DataMuseum.dk

Presents historical artifacts from the history of:

CR80 Wang WCS documentation floppies

This is an automatic "excavation" of a thematic subset of
artifacts from Datamuseum.dk's BitArchive.

See our Wiki for more about CR80 Wang WCS documentation floppies

Excavated with: AutoArchaeologist - Free & Open Source Software.


top - download

⟦b303f8c9d⟧ Wang Wps File

    Length: 45167 (0xb06f)
    Types: Wang Wps File
    Notes: CPS/TPR/051  (1. del)     
    Names: »5154A «

Derivation

└─⟦be1b733b7⟧ Bits:30006215 8" Wang WCS floppy, CR 0339A
    └─ ⟦this⟧ »5154A « 

WangText

…1c……00……00……00……00…"…02……00……00…"
"…05…"…07…!…0f… …09… 
…1f……0a……1f……00……1f……06……1e……09……1e……0c……1e……0f……1e……02……1e……07……1d……0b……86…1                                             …02…           …02…   …02…   
…0f…
    5154A/rt…02…CPS/TPR/051

…02…HAU/840901…02……02… 
CAMPS SITE PROVISIONAL ACCEPTANCE
TEST SPECIFICATION AND PROCEDURES, SITE 02-16…02……02… CAMPS…0e…














                 CAMPS SITE PROVISIONAL ACCEPTANCE
                 TEST SPECIFICATION AND PROCEDURES, SITE 02-16


                 CPS/TPR/051













                 Hans Haureberg




                 Kurt Nybroe-Nielsen








                 SHAPE (5), KNN, KM, KLA, NPP,
                 QA, GQAR, KEJ, PMS, Config. Mgr., LU Library
                 (3)














                     …0f…     Install. Mgr.        

                                               
             1    
                                               


             840901 
                           Conf. Mgr.          …0f…





    5154A/rt…02… CPS/TPR/051

…02……02……02…    
CAMPS SITE PROVISIONAL ACCEPTANCE             HAU/840901       ii
TEST SPECIFICATION AND PROCEDURES, SITE 02-16…02……02……0f……0f…CAMPS…0e……0e…


















        840901                  All      Issue 1 of document




    5154A/rt…02… CPS/TPR/051

…02… HAU/840901…02……02… iii
CAMPS SITE PROVISIONAL ACCEPTANCE
TEST SPECIFICATION AND PROCEDURES, SITE 02-16…02……02…   CAMPS






                    T̲A̲B̲L̲E̲ ̲O̲F̲ ̲C̲O̲N̲T̲E̲N̲T̲S̲



     1  GENERAL .....................................  
       
       1.1 PURPOSE ..................................  
             
       1.2 REFERENCED DOCUMENTS .....................  
             
       1.3 TERMS AND ABBREVIATIONS ..................  
             
       1.4 DOCUMENT LAYOUT ..........................  
             
       1.5 TEST PROCEDURE FORMS .....................  
             

     2  TEST SPECIFICATION AND EVALUATION ...........  
       
       2.1 TEST SPECIFICATION .......................  
             
         2.1.1 Test Purpose .........................  
                 
           2.1.1.1 Date of the SPA ..................  
                     
           2.1.1.2 Performance Summary ..............  
                     
           2.1.1.3 Overall SPA Schedule .............  
                     

         2.1.2 Test Object Identification ...........  
                 
           2.1.2.1 Hardware Configuration ...........  
                     
           2.1.2.2 Software Configuration ...........  
                     
           2.1.2.3 SHAPE/THN Supplied Equipment .....  
                     

       2.2 DATA RECORDING ...........................  
             
         2.2.1 Test Result Overview .................  
                 
         2.2.2 Discrepancy List .....................  
                 
         2.2.3 Acceptance Protocol ..................  
                 

       2.3 TEST EVALUATION ..........................  
             
         2.3.1 Acceptance Criterias .................  
                 
           2.3.1.1 Notice of Defects ................  
                     
           2.3.1.2 Discrepancy ......................  
                     
           2.3.1.3 Defects ..........................  
                     
           2.3.1.4 Correction of Defects Notice .....  
                     





    5154A/rt…02… CPS/TPR/051

…02… HAU/840901…02……02…  iv
CAMPS SITE PROVISIONAL ACCEPTANCE
TEST SPECIFICATION AND PROCEDURES, SITE 02-16…02……02…   CAMPS






                    T̲A̲B̲L̲E̲ ̲O̲F̲ ̲C̲O̲N̲T̲E̲N̲T̲S̲



     3  TEST DESCRIPTION AND PROCEDURES .............  
       
       3.1 TESTGROUP NO. 1 ..........................  
             
         3.1.1 General ..............................  
                 
         3.1.2 Testgroups ...........................  
                 
         3.1.3 Test Method ..........................  
                 
         3.1.4 Personel Requirements ................  
                 
         3.1.5 Schedule .............................  
                 

       3.2 TEST GROUP No. 2 .........................  
             
         3.2.1 General ..............................  
                 
         3.2.2 Equipment Status Level ...............  
                 
         3.2.3 Checking Procedure ...................  
                 
         3.2.4 Personel Requirements ................  
                 
         3.2.5 Schedule .............................  
                 

       3.3 TESTGROUP NO. 3...........................  
             
         3.3.1 General ..............................  
                 
         3.3.2 Inventory List .......................  
                 
         3.3.3 Checking Procedure ...................  
                 
         3.3.4 Inventory Check Constraints ..........  
                 
         3.3.5 Personel Requirements ................  
                 
         3.3.6 Responsibility .......................  
                 
         3.3.7 Schedule .............................  
                 

       3.4 TESTGROUP NO. 4 ..........................  
             
         3.4.1 General ..............................  
                 
         3.4.2 Hardware Requirements ................  
                 
         3.4.3 Software Requirements ................  
                 
         3.4.4 Personel Requirements ................  
                 
         3.4.5 Test Procedure .......................  
                 
         3.4.6 Test Setup ...........................  
                 
         3.4.7 Test Groups ..........................  
                 
         3.4.8 Switch Setting .......................  
                 
         3.4.9 Test Initialization ..................  
                 
         3.4.10  Comm.Tester Programming ............  
                   
           3.4.10.1  VDU Simulation Setup ...........  
                       
           3.4.10.2  OCR Simulation Setup ...........  
                       
           3.4.10.3  Remote Tare Simulation Setup ...  
                       





    5154A/rt…02… CPS/TPR/051

…02……02……02…    
CAMPS SITE PROVISIONAL ACCEPTANCE             HAU/840901        v
TEST SPECIFICATION AND PROCEDURES, SITE 02-16…02……02…  …0f…CAMPS…0e…






