DataMuseum.dk

Presents historical artifacts from the history of:

CR80 Wang WCS documentation floppies

This is an automatic "excavation" of a thematic subset of
artifacts from Datamuseum.dk's BitArchive.

See our Wiki for more about CR80 Wang WCS documentation floppies

Excavated with: AutoArchaeologist - Free & Open Source Software.


top - download

⟦c98d50ba6⟧ Wang Wps File

    Length: 23586 (0x5c22)
    Types: Wang Wps File
    Notes: NEC CCIS SOW              
    Names: »0778A «

Derivation

└─⟦3eaaffc64⟧ Bits:30006034 8" Wang WCS floppy, CR 0057A
    └─ ⟦this⟧ »0778A « 

WangText

…00……00……00……00……00…@…02……00……00…@
@…07…?…0b…?…00…?…06…>…09…>…0b…>…0d…>…02…>…07……86…1              …02…  …02…                                               


                                     - # -




I̲N̲T̲R̲O̲D̲U̲C̲T̲I̲O̲N̲


This statement of work (SOW) for delivery of the NEC CCIS
 com- munication subsystem (CDIMS) identifies the Work Packages
 which constitute Christian Rovsing A/S (CRAS) deliveries.

CRAS deliveries group in three major tasks:

      a.  Development and delivery from CRAS plant of CDIMS
          subsystems which fulfill the appropriate requirements
          as identified in this SOW.

      b.  Support of CDIMS systems delivered to Burroughs
          FSSG in Paoli, Pa. (4 systems) and McLean, Va (1
          system).

      c.  Logistics support including site survey and installation
          support.


All schedules given in this document are relative to award
 of CDIMS order by Burroughs Corporation to Christian Rovsing
 A/S



W̲P̲ ̲D̲e̲f̲i̲n̲i̲t̲i̲o̲n̲

WP 1…02…Hardware
WP 1.1.9…02…Other Equipment
WP 2.1.1…02…Operating System
WP 2.1.5…02…Diagnostics
WP 2.2.1…02…Communications Processing
WP 4.1.3…02…Test Procedures
WP 4.1.4…02…Test Reports
WP 4.2.1…02…Hardware CI Test
WP 4.2.2…02…Software CPCI Test
WP 4.2.5…02…System Test and Support
WP 5.1.2…02…System Analysis
WP 5.1.3…02…System Integration
WP 5.1.4…02…RMA Programme
WP 5.1.5…02…EMI/EMC Programme
WP 5.1.7…02…Hardware New Design
WP 5.2.1…02…Programme Office
WP 5.2.2/3/4…02…Config Man/QA/Inspec/Travel
WP 6…02…Documentation
WP 7.1.…02…ILS Management Organization
WP 7.2.1…02…Site Spares
WP 7.3.2…02…Provisioning Conference
WP 7.5.1…02…Site Survey
WP 7.5.2…02…Facility Design Criteria
WP 7.5.4…02…Transportation
WP 7.5.5…02…Packing/Packaging
WP 7.6.1…02…Training Burroughs FEs 
WP 7.6.3.1…02…CRAS Site Facility Cost
WP 7.6.3.2/3…02…SDC/GVL Sites
WP 7.6.4…02…Installation/C-O and Maintenance Support


W̲P̲ ̲1̲ ̲H̲a̲r̲d̲w̲a̲r̲e̲


       D̲e̲s̲c̲r̲i̲p̲t̲i̲o̲n̲

       This WP covers the manufacturing, integration,and factory
       acceptance of the hardware of the 19 NEC CCIS CDIMS
       subsystems. It consists of the CR80D modules and equipment
       as described in the Burroughs proposal II/3/4 and II/3/5

       B̲l̲o̲c̲k̲ ̲D̲i̲a̲g̲r̲a̲m̲

       Refer Burroughs Proposal Figure II/3-4-1.


       E̲q̲u̲i̲p̲m̲e̲n̲t̲/̲I̲t̲e̲m̲ ̲L̲i̲s̲t̲

       Refer Burroughs Proposal Table II/1-2-3
               Table II/1-2-6
               Table II/1-2-9


       A̲s̲s̲u̲m̲p̲t̲i̲o̲n̲s̲/̲C̲o̲n̲s̲t̲r̲a̲i̲n̲t̲s̲

       CRAS may delay production provided the required site
       de- livery is not missed. CRAS will provide storage
       for integrated CDIMS systems for the period between
       factory acceptance test (considered f.o.b. delivery)
       and scheduled site delivery (refer Burroughs proposal
       Figure III-1-10).                

