) Materials
2) Interchangeability
3) Bench Handling
4) Cover Plates
5) Cabling and Fittings, Shield Continuity
6) Cabling and Fittings, Wiring identification
7) Cabling and Fittings, Bus bars
8) Cabling and Fittings, CR part Numbers
9) Flux and Soldering, Flux
10) Flus and Soldering, Soldering
11) Ventilation and Cooling, Intake and Exhaust
12) Ventilation and Cooling, Resonance
13) Ventilation and Cooling, Air Filters
14) Accessibility, Parts Inside Containers
15) Accessibility, Withdrawal Slides
16) Accessibility, Plug-in Board Extractors
17) Testpoints, Banana Plug
18) Test points, Measuring/Injection
19) Personnel Safety, Interlocks
20) Personnel Safety, Excess of 30 Volts
21) Personnel Safety, Marking
22) Personnel Safety, Warning Principles
23) Equipment Safety, Circuit Breakers
24) Equipment Safety, Protection of Equipment
25) Equipment Safety, Fuse location and indication
26) Grounding, Three Ground Circuits
27) Grounding, AC Power Neutral
28) Grounding, Panels, Drawers and Subassemblies
29) Grounding, Signalling and Contact Ground
30) Nameplates and Product Marking
31) Controls
32) Acoustic Noise
3.6.2 V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲ ̲C̲r̲o̲s̲s̲ ̲R̲e̲f̲e̲r̲e̲n̲c̲e̲ ̲I̲n̲d̲e̲ ̲(̲V̲C̲R̲I̲)̲
The verification methods to be applied for each of
the requirements are indicated in the VCRI shown in
table 3.6.2-1 through 3.6.2-3
REQUIREMENT VERIFICATION
METHOD
N/A EXAM.
ANAL.
TEST
----------------------------------------------------------------
3.5 DESIGN AND CONSTRUCTION
REQUIREMENTS X
3.5.1 General X
3.5.1.1 Equipment Produced by
CR A/S X
3.5.1.1 a X
3.5.1.1 b X
3.5.1.1 b 1 X
3.5.1.1 b 2 X
3.5.1.1 b 3 X
3.5.1.1 c X
3.5.1.1 d X
3.5.1.1 e X
3.5.1.2 Equipment Produced by
Subcontractors X
3.5.1.2 a X
3.5.1.2 b X
3.5.1.3 Products From Other
Suppliers X
3.5.1.3 a X
3.5.1.3 b X
3.5.1.3 b.1 X
3.5.1.3 b.2 X
3.5.1.3 b.3 X
3.5.1.3 b.4 X
3.5.2 Special Requirements for
the CAMPS System X
3.5.2 a X
3.5.2 b X
3.5.2.1 Environmental Testing X
3.5.2.3 Materials X
3.5.2.4 Interchangeability X
TABLE 3.6.2-1
REQUIREMENT VERIFICATION
METHOD
N/A EXAM.
ANAL.
TEST
----------------------------------------------------------------
3.5.2.4 a X
3.5.2.4 b X
3.5.2.4 c X
3.5.2.4 d X
3.5.2.4 e X
3.5.2.5 Bench Handling X
3.5.2.6 Cover Plates X
3.5.2.7 Cabling and Fittings X
3.5.2.7 a X
3.5.2.7 b X
3.5.2.7 c X
3.5.2.7 d X
3.5.2.8 Flux and Soldering X
3.5.2.8.1 Flux X
3.5.2.8.2 Soldering X
3.5.2.9 Ventilation and Cooling X
3.5.2.9 a X
3.5.2.9 b X
3.5.2.9 c X
3.5.2.11 Test and Repair X
3.5.2.11.1 Accessibility X
3.5.2.11.1 a X
3.5.2.11.1 b X
3.5.2.11.1 c X
3.5.2.11.2 Testpoints X
3.5.2.11.2 a X
3.5.2.11.2 b X
3.5.2.12 Consumable Parts X
3.5.2.13 Safety X
3.5.2.13.2 Personnel Safety X
3.5.2.13.2 a X
3.5.2.13.2 b X
3.5.2.13.2 c X
3.5.2.13.2 d X
TABLE 3.6.2-2
REQUIREMENT VERIFICATION
METHOD
N/A EXAM.
ANAL.