                    T̲A̲B̲L̲E̲ ̲O̲F̲ ̲C̲O̲N̲T̲E̲N̲T̲S̲



       3.5 TESTGROUP NO. 5 ..........................  
             
         3.5.1 General Description ..................  
                         3.5.2                                                                                                 Test
                                                                                                                               Control
                                                                                                                               .........................
                                                                                                                               
                                                                                                                               
                                                                                                                               
                                                                                                                               
                                                                                                                               
           3.5.2.1 Input Data .......................  
                     
           3.5.2.2 Input Commands ...................  
                     
           3.5.2.3 Output Data ......................  
                     

         3.5.3 Test Procedures ......................  
                 
           3.5.3.1 Test Setup .......................  
                     
           3.5.3.2 Test Initialization ..............  
                     
           3.5.3.3 Test Overview and Detailed Steps .  
                     

       3.6 TESTGROUP NO. 6 ..........................  
             
         3.6.1 General ..............................  
                 
         3.6.2 Personel Requirements ................  
                 
         3.6.3 Verification Procedure ...............  
                 
         3.6.4 Hardware Requirements ................  
                 
         3.6.5 Software Requirements ................  
                 
         3.6.6 Acceptance Criteria ..................  
                 
         3.6.7 Schedule .............................  
                 

       3.7 TESTGROUP NO. 7 ..........................  
             
         3.7.1 General ..............................  
                 
         3.7.2 ATBB Drawings ........................  
                 
         3.7.3 AB Drawings ..........................  
                 
         3.7.4 Verification .........................  
                 

       3.8 TESTGROUP NO. 8

         3.8.1 General ..............................  
                 
         3.8.2 Testgroups ...........................  
                 
         3.8.3 Personel Requirements ................  
                 
         3.8.4 Schedule .............................  
                 
         3.8.5 CRT ON-SITE H/W Verfication ..........  
                 
           3.8.5.1 Test Method ......................  
                     

         3.8.6 CRT Equipment Status Check ...........  
                 
           3.8.6.1 Equipment Status Level ...........  
                     
           3.8.6.2 Checking Procedure ...............  
                     

         3.8.7 CRT Site Inventory Check .............  
                 
           3.8.7.1 Inventory Check List .............  
                     
           3.8.7.2 Checking Procedure ...............  
                     
           3.8.7.3 Inventory Check Constraints ......  
                     
           3.8.7.4 Responsibility ...................  
                     




    5154A/rt…02… CPS/TPR/051

…02… HAU/840901…02……02…  vi
CAMPS SITE PROVISIONAL ACCEPTANCE
TEST SPECIFICATION AND PROCEDURES, SITE 02-16…02……02…   CAMPS






                    T̲A̲B̲L̲E̲ ̲O̲F̲ ̲C̲O̲N̲T̲E̲N̲T̲S̲




       3.8.8 CRT Updated ATBB Drawings ..............  
               
           3.8.8.1 ATBB Drawings ....................  
                     
           3.8.8.2 AB Drawings ......................  
                     
           3.8.8.3 Verification .....................  
                     

       APPENDIX A  H/W Verification Printouts .......  
                     

       APPENDIX B  Site 02 Data .....................  
                     
         B.1       H/W Verification Data ............  
                     
         B.2       S/W Verification Data ............  
                     
         B.3       SPA Protocol Document
                   Test Result Overview Form
                   Discrepancy Lists ................  
                     

       APPENDIX C  Site 03 Data .....................  
                     
         C.1       H/W Verification Data ............  
                     
         C.2       S/W Verification Data ............  
                     
         C.3       SPA Protocol Document
                   Test Result Overview Form
                   Discrepancy Lists ................  
                     

       APPENDIX D  Site 04 Data
         D.1       H/W Verification Data ...........   
                     
         D.2       S/W Verification Data ...........   
                     
         D.3       SPA Protocol Document 
                   Test Result Overview Form
                   Discrepancy Lists ...............   
                     

       APPENDIX E  Site 05 Data
         E.1       H/W Verification Data
         E.2       S/W Verification Data
         E.3       SPA Protocol Document
                   Test Result Overview Form
                   Discrepancy Lists ...............   
                     




    5154A/rt…02… CPS/TPR/051

…02… HAU/840901…02……02… vii
CAMPS SITE PROVISIONAL ACCEPTANCE
TEST SPECIFICATION AND PROCEDURES, SITE 02-16…02……02…   CAMPS






                    T̲A̲B̲L̲E̲ ̲O̲F̲ ̲C̲O̲N̲T̲E̲N̲T̲S̲




       APPENDIX F  Site 06 Data
         F.1       H/W Verification Data
         F.2       S/W Verification Data
         F.3       SPA Protocol Document
                   Test Result Overview Form
                   Discrepancy Lists ...............   
                     

       APPENDIX G  Site 07 Data
         G.1       H/W Verification Data
         G.2       S/W Verification Data
         G.3       SPA Protocol Document
                   Test Result Overview Form
                   Discrepancy Lists ...............   
                     

       APPENDIX H  Site 08 Data
         H.1       H/W Verification Data
         H.2       S/W Verification Data
         H.3       SPA Protocol Document
                   Test Result Overview Form
                   Discrepancy Lists ...............   
                     

       APPENDIX I  Site 09 Data
         I.1       H/W Verification Data
         I.2       S/W Verification Data
         I.3       SPA Protocol Document
                   Test Result Overview Form
                   Discrepancy Lists ...............   
                     

       APPENDIX J  Site 10 Data
         J.1       H/W Verification Data
         J.2       S/W Verification Data
         J.3       SPA Protocol Document
                   Test Result Overview Form
                   Discrepancy Lists ...............   
                     



