LIST OF CRITICAL DOCUMENTS ON THE
CAMPS PROGRAM…02……02…CAMPS
T̲A̲B̲L̲E̲ ̲O̲F̲ ̲C̲O̲N̲T̲E̲N̲T̲S̲
1 SCOPE AND PURPOSE ............................
4
2 APPLICABLE DOCUMENTS .........................
4
2.1 APPLICABLE DOCUMENTS .....................
4
2.2 REFERENCED DOCUMENTS .....................
4
2.3 ABBREVIATIONS ............................
4
3 CRITICAL DOCUMENTS ...........................
5
3.1 PROGRAM MANAGEMENT .......................
5
3.2 SYSTEM ENGINEERING .......................
5
3.3 HARDWARE DEVELOPMENT .....................
6
3.4 SOFTWARE DEVELOPMENT .....................
6
3.5 FABRICATION AND INTEGRATION ..............
7
3.6 SITE PREPARATION & INSTALLATION ..........
7
3.7 SITE ACCEPTANCE ..........................
7
3.8 LOGISTICS SUPPORT ........................
7
3.9 DOCUMENTATION ............................
7
1̲ ̲ ̲S̲C̲O̲P̲E̲ ̲A̲N̲D̲ ̲P̲U̲R̲P̲O̲S̲E̲
The scope of this list is all documentation which is
considered critical on the CAMPS program. All documents
on the list must be reviewed and approved by SHAPE
within 15 calendar days after receipt.
2̲ ̲ ̲A̲P̲P̲L̲I̲C̲A̲B̲L̲E̲ ̲D̲O̲C̲U̲M̲E̲N̲T̲S̲ ̲A̲N̲D̲ ̲T̲E̲R̲M̲S̲
2.1 A̲P̲P̲L̲I̲C̲A̲B̲L̲E̲ ̲D̲O̲C̲U̲M̲E̲N̲T̲S̲
The following document is applicable to the list of
critical documents.
Contract Document CE 80-9009-INF.
2.2 R̲E̲F̲E̲R̲E̲N̲C̲E̲D̲ ̲D̲O̲C̲U̲M̲E̲N̲T̲S̲
The following document is referenced in the List of
Critical Documents.
System Requirements Specification
CPS/210/SYS/0001.
2.3 A̲B̲B̲R̲E̲V̲I̲A̲T̲I̲O̲N̲S̲
CDRL Contract Data Requirements List
LI Line Item.
3̲ ̲ ̲G̲R̲O̲U̲P̲I̲N̲G̲ ̲O̲F̲ ̲C̲R̲I̲T̲I̲C̲A̲L̲ ̲D̲O̲C̲U̲M̲E̲N̲T̲S̲
All critical documents have been grouped in accordance
with the CDRL found in the contract, i.e.
- Program Management
- System Engineering
- Hardware Development
- Software Development
- Fabrication and Integration
- Site Preparation & Installation
- Site Acceptance
- Logistics Support
- Documentation
3.1 P̲R̲O̲G̲R̲A̲M̲ ̲M̲A̲N̲A̲G̲E̲M̲E̲N̲T̲ ̲D̲O̲C̲U̲M̲E̲N̲T̲S̲
3.2 S̲Y̲S̲T̲E̲M̲ ̲E̲N̲G̲I̲N̲E̲E̲R̲I̲N̲G̲
1) C̲h̲a̲n̲g̲e̲ ̲N̲o̲t̲i̲f̲i̲c̲a̲t̲i̲o̲n̲ ̲o̲f̲ ̲T̲e̲s̲t̲ ̲I̲t̲e̲m̲s̲ ̲t̲o̲ ̲b̲e̲ ̲C̲h̲a̲n̲g̲e̲d̲
The System Requirements Specification section 4.2.1.7.1.2
specifies that the contractor shall justify the
use of MTBF and MTTR values for H/W modules either
by analytic calculations or by testing. If the
justification method is changed then a "Change
Notification of Test Items to be changed" shall
be forwarded to SHAPE for approval.
