top - download
⟦bc4dfe90b⟧ Wang Wps File
Length: 1939 (0x793)
Types: Wang Wps File
Notes: Spelunked
Names: »~ORPHAN06.00«
Derivation
└─⟦27ec2f823⟧ Bits:30006056 8" Wang WCS floppy, CR 0088A
└─ ⟦this⟧ »~ORPHAN06.00«
WangText
This structure allows to
- Use the same TESTER in various tests with the same
or with different test data
- Specify dynamic load and execution of TESTERS
- Execute in paralll TESTERS with internal synchronization
- Record output data from each pass (to be deleted
after proper verification)
The Test Monitor controls only the configuration and
execution of tests, the logical contents of the tests
resides fully withi the TESTERS and the test data.
The Test Monitor controls the tests in this rather
rigid manner in order to be able to trace the result
after execution of a test.
Tests may be fully automatic or interactive/automatic.
It is possible interactiely to specify test steps to
be executed and it is possible to select parts of the
automatic sequences.
Tests may run on disk-file input/output only or may
include interactive input and operator verification
of output.
In order to allow complet documentation of tests desired
input, expected output is presented for the operator
by the TESTERS when interactive tests are conducted.
The TESTDEFinition consists of control commands for
sequences. This includes commands for load of testers
an execution of sequences (parallel or in chain).
Sequences define execution of steps for one Tester
(each Tester is subdivided into subtests executed in
steps) and synchronization of sequences (signal to
other sequence, wait for other sequence).
Testers, test data, and test results are kept in 3
levels of libraries corresponding to individual responsibility,
development team responsibility and under configuration
control.This corresponds to the levels of control on
the software (figure 4.5.2.1-2) and allows a controlled
execution of operational test, because the test procedure
is approved and under configuration control.