TEST
----------------------------------------------------------------
3.5.2.13.2 d.1 X
3.5.2.13.2 d.2 X
3.5.2.13.2 d.3 X
3.5.2.13.3 Equipment Safety X
3.5.2.13.3 a X
3.5.2.13.3 b X
3.5.2.13.3 c X
3.5.2.13.4 Grounding X
3.5.2.13.4 a X X
3.5.2.13.4.a.1 X
3.5.2.13.4.a.2 X X
3.5.2.13.4.a.3 X X
3.5.2.13.4 b X
3.5.2.13.4 c X
3.5.2.13.4 d X
3.5.2.14 Nameplates and Product
Marking X
3.5.2.15 Controls X
3.5.2.16 Acoustic Noise X
TABLE 3.6.2-3
3.6.3 R̲e̲f̲e̲r̲e̲n̲c̲e̲d̲ ̲D̲o̲c̲u̲m̲e̲n̲t̲s̲
1. Design Review Report for Processor Crate
2. Design Review Report for Channel Crate
3. Design Review Report for Watchdog Crate
4. Design Review Report for CTX Crate
5. Design Review Report for D-Fan Assy.
6. Design Review Report for S-Fan Assy.
7. Design Review Report for Mains Switch
8. Design Review Report for X-Net Terminal Outlet
9. Design Review Report for Floppy Disk
10. Design Review Report for Power Supply CR80S
11. Design Review Report for Power Supply CR80D
12. Design Review Report for MAP I/O DMA
13. Design Review Report for RAM
14. Design Review Report for CPU-CACHE
15. Design Review Report for STI
16. Design Review Report for TIA
17. Design Review Report for MIA
18. Design Review Report for CCA
19. Design Review Report for MBT
20. Design Review Report for Disk Controller
21. Design Review Report for Floppy Disk Ctrl.
22. Design Review Report for CUCP
23. Design Review Report for LTU
24. Design Review Report for LIA-N
25. Design Review Report for SFA
26. Design Review Report for DCA
27. Design Review Report for CIA-A/B
28. Design Review Report for WCA
29. Design Review Report for TDX Controller
30. Design Review Report for BSM-X/BSM-X Panel
31. Design Review Report for LTUX-S
32. Design Review Report for Back Panel Type 8
33. Design Review Report for CCBA Panel
34. Design Review Report for Power Switch Panel for
Frequency Stabilizer
35. Inspection and Test Procedure for Versitron Fiber
Optic Modems CPS/TPR/015
36. Inspection and Test Procedures for ARC V24/V28
(L/L)
Adapters.
37. Inspection and Test Procedure for ARC Filter Box.
38. Inspection and Test Procedure for Captor Power
Line
Filter.
39. Inspection and Test Procedure for CDC 80Mb SMD.
9762 CPS/TPR/013.
40. Inspection and Test Procedure for CDC 80Mb MMD.
41. Inspection and Test Procedure for Abacus Frequency
Stabilizer.
42. Inspection and Test Procedure for Delta Data Terminal
7260TC CPS/TPR/012
43. Inspection Test Procedure for Tracor Medium Speed
Printer.
44 Inspection and Test Procedure for TBD Paper Tape
Punch.
45. Inspection and Test Procedure for TBD Paper Tape
Reader.
46. Inspection and Test Procedure for Electronic Enclosure
Rack.
47. NGTS 40 Environmental Test Methods Amended as applicable
for CR80 hardware.
48. CAMPS Hardware Assembly Breakdown CPS/SDS/017.
49. General Manufacturing Requirements ED/STD/0002.
50. Design and Construction Criteria for Electronic
Material ED/STD/0003.
51. Quality Requirements for Equipment Purchased for
the CAMPS Project CPS/AUX/009.
52. Test Report, Acoustic Noise.
3.6.4 T̲e̲s̲t̲ ̲P̲r̲o̲c̲e̲d̲u̲r̲e̲s̲
3.6.4.1 T̲e̲s̲t̲ ̲S̲e̲t̲u̲p̲
According to paragraph 3.6.2 table 3.6.2-1 through
3.6.2-3, the verification methods to be applied in
this test group is examination and test/demonstration.
The documents listed in paragraph 3.6.3 shall be provided
for the verification.
The hardware under test must be fully integrated and
operable.
3.6.4.2 T̲e̲s̲t̲ ̲I̲n̲i̲t̲i̲a̲l̲i̲z̲a̲t̲i̲o̲n̲
Activities associated with initialization of the individual
tests/demonstrations are described by teststeps under
the affected testprocedure.
3.6.4.3 T̲e̲s̲t̲ ̲S̲t̲e̲p̲s̲
The test steps for testgroup no. 6 are given in the
following, consisting of overview descriptions followed
by detailed test steps. The test numbers reference
to paragraph 3.6.1.
T̲E̲S̲T̲ ̲O̲V̲E̲R̲V̲I̲E̲W̲ T̲E̲S̲T̲ ̲N̲O̲.̲:̲ ̲6̲/̲a̲)̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲C̲R̲ ̲P̲r̲o̲d̲u̲c̲e̲d̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲
Test Case/
Reference Action SRS Reference
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲
1 CR Produced Equipment 3.5.1.1.a
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲
̲N̲O̲.̲:̲
̲6̲/̲a̲/̲0̲1̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲C̲R̲ ̲P̲r̲o̲d̲u̲c̲e̲d̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲,̲ ̲S̲t̲a̲n̲d̲a̲r̲d̲ ̲
S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲3̲.̲5̲.̲1̲.̲1̲ ̲a̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Case Test
Step No. Station Action Expected Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
1.01 Examine if the Design
Review Reports
certifying conformance
with the CR
standards are available
for the following
equipment:
Processor Crate Available
1.02 Channel Crate Available
1.03 Watchdog Crate Available
1.04 CTX Crate Available
1.05 D-Fan Assy. Available
1.06 S-Fan Assy. Available
1.07 Mains Switch Available
1.08 X-Net Terminal Outlet Available
1.09 Floppy Disk Available
1.10 Power Supply CR 80S Available
1.11 Power Supply CR 80D Available
1.12 MAP I/O DMA Available
1.13 RAM Available
1.14 CPU-CACHE Available
1.15 STI Available
1.16 TIA Available
1.17 MIA Available
1.18 CCA Available
1.19 MBT Available
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲
T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲
TEST QA QAR
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲
̲N̲O̲.̲:̲
̲6̲/̲a̲/̲0̲1̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲C̲R̲ ̲P̲r̲o̲d̲u̲c̲e̲d̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲,̲ ̲S̲t̲a̲n̲d̲a̲r̲d̲ ̲
S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲3̲.̲5̲.̲1̲.̲1̲ ̲a̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Case Test
Step No. Station Action Expected Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