       E̲x̲c̲l̲u̲s̲i̲o̲n̲s̲

       Burroughs will provide required paper tape readers.


       R̲e̲l̲a̲t̲e̲d̲ ̲W̲o̲r̲k̲ ̲P̲a̲c̲k̲a̲g̲e̲s̲

           - WP 4.2.1 and 4.2.2 CI/CPCI Test
           - WP 7.5.4 and 7.5.5 Transportation and Packaging


       R̲e̲l̲a̲t̲e̲d̲ ̲D̲o̲c̲u̲m̲e̲n̲t̲s̲

       N/A.




…02…S̲c̲h̲e̲d̲u̲l̲e̲

       The hardware deliveries are as follows:

       a.  At the end of the 14th month shipment from CRAS
           of 3 CR80D systems with limited CDIMS capability
           in form of interface capability to B 5900 as well
           as to Aydin Controller. Two of the systems will
           be shipped to Burroughs FSSG, Paoli, Pa. while
           the third will be shipped to SDC, McLean, Va. One
           of the systems will be equipped with disks.

       b.  At the completion of the CDIMS CI/CPCI tests (end
           of month 19) shipment from CRAS of those additional
           CR80D modules which are required to upgrade the
           three previously shipped systems to respectively
           the ACBA SWHQ, NORCCIS PSC/CRC and RSSC CDIMS configurations.

…02…c.     Shipment at the end of the 22nd month to Burroughs
       FSSG, Paoli of the second NORCCIS PSC as well as a
       CRC configuration.

…02…d      Delivery f.o.b. CRAS, Ballerup of the remaining 14
       CDIMS configurations as follows:



           Configuration                  Factory      Scheduled
                                                       
                                          Acceptance   Site
            ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲T̲e̲s̲t̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲D̲e̲l̲i̲v̲e̲r̲y̲
           ̲ ̲

           AFNORTH (CRAS dev system)      -            38
           CRC                  (2)       22           37/44
           Air Station          (3)       24           29/37/39
           ACBA Air Base        (3)       26           30/31/32
           ACBA Air Base        (3)       28           33/34/35
           Air Station          (2)       30           39/44



W̲P̲ ̲1̲.̲1̲.̲9̲ ̲ ̲O̲t̲h̲e̲r̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲


       D̲e̲s̲c̲r̲i̲p̲t̲i̲o̲n̲

       This WP covers the delivery of cables between the CR80D
       and other equipment as follows:

       a.   C̲o̲m̲m̲u̲n̲i̲c̲a̲t̲i̲o̲n̲ ̲e̲q̲u̲i̲p̲m̲e̲n̲t̲

            Not included 

       b.   D̲i̲s̲p̲l̲a̲y̲ ̲c̲o̲n̲t̲r̲o̲l̲l̲e̲r̲s̲

            Optical fibre to 142 Aydin controllers inclusive
            associated transceivers/transmitters in both ends
            as specified in the Burroughs proposal.

            128 connections each below 500 m
            14  connections each below  4 km


       S̲c̲h̲e̲d̲u̲l̲e̲

       Available f.o.b. CRAS, Ballerup 1 month prior to scheduled
       site delivery (refer Burroughs proposal Figure III-1-10).



WP 2.1.1 O̲p̲e̲r̲a̲t̲i̲n̲g̲ ̲S̲y̲s̲t̲e̲m̲


       D̲e̲s̲c̲r̲i̲p̲t̲i̲o̲n̲

       This WP covers the delivery of a DAMOS operating system
       with each of the CDIMS subsystems. It includes the
       delivery of CDIMS DAMOS development utilities only
       as part of the RSSC delivery as described in the Burroughs
       Proposal II/4/3.1 respectively II/4/3.3.


       R̲e̲l̲a̲t̲e̲d̲ ̲W̲o̲r̲k̲ ̲P̲a̲c̲k̲a̲g̲e̲s̲

            - WP 2.2.1


       S̲c̲h̲e̲d̲u̲l̲e̲

       Delivered with CDIMS hardware deliveries.


WP 2.1.5 D̲i̲a̲g̲n̲o̲s̲t̲i̲c̲s̲


       D̲e̲s̲c̲r̲i̲p̲t̲i̲o̲n̲

       This WP covers the delivery of the diagnostic package
       of  the following CR80D modules of the CDIMS:

           -   CPU/CACHE
           -   RAM
           -   STI/SBA
           -   MAP/MIA
           -   CIA-A/B
           -   LTU
           -   Disk Ctl'r/DCA
           -   Burroughs CTL'r/BCA


       R̲e̲l̲a̲t̲e̲d̲ ̲W̲o̲r̲k̲P̲a̲c̲k̲a̲g̲e̲s̲

           -   WP 1 Hardware


       S̲c̲h̲e̲d̲u̲l̲e̲

       Delivered with CDIMS hardware deliveries.