    5154A/rt…02… CPS/TPR/051

…02… HAU/840901…02……02…viii
CAMPS SITE PROVISIONAL ACCEPTANCE
TEST SPECIFICATION AND PROCEDURES, SITE 02-16…02……02…   CAMPS






                    T̲A̲B̲L̲E̲ ̲O̲F̲ ̲C̲O̲N̲T̲E̲N̲T̲S̲





       APPENDIX K  Site 11 Data
         K.1       H/W Verification Data
         K.2       S/W Verification Data
         K.3       SPA Protocol Document
                   Test Result Overview Form
                   Discrepancy Lists ...............   
                     

       APPENDIX L  Site 12 Data
         L.1       H/W Verification Data
         L.2       S/W Verification Data
         L.3       SPA Protocol Document
                   Test Result Overview Form
                   Discrepancy Lists ...............   
                     

       APPENDIX M  Site 13 Data
         M.1       H/W Verification Data
         M.2       S/W Verification Data
         M.3       SPA Protocol Document
                   Test Result Overview Form
                   Discrepancy Lists ...............   
                     

       APPENDIX N  Site 14 Data
         N.1       H/W Verification Data
         N.2       S/W Verification Data
         N.3       SPA Protocol Document
                   Test Result Overview Form
                   Discrepancy Lists ...............   
                     

       APPENDIX O  Site 15 Data
         O.1       H/W Verification Data
         O.2       S/W Verification Data
         O.3       SPA Protocol Document
                   Test Result Overview Form
                   Discrepancy Lists ...............   
                     




    5154A/rt…02… CPS/TPR/051

…02… HAU/840901…02……02… ix 
CAMPS SITE PROVISIONAL ACCEPTANCE
TEST SPECIFICATION AND PROCEDURES, SITE 02-16…02……02…   CAMPS






                    T̲A̲B̲L̲E̲ ̲O̲F̲ ̲C̲O̲N̲T̲E̲N̲T̲S̲





       APPENDIX P  Site 16 Data
         P.1       H/W Verification Data
         P.2       S/W Verification Data
         P.3       SPA Protocol Document
                   Test Result Overview Form
                   Discrepancy Lists ...............   
                     




    5154A/rt…02… CPS/TPR/051

…02… HAU/840901…02……02…  x 
CAMPS SITE PROVISIONAL ACCEPTANCE
TEST SPECIFICATION AND PROCEDURES, SITE 02-16…02……02…   CAMPS






                     L̲I̲S̲T̲ ̲O̲F̲ ̲F̲I̲G̲U̲R̲E̲S̲



         1.1     TEST OVERVIEW
         1.2     TEST STEPS FORM
         2.1     TEST RESULT OVERVIEW FORM
         2.2     DISCREPANCY LIST












                      L̲I̲S̲T̲ ̲O̲F̲ ̲T̲A̲B̲L̲E̲S̲



         2.1     SPA PERFORMANCE SUMMARY
         2.2     CAMPS SITE PROVISIONAL ACCEPTANCE PROTOCOL
         3.1     INVENTORY DOCUMENTS AND CONSTRAINTS
         3.2     ATBB DOCUMENTS


                        1  G̲E̲N̲E̲R̲A̲L̲



1.1      P̲U̲R̲P̲O̲S̲E̲

         The purpose of the "CAMPS Site Provisional Acceptance
         Test Specification and Procedures" is:

         a.  To provide a coherent outline of the necessary
             activities required for the "Site Provisional Acceptance"
             (SPA).

         b.  To define the acceptance criterias for each individual
             activity.

         c.  To define the responsibilities for conducting and
             coordinating the test activities.

         d.  To define the personnel-, equipment-, and software
             requirements for the test/inspection activities.

         e.  To provide the test procedures and the test forms
             for each individual activity.





1.2      R̲e̲f̲e̲r̲e̲n̲c̲e̲d̲ ̲D̲O̲C̲U̲M̲E̲N̲T̲S̲

         1.  CAMPS SYSTEM REQUIREMENTS SPEC.
             CPS/210/SYS/0001

         2.  CAMPS ACCEPTANCE PLAN
             CPS/PLN/012

         3.  CAMPS H/W ASSEMBLY BREAKDOWN/HARDWARE TREE
             CPS/SDS/017

         4.  CAMPS INVENTORY LIST
             CPS/AUX/0XX

         5.  ATBB DRAWINGS
             PAB/CPS/ATB/0XX

         6.  USER PROCEDURE AND ASSOCIATED FORMATS
             CPS/230/ICD/0001

         7.  SUPERVISOR COMMANDS AND PROCEDURES
             CPS/230/ICD/0002

         8.  CAMPS REMOTE TERMINALS/HARDWARE ASSEMBLY BREAKDOWN
             CRT/SDS/002





1.3      T̲E̲R̲M̲S̲ ̲A̲N̲D̲ ̲A̲B̲B̲R̲E̲V̲I̲A̲T̲I̲O̲N̲S̲

         AB          As Built Drawings
         APP         Appendix
         ATBB        As to be built drawings
         BFD         Basic File Directory
         BSM-X       Bus Switching Module

         CAMPS       Computer Aided Message Processing System
         CCA         Crate Configuration Adaptor
         CCIS        Command & Control Information System
         CIA         Crate Interface Adaptor
         COMSEC      Communication Security
         CPU         Central Processor Unit
         CR          Carriage Return
         CR A/S      Christian Rovsing A/S
         CRT         Camps Remote Terminals
         CU          Channel Unit
         CUCP        Channel Unit Control Panel

         DCA         Disk Control Adaptor
         DCE         Data Circuit-Terminating Equipment
         DTE         Data Terminal Equipment
         DW          Drawing

         ECO         Engineer Change Order

         FD          Floppy Disk

         H/W (HW)    Hardware

         IDF         Intermediate Distribution Frame

         LIA-N       Line Interface Adaptor
         LSM         Low Speed Medium
         LSP         Low Speed Teleprinter
         LTU         Line Termination Unit
         LTUX-S      Line Termination Unit for TDX

         MAP         Memory Mapping Unit
         MBT         Main Bus Termination
         M&D         Maintenance & Diagnostics
         MDCO        Message Distribution Control Operator
         MIA         Map Interface Adaptor
         MP          Maintenance Position (Camps Room)
         MSO         Message Service Operator
         MSP         Medium Speed Printer
         MUX         Multiplexer
         