1.20 Disk Controller Available
1.21 Floppy Disk Controller Available
1.22 CUCP Available
1.23 LTU Available
1.24 LIA-N Available
1.25 SFA Available
1.26 DCA Available
1.27 CIA-A/B Available
1.28 WCA Available
1.29 TDX Controller Available
1.30 BSM-X Available
1.31 LTUX-S Available
1.32 Back Panel Type 8 Available
1.33 BSM-X Panel Available
1.34 CCBA Panel Available
1.35 CCB Panel Available
1.36 Power Switch Panel for
Freq. Stabl. Available
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲
T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲
TEST QA QAR
T̲E̲S̲T̲ ̲O̲V̲E̲R̲V̲I̲E̲W̲ T̲E̲S̲T̲ ̲N̲O̲.̲:̲ ̲6̲/̲b̲)̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲S̲u̲b̲c̲o̲n̲t̲r̲a̲c̲t̲o̲r̲ ̲P̲r̲o̲d̲u̲c̲e̲d̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲
Test Case/
Reference Action SRS Reference
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲
1 Subcontractor Produced
Equipment 3.5.1.2 a and b
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲
̲N̲O̲.̲:̲
̲6̲/̲b̲/̲0̲1̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲S̲u̲b̲c̲o̲n̲t̲r̲a̲c̲t̲o̲r̲ ̲P̲r̲o̲d̲u̲c̲e̲d̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲,̲ ̲S̲t̲a̲n̲d̲a̲r̲d̲ ̲
S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲3̲.̲5̲.̲1̲.̲2̲ ̲a̲ ̲a̲n̲d̲ ̲b̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Case Test
Step No. Station Action Expected Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
1.1 Examine if "Inspection
and Test
Procedures" are available
for the following
equipment:
Versitron Fiber Optic
Modems Available
1.2 ARC V24/V28 (L/L)
Adapters Available
1.3 ARC Filter Box Available
1.4 Captor Power Line Filters Available
1.5 Select at random:
3 pc. Fiber Optic Modems
3 pc. V24/V28 (L/L)
Adapters
1 pc. Filter Box
1 pc. Power Line Filter N/A
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲
T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲
TEST QA QAR
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲
̲N̲O̲.̲:̲
̲6̲/̲b̲/̲0̲1̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲S̲u̲b̲c̲o̲n̲t̲r̲a̲c̲t̲o̲r̲ ̲P̲r̲o̲d̲u̲c̲e̲d̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲,̲ ̲S̲t̲a̲n̲d̲a̲r̲d̲ ̲
S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲3̲.̲5̲.̲1̲.̲2̲ ̲a̲ ̲a̲n̲d̲ ̲b̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Case Test
Step No. Station Action Expected Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
1.6 Examine if the selected
modules and
sub-assemblies are
equipped with an
acceptance tag certifying
they have
passed the inspection and
test procedure. Accepted tags
on the selec-
ted equipment
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲
T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲
TEST QA QAR
T̲E̲S̲T̲ ̲O̲V̲E̲R̲V̲I̲E̲W̲ T̲E̲S̲T̲ ̲N̲O̲.̲:̲ ̲6̲/̲c̲)̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲r̲o̲d̲u̲c̲t̲s̲ ̲f̲r̲o̲m̲ ̲O̲t̲h̲e̲r̲ ̲S̲u̲p̲p̲l̲i̲e̲r̲s̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲
Test Case/
Reference Action SRS Reference
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲
1 Products from other
Suppliers 3.5.1.3 b
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲
̲N̲O̲.̲:̲
̲6̲/̲c̲/̲0̲1̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲r̲o̲d̲u̲c̲t̲s̲ ̲f̲r̲o̲m̲ ̲o̲t̲h̲e̲r̲ ̲s̲u̲p̲p̲l̲i̲e̲r̲s̲,̲ ̲Q̲u̲a̲l̲i̲t̲y̲ ̲
S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲3̲.̲5̲.̲1̲.̲3̲ ̲b̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Case
Step No. Action Expected Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
1.01 Examine if "Inspection and Test
Procedures" are available for the
following equipment:
CDC Disk Drive SMD Available
1.02 CDC Disk Drive MMD Available
1.03 Abacus Frequency Stabilizer Available
1.04 Delta Data Terminal Available
1.05 Tracor Medium Speed Printer Available
1.06 TBD Paper Tape Punch Available
1.07 TBD Paper Tape Reader Available
1.08 Electronic Enclosure Rack Available
1.09 Select at random
1 pc. Disk Drive
1 pc. Frequency Stabilizer
5 pc. Terminals
3 pc. Medium Speed Printers
1 pc. Paper Tape Punch
1 pc. Paper Tape Reader
2 pc. Racks N/A
1.10 Examine if the selected modules and
subassemblies are equipped with an
acceptance tag certifying they have
passed the inspection and test proce-
dure Accepted tags
on the selec-
ted equipment
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲
T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲
TEST QA QAR
T̲E̲S̲T̲ ̲O̲V̲E̲R̲V̲I̲E̲W̲ T̲E̲S̲T̲ ̲N̲O̲.̲:̲ ̲6̲/̲d̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲S̲p̲e̲c̲i̲a̲l̲ ̲R̲E̲q̲u̲i̲r̲e̲m̲e̲n̲t̲s̲ ̲f̲o̲r̲ ̲t̲h̲e̲ ̲C̲A̲M̲P̲S̲ ̲S̲y̲s̲t̲e̲m̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲
Test Case/
Reference Action SRS Reference
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲
1 Materials 3.5.2.3
2 Interchangeability 3.5.2.4 c, d and e
3 Bench Handling 3.5.2.5
4 Cover Plates 3.5.2.6
5 Cabling and Fittings,
Shield Continuity 3.5.2.7 a
6 Cabling and Fittings,
Wiring identification 3.5.2.7 b
7 Cabling and Fittings,
Bus Cars 3.5.2.7 c
8 Cabling and Fittings, CR
Part Numbers 3.5.2.7 d
9 Flux and Soldering, Flux 3.5.2.8.1
10 Flux and Soldering, Soldering 3.5.2.8.2
11 Ventilation and Cooling,
Intake & Exhaust 3.5.2.9 a
12 Ventilation and Cooling,
Resonance 3.5.2.9 b
13 Ventilation and Cooling,
Air Filters 3.5.2.9 c
14 Accessibility, Parts Inside
Containers 3.5.2.11.1 a
15 Accessibility, Withdrawal
Slides 3.5.2.11.1 b
16 Accessibility, Plug-in
board extractors 3.5.2.11.1 c
17 Testpoints, Banana Plug 3.5.2.11.2 a
18 Testpoints, Measuring/
Injection 3.5.2.11.2 b
19 Personnel Safety, Interlocks 3.5.2.13.2 a
20 Personnel Safety, Excess of
30 Volts 3.5.2.13.2 b
21 Personnel Safety, Marking 3.5.2.13.2 c
22 Personnel Safety, Warning
Principles 3.5.2.13.2 d
23 Equipment Safety, Circuit
Breakers 3.5.2.13.3 a
