top - download
⟦c265ca54f⟧ Wang Wps File
Length: 3065 (0xbf9)
Types: Wang Wps File
Notes: Spelunked
Names: »~ORPHAN72.08«
Derivation
└─⟦518101e25⟧ Bits:30005806 8" Wang WCS floppy, CR 0110A
└─ ⟦this⟧ »~ORPHAN72.08«
WangText
…00……00……00……00……00…H…0a……00……00…H…0b…H…01…H…07…!…00…!…05… …09… …0e… …07……1f……0a……1f……0d……1f……01……1f……05……1e……09……1e……0e……1e……02……1e……06……1d……0a……1d……0f……1d…
…1d……07……1c……0b……1c……00……1c… …1b……08……1b……0c……1b……00……1b……06……1a……0b……1a……86…1 …02… …02… …02…
…02… CPS/TPR/005
…02… 820419…02……02…
DSMT (PROTOTYPE) HARDWARE TEST SPECIFICATION
AND PROCEDURES…02… 811218…02… CAMPS
3.7.4.3 T̲e̲s̲t̲ ̲P̲r̲o̲c̲e̲d̲u̲r̲e̲ ̲3̲
This testprocedure serves to verify the Watchdog Processor
System i.e. the Watchdog Processor Unit (WDP), the
Configuration Control Bus Adapter (CCBA), te Channel
Unit Control Panel (CUCP), the TDX Bus Switching Modules
(BSM-Xs) and the Configuration Control Adapters (CCAs).
The DSMT configuration under test is given in appendix
A.
3.7.4.3.1 T̲e̲s̲t̲ ̲S̲e̲t̲ ̲U̲p̲
One copy of the documents mentioned in sc 3.7.3 must
be present in the testroom.
The test is performed via an Operator Console (OC)
which is a printer and keyboard, a Medium Speed Printer
(MSP) with OPTO interface, a TEST VDU#1, a TEST VDU#2
and a TEST VDU#3 all with V24/V28 interface
The above mentioned testequipment is connected to the
DSMT system as follows:
1. Substitute the leftmost OPTO transceiver in
the rack C Adapter crate with a V24/V28(L/L)
adapter (1 channel), and connect the OC to
the V24 connector on the fron panel of the
adaptor.
2. Connect the MSP to the remaining OPTO transceiver
in the Adapter crate in rack C.
3. Remove the cable connected to the V24/V28(L/L)
adapter in the adapter crate pos. 18 and connect
the TEST VDU#1 instead.
4. Remov the cable connected to the V24/V28(L/L)
adapter in the adapter crate pos. 17 and connect
the TEST VDU#2 instead.…86…1 …02… …02… …02… …02…
5. Disconnect the two V24 cables connected to
the J1 and J2 connectors on the leftmost Back
Panel 8 located in the rear of the Adapter
crate.
6. Disconnect the V24 cable conneted to the MIA
in PU#1 and connect TESTCABLE#1 between above
mentioned (para. 5) J1 and the MIA.
7. Disconnect the V24 cable connected to the MIA
in PU#2 and connect TESTCABLE#2 between above
mentioned (para. 5) J2 and the MIA.
8. Disconnect he two V24 cables connected to J1
and J2 respectively on the WCA front panel
in the rear crate of the WDP.
9. Connect TESTCABLE#3 between the above mentioned
(para. 8) J1 and J2.
The testequipment is now connected to the DSMT system
as shown i fig. 3.7.4.3.1-1.
Carry out/control the following:
a) OC, TEST VDU#1, TEST VDU#2 and MSP set up:
The communication part of the OC is set to:
1) Asynchronous communication
2) 7 bit character length
3) Even parity check/generation
4)1 stop bit
5) 1200 Baud communication speed
b) Switch settings in PU#1 and PU#2 front crate modules:
1) The NRM/MAIN switch on the MAP module front
panel is set to NRM.
2) The EN/DIS switch on the MAP module front panel
is set to EN.
c)Switch settings in PU#1 and PU#2 rear crate modules:…86…1
…02… …02… …02… …02…
FIGURE 3.7.4.3.1-1
C̲o̲n̲n̲e̲c̲t̲i̲o̲n̲ ̲o̲f̲ ̲t̲h̲e̲ ̲t̲e̲s̲t̲e̲q̲u̲i̲p̲m̲e̲n̲t̲