WangText
…00……00……00…+…02…+
…00……00…+ +…07…*…0f…)…08…)…02…(…0c…(…02…(…06…'…0b…'…0d…'…05…&…0d…&…0f…&…05…%…0b…%…00…%…05…%…06…$…08…$…0a…$…0c…$…0e…$…05…#…0b…#…00…#
#…07…"…08…"…0c…"…0e…"…02…"
"…07…!…09…!…0d…!…0e…!…02…! …08… …09… …0d……86…1 …02… …02… …02… …02…
…02…CRT/TSS/001
…02…GT/811123…02……02…
FACTORY ACCEPTANCE TEST SPECIFICATION
AND PROCEDURE…02…ISSUE 1…02…CRT
811022 All Original
Issue
of
Document
Issue 1 811123 SHAPE tlx
CAMPS log 408
para. 1.c 14 Reference to power input
removed.
SHAPE tlx
CAMPS log 408
para. 1.a 18, Simultaneous test of
22-24a, 8 channels
24b,
25-48,
50-52,
54-56,
58-60,
62-64,
66-68,
70-72,
74-76,
78-80,
82-84,
86-88,
90-92,
94-96,
98-101,
103-106,
108-121,
123-132,
134-137,
D1
Clarifica-
tion A3-A13 Appendix A expanded.
T̲A̲B̲L̲E̲ ̲O̲F̲ ̲C̲O̲N̲T̲E̲N̲T̲S̲
1 GENERAL .......................................
7b
1.1 PURPOSE ...................................
7b
1.2 REFERENCED DOCUMENTS ......................
7b
1.3 TERMS AND ABBREVIATIONS ...................
7b
2 REQUIREMENT MAPPING ...........................
8
2.1 VERIFICATION DEFINITIONS ..................
8
2.1.1 Examination/Inspection ................
8
2.1.2 Analysis ..............................
8
2.1.3 Test ..................................
8
2.2 VERIFICATION CLASSES ......................
9
2.3 FACTORY ACCEPTANCE TEST CROSS REFERENCE
INDEX .....................................
9
3 TEST SPECIFICATION ............................
13
3.1 TEST PURPOSE ..............................
13
3.2 REQUIREMENTS ..............................
13
3.3 TEST METHODS AND CONTSTRAINTS .............
14
3.3.1 Test Drive System .....................
14
3.3.2 Test Constraints ......................
15
3.4 TEST OBJECT IDENTIFICATION ................
15
3.5 SUPPORTING EQUIPMENT ......................
15
3.6 TEST DESCRIPTION ..........................
16
3.6.1 Test Configuration Baselines ..........
16
3.6.1.1 Baseline I: CRT Link Without
Crypto/Modem ......................
16
3.6.1.2 Baseline II: Crypto/Modem Link ....
16
3.6.1.3 Baseline III: CRT Link with
Crypto/Modem ......................
16
3.6.2 Testgroup Descriptions ................
22
3.6.2.1 Testgroup 1 .......................
22
3.6.2.2 Testgroup 2 .......................
23
4 TEST PROCEDURES ...............................
24
4.1 TESTGROUP 1 ...............................
24
4.1.1 Test of Site 2 Equipment ..............
25
4.1.1.1 Test Set-Up .......................
25
4.1.1.2 Test Initialization ...............
25
4.1.1.3 Test Steps ........................
27
4.1.1.4 Test Termination ..................
28
4.1.2 Test of Site 8 Equipment ..............
29
4.1.2.1 Test Set-Up .......................
29
4.1.2.2 Test Initialization ...............
29
4.1.2.3 Test Steps ........................
31
4.1.2.4 Test Termination ..................
32
4.1.3 Test of Site 14 Equipment .............
33
4.1.3.1 Test Set-Up .......................
33
4.1.3.2 Test Initialization ...............
33
4.1.3.3 Test Steps ........................
35
4.1.3.4 Test Termination ..................
36
4.1.4 Test of Site 9 Equipment ..............
37
4.1.4.1 Test Set-Up .......................
37
4.1.4.2 Test Initialization ...............
37
4.1.4.3 Test Steps ........................
39
4.1.4.4 Test Termination ..................
40
4.1.5 Test of Site 10 Equipment .............
41
4.1.5.1 Test Set-Up .......................
41
4.1.5.2 Test Initialization ...............
41
4.1.5.3 Test Steps ........................
43
4.1.5.4 Test Termination ..................
44
4.1.6 Test of Site 13 Equipment .............
45
4.1.6.1 Test Set-Up .......................
45
4.1.6.2 Test Initialization ...............
45
4.1.6.3 Test Steps ........................
47
4.1.6.4 Test Termination ..................
48
4.1.7 Test of Site 5A Equipment .............
49
4.1.7.1 Test Set-Up .......................
49
4.1.7.2 Test Initialization ...............
49
4.1.7.3 Test Steps ........................
51
4.1.7.4 Test Termination ..................
52
4.1.8 Test of Site 5B Equipment .............
53
4.1.8.1 Test Set-Up .......................
53
4.1.8.2 Test Initialization ...............
53
4.1.8.3 Test Steps ........................
55
4.1.8.4 Test Termination ..................
56
4.1.9 Test of Site 15A Equipment ............
57
4.1.9.1 Test Set-Up .......................
57
4.1.9.2 Test Initialization ...............
57
4.1.9.3 Test Steps ........................
59
4.1.9.4 Test Termination ..................
60
4.1.10 Test of Site 15B Equipment ............
61
4.1.10.1 Test Set-Up .......................
61
4.1.10.2 Test Initialization ...............
61
4.1.10.3 Test Steps ........................
63
4.1.10.4 Test Termination ..................
64
4.1.11 Test of Site 6A Equipment .............
65
4.1.11.1 Test Set-Up .......................
65
4.1.11.2 Test Initialization ...............
65
4.1.11.3 Test Steps ........................
67
4.1.11.4 Test Termination ..................
68
4.1.12 Test of Site 6B Equipment .............
69
4.1.12.1 Test Set-Up .......................
69
4.1.12.2 Test Initialization ...............
69
4.1.12.3 Test Steps ........................
71
4.1.12.4 Test Termination ..................
72
4.1.13 Test of Site 7A Equipment .............
73
4.1.13.1 Test Set-Up .......................
73
4.1.13.2 Test Initialization ...............
73
4.1.13.3 Test Steps ........................
75
4.1.13.4 Test Termination ..................
76
4.1.14 Test of Site 7B Equipment .............
77
4.1.14.1 Test Set-Up .......................
77
4.1.14.2 Test Initialization ...............
77
4.1.14.3 Test Steps ........................
79
4.1.14.4 Test Termination ..................
80
4.1.15 Test of Site 11A Equipment ............
81
4.1.15.1 Test Set-Up .......................
81
4.1.15.2 Test Initialization ...............
81
4.1.15.3 Test Steps ........................
83
4.1.15.4 Test Termination ..................
84
4.1.16 Test of Site 11B Equipment ............
85
4.1.16.1 Test Set-Up .......................
85
4.1.16.2 Test Initialization ...............
85
4.1.16.3 Test Steps ........................
87
4.1.16.4 Test Termination ..................
88
4.1.17 Test of Site 12A Equipment ............
89
4.1.17.1 Test Set-Up .......................
89
4.1.17.2 Test Initialization ...............
89
4.1.17.3 Test Steps ........................
91
4.1.17.4 Test Termination ..................
92
4.1.18 Test of Site 12B Equipment ............
93
4.1.18.1 Test Set-Up .......................
93
4.1.18.2 Test Initialization ...............
93
4.1.18.3 Test Steps ........................
95
4.1.18.4 Test Termination ..................
96
4.1.19 Test of Site 4A Equipment .............
97
4.1.19.1 Test Set-Up .......................
97
4.1.19.2 Test Initialization ...............
97
4.1.19.3 Test Steps ........................
100
4.1.19.4 Test Termination ..................
101
4.1.20 Test of Site 4B Equipment .............
102
4.1.20.1 Test Set-Up .......................
102
4.1.20.2 Test Initialization ...............
102
4.1.20.3 Test Steps ........................
105
4.1.20.4 Test Termination ..................
106
4.1.21 Test of Site 4C Equipment .............
107
4.1.21.1 Test Set-Up .......................
107
4.1.21.2 Test Initialization ...............
107
4.1.21.3 Test Steps ........................
110
4.1.21.4 Test Termination ..................
111
4.1.22 Test of Site 4D Equipment, Opto Lines .
112
4.1.22.1 Test Set-Up .......................
112
4.1.22.2 Test Initialization ...............
112
4.1.22.3 Test Steps ........................
115
4.1.22.4 Test Termination ..................
116
4.1.23 Test of Site 4D Equipment, V28 (L/L)
Lines .................................
117
4.1.23.1 Test Set-Up .......................
117
4.1.23.2 Test Initialization ...............
117
4.1.23.3 Test Steps ........................
120
4.1.23.4 Test Termination ..................
121
4.1.24 Test of Site 4E Equipment .............
122
4.1.24.1 Test Set-Up .......................
122
4.1.24.2 Test Initialization ...............
122
4.1.24.3 Test Steps ........................
125
4.1.24.4 Test Termination ..................
126
4.2 TESTGROUP 2 ...............................
127
4.2.1 Test of Normal Connection to 8 Channels
128
4.2.1.1 Test Set-Up .......................
128
4.2.1.2 Test Initialization ...............
128
4.2.1.3 Test Steps ........................
131
4.2.1.4 Test Termination ..................
132
4.2.2 Test of Recovery from Transmission
Errors ................................