         NICS        NATO Integrated Communication System

         OCR         Optical Character Reader
         OM          OPTO MUX/DEMUX Transceiver

         PTP         Paper Tape Puncher
         PTR         Paper Tape Reader
         PU          Processor Unit

         RAM         Random Access Memory

         SCARS       Status Control and Reporting System
         SDS         System Design Specification
         SEC         Section
         SHAPE       Surpreme Headquaters Allied Powers Europe
         SPA         Site Provisional Acceptance
         SRS         System Requirement Specefication
         STI         Supra-bus & TDX Interface
         S/W (SW)    Software

         TARE        Telegraph and Relay Equipment
         TDX         Telecommunication Data Exchange
         THN         Territorial Host Nation
         TIA         TDX Interface Adaptor

         VDU         Visual Display Unit

         WD          Watchdog Crate Adaptor




1.4      D̲O̲C̲U̲M̲E̲N̲T̲ ̲L̲A̲Y̲O̲U̲T̲

         Section 2 of this document contains a general overall
         T̲est S̲pecification.

         In this section the tests/inspection activities are
         grouped into a number of test groups.

         Section 3 contains test descriptions and procedures
         for each individual test group.

         Appendix A contains all relevant test print-out for
         the on-site hardware verification.

         Appendix B through P, corresponding to site 02 through
         16, contains all site dependent data as well as the
         "SITE PROVISIONAL ACCEPTANCE PROTOCOL" for each site.


1.5      T̲E̲S̲T̲ ̲P̲R̲O̲C̲E̲D̲U̲R̲E̲ ̲F̲O̲R̲M̲S̲ ̲

         All test procedures contained in section 3 are described
         in the forms shown in Figure 1.1 - Test Overview and
         Figure 1.2 - Test Steps.

         For each function/inspection to be verified the test
         overview form is used to identify the test cases required.
          Each identified test case is described in details
         on the test steps form.

         The test steps form contains the detailed step by step
         procedure for execution of the test cases.

         The procedure for each test case is described by the
         information in the columns of the test steps form:

         -   Case step No.
         -   Test station
         -   Action
         -   Expected result

         Case step No. identifies the step in the appropriate
         test.

         Test station identifies the site terminal No. from
         which the test is controlled or on which the expected
         output is presented.

         Action describes the necessary action required to control
         the test.

         Expected result describes the expected results from
         execution of the described test action.







T̲E̲S̲T̲ ̲O̲V̲E̲R̲V̲I̲E̲W̲                                         T̲E̲S̲T̲ ̲N̲O̲.̲:̲
 ̲ ̲ ̲ ̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Test Case/
Reference             Action                               
        
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲




































                        Figure 1.1







T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲                                            T̲E̲S̲T̲ ̲N̲O̲.̲:̲
 ̲ ̲ ̲ ̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Case          Test         
Step No.      Station      Action                     Expected
 Results
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲




































                        Figure 1.2





           2  T̲E̲S̲T̲ ̲S̲P̲E̲C̲I̲F̲I̲C̲A̲T̲I̲O̲N̲ ̲A̲N̲D̲ ̲E̲V̲A̲L̲U̲A̲T̲I̲O̲N̲



2.1      T̲E̲S̲T̲ ̲S̲P̲E̲C̲I̲F̲I̲C̲A̲T̲I̲O̲N̲



2.1.1    T̲E̲S̲T̲ ̲P̲U̲R̲P̲O̲S̲E̲

         Site Provisional Acceptance is the act whereby SHAPE
         will acknowledge by protocol that CR A/S has fully
         demonstrated that the Site is complete and ready for
         initial operation.

         The SPA will take place when the following actions
         have been completed:

         a.  On-site H/W verification.

         b.  On-site S/W verification.

         c.  Verification of the site inventory.

         d.  Verification of the EQUIPMENT status level.

         e.  ACE COMSEC on-site verification.

         f.  The ATBB drawings have been updated to "As Built"
             status.

         g.  If applicable, availability of a mutually agreed
             discrepancy list showing the agreed date for clearance
             of each listed discrepancy.



2.1.1.1  D̲a̲t̲e̲ ̲o̲f̲ ̲t̲h̲e̲ ̲S̲P̲A̲

         a.  The date of the SPA Accepteance Protocol marks
             the date of the SPA.

         b.  If SHAPE delivers a "Notice of Defects" then the
             date on which SHAPE signs the "Correction of Defects
             Notice" shall be the date of the SPA.

         c.  The date of the SPA marks the time at which SHAPE
             takes over the responsibility of the site and the
             operation of the site can commence.


2.1.1.2  P̲E̲R̲F̲O̲R̲M̲A̲N̲C̲E̲ ̲S̲U̲M̲M̲A̲R̲Y̲

         Table 2.1 shows the performance summary of the SPA
         test procedure including the responsibilities for conducting
         the tests.



2.1.1.3  O̲V̲E̲R̲A̲L̲L̲ ̲S̲P̲A̲ ̲S̲C̲H̲E̲D̲U̲L̲E̲

         The duration of the SPA procedure for a typical site
         is scheduled to 10 working days as shown in the below
         overall task schedule:


         D̲a̲y̲:̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲1̲ ̲2̲ ̲3̲ ̲4̲ ̲5̲ ̲6̲ ̲7̲ ̲8̲ ̲9̲ ̲1̲0̲ ̲   
             
                                    ̲ ̲ ̲                     
              
         Hardware inspection      ^ ̲^̲ ̲^̲ ̲
         Inventory Check            ^ ̲^̲ ̲^
         Equipment Status Check     ^ ̲^̲ ̲^ ̲ ̲ ̲ ̲ ̲
         Hardware Verification          ^ ̲^̲ ̲^̲ ̲^ ̲ ̲ ̲ ̲ ̲
         Software Verification                ^ ̲^̲ ̲^̲ ̲^
         On-Site COMSEC Verification          ^ ̲^̲ ̲^̲ ̲^ 
         CRT Verification                     ^ ̲^̲ ̲^   ̲
         ATBB Drawings                              ^ ̲^
         Acceptance Protocol                        ^ ̲^




                      SKEMA


2.1.2    T̲e̲s̲t̲ ̲O̲b̲j̲e̲c̲t̲ ̲I̲d̲e̲n̲t̲i̲f̲i̲c̲a̲t̲i̲o̲n̲



2.1.2.1  H̲a̲r̲d̲w̲a̲r̲e̲ ̲C̲o̲n̲f̲i̲g̲u̲r̲a̲t̲i̲o̲n̲

         The tests will be conducted on all on-site installed
         CAMPS hardware for main sites 02-16 and the related
         CRT sites.



