DataMuseum.dk

Presents historical artifacts from the history of:

CR80 Wang WCS documentation floppies

This is an automatic "excavation" of a thematic subset of
artifacts from Datamuseum.dk's BitArchive.

See our Wiki for more about CR80 Wang WCS documentation floppies

Excavated with: AutoArchaeologist - Free & Open Source Software.


top - download

⟦bdaa2d0b2⟧ Wang Wps File

    Length: 2418 (0x972)
    Types: Wang Wps File
    Notes: Spelunked
    Names: »~ORPHAN04.12«

Derivation

└─⟦e1d52bc1b⟧ Bits:30006228 8" Wang WCS floppy, CR 0137A
    └─ ⟦this⟧ »~ORPHAN04.12« 

WangText



         The Configuration Status Accounting function records
         and maintains the informaton and documentation required
         by configuration control management. It includes listings
         of approved ngineering documentation, status reports
         of proposed changes, and implementation status of approved
         changes.

         The Physical Configuration Audit (PCA) is the formal
         examination of the as-built version of a configuration
         item against its technical doumentation in order to
         establish the Configuration Item's product baseline.
         The Functional Configuration Audit (FCA) is the verification
         of the completion, or extent of completon, of all tests
         required by development specifications.

         The Configuraion Management function gets involved
         in updating of the PIP and other plans of the project
         by the fact that DATA MANAGEMENT is handled by configuration
         control.

         The changes are normally initiated through the project
         office but controlled by Confguration Management.



3.5      A̲V̲A̲I̲L̲A̲B̲I̲L̲I̲T̲Y̲

         Availability is treated in the Technical Proposal,
         section on Availability.



3.6      T̲E̲S̲T̲I̲N̲G̲ ̲A̲N̲D̲ ̲A̲C̲C̲E̲P̲T̲A̲N̲C̲E̲

         Following system integration and unit testing of each
         software module, a Factory Qualification Tet (FQT)
         is performed.  Thereafter, each MPF system will be
         subjected to a Factory Post Production Test (FPPT)
         before shipment to site for installation.


         At the site, system integration is carried out, and
         a Preliminary Site Acceptance Test (PSAT) is performed.
          Following this, a Sub-Net-Test (SNT) - Category iii
         verifies that the PF interfaces properly to the TARE
         Communication Processor Sub-System and to the Telegraph
         Message Sub-System.  Additionally, at the second site,
         a SNT - category iv verifies that the two MPF's communicate
         properly with each other, both already havng been tested
         to SNT iii.

         Finally, an Official System Acceptance Tesat (OSAT)
         is performed, and succesful completion of the OSAT
         constitutes final acceptance of the MPF by NODECA.

         The following is a list of formal tests:

         FQT Pre-Test in Copehagen

         FQT and FPPT in Copenhagen for site 101 equipment

         PSAT site 101

         SNT (iii) site 101

         FPPT in Copenhagen for site 301 equipment

         PSAT 301

         SNT (iii) site 301

         SNT (iv)

         OSAT





3.7      T̲E̲C̲H̲N̲I̲C̲A̲L̲ ̲T̲R̲A̲N̲S̲F̲E̲R̲