133
4.2.2.1 Test Set-Up .......................
133
4.2.2.2 Test Initialization ...............
133
4.2.2.3 Test Steps ........................
136
4.2.2.4 Test Termination ..................
137
APPENDIX A .......................................
A1
APPENDIX B .......................................
B1
APPENDIX C .......................................
C1
APPENDIX E .......................................
D1
APPENDIX F .......................................
D2
1̲ ̲ ̲G̲E̲N̲E̲R̲A̲L̲
1.1 P̲U̲R̲P̲O̲S̲E̲
The purpose of this document is
a) To identify all requirements to be verified by
test/demonstration during the Factory Acceptance
Test (FAT)
b) To specify
1) Test methods
2) Test constraints
3) Test procedure, including specification of
required test equipment, test set-up, a step-by-step
procedure and expected test results
1.2 R̲E̲F̲E̲R̲E̲N̲C̲E̲D̲ ̲D̲O̲C̲U̲M̲E̲N̲T̲S̲
a) CRT/SDS/001
CRT System Requirement and Design Specification
b) CPS/PLN/012
CAMPS Acceptance Plan
1.3 T̲E̲R̲M̲S̲ ̲A̲N̲D̲ ̲A̲B̲B̲R̲E̲V̲I̲A̲T̲I̲O̲N̲S̲
CAMPS Computer Aided Message Processing System
CRT CAMPS Remote Terminals
SDS CRT System Requirement and Design Specification
FAT Factory Acceptance Test
2̲ ̲ ̲R̲E̲Q̲U̲I̲R̲E̲M̲E̲N̲T̲ ̲M̲A̲P̲P̲I̲N̲G̲
This section contains a listing of the CRT Requirements
as stated in the requirement and design specification
table of contents.
For each of the listed requirements a cross reference
is made indicating the planned verification method.
The resulting mapping of stated requirements is used
as basis for the elaboration of the Factory Acceptance
Test Specifications.
2.1 V̲E̲R̲I̲F̲I̲C̲A̲T̲I̲O̲N̲ ̲D̲E̲F̲I̲N̲I̲T̲I̲O̲N̲S̲
The following definitions apply for the planned verification
methods:
2.1.1 E̲x̲a̲m̲i̲n̲a̲t̲i̲o̲n̲/̲I̲n̲s̲p̲e̲c̲t̲i̲o̲n̲
This method is a non-functional verification, such
as visual inspection of the physical characteristics
of the item or of the documentation associated with
the item.
2.1.2 A̲n̲a̲l̲y̲s̲i̲s̲
This method is a non-functional verification, such
as deduction or translation of data, review of analytical
data, or performance of a detailed analysis.
2.1.3 T̲e̲s̲t̲
This method is a functional verification, such as actual
operation wherein the element of verification is instrumented,
measured, or displayed directly.
All hardware shall be tested to demonstrate its proper
functioning, its interfaces and its performance.
2.2 V̲E̲R̲I̲F̲I̲C̲A̲T̲I̲O̲N̲ ̲C̲L̲A̲S̲S̲E̲S̲
Tests to verify functional performance are class II
(External verification).
Analysis, examination and inspections are class I (Internal
verifications).
2.3 F̲A̲C̲T̲O̲R̲Y̲ ̲A̲C̲C̲E̲P̲T̲A̲N̲C̲E̲ ̲T̲E̲S̲T̲ ̲C̲R̲O̲S̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲ ̲I̲N̲D̲E̲X̲
The mapping of the SDS requirements is found on the
following pages.
S̲D̲S̲ ̲R̲E̲Q̲U̲I̲R̲E̲M̲E̲N̲T̲S̲
T̲A̲B̲L̲E̲ ̲O̲F̲ ̲C̲O̲N̲T̲E̲N̲T̲S̲
N̲/̲A̲
̲ ̲E̲X̲A̲M̲ ̲ ̲A̲N̲A̲L̲ ̲ ̲T̲E̲S̲T̲
3 REQUIREMENTS .............................
3.1 SYSTEM DEFINITION ....................
3.1.1 General Description .............. X X
3.1.2 Functional Requirements .......... X X
3.1.2.1 Remote Site Connections ...... X X
3.1.2.2 Main Site Connections ........ X X
3.1.3 Design Requirements .............. X
3.2 FUNCTIONAL PRINCIPLE .................
3.2.1 Basic Configuration .............. X
3.2.1.1 Main Site Configuration ...... X X
3.2.1.2 Remote Site Configuration .... X X
3.2.2 Reconfiguration Possibilities ....
3.2.2.1 Option 1 ..................... X
3.2.2.2 Option 2 ..................... X
3.2.3 Interface Capability ............. X X
3.2.4 Specific Equipment Characteri-
stics ............................
3.2.4.1 Crypto/Modem ................. X
3.2.4.2 Medium Speed Printers ........ X
3.2.4.3 Visual Display Units ......... X
3.3 PHYSICAL CHARACTERISTICS .............
3.3.1 Power Input ...................... X
3.3.2 Environmental Conditions ......... X
3.3.2.1 Temperature and Humidity ..... X
3.3.2.2 Dust and Fumes ............... X
3.4 SECURITY ............................. X
3.4.1 TEMPEST Acceptance ............... X
3.5 CONSTRUCTION REQUIREMENTS ............
3.5.1 General .......................... X
3.5.1.1 Equipment produced by
Christian Rovsing A/S ........ X
3.5.1.2 Equipment produced by
Subcontractors ............... X
3.5.1.3 Products from other Suppliers X
N̲/̲A̲
̲ ̲E̲X̲A̲M̲ ̲ ̲A̲N̲A̲L̲ ̲ ̲T̲E̲S̲T̲
3.5.2 Special Requirements for the
CRT System ....................... X
3.5.2.1 Utility Outlet Sockets ....... X
3.5.2.2 Bench Handling ............... X
3.5.2.3 Wiring ....................... X
3.5.2.4 Ventilation and Cooling ...... X
3.5.2.5 Nameplates and Product
Marking ...................... X
3.6 CRT DOCUMENTATION .................... X
3.6.1 Headlines to the CRT Equipment
Handbook ......................... X
3.6.2 Contents of the CRT Equipment
Handbook ......................... X
3.6.2.1 Scope of Manual .............. X
3.6.2.2 Introduction ................. X
3.6.2.3 Specifications ............... X
3.6.2.4 Connections .................. X
3.6.2.5 Detailed Functional Descrip-
tion ......................... X
3.6.2.6 Installation ................. X
3.6.2.7 Operating Instructions ....... X
3.6.2.8 Maintenance .................. X
3.6.2.9 Assembly Breakdown ........... X
3.6.2.10 Inventory .................... X
3.6.2.11 Spare Parts List ............. X
3.6.2.12 Circuit Boards and Diagrams .. X
3.6.3 Field Modification Documents ... X
3.7 LOGISTIC REQUIREMENTS ................
3.7.1 Transportation and Installation ..
3.7.1.1 Transportation ............... X
3.7.1.2 Installation .................
3.7.1.2.1 Equipment installation
at main sites ............ X
3.7.1.2.2 Equipment installation
at remote sites .......... X
3.7.1.2.3 Standards and Security ... X
3.7.1.2.4 Power Supply and Power
distribution ............. X
3.7.1.2.5 Grounding ................ X
3.7.1.2.6 Space and access ......... X
3.7.1.2.7 Site Surveys ............. X
N̲/̲A̲
̲ ̲E̲X̲A̲M̲ ̲ ̲A̲N̲A̲L̲ ̲ ̲T̲E̲S̲T̲
3.7.2 Maintenance and Support .......... X
3.7.3 Spares and Codification ..........
3.7.3.1 Supply of parts .............. X
3.7.3.2 NATO Codification ............ X
3.7.4 Training ......................... X
3̲ ̲ ̲T̲E̲S̲T̲ ̲S̲P̲E̲C̲I̲F̲I̲C̲A̲T̲I̲O̲N̲
3.1 T̲E̲S̲T̲ ̲P̲U̲R̲P̲O̲S̲E̲
The purpose of the Factory Acceptance Test is to verify
that all H/W comprising an integrated CRT configuration
fulfils the functions requirements as stated in the
SDS.
The functional requirements which can be verified by
test are subject to Factory Acceptance Test.
3.2 R̲E̲Q̲U̲I̲R̲E̲M̲E̲N̲T̲S̲
With reference to chapter 2, the functional requirements
to be verified by test/demonstration are described
in the SDS in:
3.2.1.1 Main Site Configuration
3.2.1.2 Remote Site Configuration
3.2.3 Interface capability
The functional requirements are divided into the following
capabilities to be verified by the FAT:
1) I̲n̲t̲e̲r̲f̲a̲c̲e̲ ̲t̲o̲ ̲C̲A̲M̲P̲S̲ ̲T̲D̲X̲-̲B̲u̲s̲
The ability to connect the CRT Main Site equipment
to a TDX bus (simulating CAMPS TDX buses) and thus
obtain communication with terminals connected to
the Remote Site Equipment via the multiplexed link,
shall be verified.
2) I̲n̲t̲e̲r̲f̲a̲c̲e̲ ̲t̲o̲ ̲V̲D̲U̲s̲ ̲a̲n̲d̲ ̲M̲S̲P̲s̲
The ability to connect VDUs and/or MSPs to the
V24 channels on remote site corresponding to the
CRT-LTUXs shall be tested.
3) A̲u̲x̲i̲l̲i̲a̲r̲y̲ ̲a̲n̲d̲ ̲O̲C̲R̲ ̲C̲h̲a̲n̲n̲e̲l̲s̲
The possibility of performing communication on
the auxiliary V24 channels (the channels normally
connected to CAMPS expansion LTUXs) shall be demonstrated.