2.1.2.2  S̲o̲f̲t̲w̲a̲r̲e̲ ̲C̲o̲n̲f̲i̲g̲u̲r̲a̲t̲i̲o̲n̲

         The software required for conducting the tests will
         be the complete CAMPS S/W system and the Maintenance
         & Diagnostic package.



2.1.2.3  S̲H̲A̲P̲E̲/̲T̲H̲N̲ ̲S̲u̲p̲p̲l̲i̲e̲d̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲

         a.  Conductance of the S/W Verification Acceptance
             Test requires the availability of the NICS TARE,
             CRT, CCIS, SCARS II, and the Point-to-Point connections.

         b.  If one or more of the interfaces are not available,
             CR A/S shall proceed with all of those components
             of the system that are independent of the missing
             interfaces.

         c.  In this case SHAPE will give Site Provisional Acceptance,
             not withstanding the inability to test all interfaces,
             providing all other aspects of the test are completed.


2.2      D̲A̲T̲A̲ ̲R̲E̲C̲O̲R̲D̲I̲N̲G̲



2.2.1    T̲e̲s̲t̲ ̲R̲e̲s̲u̲l̲t̲ ̲O̲v̲e̲r̲v̲i̲e̲w̲

         The Test result overview form shown in figure 2.1 is
         filled in after the completion of the activities in
         each test group to state if any compliances were found
         during the test.

         In case of compliances the discrepancy coloumn is filled
         in with the reference to the actual discrepancy list.



2.2.2    D̲i̲s̲c̲r̲e̲p̲a̲n̲c̲y̲ ̲L̲i̲s̲t̲

         If during the activities in a test group any comments
         are necessary due to incompliance with the expected
         result, these comments will be recorded in the discrepancy
         list shown in figure 2.2.
         A number of discrepancy lists are found for each individual
         site in appendix B through P.



2.2.3    A̲c̲c̲e̲p̲t̲a̲n̲c̲e̲ ̲P̲r̲o̲t̲o̲c̲o̲l̲

         a)  All comments or/and discrepancies recorded in the
             discrepancy lists during the performance of all
             test groups are listed in the acceptance protocol
             together with an agreed date for clearance of each
             listed discrepancy.

         b)  Upon completion of the SPA procedure and when no
             "Notice of Defects" (Ref. 2.3.1.1) has been issued,
             the acceptance protocol will be signed by both
             parties.

         c)  The Acceptance Protocol for each individual site
             are found in Appendix B through P.

         d)  Table 2.2 lists the document number of the acceptance
             protocols for each site.









                          SKEMA









                          SKEMA




          ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
         ̲ ̲
         ^ SITE NO        DOCUMENT NO.                     
                          ^
         ^̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
         ̲^̲

            02            CPS/SPA/001
            03            CPS/SPA/002
            04            CPS/SPA/003
            05            CPS/SPA/004
            06            CPS/SPA/005
            07            CPS/SPA/006
            08            CPS/SPA/007
            09            CPS/SPA/008
            10            CPS/SPA/009
            11            CPS/SPA/010
            12            CPS/SPA/011
            13            CPS/SPA/012
            14            CPS/SPA/013
            15            CPS/SPA/014
            16            CPS/SPA/015
























  TABLE 2.2…01…CAMPS SITE PROVISIONAL…01…ACCEPTANCE PROTOCOLS


2.3      T̲E̲S̲T̲ ̲E̲V̲A̲L̲U̲A̲T̲I̲O̲N̲

         Evaluation of the test results will be performed by
         comparation of test results with expected results or
         by assurance of compliance between requirements and
         the referenced documentation.



2.3.1    A̲C̲C̲E̲P̲T̲A̲N̲C̲E̲ ̲C̲R̲I̲T̲E̲R̲I̲A̲S̲



2.3.1.1  N̲o̲t̲i̲c̲e̲ ̲o̲f̲ ̲D̲e̲f̲e̲c̲t̲s̲

         a.  If during the SPA procedure a problem is encountered,
             the problem is either categorized as a discrepancy
             or a defect.

         b.  SHAPE will deliver to CR A/S in writing a "Notice
             of Defects" listing the defects which prevented
             provisional acceptance of the site.



2.3.1.2  D̲i̲s̲c̲r̲e̲p̲a̲n̲c̲y̲

         a.  Discrepancy as referred to in section 2.3.1.1 means
             a noncompliance which does not prevent completion
             of site provisional acceptance.

         b.  All discrepancies existing at the time of signing
             the "Site Provisional Acceptance Protocol" will
             be listed in the protocol together with dates for
             correction of each discrepancy.



2.3.1.3  D̲e̲f̲e̲c̲t̲s̲

         Defects as referred to in section 2.3.1.1 means any
         non-compliance with the CAMPS contract No. CE80-9009-INF
         which prevents the normal operation of the site.



2.3.1.4  C̲o̲r̲r̲e̲c̲t̲i̲o̲n̲ ̲o̲f̲ ̲D̲e̲f̲e̲c̲t̲s̲ ̲N̲o̲t̲i̲c̲e̲

         If a "Notice of Defect" has been issued, SHAPE will
         deliver in writing a "Correction of Defects Notice"
         when the listed defects have been corrected.



            3  T̲E̲S̲T̲ ̲D̲E̲S̲C̲R̲I̲P̲T̲I̲O̲N̲ ̲A̲N̲D̲ ̲P̲R̲O̲C̲E̲D̲U̲R̲E̲S̲


3.1      T̲E̲S̲T̲G̲R̲O̲U̲P̲ ̲N̲O̲.̲ ̲1̲



3.1.1    G̲E̲N̲E̲R̲A̲L̲

         The purpose of the On-Site Hardware Inspection is to
         check the overall physical condition of the installed
         equipment.

