DataMuseum.dk

Presents historical artifacts from the history of:

CR80 Wang WCS documentation floppies

This is an automatic "excavation" of a thematic subset of
artifacts from Datamuseum.dk's BitArchive.

See our Wiki for more about CR80 Wang WCS documentation floppies

Excavated with: AutoArchaeologist - Free & Open Source Software.


top - download

⟦badfb3671⟧ Wang Wps File

    Length: 6432 (0x1920)
    Types: Wang Wps File
    Notes: Min of Meet.              
    Names: »0253A «

Derivation

└─⟦231b08da1⟧ Bits:30006068 8" Wang WCS floppy, CR 0022A
    └─ ⟦this⟧ »0253A « 

WangText




…02…

…02…19801027                                                 #

…02……02…CAMPS












                           ISSUE 2
…02……02……02……02……02…6.-10./10.80…02…3…02…CR A/S

…02…          Minutes of the CAMPS Systems Requirements
          Review and Progress Review Meeting on the
          6th to 10th October.


…02…Col. Woodruff           Lars Stig Nielsen
         Col. Miller                             Gert
                                                 Jensen          Svend
                                                                 Olsen
         Ltc. Stoltz                             Boje
                                                 Rinhart         Conf.
                                                                 Mgmt.
         Maj. McDaniel  Jens Peter Ringgaard
         Maj. Robb                               Kurt
                                                 Nybroe-Nielsen
         Maj. Vargas                             Bjarne
                                                 Berthold
         Mr. Agusman                             Ole
                                                 Eskedal
         Mr. Bodur                               Finn
                                                 Hass
         Mr. Earl
         Mr. Gardiner
         Mr. Ludford
         Mr. Woodcock


1        R̲e̲v̲i̲e̲w̲ ̲o̲f̲ ̲S̲y̲s̲t̲e̲m̲ ̲R̲e̲q̲u̲i̲r̲e̲m̲e̲n̲t̲s̲ ̲S̲p̲e̲c̲i̲f̲i̲c̲a̲t̲i̲o̲n̲

         The System Requirements Specification CPS/210/SYS/0001
         version 1.1 was reviewed and agreed updates inserted.
         Concurrently a working record of the updates were made
         and they are submitted as Working Notes. These notes
         are to be regarded as working notes outside the minutes
         of meeting.

2        A̲p̲p̲r̲o̲v̲a̲l̲ ̲o̲f̲ ̲S̲y̲s̲t̲e̲m̲ ̲R̲e̲q̲u̲i̲r̲e̲m̲e̲n̲t̲ ̲S̲p̲e̲c̲i̲f̲i̲c̲a̲t̲i̲o̲n̲

         All DNs submitted by SHAPE were resolved except for
         DN 176 on site preparation. The updated SRS pages have
         been mutually agreed on all DNs except DN 176. A master
         copy of the agreed upon SRS will be transmitted to
         SHAPE within a week for Contracting Officer approval.
         The site installation drawing issue in DN 176 is still
         to be determined.

3        R̲e̲v̲i̲e̲w̲ ̲a̲n̲d̲ ̲A̲p̲p̲r̲o̲v̲a̲l̲ ̲o̲f̲ ̲C̲P̲S̲/̲2̲3̲0̲/̲I̲C̲D̲/̲0̲0̲0̲1̲

         All DNs submitted by SHAPE were resolved and the document
         updated accordingly.

         The conclusion is that SHAPE agrees to the content
         of the document as updated. The final approval will
         be notified to CR, within 5 days after receipt of a
         master copy of the updated document.

         The following comments from SHAPE were noted:

         1.  All DNs have been implemented satisfactorily.



             2.  DN No. 30, 31, 34, 35, 41 have been implemented
                 in a draft form and approved by SHAPE

             3.  DN 68: A small change concerning print out of precedence
                 has been made.

             4.  CR/SHAPE agree to remove the flow diagrams.

             5.  A section on Applicable documents will be inserted

             6.  Editorial change of format presentation:

                 -   system generated data on the screen in upper
                     case

                 -   user entered data in lower case

             7.  All retries, that presently are stated as 10 shall
                 be 5.

             8.  Update of transaction ID in accordance with SRS
                 (Time stamp).

             9.  SRS doc. page 116: Format B shall be entered in
                 para 3.2.3.4(b).

             10  The final document CPS/230/ICD/0001 will be airfreighted,
                 and the airway bill number communicated to SHAPE
                 by telex.

4            R̲e̲v̲i̲e̲w̲ ̲a̲n̲d̲ ̲A̲p̲p̲r̲o̲v̲a̲l̲ ̲o̲f̲ ̲C̲P̲S̲/̲2̲3̲0̲/̲I̲C̲D̲/̲0̲0̲0̲3̲

             All DNs submitted by SHAPE were resolved except for
             two open items

             -  DN25
             -  DN120/121

             -   To close those DNs CR will telex SHAPE 13/10 1980
                 and SHAPE shall respond by telex no later than
                 15/10 1980.

             -   CR will update the CPS/230/ICD/003 and airmail
                 to SHAPE 22/10 1980 for SHAPE to proofread the
                 editorial updates.