T̲E̲S̲T̲ ̲O̲V̲E̲R̲V̲I̲E̲W̲ T̲E̲S̲T̲ ̲N̲O̲.̲:̲ ̲6̲/̲d̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲S̲p̲e̲c̲i̲a̲l̲ ̲R̲E̲q̲u̲i̲r̲e̲m̲e̲n̲t̲s̲ ̲f̲o̲r̲ ̲t̲h̲e̲ ̲C̲A̲M̲P̲S̲ ̲S̲y̲s̲t̲e̲m̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲
Test Case/
Reference Action SRS Reference
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲
24 Equipment Safety, Protection
of Equipment 3.5.2.13.3 b
25 Equipment Safety, Fuse
location and indication 3.5.2.13.3 c
26 Grounding, Three Ground
Circuits 3.5.2.13.4 a
27 Grounding, AC Power Neutral 3.5.2.13.4 b
28 Grounding, Panels, Drawers
and Sub-assys 3.5.2.13.4 c
29 Grounding, Signalling and
Control Ground 3.5.2.13.4 d
30 Nameplates and Product
Marking 3.5.2.14
31 Controls 3.5.2.15
32 Acoustic Noise 3.5.2.16
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲
̲N̲O̲.̲:̲
̲6̲/̲d̲/̲0̲1̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲S̲p̲e̲c̲i̲a̲l̲ ̲R̲e̲q̲u̲i̲r̲e̲m̲e̲n̲t̲s̲,̲ ̲M̲a̲t̲e̲r̲i̲a̲l̲s̲
S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲3̲.̲5̲.̲2̲.̲3̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Case
Step No. Action Expected Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
1.1 Select at random the following
modules and units:
5 pc. Printed Circuit Boards
2 pc. Power Supplies
1 pc. Disk Drive
1 pc. Delta Data Terminal
1 pc. Medium Speed Printer
1 pc. Frequency Stabilizer
1 pc. Paper Tape Punch
1 pc. Paper Tape Reader N/A
1.2 Examine if the selected modules and
units include hard curing compounds
to hold replaceable parts. (Parts
soldered to terminals, printed wiring
boards ets. are not considered replace-
able in this context) They do not
hold hard
curing com-
pounds.
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲
T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲
TEST QA QAR
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲
̲N̲O̲.̲:̲
̲6̲/̲d̲/̲0̲2̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲I̲n̲t̲e̲r̲c̲h̲a̲n̲g̲e̲a̲b̲i̲l̲i̲t̲y̲
S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲3̲.̲5̲.̲2̲.̲4̲.̲ ̲c̲,̲ ̲d̲ ̲a̲n̲d̲ ̲e̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Case
Step No. Action Expected Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
2.01 In the following the concept swop-
ping is composed of four actions:
1) Switch of the system
2) Swop the selected items
3) Switch on the system
4) Run the M & D program determined
for test of the selected items in
such a way that all swopped items
will be exercised. N/A
2.02 Select at random 2
CR 80S Power Supply and swop these. No functional
deterioration
2.03 Select at random 2
CR 80D Power Supply and swop these. No functional
deterioration
2.04 Swop the MAP modules No functional
deterioration
2.05 Select at random 2 RAM
modules and swop these No functional
deterioration
2.06 Select at random 2 CPU-CACHE mo-
dules and swop these. No functional
deterioration
2.07 Swop the STI modules No functional
deterioration
2.08 Select at random 2 TIA modules
and swop these. No functional
deterioration
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲
T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲
TEST QA QAR
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲
̲N̲O̲.̲:̲
̲6̲/̲d̲/̲0̲2̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲I̲n̲t̲e̲r̲c̲h̲a̲n̲g̲e̲a̲b̲i̲l̲i̲t̲y̲
S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲3̲.̲5̲.̲2̲.̲4̲.̲ ̲c̲,̲ ̲d̲ ̲a̲n̲d̲ ̲e̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Case
Step No. Action Expected Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
2.09 Swop the MIA modules No functional
deterioration
2.10 Select at random 2 CCA modules
and swop these. No functional
deterioration
2.11 Select at random 2 Disk controllers
and swop these. No functional
deterioration
2.12 Swop the Floppy Disk Cont. with
a spare No functional
deterioration
2.13 Select at random 2 LTU modules
and swop these No functional
deterioration
2.14 Select at random 2 DCA modules
and swop these No functional
deterioration
2.15 Swop a CIA module with a spare No functional
deterioration
2.16 Swop the WCA module with a spare No functional
deterioration
2.17 Swop the TDX controllers No functional
deterioration
2.18 Select at random 2 BSM-X modules
and swop these No functional
deterioration
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲
T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲
TEST QA QAR
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲
̲N̲O̲.̲:̲
̲6̲/̲d̲/̲0̲2̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲I̲n̲t̲e̲r̲c̲h̲a̲n̲g̲e̲a̲b̲i̲l̲i̲t̲y̲
S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲3̲.̲5̲.̲2̲.̲4̲.̲ ̲c̲,̲ ̲d̲ ̲a̲n̲d̲ ̲e̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Case
Step No. Action Expected Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
2.19 Select at random 2 LTUX-S modules
and swop these No functional
deterioration
2.20 Select at random 2 Opto T/R modules
and swop these No functional
deterioration
2.21 Select at random 2 V24/V28 (L/L)
1 channel Adapters and swop these No functional
deterioration
2.22 Select at random 2 V24/V28 (L/L)
4 channel Adapters and swop these No functional
deterioration
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲
T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲
TEST QA QAR
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲
̲N̲O̲.̲:̲
̲6̲/̲d̲/̲0̲3̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲B̲e̲n̲c̲h̲ ̲H̲a̲n̲d̲l̲i̲n̲g̲
S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲3̲.̲5̲.̲2̲.̲5̲
Case
Step No. Action Expected Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
3.1 Select at random the following
number of modules and units:
2 pc. CR 80S PCBA's
2 pc. CR 80D PCBA's
1 pc. CR 80S Power Supply
1 pc. CR 80D Power Supply
1 pc. Mains Switch
1 pc. CR 80S Fan Assy.