The same applies to the channel reserved for the
future positioning of an OCR. Throughout this test
specification and procedure, this channel is treated
and nominated as an auxiliary channel
4) S̲t̲a̲t̲i̲s̲t̲i̲c̲a̲l̲ ̲M̲u̲l̲t̲i̲p̲l̲e̲x̲e̲r̲ ̲C̲o̲n̲t̲r̲o̲l̲ ̲F̲u̲n̲c̲t̲i̲o̲n̲s̲
This test shall verify the ability of the Statistical
Multiplexer to:
a) perform traffic flow control to overcome a
data peak load effect
b) recover from a transmission error on the mux-line.
5) I̲n̲t̲e̲r̲f̲a̲c̲e̲ ̲t̲o̲ ̲C̲r̲y̲p̲t̲o̲/̲M̲o̲d̲e̲m̲
Provided the cryptos and modems are available,
the ability to perform the mux-line communication
via a Crypto/Modem link shall be demonstrated.
3.3 T̲E̲S̲T̲ ̲M̲E̲T̲H̲O̲D̲S̲ ̲A̲N̲D̲ ̲C̲O̲N̲S̲T̲R̲A̲I̲N̲T̲S̲
The functional characteristics of the CRT H/W will
be checked by aid of a Test Drive System executing
the necessary test drive software. The verification
of the requirements is accomplished by successful execution
of the test drive software.
3.3.1 T̲e̲s̲t̲ ̲D̲r̲i̲v̲e̲ ̲S̲y̲s̲t̲e̲m̲
A special Test Drive System will be set up to simulate
the interface to CAMPS via the TDX Bus.
The Test Drive System is based on a CR80S computer
system with interface to a single TDX-BUS. The TDX-Controller
is also part of the Test Drive System. For a detailed
description of the Test Drive System, refer to Appendix
A.
3.3.2 T̲e̲s̲t̲ ̲C̲o̲n̲s̲t̲r̲a̲i̲n̲t̲s̲
1) As the Test Drive System only will support a single
TDX-Bus, the selection of active TDX-Bus for the
CRT system will be performed manually by having
the Mode select switch on the front panel of the
BSM-X in position Manual.
2) The firmware used in the LTUX-Ss under test is
a preliminary version.
3.4 T̲E̲S̲T̲ ̲O̲B̲J̲E̲C̲T̲ ̲I̲D̲E̲N̲T̲I̲F̲I̲C̲A̲T̲I̲O̲N̲
Each set of Remote Site equipment together with the
associated Main Site equipment forms a H/W configuration,
in the following referred to as a site configuration.
The test verifying the interface to CAMPS TDX-bus,
Crypto/Modem and terminals, and the ability of the
Stat. Mux. to perform traffic flow control will be
conducted for each individual site configuration.
The tests to verify the communication on the Auxiliary
channels and the ability of Statistical Multiplexer
to recover from transmission errors will only be conducted
to a single site configuration.
3.5 S̲U̲P̲P̲O̲R̲T̲I̲N̲G̲ ̲E̲Q̲U̲I̲P̲M̲E̲N̲T̲
The Test Drive system is described in Appendix A.
The Terminal Equipment is described in Appendix B.
The Interface Equipmnt is described in Appendix C.
3.6 T̲E̲S̲T̲ ̲D̲E̲S̲C̲R̲I̲P̲T̲I̲O̲N̲
3.6.1 T̲e̲s̲t̲ ̲C̲o̲n̲f̲i̲g̲u̲r̲a̲t̲i̲o̲n̲ ̲B̲a̲s̲e̲l̲i̲n̲e̲s̲
For the purpose of this test, 3 different test configuration
baselines are defined:
I CRT link without Crypto/Modem
II Crypto/Modem link
III CRT link with Crypto/Modem.
The baselines are depicted in figure 3.6-1.
3.6.1.1 B̲a̲s̲e̲l̲i̲n̲e̲ ̲I̲:̲ ̲C̲R̲T̲ ̲L̲i̲n̲k̲ ̲W̲i̲t̲h̲o̲u̲t̲ ̲C̲r̲y̲p̲t̲o̲/̲M̲o̲d̲e̲m̲
Baseline I is used for preliminary tests to verify
the CRT equipment.
It will also be used during the Factory Acceptance
Test if the Crypto or Modem equipment is unavailable.
3.6.1.2 B̲a̲s̲e̲l̲i̲n̲e̲ ̲I̲I̲:̲ ̲C̲r̲y̲p̲t̲o̲/̲M̲o̲d̲e̲m̲ ̲L̲i̲n̲k̲
Baseline II is used to verify the crypto and modem
equipment prior to integration with CRT equipment.
CR is not responsible for verification of Crypto and
Modem Equipment.
3.6.1.3 B̲a̲s̲e̲l̲i̲n̲e̲ ̲I̲I̲I̲:̲ ̲C̲R̲T̲ ̲L̲i̲n̲k̲ ̲w̲i̲t̲h̲ ̲C̲r̲y̲p̲t̲o̲/̲M̲o̲d̲e̲m̲
Baseline III will be used for the Factory Acceptance
Test unless the Crypto or Modem equipment is unavailable.
In case an error is detected during the test, baseline
III will be split into baselines I and II to locate
the error.
TEST CONFIGURATION BASELINE I AND III, OVERALL
…01…FIGURE 3.6-1 (SHEET 1 OF 5)
TEST CONFIGURATION FOR FACTORY ACCEPTANCE TEST
Equipment marked with $ is supporting equipment
Equipment marked with * is not used during the test.
TEST CONFIGURATION BASELINE I AND III; MAIN SITE EQUIPMENT…01…
FIGURE 3.6-1 (SHEET 2 OF 5)
TEST CONFIGURATION FOR FACTORY ACCEPTANCE TEST
…01…TEST CONFIGURATION BASELINE I AND III, REMOTE SITE EQUIPMENT
…01…FIGURE 3.6-1 (SHEET 3 OF 5)
TEST CONFIGURATION FOR FACTORY ACCEPTANCE TEST
Note: The mode selection switches in the Stat. Mux.
shall be set to utilize V24 circuit 113 instead
of circuit 114. Otherwise an external clock
generator shall be used to generate clocksignal
for circuits 114 and 115.
…01…TEST CONFIGURATION BASELINE I, INTERFACE EQUIPMENT
…01…FIGURE 3.6-1 (SHEET 4 OF 5)
TEST CONFIGURATION FOR FACTORY ACCEPTANCE TEST
TEST CONFIGURATION BASELINE II (AND II), INTERFACE EQUIPMENT
…01…FIGURE 3.6-1 (SHEET 5 OF 5)
TEST CONFIGURATION FOR FACTORY ACCEPTANCE TEST
3.6.2 T̲e̲s̲t̲g̲r̲o̲u̲p̲ ̲D̲e̲s̲c̲r̲i̲p̲t̲i̲o̲n̲s̲
The tests to be performed at the FAT are divided in
2 testgroups. Within each testgroup, the wiring of
the CRT equipment and the nubmer of connected VDUs
and MSPs is not changed.
3.6.2.1 T̲e̲s̲t̲g̲r̲o̲u̲p̲ ̲1̲
The tests performed in this testgroup will give a verification
of the interface to the TDX-bus and to the number of
terminals which will communicate with the CRT-LTUXs
(ref. CRT/SDS/001) the interface to Crypto/Modem and
the ability of the Stat. Mux. to perform flow control
and to multiplex/demultiplex 8 V24 channels. 6 VDUs
and 2 MSPs will be used for connection to the remote
site equipment. For all the VDUs it shall be verified
that data can be transferred to and from the VDU. For
the MSPs, data will only be transmitted to the MSP.
It is verified that all data are transmitted to/from
the terminals even in a peak load situation. To be
able to support the auxillary V24 channels, an additional
LTUX will be used together with the main site equipment,
for sites where only one LTUX is provided. For sites
where more than one LTUX is provided, the LTUX not
subject to test will be used as supporting equipment.
a) T̲e̲s̲t̲ ̲C̲o̲n̲t̲r̲o̲l̲
The tests are initiated on the terminal attached
to the test drive system. The test program controls
the execution of the test.
b) I̲n̲p̲u̲t̲ ̲D̲a̲t̲a̲
Input data is supplied by the test drive system.
c) I̲n̲p̲u̲t̲ ̲C̲o̲m̲m̲a̲n̲d̲s̲
The test drive system will supply the commands,
necessary to control the terminals.
d) O̲u̲t̲p̲u̲t̲ ̲D̲a̲t̲a̲
Output data to the terminals will be visualized
on the terminals. Data returned from a VDU will
be compared with the expected data in the test
drive system.
e) T̲e̲s̲t̲ ̲S̲t̲a̲t̲u̲s̲
The current Test Status will be printed on the
terminal attached to the test drive system.
3.6.2.2 T̲e̲s̲t̲g̲r̲o̲u̲p̲ ̲2̲
The tests performed in this testgroup will give a verification
of the ability of the Statistical Multiplexer to recover
from a transmission error. By a short disconnection
of the mux-line it is verified that the Stat. Mux.
can recover from a transmission error.
a) T̲e̲s̲t̲ ̲C̲o̲n̲t̲r̲o̲l̲
The tests are initiated on the terminal attached
to the test drive system. The test program controls
the execution of the test.
b) I̲n̲p̲u̲t̲ ̲D̲a̲t̲a̲
Input data is supplied by the test drive system.
c) I̲n̲p̲u̲t̲ ̲C̲o̲m̲m̲a̲n̲d̲s̲
The test drive system will supply the commands
necessary to control the terminals.
d) O̲u̲t̲p̲u̲t̲ ̲D̲a̲t̲a̲
Output data to the terminals will be visualized
on the terminals. Data returned from a VDU will
be compared with the expected data in the test
drive system.
e) T̲e̲s̲t̲ ̲S̲t̲a̲t̲u̲s̲
The current test status will be printed on the
terminal attached to the test drive system.