WP 2.2.1 C̲o̲m̲m̲u̲n̲i̲c̲a̲t̲i̲o̲n̲s̲ ̲P̲r̲o̲c̲e̲s̲s̲i̲n̲g̲


       D̲e̲s̲c̲r̲i̲p̲t̲i̲o̲n̲

       This WP covers the detailed design, coding, test and
       in- tegration of software and LTU-firmware for the
       CDIMS sub- system as described in the Burroughs proposal:

            - II/1/2.3.4.1.2.1 -  Bootstrap Loader
            - II/2.3.4.2.6     -  Communication Software
            - II/1/2.7.4       -  Communication Interface
            Modules
            - II/4/3.2         -  Communication Software


…02…E̲q̲u̲i̲p̲m̲e̲n̲t̲/̲I̲t̲e̲m̲ ̲L̲i̲s̲t̲ ̲(̲C̲P̲C̲s̲)̲

       Communication Software

       o Protocol Drivers (LTU-firmware)

            - X25/2 SCCIWG
            - X25/2 NDDN
            - LINK-1
            - TOSCA
            - PTR/PTP
            - CAMPS VDU
            - CRYPTO Monitoring/Control


       o Conversion Handlers

            - Comm Line ITA-5 Conversion
            - ITA-2 Conversion
            - Display Data Conversion
            - Link-1 Data Conversion


       o Control/Dispatch (Basic Transport Service)

            - Message Dispatch Control
            - Replication of Data Stream
            - Overall Monitoring and Status


       o Burroughs Interface Driver


       o Bootstrap Loader

            - Bootstraploader
            - Basic Maintenance Utilities


       o Backup Programs

            - ACBA SWHQ Msg. Prep. Back-up
            - Air Base Back-up


       A̲s̲s̲u̲m̲p̲t̲i̲o̲n̲s̲/̲C̲o̲n̲s̲t̲r̲a̲i̲n̲t̲s̲

       In order to fulfil the schedule Burroughs shall supply
       specifications and equipment as follows:

       3̲r̲d̲ ̲m̲o̲n̲t̲h̲

            o   Front-end Interface Specification Burroughs/CR80D
                interface as outlined in Burroughs Memo 52211-JPG-0218
                from J.Gibson dated 29.Sep.80.

            o   External Interface Protocol Specifications,
                i.e.

                - X25 SCCIWG
                - X25 NDDN
                - TOSCA
                - LINK-1
                - PTR/PTP
                - Crypto

                including electrical and protocol specification


       4̲t̲h̲ ̲m̲o̲n̲t̲h̲

            o   Definition of data format for Aydin (EBCDIC
                con- version)


       6̲t̲h̲ ̲m̲o̲n̲t̲h̲

            o   Final Functional Display Operation Specification
                (to enable implementation of ITD to VDU conversion)


       9̲t̲h̲ ̲m̲o̲n̲t̲h̲

            o   Burroughs B 5900 running at CRAS, Ballerup
                by start of 9th month
            o   Burroughs provide Paper Tape Reader


       1̲0̲t̲h̲ ̲m̲o̲n̲t̲h̲:̲

            o   Aydin controller with ITD and IGD as a minimum
                running at CRAS, Ballerup by start of 10th
                month

       1̲4̲t̲h̲ ̲m̲o̲n̲t̲h̲

            o   At least two Aydin Controllers connected to
                one of each display type up and running at
                CRAS by start of month 14




       R̲e̲l̲a̲t̲e̲d̲ ̲W̲o̲r̲k̲ ̲P̲a̲c̲k̲a̲g̲e̲s̲

            -   WP 2.1.1 Operating System (DAMOS)
            -   WP 5.1.3 System Integration (CDIMS Dev. Spec.)
            -   WP 4.2.2 Software CPCI Test


       S̲c̲h̲e̲d̲u̲l̲e̲

       The communication Processing is partioned in two separate
       tasks, the Bootstrap-loader and the operational Communication
       Processing; the latter consists of two phases of which
       the first phase consists of providing a single path
       from the B 5900 through the CDIMS to an Aydin Controller
       while the second consists of the upgrades required
       for the final CDIMS operational program.