1 pc. CR 80D Fan Assy. 1
pc.
PCBA
from
the
VDU
1 pc. PCBA from the MSP
1 pc. CUCP
1 pc. Floppy Disk
1 pc. PCBA from the SMD
1 pc. PCBA from the MMD
1 pc. Adapter Power Supply N/A
3.2 Operate the selected test items e.g.
by using the M & D program relevant
for each single item, and note the
results N/A
3.3 Perform the Bench Handling test on
each one of the selected test items,
as specified in NGTS 40 method 516
procedure V (see appendix B) with
the limit in step 1 (a) modified from
45 degrees to 30 degrees N/A
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲
T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲
TEST QA QAR
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲
̲N̲O̲.̲:̲
̲6̲/̲d̲/̲0̲3̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲B̲e̲n̲c̲h̲ ̲H̲a̲n̲d̲l̲i̲n̲g̲
S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲3̲.̲5̲.̲2̲.̲5̲
Case
Step No. Action Expected Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
3.4 Examine the test items as specified
in NGTS 40 paragraph 3.2.4 No visible
damage
3.5 Operate the test items as in test
step 3.2 and compare the results No functional
deterioration
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲
T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲
TEST QA QAR
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲
̲N̲O̲.̲:̲
̲6̲/̲d̲/̲0̲4̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲C̲o̲v̲e̲r̲ ̲P̲l̲a̲t̲e̲s̲
S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲3̲.̲5̲.̲2̲.̲6̲
Case Test
Step No. Station Action Expected Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
4.1 Examine if cover plates
are firmly
fixed in a way that are
consistent
with normal mechanical
strength requirements. They are
4.2 Examine if fasteners for
cover plates fitted on
modules are of the
"captive" type They are
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲
T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲
TEST QA QAR
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲
̲N̲O̲.̲:̲
̲6̲/̲d̲/̲0̲5̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲C̲a̲b̲l̲i̲n̲g̲ ̲a̲n̲d̲ ̲F̲i̲t̲t̲i̲n̲g̲s̲,̲ ̲S̲h̲i̲e̲l̲d̲ ̲C̲o̲n̲t̲i̲n̲u̲i̲t̲y̲
S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲3̲.̲5̲.̲2̲.̲7̲ ̲a̲
Case Test
Step No. Station Action Expected Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
5.1 Examine if the cables
between
rack C and D is run in
a steel
conduit ensuring correct
grounding. They are
5.2 Examine if the shield in
cables
connecting low speed
devices with
the filter box are
connected to pin
1 of the plug in one
end of the cable only It is
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲
T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲
TEST QA QAR
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲
̲N̲O̲.̲:̲
̲6̲/̲d̲/̲0̲6̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲C̲a̲b̲l̲i̲n̲g̲ ̲a̲n̲d̲ ̲F̲i̲t̲t̲i̲n̲g̲s̲,̲ ̲W̲i̲r̲i̲n̲g̲ ̲I̲d̲e̲n̲t̲i̲f̲i̲c̲a̲t̲i̲o̲n̲
S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲3̲.̲5̲.̲2̲.̲7̲ ̲b̲
Case Test
Step No. Station Action Expected Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
6.1 Examine if all wires
which connect
units mounted in the
racks are
marked in both ends
with a W-number, unique
to the individual wire They are
6.2 Examine if the colour
coding of
chassis wiring are
Yellow/Green It is
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲
T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲
TEST QA QAR
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲
̲N̲O̲.̲:̲
̲6̲/̲d̲/̲0̲7̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲C̲a̲b̲l̲i̲n̲g̲ ̲a̲n̲d̲ ̲F̲i̲t̲t̲i̲n̲g̲s̲,̲ ̲B̲u̲s̲ ̲B̲a̲r̲s̲
S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲3̲.̲5̲.̲2̲.̲7̲ ̲c̲
Case Test
Step No. Station Action Expected Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
7.1 Examine if bus bars are
used for
interconnection between
assemblies
and subassemblies They are not
used
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲
T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲
TEST QA QAR
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲
̲N̲O̲.̲:̲
̲6̲/̲d̲/̲0̲8̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲C̲a̲b̲l̲i̲n̲g̲ ̲a̲n̲d̲ ̲F̲i̲t̲t̲i̲n̲g̲s̲,̲ ̲C̲R̲ ̲P̲a̲r̲t̲ ̲N̲u̲m̲b̲e̲r̲s̲
S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲3̲.̲5̲.̲2̲.̲7̲ ̲d̲
Case Test
Step No. Station Action Expected Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
8.1 Select at random 10
pc. cables
and wires or similar
connectors N/A
8.2 Examine if the 10
selected items
are marked with CR part
numbers They are
8.3 Examine if the part
numbers corresponds with
the numbers indi-
cated in "CAMPS Hardware
Assembly
Breakdown" CPS/SDS/017 They correspond
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲
T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲
TEST QA QAR
