DataMuseum.dk

Presents historical artifacts from the history of:

CR80 Wang WCS documentation floppies

This is an automatic "excavation" of a thematic subset of
artifacts from Datamuseum.dk's BitArchive.

See our Wiki for more about CR80 Wang WCS documentation floppies

Excavated with: AutoArchaeologist - Free & Open Source Software.


top - download

⟦b7bdefa47⟧ Wang Wps File

    Length: 5641 (0x1609)
    Types: Wang Wps File
    Notes: CPS/TPR/047               
    Names: »4831A «

Derivation

└─⟦f44499b45⟧ Bits:30006204 8" Wang WCS floppy, CR 0303A
    └─ ⟦this⟧ »4831A « 

WangText




    4831A/al…02…CPS/TPR/047

…02…FLY/840412…02……02… #
INSPECTION AND TEST PROCEDURE
FOR V24 MONITOR MODULES…02……02…CAMPS














                 CAMPS
                 INSPECTION AND TEST PROCEDURE
                 FOR V24 MONITOR MODULES

                 CPS/TPR/047














                 Flemming Lydeking




                 Kurt Nybro-Nielsen







                 KNN, OWE, PMS, LU, FLY, IJO, GQAR, QA, BB















                     …0f…     CPS QA H/W      840412

                         ILS Maint. Mgr.  840524
              
             1           ILS Config.Mgr.  840524


             840412…0e…





    4831A/al…02… CPS/TPR/047

INSPECTION AND TEST PROCEDURE…02… FLY/840412…02……02…ii
FOR V24 MONITOR MODULES
…02……02… CAMPS


















        840412                  All      Initial issue of document




    4831A/al…02…CPS/TPR/047

…02…FLY/840412…02……02…iii
INSPECTION AND TEST PROCEDURE
FOR V24 MONITOR MODULES…02……02…  CAMPS





                                      T̲A̲B̲L̲E̲ ̲O̲F̲ ̲C̲O̲N̲T̲E̲N̲T̲S̲



     1 SCOPE ........................................  
       1 

     2 APPLICABLE DOCUMENTS .........................  
       2 

     3 VISUAL INSPECTION ............................  
       3 
       3.1 INSPECTION POINTS ........................  
           3 

     4 TEST EQUIPMENT ...............................  
       3 

     5 TEST CONFIGURATION ...........................  
       4 
       5.1 TEST CONNECTION ..........................  
           4 

     6 FUNCTIONAL TEST ..............................  
       5 
       6.1 POWER SUPPLY .............................  
           5 
       6.2 OUTPUT ...................................  
           5 
       6.3 PULSE TRAP ...............................  
           6 
       6.4 TEST REPORT ..............................  
           6 

     7 FRONT PANEL (Figure 6.3-1) ...................  
       7 


     APPENDIX A:  Test Configuration A1 .............  
     8 
     APPENDIX B:  Test Report B1 ....................  
     9 



                         1  S̲C̲O̲P̲E̲

         This document describes the procedure for inspection
         and test of V24 Monitor Module.





                 2  A̲P̲P̲L̲I̲C̲A̲B̲L̲E̲ ̲D̲O̲C̲U̲M̲E̲N̲T̲S̲

         SD/STD/017
         INCOMING INSPECTION STANDARD

         PAD/PRC/0002
         NON-CONFORMANCE HANDLING

         CPS/AUX/009
         QUALITY REQUIREMENTS FOR EQUIPMENT
         PURCHASED FOR THE CAMPS PROJECT





                   3  V̲I̲S̲U̲A̲L̲ ̲I̲N̲S̲P̲E̲C̲T̲I̲O̲N̲



3.1      I̲N̲S̲P̲E̲C̲T̲I̲O̲N̲ ̲P̲O̲I̲N̲T̲S̲

         a)  Inspect the module for possible damage.

         b)  Verify that the workmanship is in accordance with
             CPS/AUX/009.









                    4  T̲E̲S̲T̲ ̲E̲Q̲U̲I̲P̲M̲E̲N̲T̲

         The following test equipment will be utilized during
         the test.

         a)  Pulse-generator, Philips PM 5715
         b)  Multimeter, Fluke 8020A
         c)  Adapter Power Supply, Metric
         d)  Test Adapter, CR
         e)  Test box, CR











                  5  T̲E̲S̲T̲ ̲C̲O̲N̲F̲I̲G̲U̲R̲A̲T̲I̲O̲N̲



5.1      T̲E̲S̲T̲ ̲C̲O̲N̲N̲E̲C̲T̲I̲O̲N̲

         The test configuration is shown in appendix A.

         All inputs to the V24 Monitor Module are interfacing
         through a test adapter making it easy to replace the
         board under test with another one to be tested.

         The V24 Monitor Module requires a 2x9 VAC power supply,
         which is supplied from the adapter power supply (ref.
         sec. 4).

         The necessary test signal is supplied from the pulse
         generator (ref. sec. 4) connecting to the Test Adapter.
          A rotary switch on the Test Adapter connects the generator
         to the selected input on the V24 Monitor Module.











                    6  F̲U̲N̲C̲T̲I̲O̲N̲A̲L̲ ̲T̲E̲S̲T̲



6.1      P̲O̲W̲E̲R̲ ̲S̲U̲P̲P̲L̲Y̲ ̲T̲E̲S̲T̲

         Measure the voltage between ground connection and:

             Cap. C3/+ to be within + 13C +̲ 10%
             Cap. C5/- to be within - 13V +̲ 10%
             Cap. C2/+ to be within +  5V +̲  5%



6.2      O̲U̲T̲P̲U̲T̲ ̲T̲E̲S̲T̲

         Connected the pulse generator to input on the test
         adapter and adjust the generator to supply 600 Hz square
         wawe plus/minus 2.2V amplitude.

         a)  Connect the Test Box to connector Ch. 1 on V24
             Monitor Module.

         b)  Connect the pulse generator to Ch. 1 on the Test
             Adapter.

         c)  Set channel switch on V24 Monitor Module to Ch.
             1.

         d)  Now all inputs on the channel concerned are tested
             sequentially.

             Select the input to be tested by the rotary switch
             on the Test Adapter.  Inspect visually that the
             relevant LED's on the front panel and test box
             are turned on/off corresponding to the signal input.

         e)  Repeat steps a to d testing channel 2,3 and 4 respectively.





6.3      P̲U̲L̲S̲E̲ ̲T̲R̲A̲P̲ ̲T̲E̲S̲T̲

         Disconnect the pulse generator, reset the pulse trap
         and connect a cable to C2/+.

         Now the switch S1 (ref. Figure 6.3-1) is set to position
         "1" and switch S2 to position marked "6".

         The cable is connected to the input of the Test Adapter
         corresponding to the actual switch setting, and it
         is visually tested if the LEDs marked "+" and "-" are
         turned on.

         This procedure is repeated for all combinations of
         switch settings of S1 and S2.



6.4      T̲E̲S̲T̲ ̲R̲E̲P̲O̲R̲T̲

         All test results shall be reported in a Test Report
         (ref. appendix B).






















































                       Figure 6.3-1



              A̲P̲P̲E̲N̲D̲I̲X̲ ̲A̲…01……01…TEST CONFIGURATION





             A̲P̲P̲E̲N̲D̲I̲X̲ ̲B̲…01……01…INSPECTION AND TEST