5            V̲D̲U̲ ̲M̲a̲n̲m̲a̲c̲h̲i̲n̲e̲ ̲I̲n̲t̲e̲r̲f̲a̲c̲e̲

             CR informed to SHAPE that the implementation of a more
             elaborate vdu mmi will have an impact upon contract
             shcedule and cost and will be addressed by CR in a
             package proposal to be provided by 1st week of nobember.
             Pending the CR reply, SHAPE concluded that the baseline
             for the man machine interface should remain the line-by-line
             concept as specified in CPS/230/ICD/0001.

6            R̲S̲P̲L̲

             CR handed over Issue 2 of the RSPL for SHAPE approval.

7            F̲o̲r̲m̲a̲l̲ ̲P̲r̲o̲g̲r̲e̲s̲s̲ ̲M̲e̲e̲t̲i̲n̲g̲

             The minutes of the formal progress meeting is presented
             in a separate Minutes of Meetings.

8            P̲r̲o̲g̲r̲a̲m̲ ̲I̲m̲p̲l̲e̲m̲e̲n̲t̲a̲t̲i̲o̲n̲ ̲P̲l̲a̲n̲

             The DNs are resolved and a joint understanding is being
             developed to be the basis of the contract officers
             approval of the PIP.9

9            S̲u̲b̲c̲o̲n̲t̲r̲a̲c̲t̲ ̲M̲a̲n̲a̲g̲e̲m̲e̲n̲t̲ ̲P̲l̲a̲n̲

             CR will update the subcontract management plan and
             procedures to reflect subcontracts and associated major
             milestones. It will be issued the 1/11 1980.

10           R̲e̲m̲o̲t̲e̲ ̲T̲e̲r̲m̲i̲n̲a̲l̲ ̲C̲o̲n̲c̲e̲p̲t̲

             The remote terminals will be handled as a contract
             amendment. The finalization of the contract amendments
             will take place by the end of november.

11           C̲o̲n̲f̲i̲g̲u̲r̲a̲t̲i̲o̲n̲ ̲M̲a̲n̲a̲g̲e̲m̲e̲n̲t̲ ̲P̲l̲a̲n̲

             Not covered during meeting.

12           A̲p̲p̲r̲o̲v̲a̲l̲ ̲o̲f̲ ̲H̲/̲W̲ ̲C̲o̲n̲f̲i̲g̲u̲r̲a̲t̲i̲o̲n̲

             SHAPE will provide a statement of approval/disapproval
             by 13/14 October 1980.



13           F̲r̲e̲q̲u̲e̲n̲c̲y̲ ̲S̲t̲a̲b̲i̲l̲i̲z̲e̲r̲s̲

             This topic was handled during the formal CAMPS Progress
             Review Meeting on october 9th, 1980.

             The subject of frequency stabilization will be part
             of the set of change proposals due to SHAPE in the
             1st week of november.

14           T̲e̲r̲m̲i̲n̲a̲l̲ ̲D̲e̲v̲i̲c̲e̲ ̲S̲t̲a̲n̲d̲a̲r̲d̲i̲z̲a̲t̲i̲o̲n̲

             CR will provide a summary report 14th October 1980
             and a more detailled technical report during first
             week of November. These reports will allow SHAPE to
             conclude the analysis of the Terminal standardization
             and advise CR.

             CR asked for a decision on the telex no. 37 of 29.
             August 1980. SHAPE could not offer any other answers
             than the SHAPE telex 22, which CR finds insufficient.
             CR clarified that if the standardization shall succeed
             the technical requirements put forward to CR and Burroughs
             must be the same. Therefore SHAPE needs to answer the
             CR telex No. 37.


15           O̲C̲R̲

             CR will provide SHAPE with the specification for an
             standard OCR interface defining the data formats and
             the electrical interface.

16           S̲u̲p̲e̲r̲v̲i̲s̲o̲r̲ ̲I̲C̲D̲:̲ ̲C̲P̲S̲/̲2̲3̲0̲/̲I̲C̲D̲/̲0̲0̲0̲2̲

             SHAPE has reviewed the ICD/0002 and has forwarded their
             comments. These comments were received by CR without
             the enclosures. SHAPE will clarify the situation.

17           S̲D̲S̲ ̲D̲o̲c̲u̲m̲e̲n̲t̲a̲t̲i̲o̲n̲ ̲S̲t̲a̲n̲d̲a̲r̲d̲ ̲a̲n̲d̲ ̲R̲e̲v̲i̲e̲w̲ ̲C̲r̲i̲t̲e̲r̲i̲a̲

             The SHAPE submitted input to the subject standard was
             mutually concluded to be in line with CR in house proposals.
             CR will develop a final standard. SHAPE will provide
             approval of this standard after SHAPE approval of the
             System Development Plan.



             The SDR will take place after submittal of the SDS
             on January 1st, 1981.

18           N̲A̲T̲O̲ ̲H̲Q̲ ̲C̲A̲M̲P̲S̲

             CR will participate during meeting on October 14, 1980.
             The scope of the contract amendment necessary to expand
             the number of terminals must be clearly indicated.

19           A̲t̲t̲a̲c̲h̲e̲d̲ ̲d̲o̲c̲u̲m̲e̲n̲t̲s̲