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲
̲N̲O̲.̲:̲
̲6̲/̲d̲/̲0̲9̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲F̲l̲u̲x̲ ̲a̲n̲d̲ ̲s̲o̲l̲d̲e̲r̲i̲n̲g̲,̲ ̲F̲l̲u̲x̲
S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲3̲.̲5̲.̲2̲.̲8̲.̲1̲
Case Test
Step No. Station Action Expected Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
9.1 This requirement is
stated in CR
standards "General
Manufacturing
Requirements"
ED/STD/0002 and in
"Quality Requirements
for Equipment Purchased
for the CAMPS Pro-
ject" CPS/AUX/009, and
is consequently already
verified in test
procedures: 6/a/1, 6/b/1
and 6/c/1. N/A
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲
T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲
TEST QA QAR
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲
̲N̲O̲.̲:̲
̲6̲/̲d̲/̲1̲0̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲F̲l̲u̲x̲ ̲a̲n̲d̲ ̲s̲o̲l̲d̲e̲r̲i̲n̲g̲,̲ ̲S̲o̲l̲d̲e̲r̲i̲n̲g̲
S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲3̲.̲5̲.̲2̲.̲8̲.̲2̲
Case Test
Step No. Station Action Expected Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
10.1 This requirement is
stated in CR
standards "General
Manufacturing
Requirements"
ED/STD/0002 and in
"Quality Requirements
for Equipment Purchased
for the CAMPS Pro-
ject" CPS/AUX/009, and
is consequently already
verified in test
procedures: 6/a/1, 6/b/1
and 6/c/1 N/A
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲
T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲
TEST QA QAR
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲
̲N̲O̲.̲:̲
̲6̲/̲d̲/̲1̲1̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲V̲e̲n̲t̲i̲l̲a̲t̲i̲o̲n̲ ̲a̲n̲d̲ ̲C̲o̲o̲l̲i̲n̲g̲,̲ ̲I̲n̲t̲a̲k̲e̲ ̲a̲n̲d̲ ̲E̲x̲h̲a̲u̲s̲t̲
S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲3̲.̲5̲.̲2̲.̲9̲ ̲a̲
Case Test
Step No. Station Action Expected Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
11.1 Examine if cabinets have
filtered cooling air
intake They have
11.2 Examine if cooling air
is exhausted
to the atmosphere at the
top of the
cabinets It is
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲
T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲
TEST QA QAR
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲
̲N̲O̲.̲:̲
̲6̲/̲d̲/̲1̲2̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲V̲e̲n̲t̲i̲l̲a̲t̲i̲o̲n̲ ̲a̲n̲d̲ ̲C̲o̲o̲l̲i̲n̲g̲,̲ ̲R̲e̲s̲o̲n̲a̲n̲c̲e̲
S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲3̲.̲5̲.̲2̲.̲9̲ ̲b̲
Case Test
Step No. Station Action Expected Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
12.1 Examine if ventilation
and cooling
cause any resonance
effects and
vibrations There are no
resonance or
vibration of
any signifi-
cance
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲
T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲
TEST QA QAR
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲
̲N̲O̲.̲:̲
̲6̲/̲d̲/̲1̲3̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲V̲e̲n̲t̲i̲l̲a̲t̲i̲o̲n̲ ̲a̲n̲d̲ ̲C̲o̲o̲l̲i̲n̲g̲,̲ ̲A̲i̲r̲ ̲F̲i̲l̲t̲e̲r̲s̲
S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲3̲.̲5̲.̲2̲.̲9̲ ̲c̲
Case Test
Step No. Station Action Expected Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
13.1 Examine if the distributed
cooling
systems in the CR produced
equipment
are supplied with air
filters They are
13.2 Measure the thickness of
filters in
the CR 80S Fan Assy. 5 mm.
13.3 Measure the thickness of
filters in
the CR 80D Fan Assy 20 mm.
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲
T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲
TEST QA QAR
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲
̲N̲O̲.̲:̲
̲6̲/̲d̲/̲1̲4̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲A̲c̲c̲e̲s̲s̲i̲b̲i̲l̲i̲t̲y̲,̲ ̲P̲a̲r̲t̲s̲ ̲I̲n̲s̲i̲d̲e̲ ̲C̲o̲n̲t̲a̲i̲n̲e̲r̲s̲
S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲3̲.̲5̲.̲2̲.̲1̲1̲.̲1̲ ̲a̲
Case Test
Step No. Station Action Expected Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
14.1 Examine if connections
to parts
inside removable
containers run
through the container
by threading This is the case
only for the
CR 80S Fan Assy
which has a very
low failure rate
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲
T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲
TEST QA QAR
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲
̲N̲O̲.̲:̲
̲6̲/̲d̲/̲1̲5̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲A̲c̲c̲e̲s̲s̲i̲b̲i̲l̲i̲t̲y̲,̲ ̲W̲i̲t̲h̲d̲r̲a̲w̲a̲l̲ ̲S̲l̲i̲d̲e̲s̲
S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲3̲.̲5̲.̲2̲.̲1̲1̲.̲1̲ ̲b̲
Case Test
Step No. Station Action Expected Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
15.1 Examine if chassis and
assemblies
contained within
cabinets or
consoles which require
removal or
replacement during normal
maintenance and repair are
mounted on
withdrawable slides SMD and MMD