3.1.2    T̲E̲S̲T̲G̲R̲O̲U̲P̲S̲

         This section has been subdivided into two test groups:

             T̲e̲s̲t̲g̲r̲o̲u̲p̲ ̲D̲e̲s̲c̲r̲i̲p̲t̲i̲o̲n̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲N̲o̲.̲ ̲ ̲

             CAMPS Equipment Area                  1
             User terminals                        2



3.1.3    T̲E̲S̲T̲ ̲M̲E̲T̲H̲O̲D̲

         a.  All installed equipment is visualy inspected for
             damages, mechanical functions etc.

         b.  The installation of the equipment, positioning,
             terminal location etc. are checked against the
             updated as-to-be-built drawings.

         c.  If during the inspection any comments are necessary,
             these comments will be recorded in the Discrepancy
             List.



3.1.4    P̲E̲R̲S̲O̲N̲N̲E̲L̲ ̲R̲E̲Q̲U̲I̲R̲E̲M̲E̲N̲T̲S̲

         The On-Site Hardware Inspection will be conducted by
         SHAPE and witnessed by CR A/S.





3.1.5    S̲C̲H̲E̲D̲U̲L̲E̲

         The On-Site Hardware Inspection is the first step in
         the CAMPS Site Provisional Acceptance Procedure.

         The duration of test group No. 1 is scheduled to 1
         day.

         Test group No. 2 will be performed together with the
         Inventory Check of the user terminals.






T̲E̲S̲T̲ ̲O̲V̲E̲R̲V̲I̲E̲W̲                                         T̲E̲S̲T̲ ̲N̲O̲.̲:̲
 ̲1̲ ̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲O̲n̲-̲S̲i̲t̲e̲ ̲H̲a̲r̲d̲w̲a̲r̲e̲ ̲I̲n̲s̲p̲e̲c̲t̲i̲o̲n̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Test Case/
Reference             Action                               
        
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

     1             CAMPS Equipment Area                    
   

     2             User Terminals                          
   









































T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲                                            T̲E̲S̲T̲ ̲N̲O̲.̲:̲
 ̲1̲ ̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲O̲n̲-̲S̲i̲t̲e̲ ̲H̲a̲r̲d̲w̲a̲r̲e̲ ̲I̲n̲s̲p̲e̲c̲t̲i̲o̲n̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Case          Test         
Step No.      Station      Action                     Expected
 Results
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

1.1            N/A      Verify by inspection that
                        the installed hardware           No
 physical
                        inside the CAMPS equipment       defects
                        area have no physical
                        defects.

1.2           N/A       Verify by inspection that
                        the installation coincide        Installation
                        with the updated ATBB            coincide
                        drawings.











T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲                                            T̲E̲S̲T̲ ̲N̲O̲.̲:̲
 ̲1̲ ̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲O̲n̲-̲S̲i̲t̲e̲ ̲H̲a̲r̲d̲w̲a̲r̲e̲ ̲I̲n̲s̲p̲e̲c̲t̲i̲o̲n̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Case          Test         
Step No.      Station      Action                     Expected
 Results
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

2.1            N/A      Verify by inspection that
                        the user terminals               No
 physical
                        have no physical defects         defects

2.2           N/A       Verify by inspection that
                        the terminal locations           Location
                        coincide with the                coincide
                        updated ATBB drawings














3.2      T̲E̲S̲T̲G̲B̲R̲O̲U̲P̲ ̲N̲O̲.̲ ̲2̲



3.2.1    G̲E̲N̲E̲R̲A̲L̲

         The purpose of the Equipment Status Check is:

         a)  To verify that all delivered hardware has been
             updated to the latest baseline ECO version.

         b)  To verify that all delivered firmware has been
             updated to the latest firmware release.



3.2.2    E̲Q̲U̲I̲P̲M̲E̲N̲T̲ ̲S̲T̲A̲T̲U̲S̲ ̲L̲E̲V̲E̲L̲

         The latest status level is found in the following test
         steps forms which include the following data elements:

         1.  Case step No
         2.  Test Station (unit to be checked)
         3.  Latest ECO status
         4.  Latest Firmware Release







3.2.3    C̲H̲E̲C̲K̲I̲N̲G̲ ̲P̲R̲O̲C̲E̲D̲U̲R̲E̲

         a.  All ECO updated items will be checked.

             The number of items are found in the site inventory
             list (Ref. Table 3.1)

         b.  The firmware version on all listed modules are
             checked.

         c.  For plug-in modules where the ECO label is placed
             inside the board, these modules will be demounted
             after powering down the system.

         d.  The ECO level and Firmware version of the checked
             items are compared with the expected result in
             the test steps form.

         e.  Units with ECO status 1/- will not be checked as
             no ECO has been introduced to these units.

         f.  In case of any discrepancies, these will be recorded
             in the Discrepancy List.

3.2.4    P̲E̲R̲S̲O̲N̲N̲E̲L̲ ̲R̲E̲Q̲U̲I̲R̲E̲M̲E̲N̲T̲S̲

         The Equipment Status Check will be conducted by CR
         A/S and witnessed by at least one representative from
         SHAPE.



3.2.5    S̲C̲H̲E̲D̲U̲L̲E̲

         The duration of the Equipment Status Check is scheduled
         to 2 days. The Equipment Status Check will be performed
         together with the Inventory Check.







T̲E̲S̲T̲ ̲O̲V̲E̲R̲V̲I̲E̲W̲                                         T̲E̲S̲T̲ ̲N̲O̲.̲:̲
 ̲0̲2̲ ̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲E̲Q̲U̲I̲P̲M̲E̲N̲T̲ ̲S̲t̲a̲t̲u̲s̲ ̲C̲h̲e̲c̲k̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Test Case/
Reference             Action                               
        
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

     1             Verify that the ECO status
                   level on all items mentioned            
    
                   in the test steps forms
                   coincides with the latest
                   ECO update.

                   Verify that the firmware on 
                   all items mentioned in the test
                   steps form coincides with the 
                   latest firmware release.


