…02…a̲.̲ ̲B̲o̲o̲t̲s̲t̲r̲a̲p̲-̲l̲o̲a̲d̲e̲r̲ ̲(̲C̲P̲C̲)̲

            4    start of detailed design
            6-7  preliminary Product Spec (Dev. Spec.)
            10   start test versus B 5900 controller prototype
            12   CPC complete


       b̲.̲ ̲O̲p̲e̲r̲a̲t̲i̲o̲n̲a̲l̲

       b.1. P̲h̲a̲s̲e̲ ̲1̲

            7   Availability of CDIMS development spec
            10  Product Specification
            14  Integration Complete

       b.2  P̲h̲a̲s̲e̲ ̲2̲

            18  CDIMS Integration Complete…86…1       …02…    …02…   …02…
                                                         
             
WP 4.1.3 T̲e̲s̲t̲ ̲P̲r̲o̲c̲e̲d̲u̲r̲e̲s̲


       D̲e̲s̲c̲r̲i̲p̲t̲i̲o̲n̲

       This WP covers the preparation based upon the Burroughs
       Requirements Specifications of the test procedures
       ap- plicable to the CDIMS subsystem with respect to
       vali- dation of the performance of the following

            -   CDIMS Hardware (CI Test) 

            -   CDIMS Software (CPCI Test) 


       E̲q̲u̲i̲p̲m̲e̲n̲t̲/̲I̲t̲e̲m̲ ̲

            -   CI test procedure
            -   CPCI test test procedure


       A̲s̲s̲u̲m̲p̲t̲i̲o̲n̲s̲/̲C̲o̲n̲s̲t̲r̲a̲i̲n̲t̲s̲

            Specifications available as defined in WP 2.2.1
            and WP 5.1.7


       R̲e̲l̲a̲t̲e̲d̲ ̲W̲o̲r̲k̲ ̲P̲a̲c̲k̲a̲g̲e̲s̲

            -   WP 2.2.1 Communications Processing
            -   WP 5.1.7 Hardware New Development


       R̲e̲l̲a̲t̲e̲d̲ ̲D̲o̲c̲u̲m̲e̲n̲t̲s̲

            o   Burroughs Proposal
            o   Burroughs Interface Specifications
                - electrical
                - logical interface
            o   External Interfaces


       S̲c̲h̲e̲d̲u̲l̲e̲

       The test procedure will be available 4 months and shall
       be agreed upon 3 months prior to conduct of the associated
       tests.


WP 4.1.4 T̲e̲s̲t̲ ̲R̲e̲p̲o̲r̲t̲s̲


       D̲e̲s̲c̲r̲i̲p̲t̲i̲o̲n̲

       This WP covers the manpower required to finalize the
       CI/CPCI test reports of the CDIMS subsystem.


       E̲q̲u̲i̲p̲m̲e̲n̲t̲/̲I̲t̲e̲m̲ ̲L̲i̲s̲t̲

            -   CI test report
            -   CPCI test report


       R̲e̲l̲a̲t̲e̲d̲ ̲W̲o̲r̲k̲ ̲P̲a̲c̲k̲a̲g̲e̲s̲

            -   4.2.1 CI Test
            -   4.2.2 CPCI Test


       S̲c̲h̲e̲d̲u̲l̲e̲

       The Test Report is due for delivery one month after
       the completion of CI/CPCI test .


WP 4.2.1 H̲a̲r̲d̲w̲a̲r̲e̲ ̲C̲I̲ ̲T̲e̲s̲t̲


       D̲e̲s̲c̲r̲i̲p̲t̲i̲o̲n̲

       This WP  covers the conduction at CRAS, Ballerup of
       the hardware CI test of the CDIMS in accordance with
       the as- sociated test procedure .

       It includes development of special test software antici-
       pated for the CI Test.


       R̲e̲l̲a̲t̲e̲d̲ ̲W̲o̲r̲k̲ ̲P̲a̲c̲k̲a̲g̲e̲s̲

            -   WP 5.1.7 Hardware New Design


       R̲e̲l̲a̲t̲e̲d̲ ̲D̲o̲c̲u̲m̲e̲n̲t̲s̲

            -   WP 4.1.3 Test Procedure (CI)


       S̲c̲h̲e̲d̲u̲l̲e̲ ̲

       This WP is scheduled as the first two weeks of month
       19.


WP 4.2.2 S̲o̲f̲t̲w̲a̲r̲e̲ ̲C̲P̲C̲I̲ ̲T̲e̲s̲t̲


       D̲e̲s̲c̲r̲i̲p̲t̲i̲o̲n̲

       This item covers the conduction at CRAS, Ballerup of
       the software CPCI test of the CDIMS in accordance with
       the associated test procedure .

       It includes development of special test software antici-
       pated for the CPCI Test.