4̲ ̲ ̲T̲E̲S̲T̲ ̲P̲R̲O̲C̲E̲D̲U̲R̲E̲S̲
4.1 T̲E̲S̲T̲G̲R̲O̲U̲P̲ ̲1̲
The tests within this testgroup are performed for each
set of Remote Site equipment together with its associated
Main Site equipment.
Several CRT H/W capabilities are demonstrated by the
single tests, due to the configuration.
With reference to the SDS, the following capabilities
of the Main Site Configuration (SDS para. 3.2.1.1)
are demonstrated.
1) Point a: Connection to TDX bus
Reason: The Test Drive System is connected
via a TDX bus.
2) Point b and c1: Channel multiplexing of 8 V24 channels.
Reason: The 8 V24 channels are transmited
on a single mux-line.
3) Point c3: Traffic flow control
Reason: The amount of data transmitted
from the LTUX, if traffic flow
control was not performed, exceeds
the amount of data which can be
transmitted on the mux-line or
buffered in the Stat. Mux.
The following capabilities of the Remote Site Configuration
(SDS para 3.2.1.2) are demonstrated:
1) Point b: Channel demultiplexing of 8 V24
channels.
Reason: Data received on the single mux-line
are transmitted to 8 terminals.
The following Interface Capabilities (SDS para. 3.2.3)
are demonstrated:
1) VDUs with OPTO-interface
Reason: 4 VDUs with opto interface are
connected to the Remote Site Equipment.
2) VDUs and MSPs with V28 interface
Reason: 2 VDUs and 2 MSPs are connected
to the auxillary channels at Remote
Site.
3) Auxillary channels
Reason: A supporting LTUX supplies data
to the auxillary channels at Main
Site and Terminals are connected
at Remote Site.
4) Crypto/Modem
Reason: The crypto is used for he mux-line
communication, if available.
4.1.1 T̲e̲s̲t̲ ̲o̲f̲ ̲S̲i̲t̲e̲ ̲2̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲
4.1.1.1 T̲e̲s̲t̲ ̲S̲e̲t̲-̲U̲p̲
1 Connect the equipment under test with the supporting
equipment as shown in figure 4.1.1-1.
2.1 Check the LTUX-S configuration. The correct configuration
is described in Appendix A para. 3.1.1.
The device number of the LTUX-S under test shall
be 13…0f…H…0e…. The supporting LTUX-S shall be set to 14…0f…H…0e….
2.2 Check that the Stat. Mux. configuration is in accordance
with the description of Appendix E.
3 Set the Mode select switch on the BSM-X to "MAN"
and the Bus select switch to "1".
4 Turn power on supporting equipment.
5 Turn power on equipment under test.
6 Boot test drive system as described in Appendix
F, part I.
4.1.1.2 T̲e̲s̲t̲ ̲I̲n̲i̲t̲i̲a̲l̲i̲z̲a̲t̲i̲o̲n̲
Perform initialization as described in Appendix F,
Part II.
FIGURE 4.1.1-1…01…TEST CONFIGURATION SITE 2
4.1.1.3 T̲e̲s̲t̲ ̲S̲t̲e̲p̲s̲
G̲R̲O̲U̲P̲/̲T̲E̲S̲T̲ ̲N̲O̲.̲:̲ 1/1
F̲U̲N̲C̲T̲I̲O̲N̲:̲ Interface to TDX-bus, CRT channels,
and Crypto/Modem, and Stat. Mux. Multiplexing
Traffic flow control
R̲E̲F̲.̲ ̲S̲D̲S̲ ̲P̲A̲R̲A̲:̲ 3.2.1.1, 3.2.1.2, and 3.2.3
D̲A̲T̲E̲:̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
PROC. ACTION EXPECTED RESULT
STEP
NO.
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
1 Start up the test by Print out on the Line
writing: Pinter identical with
DO DELTA.TEST ̲4 CR the print out in Appendix
on the console D, apart from the time
indication
COMMENTS
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
TEST WITNESSES
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
TEST QA GQAR
4.1.1.4 T̲e̲s̲t̲ ̲T̲e̲r̲m̲i̲n̲a̲t̲i̲o̲n̲
1 When the line printer connected to the test drive
system has stopped, the print out is ready for
comparison with the listing of Appendix D.
2 Close-down by
2.1 Remove the discettes from the floppy-drive.
2.2 Turn power off the equipment under test.
2.3 Turn power off the supporting equipment.
4.1.2 T̲e̲s̲t̲ ̲o̲f̲ ̲S̲i̲t̲e̲ ̲8̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲
4.1.2.1 T̲e̲s̲t̲ ̲S̲e̲t̲-̲U̲p̲
1 Connect the equipment under test with the supporting
equipment as shown in figure 4.1.2-1.
2.1 Check the LTUX-S configuration. The correct configuration
is described in Appendix A para. 3.1.1.
The device number of the LTUX-S under test shall
be 13…0f…H…0e…. The supporting LTUX-S shall be set to 14…0f…H…0e….
2.2 Check that the Stat. Mux. configuration is in accordance
with the description of Appendix E.
3 Set the Mode select switch on the BSM-X to "MAN"
and the Bus select switch to "1".
4 Turn power on supporting equipment.
5 Turn power on equipment under test.
6 Boot test drive system as described in Appendix
F, part I.
4.1.2.2 T̲e̲s̲t̲ ̲I̲n̲i̲t̲i̲a̲l̲i̲z̲a̲t̲i̲o̲n̲
Perform initialization as described in Appendix F,
Part II.
FIGURE 4.1.2-1…01…TEST CONFIGURATION SITE 8
4.1.2.3 T̲e̲s̲t̲ ̲S̲t̲e̲p̲s̲
G̲R̲O̲U̲P̲/̲T̲E̲S̲T̲ ̲N̲O̲.̲:̲ 1/2
F̲U̲N̲C̲T̲I̲O̲N̲:̲ Interface to TDX-bus, CRT channels,
and Crypto/Modem, and Stat. Mux. Multiplexing
Traffic flow control
R̲E̲F̲.̲ ̲S̲D̲S̲ ̲P̲A̲R̲A̲:̲ 3.2.1.1, 3.2.1.2, and 3.2.3
D̲A̲T̲E̲:̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
PROC. ACTION EXPECTED RESULT
STEP
NO.
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
1 Start up the test by Print out on the Line
writing: Pinter identical with
DO DELTA.TEST ̲4 CR the print out in Appendix
on the console D, apart from the time
indication
COMMENTS
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
TEST WITNESSES
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
TEST QA GQAR
4.1.2.4 T̲e̲s̲t̲ ̲T̲e̲r̲m̲i̲n̲a̲t̲i̲o̲n̲
1 When the line printer connected to the test drive
system has stopped, the print out is ready for
comparison with the listing of Appendix D.
2 Close-down by
2.1 Remove the discettes from the floppy-drive.
2.2 Turn power off the equipment under test.
2.3 Turn power off the supporting equipment.
4.1.3 T̲e̲s̲t̲ ̲o̲f̲ ̲S̲i̲t̲e̲ ̲1̲4̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲
4.1.3.1 T̲e̲s̲t̲ ̲S̲e̲t̲-̲U̲p̲
1 Connect the equipment under test with the supporting
equipment as shown in figure 4.1.3-1.
2.1 Check the LTUX-S configuration. The correct configuration
is described in Appendix A para. 3.1.1.
The device number of the LTUX-S under test shall
be 13…0f…H…0e…. The supporting LTUX-S shall be set to 14…0f…H…0e….
2.2 Check that the Stat. Mux. configuration is in accordance
with the description of Appendix E.
3 Set the Mode select switch on the BSM-X to "MAN"
and the Bus select switch to "1".
4 Turn power on supporting equipment.
5 Turn power on equipment under test.
6 Boot test drive system as described in Appendix
F, part I.
4.1.3.2 T̲e̲s̲t̲ ̲I̲n̲i̲t̲i̲a̲l̲i̲z̲a̲t̲i̲o̲n̲
Perform initialization as described in Appendix F,
Part II.
FIGURE 4.1.3-1…01…TEST CONFIGURATION SITE 14
4.1.3.3 T̲e̲s̲t̲ ̲S̲t̲e̲p̲s̲
G̲R̲O̲U̲P̲/̲T̲E̲S̲T̲ ̲N̲O̲.̲:̲ 1/3
F̲U̲N̲C̲T̲I̲O̲N̲:̲ Interface to TDX-bus, CRT channels,
and Crypto/Modem, and Stat. Mux. Multiplexing
Traffic flow control
R̲E̲F̲.̲ ̲S̲D̲S̲ ̲P̲A̲R̲A̲:̲ 3.2.1.1, 3.2.1.2, and 3.2.3
D̲A̲T̲E̲:̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
PROC. ACTION EXPECTED RESULT
STEP
NO.
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
1 Start up the test by Print out on the Line
writing: Pinter identical with
DO DELTA.TEST ̲4 CR the print out in Appendix
on the console D, apart from the time
indication
COMMENTS
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
TEST WITNESSES
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
TEST QA GQAR
4.1.3.4 T̲e̲s̲t̲ ̲T̲e̲r̲m̲i̲n̲a̲t̲i̲o̲n̲
1 When the line printer connected to the test drive
system has stopped, the print out is ready for
comparison with the listing of Appendix D.
