DataMuseum.dk

Presents historical artifacts from the history of:

CR80 Wang WCS documentation floppies

This is an automatic "excavation" of a thematic subset of
artifacts from Datamuseum.dk's BitArchive.

See our Wiki for more about CR80 Wang WCS documentation floppies

Excavated with: AutoArchaeologist - Free & Open Source Software.


top - download

⟦bc461b29c⟧ Wang Wps File

    Length: 5064 (0x13c8)
    Types: Wang Wps File
    Notes: ACCESS, Maintenance Req.  
    Names: »3223A «

Derivation

└─⟦563d5c4e7⟧ Bits:30006220 8" Wang WCS floppy, CR 0275A
    └─ ⟦this⟧ »3223A « 

WangText



DOC NO. 3223A
ACCESS  PART I - SYSTEM PROPOSAL                  SYS/1983-01-11
Subpart B - Requirements                                Page
 #

















MAINTENANCE REQUIREMENTS…86…1         …02…   …02…   …02…   …02…                                 
          
1        I̲N̲T̲R̲O̲D̲U̲C̲T̲I̲O̲N̲

         Christian Rovsing A/S 's support organisation Integrated
         Logistics Support Department (ILS) has the total responsibility
         for maintenance and technical support.

         The ACCESS Program is unique in that respect that it
         is the intention that Data Service Division of RCA
         Service Company will carry out equipment maintenance
         during and after warranty.

         Preventive and emergency maintenance will be specified
         in a maintenance contract between Christian Rovsing
         A/S and RCA based on the requirements stated by AFCC.
          However, it would be possible for AFCC to take over
         this maintenance contract or undertake this task after
         having received training.

         The Maintenance and Technical Support Section in PART
         II Subpart G describes the Maintenance's Planning taking
         place at Christian Rovsing A/S.  An overview of the
         maintenane documentation is presented and the maintenance
         activities at the system is described



2.       R̲E̲Q̲U̲I̲R̲E̲M̲E̲N̲T̲S̲ ̲A̲N̲A̲L̲Y̲S̲I̲S̲

         Based on the requirements stated in the RFP, Christian
         Rovsing A/S's previous experience with similar systems
         as well as RCA's proposed role as a maintenance sub-contractor,
         the following requirements can be stated:

         -   RFP page C71, para: C9 line item 0005 Maintenance

         Christian Rovsing A/S  shall provide maintenance to
         support the system performance requirements of RFP
         Section C.

         a.  There will be no use of off-site remotely accessed
             diagnostic devices connected to the system



         b.  Christian Rovsing A/S shall provide a primary and
             alternate point of contract for notification 24
             hours per day, seven days per week.

         c.  When H/W failure notifications occur within the
             PPM, display terminal, terminal printers and video
             copiers shall be replaced within two hours following
             notification. Line printers, high speed printers,
             optical character recorders, graphic digitizers,
             color cameras and color graphic copiers shall be
             repaired within eight hours following notification.
              All other components shall be repaired within
             four hours following notification.

             When H/W failure notifications occur outside the
             PPM, the equipment shall be repaired within 12
             hours or by the beginning of the next PPM whichever
             is earliest.  Calls made within 2 hours of the
             beginning of the next PPM will default to the time
             requirements in 4) above.

         d.  Each component shall be maintained to assure a
             minimum effectiveness level of 95%.

             RFP page H4-5 section H11, Replacement Parts.

             Christian Rovsing A/S guarantees component replacement
             parts shall be available to the Government for
             all items that may be ordered during the life of
             this contract.  If, for reasons beyond the Christian
             Rovsing A/S 's control, replacement parts cease
             to be available to,the Government, Christian Rovsing
             A/S agrees to provide all data necessary to enable
             manufacturing by or for the Government in accordance
             with the clause of Section I entitled "Derred Ordering
             of Technical Data or Computer Software".  Negotiations
             resulting from ordering under said clause shall
             consider both data generated under this contract
             and data developed for other purposes.  Moreover,
             Christian Rovsing A/S agrees to notify the Procuring
             Contracting Officer of component replacement parts
             no longer being available for two (2) years after
             contract expiration.

             RFP page C76 para C12 Technical Support.

             Within the PPS, three fully qualified programmers/analysts,
             experienced in the ACCESS Application Software
             and Operating System, can be placed on site.



         -   RFP, page H5 para, H13. Alterations and Attachments.

         In the event that AFCC makes alterations or install
         attachments to equipment put in place under this contract
         Christian Rovsing A/S shall respond in accordance with
         DAR 7.104.86.  Mutually agreeable arrangements for
         additional maintenance shall be made on an individual
         installation basis

         -   RFP page H9, para. H24c, Modifications.

         All modifications, except safety changes shall be accomplished
         at the site.

         -   RFP, page H12, para. H28a, Preventive Maintenance

         Christian Rovsing A/S shall recommend the frequency
         and duration of the preventive maintenance required
         for the system.  Preventive maintenance which exceeds
         its scheduled duration shall occur toward downtime.

         -   RFP, page H12, para. H23c Maintenance Responsibilities

         (1) Christian Rovsing A/S  shall provide all supplies,
             parts, tools and test equipment required for the
             maintenance of the system.

         (2) Christian Rovsing A/S  is responsible for the total
             system maintenance.…86…1         …02…   …02…   …02…   …02…