2) C̲P̲S̲/̲2̲1̲0̲/̲S̲Y̲S̲/̲0̲0̲0̲1̲ ̲-̲ ̲S̲Y̲S̲T̲E̲M̲ ̲R̲E̲Q̲U̲I̲R̲E̲M̲E̲N̲T̲S̲ ̲S̲P̲E̲C̲I̲F̲I̲C̲A̲T̲I̲O̲N̲
̲-̲ ̲L̲I̲ ̲2̲.̲1̲.̲1̲ ̲-̲ ̲C̲D̲R̲L̲ ̲0̲2̲
3) C̲P̲S̲/̲2̲3̲0̲/̲I̲C̲D̲/̲0̲0̲0̲1̲ ̲-̲ ̲U̲s̲e̲r̲ ̲P̲r̲o̲c̲e̲d̲u̲r̲e̲s̲ ̲a̲n̲d̲ ̲A̲s̲s̲o̲c̲i̲a̲t̲e̲d̲
̲F̲o̲r̲m̲a̲t̲s̲ ̲-̲ ̲L̲I̲ ̲2̲.̲2̲.̲1̲ ̲-̲ ̲C̲D̲R̲L̲ ̲0̲4̲
4) C̲P̲S̲/̲2̲3̲0̲/̲I̲C̲D̲/̲0̲0̲0̲2̲ ̲-̲ ̲S̲u̲p̲e̲r̲v̲i̲s̲o̲r̲ ̲C̲o̲m̲m̲a̲n̲d̲s̲ ̲a̲n̲d̲ ̲P̲r̲o̲c̲e̲d̲u̲r̲e̲s̲
̲-̲ ̲L̲I̲ ̲2̲.̲2̲.̲4̲ ̲-̲ ̲C̲D̲R̲L̲ ̲0̲6̲
5) C̲P̲S̲/̲2̲3̲0̲/̲I̲C̲D̲/̲0̲0̲0̲3̲ ̲-̲ ̲A̲C̲P̲1̲2̲7̲ ̲N̲A̲T̲O̲ ̲S̲u̲p̲p̲.̲ ̲3̲ ̲P̲r̲o̲c̲e̲d̲u̲r̲e̲s̲
̲-̲ ̲L̲I̲ ̲2̲.̲2̲.̲3̲ ̲-̲ ̲C̲D̲R̲L̲ ̲0̲5̲
6) C̲P̲S̲/̲I̲C̲D̲/̲0̲0̲4̲ ̲-̲ ̲N̲I̲C̲S̲ ̲T̲A̲R̲E̲ ̲I̲n̲t̲e̲r̲f̲a̲c̲e̲
7) C̲P̲S̲/̲I̲C̲D̲/̲0̲0̲5̲ ̲-̲ ̲S̲C̲A̲R̲S̲ ̲I̲I̲ ̲I̲n̲t̲e̲r̲f̲a̲c̲e̲
8) C̲P̲S̲/̲I̲C̲D̲/̲0̲0̲6̲ ̲-̲ ̲A̲C̲E̲ ̲C̲C̲I̲S̲ ̲I̲n̲t̲e̲r̲f̲a̲c̲e̲
9) C̲P̲S̲/̲I̲C̲D̲/̲0̲0̲7̲ ̲-̲ ̲T̲R̲C̲,̲ ̲P̲o̲i̲n̲t̲ ̲t̲o̲ ̲P̲o̲i̲n̲t̲ ̲C̲o̲n̲n̲e̲c̲t̲i̲o̲n̲ ̲I̲n̲t̲e̲r̲f̲a̲c̲e̲
10) C̲P̲S̲/̲I̲C̲D̲/̲0̲0̲8̲ ̲-̲ ̲O̲C̲R̲ ̲I̲n̲t̲e̲r̲f̲a̲c̲e̲
3.3 H̲A̲R̲D̲W̲A̲R̲E̲ ̲D̲E̲V̲E̲L̲O̲P̲M̲E̲N̲T̲
O̲E̲M̲ ̲D̲O̲C̲U̲M̲E̲N̲T̲A̲T̲I̲O̲N̲
All OEM documentation which have to be reviewed by
SHAPE during the subcontractor negotiation phase are
on the List of Critical Documents.