disk drives
are mounted
on withdraw-
able slides
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲
T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲
TEST QA QAR
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲
̲N̲O̲.̲:̲
̲6̲/̲d̲/̲1̲6̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲A̲c̲c̲e̲s̲s̲i̲b̲i̲l̲i̲t̲y̲,̲ ̲P̲l̲u̲g̲-̲i̲n̲ ̲B̲o̲a̲r̲d̲ ̲E̲x̲t̲r̲a̲c̲t̲o̲r̲s̲
S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲3̲.̲5̲.̲2̲.̲1̲1̲.̲1̲ ̲c̲
Case Test
Step No. Station Action Expected Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
16.1 Examine if plug-in boards
are provided with build-in
ejectors/extractors They are
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲
T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲
TEST QA QAR
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲
̲N̲O̲.̲:̲
̲6̲/̲d̲/̲1̲7̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲T̲e̲s̲t̲p̲o̲i̲n̲t̲s̲,̲ ̲B̲a̲n̲a̲n̲a̲ ̲P̲l̲u̲g̲s̲
S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲3̲.̲5̲.̲2̲.̲1̲1̲.̲2̲ ̲a̲
Case Test
Step No. Station Action Expected Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
17.1 Examine if testjacks are
of the banana plug type They are not
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲
T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲
TEST QA QAR
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲
̲N̲O̲.̲:̲
̲6̲/̲d̲/̲1̲8̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲T̲e̲s̲t̲p̲o̲i̲n̲t̲s̲,̲ ̲M̲e̲a̲s̲u̲r̲i̲n̲g̲/̲I̲n̲j̲e̲c̲t̲i̲o̲n̲
S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲3̲.̲5̲.̲2̲.̲1̲1̲.̲2̲ ̲b̲
Case Test
Step No. Station Action Expected Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
18.1 Examine if test points/
tracing points are pro-
vided only to the extend
they form part of the
maintenance/repair
concept They are
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲
T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲
TEST QA QAR
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲
̲N̲O̲.̲:̲
̲6̲/̲d̲/̲1̲9̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲e̲r̲s̲o̲n̲n̲e̲l̲ ̲S̲a̲f̲e̲t̲y̲,̲ ̲I̲n̲t̲e̲r̲l̲o̲c̲k̲s̲
S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲3̲.̲5̲.̲2̲.̲1̲3̲.̲2̲ ̲a̲
Case Test
Step No. Station Action Expected Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
19.1 Examine if it is possib-
le for unauthorised per-
sonnel to open major
assemblies carrying high
tension voltages This is not
possible
without the
use of tools
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲
T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲
TEST QA QAR
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲
̲N̲O̲.̲:̲
̲6̲/̲d̲/̲2̲0̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲e̲r̲s̲o̲n̲n̲e̲l̲ ̲S̲a̲f̲e̲t̲y̲,̲ ̲E̲x̲c̲e̲s̲s̲ ̲o̲f̲ ̲3̲0̲ ̲V̲o̲l̲t̲s̲ ̲
S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲3̲.̲5̲.̲2̲.̲1̲3̲.̲2̲ ̲b̲
Case Test
Step No. Station Action Expected Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
20.1 Examine if personnel,
with the equipment as-
sembled and set up for
operation, are pro-
tected from contact
with potentials in
excess of 30 volts to
ground, chassis or
frame, including poten-
tials on charged capa-
citors They are
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲
T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲
TEST QA QAR
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲
̲N̲O̲.̲:̲
̲6̲/̲d̲/̲2̲1̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲e̲r̲s̲o̲n̲n̲e̲l̲ ̲S̲a̲f̲e̲t̲y̲,̲ ̲M̲a̲r̲k̲i̲n̲g̲
S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲3̲.̲5̲.̲2̲.̲1̲3̲.̲2̲ ̲c̲
Case Test
Step No. Station Action Expected Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
21.1 Examine if relevant no-
tice and markings on the
equipment are provided to
points where dangerous
voltages are encountered They are
provided
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲
T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲
TEST QA QAR
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲
̲N̲O̲.̲:̲
̲6̲/̲d̲/̲2̲2̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲e̲r̲s̲o̲n̲n̲e̲l̲ ̲S̲a̲f̲e̲t̲y̲,̲ ̲W̲a̲r̲n̲i̲n̲g̲ ̲P̲r̲i̲n̲c̲i̲p̲l̲e̲s̲
S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲3̲.̲5̲.̲2̲.̲1̲3̲.̲2̲ ̲d̲
Case Test
Step No. Station Action Expected Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
2.1 Examine if a suitable
warning is provided where
a voltage of 50 or more
volts are exposed during
the maintenance activit- ies It
is
22.2 Examine if the warning is
according to the follow-
ing principles:
1) "DANGER (xxx) VOLTS
WHEN COVER REMOVED" (in
aluminium or white let-
tering 1.5 cm high on a
read background) where
(xxx) is the nominal vol-
tage.
2) "DANGER HIGH VOLTAGE
(xxx) VOLTS" where (xxx)
is the nominal voltage.
3) "CAUTION (xxx) VOLTS.