       R̲e̲l̲a̲t̲e̲d̲ ̲W̲o̲r̲k̲ ̲P̲a̲c̲k̲a̲g̲e̲s̲

       -    WP 4.1.3 Test Procedure (CPCI)
       -    WP 1     Hardware (item b)


       S̲c̲h̲e̲d̲u̲l̲e̲

       This WP is scheduled at the end of the hardware CI
       test as the later two weeks of month 19.


WP 4.2.5 S̲y̲s̲t̲e̲m̲ ̲T̲e̲s̲t̲ ̲a̲n̲d̲ ̲S̲u̲p̲p̲o̲r̲t̲


       D̲e̲s̲c̲r̲i̲p̲t̲i̲o̲n̲

       This WP covers the on-site CRAS system/hardware/software
       engineering support at field site required for the
       CDIMS hardware and software.


       A̲s̲s̲u̲m̲p̲t̲i̲o̲n̲s̲/̲C̲o̲n̲s̲t̲r̲a̲i̲n̲t̲s̲

       Burroughs shall provide the recommended tools and test
       equipment required for the CR80D system.


       S̲c̲h̲e̲d̲u̲l̲e̲

       A major part of this support is expected to take place
       during the LOC at ACBA SWHQ.


WP 5.1.2 S̲y̲s̲t̲e̲m̲ ̲A̲n̲a̲l̲y̲s̲i̲s̲


       D̲e̲s̲c̲r̲i̲p̲t̲i̲o̲n̲

       This WP covers CRAS services with CDIMS related items
       of the following areas:

            o   system overall design (front-end trade-offs)

            o   update of system specification

            o   prepare material for design reviews (SDR,
                PDR, and CDR) for CDIMS CI/CPCI at CRAS, Ballerup

            o   conduct design reviews at CRAS, Ballerup of
                hardware/software items for which CRAS is
                responsible 

            o   participate in major design reviews

            o   limited participation in working groups con-
                cerned with external interfaces


       A̲s̲s̲u̲m̲p̲t̲i̲o̲n̲s̲/̲C̲o̲n̲s̲t̲r̲a̲i̲n̲t̲s̲

       Burroughs shall provide CRAS with the following in-
       formation

            m̲o̲n̲t̲h̲ ̲0̲

            hardware spec on Burroughs/CR80D interface (relevant
            version of SDS 2323-7472 and SDS 1947-5011 specifications)

            otherwise as for WP 2.2.1


       S̲c̲h̲e̲d̲u̲l̲e̲

       The front-end trade-offs and System Design part is
       anticipated to take place in US while the remaining
       takes plase as the CRAS plant, Ballerup..




WP 5.1.3 S̲y̲s̲t̲e̲m̲ ̲I̲n̲t̲e̲g̲r̲a̲t̲i̲o̲n̲


       D̲e̲s̲c̲r̲i̲p̲t̲i̲o̲n̲

       This WP covers CRAS contribution to level B-spec (de-
       velopment design specification) for the CDIMS.

       It includes the conduction of preliminary and critical
       design reviews at CRAS, Ballerup.
       
       It includes the engineering input required with respect
       to documentation and review of same.


       A̲s̲s̲u̲m̲p̲t̲i̲o̲n̲s̲/̲C̲o̲n̲s̲t̲r̲a̲i̲n̲t̲s̲

       In order to meet the schedule Burroughs shall provide
       specifications to CRAS as specified in WP 2.2.1 and
       5.1.7
       Timely delivery of this and dependant Work Packages
       depends upon acceptance of System Design (WP 5.1.2)
       by end of month 3.



       S̲c̲h̲e̲d̲u̲l̲e̲ ̲

       Development Specification complete at end of month
       7.




WP 5.1.4 R̲M̲A̲ ̲P̲r̲o̲g̲r̲a̲m̲m̲e̲


       D̲e̲s̲c̲r̲i̲p̲t̲i̲o̲n̲ ̲

       This WP covers CRAS support to Burroughs as follows:

       o    reliability: provide Burroughs with failure rates
            for supplied CR80D modules in accordance with
            MIL-HDBK-217C

       o    maintainability: provide Burroughs with values
            of MTTR's of applicable modules

       o    provide information as requested by Burroughs
            on maintainability plan and demonstration


       S̲c̲h̲e̲d̲u̲l̲e̲ ̲

       Data on MTBF and MTTR on all but specially developed
       modules will be provided by month 6.
       
       Values related to specially developed modules will
       be available at CI Test.