2 Close-down by
2.1 Remove the discettes from the floppy-drive.
2.2 Turn power off the equipment under test.
2.3 Turn power off the supporting equipment.
4.1.4 T̲e̲s̲t̲ ̲o̲f̲ ̲S̲i̲t̲e̲ ̲9̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲
4.1.4.1 T̲e̲s̲t̲ ̲S̲e̲t̲-̲U̲p̲
1 Connect the equipment under test with the supporting
equipment as shown in figure 4.1.4-1.
2.1 Check the LTUX-S configuration. The correct configuration
is described in Appendix A para. 3.1.1.
The device number of the LTUX-S under test shall
be 13…0f…H…0e…. The supporting LTUX-S shall be set to 14…0f…H…0e….
2.2 Check that the Stat. Mux. configuration is in accordance
with the description of Appendix E.
3 Set the Mode select switch on the BSM-X to "MAN"
and the Bus select switch to "1".
4 Turn power on supporting equipment.
5 Turn power on equipment under test.
6 Boot test drive system as described in Appendix
F, part I.
4.1.4.2 T̲e̲s̲t̲ ̲I̲n̲i̲t̲i̲a̲l̲i̲z̲a̲t̲i̲o̲n̲
Perform initialization as described in Appendix F,
Part II.
FIGURE 4.1.4-1…01…TEST CONFIGURATION SITE 9
4.1.4.3 T̲e̲s̲t̲ ̲S̲t̲e̲p̲s̲
G̲R̲O̲U̲P̲/̲T̲E̲S̲T̲ ̲N̲O̲.̲:̲ 1/4
F̲U̲N̲C̲T̲I̲O̲N̲:̲ Interface to TDX-bus, CRT channels,
and Crypto/Modem, and Stat. Mux. Multiplexing
Traffic flow control
R̲E̲F̲.̲ ̲S̲D̲S̲ ̲P̲A̲R̲A̲:̲ 3.2.1.1, 3.2.1.2, and 3.2.3
D̲A̲T̲E̲:̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
PROC. ACTION EXPECTED RESULT
STEP
NO.
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
1 Start up the test by Print out on the Line
writing: Pinter identical with
DO DELTA.TEST ̲4 CR the print out in Appendix
on the console D, apart from the time
indication
COMMENTS
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
TEST WITNESSES
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
TEST QA GQAR
4.1.4.4 T̲e̲s̲t̲ ̲T̲e̲r̲m̲i̲n̲a̲t̲i̲o̲n̲
1 When the line printer connected to the test drive
system has stopped, the print out is ready for
comparison with the listing of Appendix D.
2 Close-down by
2.1 Remove the discettes from the floppy-drive.
2.2 Turn power off the equipment under test.
2.3 Turn power off the supporting equipment.
4.1.5 T̲e̲s̲t̲ ̲o̲f̲ ̲S̲i̲t̲e̲ ̲1̲0̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲
4.1.5.1 T̲e̲s̲t̲ ̲S̲e̲t̲-̲U̲p̲
1.1 Connect the Power Line Transformator input to 220V/50Hz
and adjust to 240V + 1%/-1% output.
1.2 Connect the equipment under test with the supporting
equipment as shown in figure 4.1.5-1.
2.1 Check the LTUX-S configuration. The correct configuration
is described in Appendix A para. 3.1.1.
The device number of the LTUX-S under test shall
be 13…0f…H…0e…. The supporting LTUX-S shall be set to 14…0f…H…0e….
2.2 Check that the Stat. Mux. configuration is in accordance
with the description of Appendix E.
3 Set the Mode select switch on the BSM-X to "MAN"
and the Bus select switch to "1".
4 Turn power on supporting equipment.
5 Turn power on equipment under test.
6 Boot test drive system as described in Appendix
F, part I.
4.1.5.2 T̲e̲s̲t̲ ̲I̲n̲i̲t̲i̲a̲l̲i̲z̲a̲t̲i̲o̲n̲
Perform initialization as described in Appendix F,
Part II.
FIGURE 4.1.5-1…01…TEST CONFIGURATION SITE 10
4.1.5.3 T̲e̲s̲t̲ ̲S̲t̲e̲p̲s̲
G̲R̲O̲U̲P̲/̲T̲E̲S̲T̲ ̲N̲O̲.̲:̲ 1/5
F̲U̲N̲C̲T̲I̲O̲N̲:̲ Interface to TDX-bus, CRT channels,
and Crypto/Modem, and Stat. Mux. Multiplexing
Traffic flow control
R̲E̲F̲.̲ ̲S̲D̲S̲ ̲P̲A̲R̲A̲:̲ 3.2.1.1, 3.2.1.2, and 3.2.3
D̲A̲T̲E̲:̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
PROC. ACTION EXPECTED RESULT
STEP
NO.
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
1 Start up the test by Print out on the Line
writing: Pinter identical with
DO DELTA.TEST ̲4 CR the print out in Appendix
on the console D, apart from the time
indication
COMMENTS
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
TEST WITNESSES
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
TEST QA GQAR
4.1.5.4 T̲e̲s̲t̲ ̲T̲e̲r̲m̲i̲n̲a̲t̲i̲o̲n̲
1 When the line printer connected to the test drive
system has stopped, the print out is ready for
comparison with the listing of Appendix D.
2 Close-down by
2.1 Remove the discettes from the floppy-drive.
2.2 Turn power off the equipment under test.
2.3 Turn power off the supporting equipment.
4.1.6 T̲e̲s̲t̲ ̲o̲f̲ ̲S̲i̲t̲e̲ ̲1̲3̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲
4.1.6.1 T̲e̲s̲t̲ ̲S̲e̲t̲-̲U̲p̲
1 Connect the equipment under test with the supporting
equipment as shown in figure 4.1.6-1.
2.1 Check the LTUX-S configuration. The correct configuration
is described in Appendix A para. 3.1.1.
The device number of the LTUX-S under test shall
be 13…0f…H…0e…. The supporting LTUX-S shall be set to 14…0f…H…0e….
2.2 Check that the Stat. Mux. configuration is in accordance
with the description of Appendix E.
3 Set the Mode select switch on the BSM-X to "MAN"
and the Bus select switch to "1".
4 Turn power on supporting equipment.
5 Turn power on equipment under test.
6 Boot test drive system as described in Appendix
F, part I.
4.1.6.2 T̲e̲s̲t̲ ̲I̲n̲i̲t̲i̲a̲l̲i̲z̲a̲t̲i̲o̲n̲
Perform initialization as described in Appendix F,
Part II.
FIGURE 4.1.6-1…01…TEST CONFIGURATION SITE 13
4.1.6.3 T̲e̲s̲t̲ ̲S̲t̲e̲p̲s̲
G̲R̲O̲U̲P̲/̲T̲E̲S̲T̲ ̲N̲O̲.̲:̲ 1/6
F̲U̲N̲C̲T̲I̲O̲N̲:̲ Interface to TDX-bus, CRT channels,
and Crypto/Modem, and Stat. Mux. Multiplexing
Traffic flow control
R̲E̲F̲.̲ ̲S̲D̲S̲ ̲P̲A̲R̲A̲:̲ 3.2.1.1, 3.2.1.2, and 3.2.3
D̲A̲T̲E̲:̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
PROC. ACTION EXPECTED RESULT
STEP
NO.
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
1 Start up the test by Print out on the Line
writing: Pinter identical with
DO DELTA.TEST ̲4 CR the print out in Appendix
on the console D, apart from the time
indication
COMMENTS
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
TEST WITNESSES
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
TEST QA GQAR
4.1.6.4 T̲e̲s̲t̲ ̲T̲e̲r̲m̲i̲n̲a̲t̲i̲o̲n̲
1 When the line printer connected to the test drive
system has stopped, the print out is ready for
comparison with the listing of Appendix D.
2 Close-down by
2.1 Remove the discettes from the floppy-drive.
2.2 Turn power off the equipment under test.
2.3 Turn power off the supporting equipment.
4.1.7 T̲e̲s̲t̲ ̲o̲f̲ ̲S̲i̲t̲e̲ ̲5̲A̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲
4.1.7.1 T̲e̲s̲t̲ ̲S̲e̲t̲-̲U̲p̲
1 Connect the equipment under test with the supporting
equipment as shown in figure 4.1.7-1.
2.1 Check the LTUX-S configuration. The correct configuration
is described in Appendix A para. 3.1.1.
The device no. of LTUX-S no. 1 shall be set to
13…0f…H…0e… and for LTUX-S no. 2 to 14…0f…H…0e….
2.2 Check that the Stat. Mux. configuration is in accordance
with the description of Appendix E.
3 Set the Mode select switch on the BSM-X to "MAN"
and the Bus select switch to "1".
4 Turn power on supporting equipment.
5 Turn power on equipment under test.
6 Boot test drive system as described in Appendix
F, part I.
4.1.7.2 T̲e̲s̲t̲ ̲I̲n̲i̲t̲i̲a̲l̲i̲z̲a̲t̲i̲o̲n̲
Perform initialization as described in Appendix F,
Part II.
FIGURE 4.1.7-1 TEST
CONFIGURATION
SITE
5A
4.1.7.3 T̲e̲s̲t̲ ̲S̲t̲e̲p̲s̲
G̲R̲O̲U̲P̲/̲T̲E̲S̲T̲ ̲N̲O̲.̲:̲ 1/7
F̲U̲N̲C̲T̲I̲O̲N̲:̲ Interface to TDX-bus, CRT channels,
and Crypto/Modem, and Stat. Mux. Multiplexing
Traffic flow control
R̲E̲F̲.̲ ̲S̲D̲S̲ ̲P̲A̲R̲A̲:̲ 3.2.1.1, 3.2.1.2, and 3.2.3
D̲A̲T̲E̲:̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
PROC. ACTION EXPECTED RESULT
STEP
NO.