T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ ̲                                           T̲E̲S̲T̲ ̲N̲O̲.̲:̲
 ̲2̲ ̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲E̲Q̲U̲I̲P̲M̲E̲N̲T̲ ̲S̲t̲a̲t̲u̲s̲ ̲C̲h̲e̲c̲k̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Case             Test                               ECO STATUS       FIRMWARE
Step No.       Station                                RELEASE
      
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

1.       MMD DISK DRIVE              S-CODE 26:     ECO 1
                                                    ECO 2
                                                    ECO 3
                                                    ECO 4

                                     S-CODE 27:     ECO 1
                                                    ECO 2
                                                    ECO 4

                                     S-CODE 28:     ECO 4

                                     S-CODE 29:     NIL

2.       SMD DISK DRIVE              S-CODE 38:     ECO 24

                                     S-CODE 40:     NIL

3.       PROCESSOR CRATE              1/D

4.       CHANNEL CRATE                1/A

5.       WATCHDOG CRATE               2/A

6.       CTX CRATE                    2/A

7.       ADAPTER CRATE                2/A

8.       M-POWER SUPPLY               3/B

9.       S-POWER SUPPLY              1/F-E

10.      ADAP. POWER SUPPLY           1/-




T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ ̲                                           T̲E̲S̲T̲ ̲N̲O̲.̲:̲
 ̲2̲ ̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲E̲Q̲U̲I̲P̲M̲E̲N̲T̲ ̲S̲t̲a̲t̲u̲s̲ ̲C̲h̲e̲c̲k̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Case             Test                               ECO STATUS       FIRMWARE
Step No.       Station                                RELEASE
      
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

11.      CPU/CACHE                   2/L

12.      RAM, 512K                   4/-

13.      MAP, 2 MW                   2/G

14.      STI, MAPPED                 3/D            2174-6
                                                    2173-6

15.      DISK CTRL, 32K              2/K

16.      FD CTRL                     3/F

17.      LTU, 32K                    2/K

18.      WD LTU, 32K                 3/F            0201-95

19.      LTU, 64K                    2/m

20.      CUCP                        1/c

21.      MIA                         2/E

22.      TIA                         2/A            1872-05

23.      MBT                         5/-

24.      MBT-1                       5/A

25.      CIA-A                       2/D

26.      CIA-B                       2/E

27.      DCA                         2/C

28.      SFA                         1/-
         




T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲ ̲                                           T̲E̲S̲T̲ ̲N̲O̲.̲:̲
 ̲2̲ ̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲E̲Q̲U̲I̲P̲M̲E̲N̲T̲ ̲S̲t̲a̲t̲u̲s̲ ̲C̲h̲e̲c̲k̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Case             Test                               ECO STATUS       FIRMWARE
Step No.       Station                                RELEASE
      
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

29.      LIA-N                       3/C


30.      LIA-N (TARE)                4/-

31.      WCA                         2/C            0201-91,92,93,94

32.      CCA                         3/B

33.      CCBA                        1/A

34.      TDX CTRL                    2/L            1766-02

35.      BSM-X                       2/E

36.      LTUX-S TYPE 1               2/M            0202-11,12,13
                                                    2298-03

37.      LTUX-S TYPE 2               2/M            0302-21,22,23
                                                    2298-03

38.      LTUX-S TYPE 3               2/M            0102-31,33
                                                    2298-03

39       L/L ADAP. 1 CH.             1/-

40.      L/L ADAP. 4 CH.             1/A

41.      OPTO T/R (OM-2)             1/-

42.      X-NET WALL OUTLET           4/c

43.      VDU                         -              V2.2

44.      MSP                         -

45.      PTP/PTR                     1/-


3.3  T̲E̲S̲T̲G̲R̲O̲U̲P̲ ̲N̲O̲.̲ ̲3̲



3.3.1    G̲E̲N̲E̲R̲A̲L̲

         The Inventory Check shall verify that all equipment
         for the site has been delivered in accordance with
         the contents of the property inventory list.
         



3.3.2    I̲N̲V̲E̲N̲T̲O̲R̲Y̲ ̲C̲H̲E̲C̲K̲ ̲L̲I̲S̲T̲

         a.  The inventory list has been subdivided into 9 groups:

             1:  Equipment Racks
                 (Racks, Modules, Disk Drives etc.)

             2:  Terminal Equipment
                 (VDU, MSP, and PTP/PTR)

             3:  Ancillary Equipment
                 (Cabinets, Tables etc.)

             4:  Tools and test equipment

             5:  Installation material

             6:  Documents

             7:  Spare parts

             8:  Software deliverables

             9:  Verification





         b.  The inventory list includes the following data
             elements:

             1:  Date of Printout/Site No.

             2:  Line item No.

             3:  Type No.

             4:  Description

             5:  True manufacturers part No.

             6:  Serial No.

             7:  True manufacturers code

             8:  NATO Stock No.

             9.  Configuration reference

            10.  Remarks

            11.  Delivered quantity

            12.  Received quantity


         c. A copy of the Site inventory list will be forwarded
            to SHAPE at least 1 month prior to SPA for each
            site.

         d. Table 3.1. lists the actual site inventory lists
            per site including the inventory check constraints.
            (Ref. 3.3.4).




3.3.3    C̲H̲E̲C̲K̲I̲N̲G̲ ̲P̲R̲O̲C̲E̲D̲U̲R̲E̲

         a.  All items with serial numbers are checked against
             the serial number in column 5 of the inventory
             list.

             In case of any discrepancy between the checked
             item serial number and the serial number in the
             inventory list, the inventory list shall be updated
             with the new serial number of the checked item.

             The quantity of received items, including items
             without serial numbers, recorded in column 11 (REC.
             QTY.) of the inventory list, are compared with
             the quantity of delivered items (DEL. QTY.) in
             column 10.

             Discrepancies between received and delivered items
             will be recorded in the verification part of the
             inventory list. These Discrepancies will be transferred
             to the SPA acceptance protocol at the time of SPA.

             The verification part of the inventory lists is
             signed by one representative from SHAPE and one
             representative from CR A/S.