3.4 S̲O̲F̲T̲W̲A̲R̲E̲ ̲D̲E̲V̲E̲L̲O̲P̲M̲E̲N̲T̲
1) M̲o̲d̲u̲l̲e̲ ̲T̲e̲s̲t̲ ̲R̲e̲s̲u̲l̲t̲ ̲-̲ ̲L̲I̲ ̲4̲.̲4̲.̲2̲ ̲-̲ ̲4̲.̲4̲.̲1̲0̲ ̲-̲ ̲C̲D̲R̲L̲ ̲0̲6̲
2) S̲/̲W̲ ̲I̲n̲t̲e̲g̲r̲a̲t̲i̲o̲n̲ ̲P̲l̲a̲n̲ ̲-̲ ̲L̲I̲ ̲4̲.̲6̲.̲3̲ ̲-̲ ̲C̲D̲R̲L̲ ̲0̲7̲
3) I̲n̲t̲e̲g̲r̲a̲t̲i̲o̲n̲ ̲T̲e̲s̲t̲ ̲R̲e̲s̲u̲l̲t̲s̲ ̲(̲A̲p̲p̲l̲i̲c̲a̲t̲i̲o̲n̲ ̲S̲/̲W̲)̲ ̲-̲ ̲L̲I̲
̲4̲.̲6̲.̲6̲ ̲-̲ ̲C̲D̲R̲L̲ ̲1̲0̲
4) I̲n̲t̲e̲g̲r̲a̲t̲i̲o̲n̲ ̲T̲e̲s̲t̲ ̲R̲e̲s̲u̲l̲t̲s̲ ̲(̲S̲y̲s̲t̲e̲m̲ ̲S̲/̲W̲)̲ ̲-̲ ̲L̲I̲ ̲4̲.̲6̲.̲5̲
̲-̲ ̲C̲D̲R̲L̲ ̲0̲9̲
3.5 F̲A̲B̲R̲I̲C̲A̲T̲I̲O̲N̲ ̲A̲N̲D̲ ̲I̲N̲T̲E̲G̲R̲A̲T̲I̲O̲N̲
3.6 S̲I̲T̲E̲ ̲P̲R̲E̲P̲A̲R̲A̲T̲I̲O̲N̲ ̲&̲ ̲I̲N̲S̲T̲A̲L̲L̲A̲T̲I̲O̲N̲
1) C̲i̲v̲i̲l̲ ̲W̲o̲r̲k̲s̲ ̲R̲e̲q̲u̲i̲r̲e̲m̲e̲n̲t̲s̲ ̲-̲ ̲L̲I̲ ̲6̲.̲4̲.̲1̲ ̲-̲ ̲6̲.̲4̲.̲1̲6̲ ̲C̲D̲R̲L̲
̲0̲2̲
2) S̲i̲t̲e̲ ̲D̲e̲s̲i̲g̲n̲ ̲(̲A̲s̲ ̲t̲o̲ ̲b̲e̲ ̲B̲u̲i̲l̲t̲)̲ ̲-̲ ̲L̲I̲ ̲6̲.̲5̲.̲1̲ ̲-̲ ̲6̲.̲5̲.̲1̲6̲
3.7 S̲I̲T̲E̲ ̲A̲C̲C̲E̲P̲T̲A̲N̲C̲E̲
3.8 L̲O̲G̲I̲S̲T̲I̲C̲S̲ ̲S̲U̲P̲P̲O̲R̲T̲
3.9 D̲O̲C̲U̲M̲E̲N̲T̲A̲T̲I̲O̲N̲