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
1 Start up the test by Print out on the Line
writing: Pinter identical with
DO DELTA.TEST ̲4 CR the print out in Appendix
on the console D, apart from the time
indication
COMMENTS
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
TEST WITNESSES
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
TEST QA GQAR
4.1.7.4 T̲e̲s̲t̲ ̲T̲e̲r̲m̲i̲n̲a̲t̲i̲o̲n̲
1 When the line printer connected to the test drive
system has stopped, the print out is ready for
comparison with the listing of Appendix D.
2 Close-down by
2.1 Remove the discettes from the floppy-drive.
2.2 Turn power off the equipment under test.
2.3 Turn power off the supporting equipment.
4.1.8 T̲e̲s̲t̲ ̲o̲f̲ ̲S̲i̲t̲e̲ ̲5̲B̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲
4.1.8.1 T̲e̲s̲t̲ ̲S̲e̲t̲-̲U̲p̲
1 Connect the equipment under test with the supporting
equipment as shown in figure 4.1.8-1.
2.1 Check the LTUX-S configuration. The correct configuration
is described in Appendix A para. 3.1.1.
The device no. of LTUX-S no. 1 shall be set to
14…0f…H…0e… and for LTUX-S no. 2 to 13…0f…H…0e….
2.2 Check that the Stat. Mux. configuration is in accordance
with the description of Appendix E.
3 Set the Mode select switch on the BSM-X to "MAN"
and the Bus select switch to "1".
4 Turn power on supporting equipment.
5 Turn power on equipment under test.
6 Boot test drive system as described in Appendix
F, part I.
4.1.8.2 T̲e̲s̲t̲ ̲I̲n̲i̲t̲i̲a̲l̲i̲z̲a̲t̲i̲o̲n̲
Perform initialization as described in Appendix F,
Part II.
FIGURE 4.1.8-1 TEST
CONFIGURATION
SITE
5B
4.1.8.3 T̲e̲s̲t̲ ̲S̲t̲e̲p̲s̲
G̲R̲O̲U̲P̲/̲T̲E̲S̲T̲ ̲N̲O̲.̲:̲ 1/8
F̲U̲N̲C̲T̲I̲O̲N̲:̲ Interface to TDX-bus, CRT channels,
and Crypto/Modem, and Stat. Mux. Multiplexing
Traffic flow control
R̲E̲F̲.̲ ̲S̲D̲S̲ ̲P̲A̲R̲A̲:̲ 3.2.1.1, 3.2.1.2, and 3.2.3
D̲A̲T̲E̲:̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
PROC. ACTION EXPECTED RESULT
STEP
NO.
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
1 Start up the test by Print out on the Line
writing: Pinter identical with
DO DELTA.TEST ̲4 CR the print out in Appendix
on the console D, apart from the time
indication
COMMENTS
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
TEST WITNESSES
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
TEST QA GQAR
4.1.8.4 T̲e̲s̲t̲ ̲T̲e̲r̲m̲i̲n̲a̲t̲i̲o̲n̲
1 When the line printer connected to the test drive
system has stopped, the print out is ready for
comparison with the listing of Appendix D.
2 Close-down by
2.1 Remove the discettes from the floppy-drive.
2.2 Turn power off the equipment under test.
2.3 Turn power off the supporting equipment.
4.1.9 T̲e̲s̲t̲ ̲o̲f̲ ̲S̲i̲t̲e̲ ̲1̲5̲A̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲
4.1.9.1 T̲e̲s̲t̲ ̲S̲e̲t̲-̲U̲p̲
1 Connect the equipment under test with the supporting
equipment as shown in figure 4.1.9-1.
2.1 Check the LTUX-S configuration. The correct configuration
is described in Appendix A para. 3.1.1.
The device no. of LTUX-S no. 1 shall be set to
13…0f…H…0e… and for LTUX-S no. 2 to 14…0f…H…0e….
2.2 Check that the Stat. Mux. configuration is in accordance
with the description of Appendix E.
3 Set the Mode select switch on the BSM-X to "MAN"
and the Bus select switch to "1".
4 Turn power on supporting equipment.
5 Turn power on equipment under test.
6 Boot test drive system as described in Appendix
F, part I.
4.1.9.2 T̲e̲s̲t̲ ̲I̲n̲i̲t̲i̲a̲l̲i̲z̲a̲t̲i̲o̲n̲
Perform initialization as described in Appendix F,
Part II.
FIGURE 4.1.9-1
TEST CONFIGURATION SITE 15A
4.1.9.3 T̲e̲s̲t̲ ̲S̲t̲e̲p̲s̲
G̲R̲O̲U̲P̲/̲T̲E̲S̲T̲ ̲N̲O̲.̲:̲ 1/9
F̲U̲N̲C̲T̲I̲O̲N̲:̲ Interface to TDX-bus, CRT channels,
and Crypto/Modem, and Stat. Mux. Multiplexing
Traffic flow control
R̲E̲F̲.̲ ̲S̲D̲S̲ ̲P̲A̲R̲A̲:̲ 3.2.1.1, 3.2.1.2, and 3.2.3
D̲A̲T̲E̲:̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
PROC. ACTION EXPECTED RESULT
STEP
NO.
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
1 Start up the test by Print out on the Line
writing: Pinter identical with
DO DELTA.TEST ̲4 CR the print out in Appendix
on the console D, apart from the time
indication
COMMENTS
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
TEST WITNESSES
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
TEST QA GQAR
4.1.9.4 T̲e̲s̲t̲ ̲T̲e̲r̲m̲i̲n̲a̲t̲i̲o̲n̲
1 When the line printer connected to the test drive
system has stopped, the print out is ready for
comparison with the listing of Appendix D.
2 Close-down by
2.1 Remove the discettes from the floppy-drive.
2.2 Turn power off the equipment under test.
2.3 Turn power off the supporting equipment.
4.1.10 T̲e̲s̲t̲ ̲o̲f̲ ̲S̲i̲t̲e̲ ̲1̲5̲B̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲
4.1.10.1 T̲e̲s̲t̲ ̲S̲e̲t̲-̲U̲p̲
1 Connect the equipment under test with the supporting
equipment as shown in figure 4.1.10-1.
2.1 Check the LTUX-S configuration. The correct configuration
is described in Appendix A para. 3.1.1.
The device no. of LTUX-S no. 1 shall be set to
14…0f…H…0e… and for LTUX-S no. 2 to 13…0f…H…0e….
2.2 Check that the Stat. Mux. configuration is in accordance
with the description of Appendix E.
3 Set the Mode select switch on the BSM-X to "MAN"
and the Bus select switch to "1".
4 Turn power on supporting equipment.
5 Turn power on equipment under test.
6 Boot test drive system as described in Appendix
F, part I.
4.1.10.2 T̲e̲s̲t̲ ̲I̲n̲i̲t̲i̲a̲l̲i̲z̲a̲t̲i̲o̲n̲
Perform initialization as described in Appendix F,
Part II.
FIGURE 4.1.10-1
TEST CONFIGURATION SITE 15B
4.1.10.3 T̲e̲s̲t̲ ̲S̲t̲e̲p̲s̲
G̲R̲O̲U̲P̲/̲T̲E̲S̲T̲ ̲N̲O̲.̲:̲ 1/10
F̲U̲N̲C̲T̲I̲O̲N̲:̲ Interface to TDX-bus, CRT channels,
and Crypto/Modem, and Stat. Mux. Multiplexing
Traffic flow control
R̲E̲F̲.̲ ̲S̲D̲S̲ ̲P̲A̲R̲A̲:̲ 3.2.1.1, 3.2.1.2, and 3.2.3
D̲A̲T̲E̲:̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
PROC. ACTION EXPECTED RESULT
STEP
NO.
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
1 Start up the test by Print out on the Line
writing: Pinter identical with
DO DELTA.TEST ̲4 CR the print out in Appendix
on the console D, apart from the time
indication
COMMENTS
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
TEST WITNESSES
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
TEST QA GQAR
4.1.10.4 T̲e̲s̲t̲ ̲T̲e̲r̲m̲i̲n̲a̲t̲i̲o̲n̲
1 When the line printer connected to the test drive
system has stopped, the print out is ready for
comparison with the listing of Appendix D.
2 Close-down by
2.1 Remove the discettes from the floppy-drive.
2.2 Turn power off the equipment under test.
2.3 Turn power off the supporting equipment.
4.1.11 T̲e̲s̲t̲ ̲o̲f̲ ̲S̲i̲t̲e̲ ̲6̲A̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲
4.1.11.1 T̲e̲s̲t̲ ̲S̲e̲t̲-̲U̲p̲
1 Connect the equipment under test with the supporting
equipment as shown in figure 4.1.11-1.
2.1 Check the LTUX-S configuration. The correct configuration
is described in Appendix A para. 3.1.1.
The device no. of LTUX-S no. 1 shall be set to
13…0f…H…0e… and for LTUX-S no. 2 to 14…0f…H…0e….
2.2 Check that the Stat. Mux. configuration is in accordance
with the description of Appendix E.
3 Set the Mode select switch on the BSM-X to "MAN"
and the Bus select switch to "1".
4 Turn power on supporting equipment.
5 Turn power on equipment under test.
6 Boot test drive system as described in Appendix
F, part I.
4.1.11.2 T̲e̲s̲t̲ ̲I̲n̲i̲t̲i̲a̲l̲i̲z̲a̲t̲i̲o̲n̲
Perform initialization as described in Appendix F,
Part II.