WP 5.1.5 E̲M̲I̲/̲E̲M̲C̲ ̲P̲r̲o̲g̲r̲a̲m̲m̲e̲


       D̲e̲s̲c̲r̲i̲p̲t̲i̲o̲n̲

       This WP covers a CRAS report to Burroughs with EMI/EMC
       data related to the CDIMS processor equipment.


WP 5.1.7 H̲a̲r̲d̲w̲a̲r̲e̲ ̲N̲e̲w̲ ̲D̲e̲s̲i̲g̲n̲


       D̲e̲s̲c̲r̲i̲p̲t̲i̲o̲n̲

       This WP covers the following hardware development:

            -   B 5900 if controller…02…                               - optical
                                                                     transceivers

       Included are the associated hardware module development
       as well as product specification.

       The diagnostic software related to the B 5900 controller
       is included in this WP.


       A̲s̲s̲u̲m̲p̲t̲i̲o̲n̲s̲/̲C̲o̲n̲s̲t̲r̲a̲i̲n̲t̲s̲

       This WP is dependant on a timely delivery by Burroughs
       of specifications for the

            -   electrical interface (day 0)
            -   front-end interface protocol spec (month 3)

       It is dependant on timely availability of running B
       5900 (refer WP 2.2.1)


       R̲e̲l̲a̲t̲e̲d̲ ̲W̲o̲r̲k̲ ̲P̲a̲c̲k̲a̲g̲e̲s̲

            -   WP 4.2.1 Hardware CI test


       S̲c̲h̲e̲d̲u̲l̲e̲


       The Development Spec will be available at end of 4th
       month (PDR) while the Product Spec will be available
       at end of 8th month.(CDR)


WP 5.2.1 P̲r̲o̲g̲r̲a̲m̲ ̲O̲f̲f̲i̲c̲e̲


       D̲e̲s̲c̲r̲i̲p̲t̲i̲o̲n̲

       This WP covers the manpower required to run the CDIMS
       program office and includes monthly status reports.
       


WP 5.2.2/3/4 C̲o̲n̲f̲i̲g̲u̲r̲a̲t̲i̲o̲n̲ ̲M̲a̲n̲/̲Q̲A̲ ̲I̲n̲s̲p̲e̲c̲/̲T̲r̲a̲v̲e̲l̲


       D̲e̲s̲c̲r̲i̲p̲t̲i̲o̲n̲

       These WPs cover the manpower and costs associated with
       the following tasks:

            o   Configuration management - includes baseline
                management of all specifications and drawings,
                site inventory list as well as participation
                in configuration Control Board

            o   conduct QA program and inspection of hardware
                and software, including the cost of factory
                acceptance test

            o   Travel expenses

       which are related to the CDIMS development at CRAS.



WP 6     D̲o̲c̲u̲m̲e̲n̲t̲a̲t̲i̲o̲n̲


       D̲e̲s̲c̲r̲i̲p̲t̲i̲o̲n̲

       This WP covers the technical writing,publication and
       reproduction costs of CDIMS documentation.


       R̲e̲l̲a̲t̲e̲d̲ ̲D̲o̲c̲u̲m̲e̲n̲t̲s̲

         o  Engineering Data                     Qty

            -   HW Dev Spec                      10 copies
            -   HW Product Spec                  10 copies
            -   CDIMS Software Dev Spec          10 copies
            -   CDIMS Product Spec               10 copies
            -   Test Procedures                  10 copies
            -   Test Reports                     10 copies

       o    Management Data

            -   Design Review Data               20 copies

       o    Technical Publication Data

            -   Maintenance Manual               100 copies
            -   Supply Manual (CRAS reorder
                procedures)                       50 copies
            -   Program Maintenance Manual        20 copies
            -   SW Installation Procedures        20 copies
            -   Programmer User Manuals           20 copies
            -   Operator User Manuals             20 copies
            -   Source Code Listings of
                CDIMS appl SW                     2 + 1 hardcopy
            -   Software Support Manuals          20 copies


WP 7.1.1 I̲L̲S̲ ̲M̲a̲n̲a̲g̲e̲m̲e̲n̲t̲ ̲O̲r̲g̲a̲n̲i̲z̲a̲t̲i̲o̲n̲


       D̲e̲s̲c̲r̲i̲p̲t̲i̲o̲n̲

       This WP covers ILS management costs associated with
       the CRAS ILS support on the NEC CCIS program.

       It includes liaison with Burroughs and sites on ILS
       areas where CRAS contributes directly.


WP 7.2.1 S̲i̲t̲e̲ ̲S̲p̲a̲r̲e̲s̲


       D̲e̲s̲c̲r̲i̲p̲t̲i̲o̲n̲

       This item covers provision of information to Burroughs
       with respect to:

            -   installed quantity
            -   failure rate
            -   unit price

       on a line replaceable unit basis and per site.