DISCONNECT POWER BEFORE
REMOVAL OF COVER" where
(xxx) is the nominal vol-
tage It is
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲
T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲
TEST QA QAR
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲
̲N̲O̲.̲:̲
̲6̲/̲d̲/̲2̲3̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲ ̲S̲a̲f̲e̲t̲y̲,̲ ̲C̲i̲r̲c̲u̲i̲t̲ ̲B̲r̲e̲a̲k̲e̲r̲s̲
S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲3̲.̲5̲.̲2̲.̲1̲3̲.̲3̲ ̲a̲
Case Test
Step No. Station Action Expected Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
23.1 Examine if circuit break-
ers or switches which
operate to make or break
AC power lines will make
or break all conductors at
the same time. They will
23.2 Examine if the neutral
wire pass through any
fuse in three-phase cir-
cuits It does not
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲
T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲
TEST QA QAR
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲
̲N̲O̲.̲:̲
̲6̲/̲d̲/̲2̲4̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲ ̲S̲a̲f̲e̲t̲y̲,̲ ̲P̲r̲o̲t̲e̲c̲t̲i̲o̲n̲ ̲o̲f̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲
S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲3̲.̲5̲.̲2̲.̲1̲3̲.̲3̲ ̲b̲
Case Test
Step No. Station Action Expected Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
24.1 Examine if fuses and
circuit breakers are
provided within the e-
quipment to protect it
from damage due to over- load They
are
provided
24.2 Examine if each major as-
sembly is individually
protected so that a
fault in one major as-
sembly cannot damage any
other major assembly They are
individually
protected
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲
T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲
TEST QA QAR
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲
̲N̲O̲.̲:̲
̲6̲/̲d̲/̲2̲5̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲ ̲S̲a̲f̲e̲t̲y̲,̲ ̲F̲u̲s̲e̲ ̲L̲o̲c̲a̲t̲i̲o̲n̲ ̲a̲n̲d̲ ̲I̲n̲d̲i̲c̲a̲t̲i̲o̲n̲
S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲3̲.̲5̲.̲2̲.̲1̲3̲.̲3̲ ̲c̲
Case Test
Step No. Station Action Expected Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
25.1 Examine if all fuses and
circuit breakers are lo-
cated such that they are
readily accessible They are
25.2 Examine if all fuses in-
corporate a visual sy-
stem of failure indica-
tion They do
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲
T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲
TEST QA QAR
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲
̲N̲O̲.̲:̲
̲6̲/̲d̲/̲2̲6̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲G̲r̲o̲u̲n̲d̲i̲n̲g̲,̲ ̲T̲h̲r̲e̲e̲ ̲G̲r̲o̲u̲n̲d̲ ̲C̲i̲r̲c̲u̲i̲t̲s̲
S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲3̲.̲5̲.̲2̲.̲1̲3̲.̲4̲ ̲a̲
Case Test
Step No. Station Action Expected Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
26.1 Examine if the grounding
system will provide an
effective protection for
personnel and material a-
gainst insulation defects It will
26.2 Examine if it is arranged
so that there are three
separate and isolated
ground circuits, namely:
1) AC power neutral
2) Equipment frame ground
3) Signalling and control
ground It is arranged
so
26.3 Measure with an ohm-meter
it the "Equipment frame
ground" is isolated from
the "Signalling and con-
trol ground" They are iso-
lated from
each other
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲
T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲
TEST QA QAR
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲
̲N̲O̲.̲:̲
̲6̲/̲d̲/̲2̲7̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲G̲r̲o̲u̲n̲d̲i̲n̲g̲,̲ ̲A̲C̲ ̲P̲o̲w̲e̲r̲ ̲N̲e̲u̲t̲r̲a̲l̲
S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲3̲.̲5̲.̲2̲.̲1̲3̲.̲4̲ ̲b̲
Case Test
Step No. Station Action Expected Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
27.1 Disconnect the equipment
from the mains N/A
27.2 Measure with an ohm-meter
if the "AC power neutral"
is isolated from the "e-
quipment frame ground" They are iso-
lated from
each other
27.3 Connect the equipment to
the mains again N/A
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲
T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲
TEST QA QAR
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲
̲N̲O̲.̲:̲
̲6̲/̲d̲/̲2̲8̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲G̲r̲o̲u̲n̲d̲i̲n̲g̲,̲ ̲P̲a̲n̲e̲l̲s̲,̲ ̲D̲r̲a̲w̲e̲r̲s̲ ̲a̲n̲d̲ ̲S̲u̲b̲-̲a̲s̲s̲y̲'̲s̲
S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲3̲.̲5̲.̲2̲.̲1̲3̲.̲4̲ ̲c̲
Case Test
Step No. Station Action Expected Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
28.1 Examine if all panels,
drawers and other sub-
assemblies, whether fixed
or removeable are fastened
or connected to the associ-
ated frame, in a manner
that ensures they are se-
curely grounded They are se-
curely groun-
ded
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲
T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲
TEST QA QAR
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲
̲N̲O̲.̲:̲
̲6̲/̲d̲/̲2̲9̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲G̲r̲o̲u̲n̲d̲i̲n̲g̲,̲ ̲S̲i̲g̲n̲a̲l̲l̲i̲n̲g̲ ̲a̲n̲d̲ ̲C̲o̲n̲t̲r̲o̲l̲ ̲G̲r̲o̲u̲n̲d̲
S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲3̲.̲5̲.̲2̲.̲1̲3̲.̲4̲ ̲d̲
Case Test
Step No. Station Action Expected Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
29.1 Examine if the signalling
and control ground is
routed via interconnecting
wires and cables It is
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲
T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲
TEST QA QAR
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲
̲N̲O̲.̲:̲
̲6̲/̲d̲/̲3̲0̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲N̲a̲m̲e̲p̲l̲a̲t̲e̲s̲ ̲a̲n̲d̲ ̲P̲r̲o̲d̲u̲c̲t̲ ̲M̲a̲r̲k̲i̲n̲g̲
S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲3̲.̲5̲.̲2̲.̲1̲4̲
Case Test
Step No. Station Action Expected Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
30.1 Examine if each major as-
sembly has a nameplate
attached in a prominent
position They have
30.2 Examine if these name-
plates indicate:
- Serial number
- SHAPE contract number
- Date of manufacture
- Principal characteri-
stics
- Manufacturers name and
address They do
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲
T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲
TEST QA QAR
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲
̲N̲O̲.̲:̲
̲6̲/̲d̲/̲3̲1̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲C̲o̲n̲t̲r̲o̲l̲s̲
S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲3̲.̲5̲.̲2̲.̲1̲5̲
Case Test
Step No. Station Action Expected Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
31.1 Examine if the type and
layout of controls are
such as to avoid an in-
terruption of service or
change of operational
mode as a result of acci-
dental bumping, touching
or catching of clothing It is
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲
T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲
TEST QA QAR
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ T̲E̲S̲T̲
̲N̲O̲.̲:̲
̲6̲/̲d̲/̲3̲2̲
F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲A̲c̲o̲u̲s̲t̲i̲c̲ ̲N̲o̲i̲s̲e̲
S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲3̲.̲5̲.̲2̲.̲1̲6̲
Case Test
Step No. Station Action Expected Results
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
32.1 Examine if a test report
verifying fullfulment of
the stated requirement is
available It is
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲
T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲
TEST QA QAR