FIGURE 4.1.11-1
TEST CONFIGURATION SITE 6A
4.1.11.3 T̲e̲s̲t̲ ̲S̲t̲e̲p̲s̲
G̲R̲O̲U̲P̲/̲T̲E̲S̲T̲ ̲N̲O̲.̲:̲ 1/11
F̲U̲N̲C̲T̲I̲O̲N̲:̲ Interface to TDX-bus, CRT channels,
and Crypto/Modem, and Stat. Mux. Multiplexing
Traffic flow control
R̲E̲F̲.̲ ̲S̲D̲S̲ ̲P̲A̲R̲A̲:̲ 3.2.1.1, 3.2.1.2, and 3.2.3
D̲A̲T̲E̲:̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
PROC. ACTION EXPECTED RESULT
STEP
NO.
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
1 Start up the test by Print out on the Line
writing: Pinter identical with
DO DELTA.TEST ̲4 CR the print out in Appendix
on the console D, apart from the time
indication
COMMENTS
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
TEST WITNESSES
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
TEST QA GQAR
4.1.11.4 T̲e̲s̲t̲ ̲T̲e̲r̲m̲i̲n̲a̲t̲i̲o̲n̲
1 When the line printer connected to the test drive
system has stopped, the print out is ready for
comparison with the listing of Appendix D.
2 Close-down by
2.1 Remove the discettes from the floppy-drive.
2.2 Turn power off the equipment under test.
2.3 Turn power off the supporting equipment.
4.1.12 T̲e̲s̲t̲ ̲o̲f̲ ̲S̲i̲t̲e̲ ̲6̲B̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲
4.1.12.1 T̲e̲s̲t̲ ̲S̲e̲t̲-̲U̲p̲
1 Connect the equipment under test with the supporting
equipment as shown in figure 4.1.12-1.
2.1 Check the LTUX-S configuration. The correct configuration
is described in Appendix A para. 3.1.1.
The device no. of LTUX-S no. 1 shall be set to
14…0f…H…0e… and for LTUX-S no. 2 to 13…0f…H…0e….
2.2 Check that the Stat. Mux. configuration is in accordance
with the description of Appendix E.
3 Set the Mode select switch on the BSM-X to "MAN"
and the Bus select switch to "1".
4 Turn power on supporting equipment.
5 Turn power on equipment under test.
6 Boot test drive system as described in Appendix
F, part I.
4.1.12.2 T̲e̲s̲t̲ ̲I̲n̲i̲t̲i̲a̲l̲i̲z̲a̲t̲i̲o̲n̲
Perform initialization as described in Appendix F,
Part II.
FIGURE 4.1.12-1
TEST CONFIGURATION SITE 6B
4.1.12.3 T̲e̲s̲t̲ ̲S̲t̲e̲p̲s̲
G̲R̲O̲U̲P̲/̲T̲E̲S̲T̲ ̲N̲O̲.̲:̲ 1/12
F̲U̲N̲C̲T̲I̲O̲N̲:̲ Interface to TDX-bus, CRT channels,
and Crypto/Modem, and Stat. Mux. Multiplexing
Traffic flow control
R̲E̲F̲.̲ ̲S̲D̲S̲ ̲P̲A̲R̲A̲:̲ 3.2.1.1, 3.2.1.2, and 3.2.3
D̲A̲T̲E̲:̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
PROC. ACTION EXPECTED RESULT
STEP
NO.
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
1 Start up the test by Print out on the Line
writing: Pinter identical with
DO DELTA.TEST ̲4 CR the print out in Appendix
on the console D, apart from the time
indication
COMMENTS
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
TEST WITNESSES
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
TEST QA GQAR
4.1.12.4 T̲e̲s̲t̲ ̲T̲e̲r̲m̲i̲n̲a̲t̲i̲o̲n̲
1 When the line printer connected to the test drive
system has stopped, the print out is ready for
comparison with the listing of Appendix D.
2 Close-down by
2.1 Remove the discettes from the floppy-drive.
2.2 Turn power off the equipment under test.
2.3 Turn power off the supporting equipment.
4.1.13 T̲e̲s̲t̲ ̲o̲f̲ ̲S̲i̲t̲e̲ ̲7̲A̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲
4.1.13.1 T̲e̲s̲t̲ ̲S̲e̲t̲-̲U̲p̲
1 Connect the equipment under test with the supporting
equipment as shown in figure 4.1.13-1.
2.1 Check the LTUX-S configuration. The correct configuration
is described in Appendix A para. 3.1.1.
The device no. of LTUX-S no. 1 shall be set to
13…0f…H…0e… and for LTUX-S no. 2 to 14…0f…H…0e….
2.2 Check that the Stat. Mux. configuration is in accordance
with the description of Appendix E.
3 Set the Mode select switch on the BSM-X to "MAN"
and the Bus select switch to "1".
4 Turn power on supporting equipment.
5 Turn power on equipment under test.
6 Boot test drive system as described in Appendix
F, part I.
4.1.13.2 T̲e̲s̲t̲ ̲I̲n̲i̲t̲i̲a̲l̲i̲z̲a̲t̲i̲o̲n̲
Perform initialization as described in Appendix F,
Part II.
FIGURE 4.1.13-1
TEST CONFIGURATION SITE 7A
4.1.13.3 T̲e̲s̲t̲ ̲S̲t̲e̲p̲s̲
G̲R̲O̲U̲P̲/̲T̲E̲S̲T̲ ̲N̲O̲.̲:̲ 1/13
F̲U̲N̲C̲T̲I̲O̲N̲:̲ Interface to TDX-bus, CRT channels,
and Crypto/Modem, and Stat. Mux. Multiplexing
Traffic flow control
R̲E̲F̲.̲ ̲S̲D̲S̲ ̲P̲A̲R̲A̲:̲ 3.2.1.1, 3.2.1.2, and 3.2.3
D̲A̲T̲E̲:̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
PROC. ACTION EXPECTED RESULT
STEP
NO.
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
1 Start up the test by Print out on the Line
writing: Pinter identical with
DO DELTA.TEST ̲4 CR the print out in Appendix
on the console D, apart from the time
indication
COMMENTS
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
TEST WITNESSES
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
TEST QA GQAR
4.1.13.4 T̲e̲s̲t̲ ̲T̲e̲r̲m̲i̲n̲a̲t̲i̲o̲n̲
1 When the line printer connected to the test drive
system has stopped, the print out is ready for
comparison with the listing of Appendix D.
2 Close-down by
2.1 Remove the discettes from the floppy-drive.
2.2 Turn power off the equipment under test.
2.3 Turn power off the supporting equipment.
4.1.14 T̲e̲s̲t̲ ̲o̲f̲ ̲S̲i̲t̲e̲ ̲7̲B̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲
4.1.14.1 T̲e̲s̲t̲ ̲S̲e̲t̲-̲U̲p̲
1 Connect the equipment under test with the supporting
equipment as shown in figure 4.1.14-1.
2.1 Check the LTUX-S configuration. The correct configuration
is described in Appendix A para. 3.1.1.
The device no. of LTUX-S no. 1 shall be set to
14…0f…H…0e… and for LTUX-S no. 2 to 13…0f…H…0e….
2.2 Check that the Stat. Mux. configuration is in accordance
with the description of Appendix E.
3 Set the Mode select switch on the BSM-X to "MAN"
and the Bus select switch to "1".
4 Turn power on supporting equipment.
5 Turn power on equipment under test.
6 Boot test drive system as described in Appendix
F, part I.
4.1.14.2 T̲e̲s̲t̲ ̲I̲n̲i̲t̲i̲a̲l̲i̲z̲a̲t̲i̲o̲n̲
Perform initialization as described in Appendix F,
Part II.
FIGURE 4.1.14-1
TEST CONFIGURATION SITE 7B
4.1.14.3 T̲e̲s̲t̲ ̲S̲t̲e̲p̲s̲
G̲R̲O̲U̲P̲/̲T̲E̲S̲T̲ ̲N̲O̲.̲:̲ 1/14
F̲U̲N̲C̲T̲I̲O̲N̲:̲ Interface to TDX-bus, CRT channels,
and Crypto/Modem, and Stat. Mux. Multiplexing
Traffic flow control
R̲E̲F̲.̲ ̲S̲D̲S̲ ̲P̲A̲R̲A̲:̲ 3.2.1.1, 3.2.1.2, and 3.2.3
D̲A̲T̲E̲:̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
PROC. ACTION EXPECTED RESULT
STEP
NO.
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
1 Start up the test by Print out on the Line
writing: Pinter identical with
DO DELTA.TEST ̲4 CR the print out in Appendix
on the console D, apart from the time
indication
COMMENTS
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
TEST WITNESSES
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
TEST QA GQAR
4.1.14.4 T̲e̲s̲t̲ ̲T̲e̲r̲m̲i̲n̲a̲t̲i̲o̲n̲
1 When the line printer connected to the test drive
system has stopped, the print out is ready for
comparison with the listing of Appendix D.
2 Close-down by
2.1 Remove the discettes from the floppy-drive.
2.2 Turn power off the equipment under test.
2.3 Turn power off the supporting equipment.
4.1.15 T̲e̲s̲t̲ ̲o̲f̲ ̲S̲i̲t̲e̲ ̲1̲1̲A̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲
4.1.15.1 T̲e̲s̲t̲ ̲S̲e̲t̲-̲U̲p̲
1 Connect the equipment under test with the supporting
equipment as shown in figure 4.1.15-1.
2.1 Check the LTUX-S configuration. The correct configuration
is described in Appendix A para. 3.1.1.
The device no. of LTUX-S no. 1 shall be set to
13…0f…H…0e… and for LTUX-S no. 2 to 14…0f…H…0e….