       

       A̲s̲s̲u̲m̲p̲t̲i̲o̲n̲s̲/̲C̲o̲n̲s̲t̲r̲a̲i̲n̲t̲s̲

       Dependant on configurations (WP 1)


       E̲x̲c̲l̲u̲s̲i̲o̲n̲s̲

       No spare parts are provided

       NATO codification is not included.


       S̲c̲h̲e̲d̲u̲l̲e̲

       Due 3rd month.


WP 7.3.2 P̲r̲o̲v̲i̲s̲i̲o̲n̲i̲n̲g̲ ̲C̲o̲n̲f̲e̲r̲e̲n̲c̲e̲ ̲


       D̲e̲s̲c̲r̲i̲p̲t̲i̲o̲n̲


       This WP covers CRAS support to Burroughs prior to and
       during spare parts provisioning conference in either
       CPH or at Kolsaas.


       S̲c̲h̲e̲d̲u̲l̲e̲

       The provisioning conference is anticipated to be in
       month 4.


WP 7.4.1 S̲i̲t̲e̲ ̲T̲o̲o̲l̲s̲/̲T̲e̲s̲t̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲


       This WP covers the tools and test equipment required
       by CRAS.


       E̲x̲c̲l̲u̲s̲i̲o̲n̲s̲

       No tools and test equipment will be provided by CRAS.


WP 7.5.1 S̲i̲t̲e̲ ̲S̲u̲r̲v̲e̲y̲


       D̲e̲s̲c̲r̲i̲p̲t̲i̲o̲n̲

       This WP covers CRAS participation and carry out of
       the initial site survey. CRAS will cover the areas
       of which CRAS holds the installation responsibility:

            -   CR80D equipment
            -   optical fibres between CR80D and Aydin Controller


       E̲x̲c̲l̲u̲s̲i̲o̲n̲s̲

       Secure cabling between CR80D and customer provided
       com- munication termination equipment and CAMPS is
       not   in- cluded as customer responsibility.


       A̲s̲s̲u̲m̲p̲t̲i̲o̲n̲s̲/̲C̲o̲n̲s̲t̲r̲a̲i̲n̲t̲s̲ ̲

       Burroughs has responsibility for the site survey as
       well as for finalization of site survey report.


       S̲c̲h̲e̲d̲u̲l̲e̲ ̲

       CRAS will provide Burroughs with draft report covering
       CRAS areas within one month from end of final initial
       site survey.


WP 7.5.2 F̲a̲c̲i̲l̲i̲t̲y̲ ̲D̲e̲s̲i̲g̲n̲ ̲C̲r̲i̲t̲e̲r̲i̲a̲


       D̲e̲s̲c̲r̲i̲p̲t̲i̲o̲n̲

       This WP covers CRAS support to Burroughs with respect
       to Facility Design Criteria, e.g. floor loading, floor
       cut- outs, physical dimensions, weight, power consumption.


       S̲c̲h̲e̲d̲u̲l̲e̲

       The required information will be provided in report
       prior to month 11.



WP 7.5.4 T̲r̲a̲n̲s̲p̲o̲r̲t̲a̲t̲i̲o̲n̲ ̲


       D̲e̲s̲c̲r̲i̲p̲t̲i̲o̲n̲

       This WP covers the shipment, insurance cost associated
       with the total of 5 CDIMS systems which are to be delivered
       to US.

       Burroughs is responsible for site delivery whether
       of 5 US-based system or the remaining 14 systems which
       are delivered f.o.b. CRAS, Ballerup.


       S̲c̲h̲e̲d̲u̲l̲e̲

       Refer WP 1.


WP 7.5.5 P̲a̲c̲k̲i̲n̲g̲/̲P̲a̲c̲k̲a̲g̲i̲n̲g̲


       D̲e̲s̲c̲r̲i̲p̲t̲i̲o̲n̲

       This WP covers the packing/packaging costs for all
       systems delivered as part of the NEC CCIS program.
       In total 13 dual and 6 single configurations.

       Packaging will for all systems be for air transportation.


       S̲c̲h̲e̲d̲u̲l̲e̲

       Refer WP 1


WP 7.6.1 T̲r̲a̲i̲n̲i̲n̲g̲ ̲B̲u̲r̲r̲o̲u̲g̲h̲s̲ ̲F̲E̲'̲s̲


       D̲e̲s̲c̲r̲i̲p̲t̲i̲o̲n̲

       This WP covers the conduction of two 3-week training
       courses at CRAS, Ballerup.

