5.9 P̲O̲W̲E̲R̲ ̲U̲P̲ ̲A̲N̲D̲ ̲C̲H̲E̲C̲K̲ ̲O̲U̲T̲
Before powering up, verify that a̲l̲l̲ ̲s̲w̲i̲t̲c̲h̲e̲s̲ on a̲l̲l̲
e̲q̲u̲i̲p̲m̲e̲n̲t̲ are i̲n̲ ̲p̲o̲s̲i̲t̲i̲o̲n̲ ̲o̲f̲f̲ or O.
5.9.1 G̲r̲o̲u̲n̲d̲i̲n̲g̲s̲
a) Measure with an Ohm-meter that no shor circuit
exists between the safety group (cabinets) and
the lines of circuit no. 1 through 9 and 1a through
3a.
b) Remount the lids of the power line filters by the
30 screws.
c) Measure with an Ohm-meter if the "Equipment Frame
Ground" (cabines) is isolated from the "Signal
Ground" (5V return).
The "Signal Ground" (GND) is found on the CCA-panel,
refer to Figure 5.9.1.
d) Start the powering up in the below sequence, starting
at the CAMPS power distribution board (PDB):
5.9.2 C̲A̲M̲S̲ ̲P̲D̲B̲
T̲U̲R̲N̲ ̲O̲N̲: Main circuit breaker
T̲U̲R̲N̲ ̲O̲N̲: Miniature circuit breakers
C̲H̲E̲C̲K̲O̲U̲T̲: No fuses in the CAMPS PDB blown due to
short circuit in the installation.
Figure 5.9.1
Front Layout for CCA