2.2 Check that the Stat. Mux. configuration is in accordance
with the description of Appendix E.
3 Set the Mode select switch on the BSM-X to "MAN"
and the Bus select switch to "1".
4 Turn power on supporting equipment.
5 Turn power on equipment under test.
6 Boot test drive system as described in Appendix
F, part I.
4.1.15.2 T̲e̲s̲t̲ ̲I̲n̲i̲t̲i̲a̲l̲i̲z̲a̲t̲i̲o̲n̲
Perform initialization as described in Appendix F,
Part II.
FIGURE 4.1.15-1
TEST CONFIGURATION SITE 11A
4.1.15.3 T̲e̲s̲t̲ ̲S̲t̲e̲p̲s̲
G̲R̲O̲U̲P̲/̲T̲E̲S̲T̲ ̲N̲O̲.̲:̲ 1/15
F̲U̲N̲C̲T̲I̲O̲N̲:̲ Interface to TDX-bus, CRT channels,
and Crypto/Modem, and Stat. Mux. Multiplexing
Traffic flow control
R̲E̲F̲.̲ ̲S̲D̲S̲ ̲P̲A̲R̲A̲:̲ 3.2.1.1, 3.2.1.2, and 3.2.3
D̲A̲T̲E̲:̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
PROC. ACTION EXPECTED RESULT
STEP
NO.
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
1 Start up the test by Print out on the Line
writing: Pinter identical with
DO DELTA.TEST ̲4 CR the print out in Appendix
on the console D, apart from the time
indication
COMMENTS
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
TEST WITNESSES
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
TEST QA GQAR
4.1.15.4 T̲e̲s̲t̲ ̲T̲e̲r̲m̲i̲n̲a̲t̲i̲o̲n̲
1 When the line printer connected to the test drive
system has stopped, the print out is ready for
comparison with the listing of Appendix D.
2 Close-down by
2.1 Remove the discettes from the floppy-drive.
2.2 Turn power off the equipment under test.
2.3 Turn power off the supporting equipment.
4.1.16 T̲e̲s̲t̲ ̲o̲f̲ ̲S̲i̲t̲e̲ ̲1̲1̲B̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲
4.1.16.1 T̲e̲s̲t̲ ̲S̲e̲t̲-̲U̲p̲
1 Connect the equipment under test with the supporting
equipment as shown in figure 4.1.16-1.
2.1 Check the LTUX-S configuration. The correct configuration
is described in Appendix A para. 3.1.1.
The device no. of LTUX-S no. 1 shall be set to
14…0f…H…0e… and for LTUX-S no. 2 to 13…0f…H…0e….
2.2 Check that the Stat. Mux. configuration is in accordance
with the description of Appendix E.
3 Set the Mode select switch on the BSM-X to "MAN"
and the Bus select switch to "1".
4 Turn power on supporting equipment.
5 Turn power on equipment under test.
6 Boot test drive system as described in Appendix
F, part I.
4.1.16.2 T̲e̲s̲t̲ ̲I̲n̲i̲t̲i̲a̲l̲i̲z̲a̲t̲i̲o̲n̲
Perform initialization as described in Appendix F,
Part II.
FIGURE 4.1.16-1
TEST CONFIGURATION SITE 11B
4.1.16.3 T̲e̲s̲t̲ ̲S̲t̲e̲p̲s̲
G̲R̲O̲U̲P̲/̲T̲E̲S̲T̲ ̲N̲O̲.̲:̲ 1/16
F̲U̲N̲C̲T̲I̲O̲N̲:̲ Interface to TDX-bus, CRT channels,
and Crypto/Modem, and Stat. Mux. Multiplexing
Traffic flow control
R̲E̲F̲.̲ ̲S̲D̲S̲ ̲P̲A̲R̲A̲:̲ 3.2.1.1, 3.2.1.2, and 3.2.3
D̲A̲T̲E̲:̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
PROC. ACTION EXPECTED RESULT
STEP
NO.
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
1 Start up the test by Print out on the Line
writing: Pinter identical with
DO DELTA.TEST ̲4 CR the print out in Appendix
on the console D, apart from the time
indication
COMMENTS
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
TEST WITNESSES
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
TEST QA GQAR
4.1.16.4 T̲e̲s̲t̲ ̲T̲e̲r̲m̲i̲n̲a̲t̲i̲o̲n̲
1 When the line printer connected to the test drive
system has stopped, the print out is ready for
comparison with the listing of Appendix D.
2 Close-down by
2.1 Remove the discettes from the floppy-drive.
2.2 Turn power off the equipment under test.
2.3 Turn power off the supporting equipment.
4.1.17 T̲e̲s̲t̲ ̲o̲f̲ ̲S̲i̲t̲e̲ ̲1̲2̲A̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲
4.1.17.1 T̲e̲s̲t̲ ̲S̲e̲t̲-̲U̲p̲
1 Connect the equipment under test with the supporting
equipment as shown in figure 4.1.17-1.
2.1 Check the LTUX-S configuration. The correct configuration
is described in Appendix A para. 3.1.1.
The device no. of LTUX-S no. 1 shall be set to
13…0f…H…0e… and for LTUX-S no. 2 to 14…0f…H…0e….
2.2 Check that the Stat. Mux. configuration is in accordance
with the description of Appendix E.
3 Set the Mode select switch on the BSM-X to "MAN"
and the Bus select switch to "1".
4 Turn power on supporting equipment.
5 Turn power on equipment under test.
6 Boot test drive system as described in Appendix
F, part I.
4.1.17.2 T̲e̲s̲t̲ ̲I̲n̲i̲t̲i̲a̲l̲i̲z̲a̲t̲i̲o̲n̲
Perform initialization as described in Appendix F,
Part II.
FIGURE 4.1.17-1
TEST CONFIGURATION SITE 12A
4.1.17.3 T̲e̲s̲t̲ ̲S̲t̲e̲p̲s̲
G̲R̲O̲U̲P̲/̲T̲E̲S̲T̲ ̲N̲O̲.̲:̲ 1/17
F̲U̲N̲C̲T̲I̲O̲N̲:̲ Interface to TDX-bus, CRT channels,
and Crypto/Modem, and Stat. Mux. Multiplexing
Traffic flow control
R̲E̲F̲.̲ ̲S̲D̲S̲ ̲P̲A̲R̲A̲:̲ 3.2.1.1, 3.2.1.2, and 3.2.3
D̲A̲T̲E̲:̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
PROC. ACTION EXPECTED RESULT
STEP
NO.
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
1 Start up the test by Print out on the Line
writing: Pinter identical with
DO DELTA.TEST ̲4 CR the print out in Appendix
on the console D, apart from the time
indication
COMMENTS
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
TEST WITNESSES
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
TEST QA GQAR
4.1.17.4 T̲e̲s̲t̲ ̲T̲e̲r̲m̲i̲n̲a̲t̲i̲o̲n̲
1 When the line printer connected to the test drive
system has stopped, the print out is ready for
comparison with the listing of Appendix D.
2 Close-down by
2.1 Remove the discettes from the floppy-drive.
2.2 Turn power off the equipment under test.
2.3 Turn power off the supporting equipment.
4.1.18 T̲e̲s̲t̲ ̲o̲f̲ ̲S̲i̲t̲e̲ ̲1̲2̲B̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲
4.1.18.1 T̲e̲s̲t̲ ̲S̲e̲t̲-̲U̲p̲
1 Connect the equipment under test with the supporting
equipment as shown in figure 4.1.18-1.
2.1 Check the LTUX-S configuration. The correct configuration
is described in Appendix A para. 3.1.1.
The device no. of LTUX-S no. 1 shall be set to
14…0f…H…0e… and for LTUX-S no. 2 to 13…0f…H…0e….
2.2 Check that the Stat. Mux. configuration is in accordance
with the description of Appendix E.
3 Set the Mode select switch on the BSM-X to "MAN"
and the Bus select switch to "1".
4 Turn power on supporting equipment.
5 Turn power on equipment under test.
6 Boot test drive system as described in Appendix
F, part I.
4.1.18.2 T̲e̲s̲t̲ ̲I̲n̲i̲t̲i̲a̲l̲i̲z̲a̲t̲i̲o̲n̲
Perform initialization as described in Appendix F,
Part II.
FIGURE 4.1.18-1
TEST CONFIGURATION SITE 12B
4.1.18.3 T̲e̲s̲t̲ ̲S̲t̲e̲p̲s̲
G̲R̲O̲U̲P̲/̲T̲E̲S̲T̲ ̲N̲O̲.̲:̲ 1/18
F̲U̲N̲C̲T̲I̲O̲N̲:̲ Interface to TDX-bus, CRT channels,
and Crypto/Modem, and Stat. Mux. Multiplexing
Traffic flow control
R̲E̲F̲.̲ ̲S̲D̲S̲ ̲P̲A̲R̲A̲:̲ 3.2.1.1, 3.2.1.2, and 3.2.3
D̲A̲T̲E̲:̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
PROC. ACTION EXPECTED RESULT
STEP
NO.
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
1 Start up the test by Print out on the Line
writing: Pinter identical with
DO DELTA.TEST ̲4 CR the print out in Appendix
on the console D, apart from the time
indication
COMMENTS
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
TEST WITNESSES
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
TEST QA GQAR
4.1.18.4 T̲e̲s̲t̲ ̲T̲e̲r̲m̲i̲n̲a̲t̲i̲o̲n̲
1 When the line printer connected to the test drive
system has stopped, the print out is ready for
comparison with the listing of Appendix D.
2 Close-down by
2.1 Remove the discettes from the floppy-drive.
2.2 Turn power off the equipment under test.
2.3 Turn power off the supporting equipment.