       The first course will be for 2 US instructors and 6
       Tech. Personnel (FEs) from BKurroughs, DK. The last
       course will be for 6 Tech Personnel (FEs) from Burroughs,
       N.

       Courses will be conducted in English and as described
       in the Burroughs Proposal.

       The WP covers preparation, conduction, materials, fa-
       cilities during the length of the course. The level
       will be 
           hardware -  pull and replacement basis
           software -  to the extent required to modify software
                       by e.g. incorporation of patches and
                       re-compilation.


       S̲c̲h̲e̲d̲u̲l̲e̲

       First course       month 26-30
       Second course      month 32-36


WP 7.6.3.1 C̲R̲A̲S̲ ̲S̲i̲t̲e̲ ̲F̲a̲c̲i̲l̲i̲t̲y̲ ̲C̲o̲s̲t̲


       D̲e̲s̲c̲r̲i̲p̲t̲i̲o̲n̲

       This WP covers the facility costs associated with the
       CRAS site until month 38. Facilities will be provided
       for

           -   B 5900 installation with peripherals such as
               disks, line printers, mag tape

           -   a limited number of Aydin controllers and dis-
               plays

           -   dual CDIMS communications front-end with disks,
               development VDUs and matrix printer

       The WP includes maintenance of CRAS produced equipment.


       A̲s̲s̲u̲m̲p̲t̲i̲o̲n̲s̲/̲C̲o̲n̲s̲t̲r̲a̲i̲n̲t̲s̲

       Burroughs shall be responsible for installation, operation
       and maintenance and later refurbishment of B 5900 as
       well as Aydin supplied equipment.


       S̲c̲h̲e̲d̲u̲l̲e̲

       The facilities will be available for installation from
       month 8 and until end of month 38.


WP 7.6.3.2/3 S̲D̲C̲/̲G̲V̲L̲ ̲S̲i̲t̲e̲s̲


       D̲e̲s̲c̲r̲i̲p̲t̲i̲o̲n̲ ̲

       This WP covers CRAS hardware and software support of
       the five CDIMS communication front-ends installed with
       one at SDC, McLean and four at Burroughs, Paoli.

       Included is support in form of spare parts as required
       to maintain above sites in US. Faulty modules to be
       shipped by Burroughs to CRAS, Ballerup for repair.


       A̲s̲s̲u̲m̲p̲t̲i̲o̲n̲s̲/̲C̲o̲n̲s̲t̲r̲a̲i̲n̲t̲s̲

       Burroughs shall provide at least one TTY-compatible
       VDU on each system, which can interface with the CR80D
       for software development purposes.


       S̲c̲h̲e̲d̲u̲l̲e̲ ̲

       US-based support is included for the first 6 months
       of the period, as well as the support required for
       installation, US of the five systems in question: 


       o    Paoli Sites

            -   ACBA SWHQ       14-22
            -   NORCCIS PSC/CRC 14-29
            -   NORCCIS PSC     29-44
            -   CRC             22-49


       o    SDC

            -   RSSC            14-38


WP 7.6.4 I̲n̲s̲t̲a̲l̲l̲a̲t̲i̲o̲n̲/̲C̲h̲e̲c̲k̲-̲o̲u̲t̲ ̲a̲n̲d̲ ̲M̲a̲i̲n̲t̲e̲n̲a̲n̲c̲e̲ ̲S̲u̲p̲p̲o̲r̲t̲ ̲


       D̲e̲s̲c̲r̲i̲p̲t̲i̲o̲n̲

       This WP covers CRAS Technical FE-support during site
       in- stallation of the 19 NEC CCIS installations in
       Denmark and Norway. CRAS FE participation will cover
       installation and Check-out on the site with respect
       to the CR80D com- munications front-end and associated
        optical fibre cable runs to display controllers.

       It includes maintenance support during the warranty
       period.


       A̲s̲s̲u̲m̲p̲t̲i̲o̲n̲s̲/̲C̲o̲n̲s̲t̲r̲a̲i̲n̲t̲s̲ ̲

       Burroughs has overall installation responsibility.

       Cable runs, cableducts, piping etc. is provided by
       the customer and is ready before CRAS installation
       can take place. It will be the full responsibility
       of Burroughs to ensure that site readiness on CRAS
       items is ensured through a site verification prior
       to installation.


       E̲x̲c̲l̲u̲s̲i̲o̲n̲s̲

       Secure cabling between CR80D and customer provided
       com- munication termination equipment is not included.

       S̲c̲h̲e̲d̲u̲l̲e̲

       The installation is scheduled as described in Burroughs
       proposal III/1.2.3.