3.3.4    I̲N̲V̲E̲N̲T̲O̲R̲Y̲ ̲C̲H̲E̲C̲K̲ ̲C̲O̲N̲S̲T̲R̲A̲I̲N̲T̲S̲

         All internal cables and mechanical assemblies without
         serial No. will not be checked as some of the items
         are inaccessible without demounting the racks.
         (Ref. Table 3.1)



3.3.5    P̲E̲R̲S̲O̲N̲N̲E̲L̲ ̲R̲E̲Q̲U̲I̲R̲E̲M̲E̲N̲T̲S̲

         The inventory check will be conducted by CR A/S and
         witnessed by at least one representative from SHAPE
         or the THN Property Section.

         Both parties will record the results of the inventory
         check in each one copy of the inventory check list.



3.3.6    R̲E̲S̲P̲O̲N̲S̲I̲B̲I̲L̲I̲T̲Y̲

         a.  The marked up copies of the inventory lists shall
             form the official record of all equipment and other
             items that have been delivered.

         b.  Upon completion of the SPA SHAPE/THN takes over
             the final responsibility of the equipment.



3.3.7    S̲C̲H̲E̲D̲U̲L̲E̲

         The duration of the Inventory Check is scheduled to
         2 days and will be performed together with the Equipment
         Status Check.

         The Inventory Check of the user terminals will be performed
         together with the On-Site Hardware Inspection.







   ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
  ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
  ^ SITE NO    DOCUMENT TO BE USED    CHECKING CONSTRAINTS
                                          ^
  ^̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
  ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲^̲

     1         CPS/AUX/039            ITEM 0272 through
                                      0350
     2         CPS/AUX/040            ITEM 0207 through 0284
     2A        CPS/AUX/040            ITEM 0015 through 0041
     3         CPS/AUX/041            ITEM 0195 through 0285
     3A        CPS/AUX/041            ITEM 0010 through 0036
     4         CPS/AUX/042            ITEM TBD  through TBD
     4A        CPS/AUX/042            ITEM TBD  through TBD
     4B        CPS/AUX/042            ITEM TBD  through TBD
     4C        CPS/AUX/042            ITEM TBD  through TBD
     4D        CPS/AUX/042            ITEM TBD  through TBD
     4E        CPS/AUX/042            ITEM TBD  through TBD
     5         CPS/AUX/043            ITEM 0277 through 0370
     5A        CPS/AUX/043            ITEM 0015 through 0043
     5B        CPS/AUX/043            ITEM 0015 through 0033
     6         CPS/AUX/044            ITEM 0219 through 0309
     6A        CPS/AUX/044            ITEM 0015 through 0042
     6B        CPS/AUX/044            ITEM 0015 through 0042
     7         CPS/AUX/045            ITEM TBD  through TBD
                                                        
     7A        CPS/AUX/045            ITEM TBD  through TBD
                                                        
     7B        CPS/AUX/045            ITEM TBD  through TBD
                                                        
     8         CPS/AUX/046            ITEM TBD  through TBD
                                                        
     8A        CPS/AUX/046            ITEM TBD  through TBD
                                                        
     9         CPS/AUX/047            ITEM 0209 through 0294
     9A        CPS/AUX/047            ITEM 0015 through 0042
     10        CPS/AUX/048            ITEM 0268 through 0361
     10A       CPS/AUX/048            ITEM 0015 through 0042
     11        CPS/AUX/049            ITEM TBD  through 
                                                        TBD
     11A       CPS/AUX/049            ITEM TBD  through 
                                                        TBD
     11B       CPS/AUX/049            ITEM TBD  through 
                                                        TBD
     12        CPS/AUX/050            ITEM TBD  through 
                                                        TBD
     12A       CPS/AUX/050            ITEM TBD  through 
                                                        TBD
     12B       CPS/AUX/050            ITEM TBD  through 
                                                        TBD
     13        CPS/AUX/051            ITEM 0244 through 0329
     13A       CPS/AUX/051            ITEM 0015 through 0042
     14        CPS/AUX/052            ITEM TBD  through 
                                                        TBD
     14A       CPS/AUX/052            ITEM TBD  through 
                                                        TBD
     15        CPS/AUX/053            ITEM 0210 through 0300
     15A       CPS/AUX/053            ITEM 0015 through 0042
     15B       CPS/AUX/053            ITEM 0015 through
                                      0041
     16        CPS/AUX/054            ITEM TBD  through
                                       TBD

   TABLE 3.1…01…INVENTORY DOCUMENTS AND CONSTRAINTS






           C̲A̲M̲P̲S̲ ̲S̲P̲A̲ ̲D̲I̲S̲C̲R̲E̲P̲A̲N̲C̲Y̲ ̲L̲I̲S̲T̲ ̲S̲I̲T̲E̲ ̲N̲O̲.̲


 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
^ SERIAL DATE    TESTGROUP   CASE        DESCRIPTION       
                                                         ^
^                No.         STEP NO.                      
                                             ^
^̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲^̲
^                                                          
                   ^
^                                                          
                   ^
^                                                          
                   ^
^                                                          
                   ^
^                                                          
                   ^
^                                                          
                   ^
^                                                          
                   ^
^                                                          
                   ^
^                                                          
                   ^
^                                                          
                   ^
^                                                          
                   ^
^                                                          
                   ^
^                                                          
                   ^
^                                                          
                   ^
^                                                          
                   ^
^                                                          
                   ^
^                                                          
                   ^
^                                                          
                   ^
^                                                          
                   ^
^                                                          
                   ^
^                                                          
                   ^
^                                                          
                   ^
^                                                          
                   ^
^                                                          
                   ^
^                                                          
                   ^
^                                                          
                   ^
^                                                          
                   ^
^                                                          
                   ^
^                                                          
                   ^
^                                                          
                   ^
^                                                          
                   ^
^                                                          
                   ^
^                                                          
                   ^
^                                                          
                   ^
^                                                          
                   ^
^                                                          
                   ^
^̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲^̲

               FIGURE 2.2…01…DISCREPANCY LIST





                T̲E̲S̲T̲ ̲R̲E̲S̲U̲L̲T̲ ̲O̲V̲E̲R̲V̲I̲E̲W̲ ̲

 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
TEST ACTIVITY                     APPLICABLE SPECIFICATION         TEST
                                                                   RESULT
GROUP                                                              NO
                                                                   REMARKS REF.Discr.
                                                                           LIST
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

1    On-Site H/W Inspection       Test 01 Test Steps Form