DataMuseum.dk

Presents historical artifacts from the history of:

CR80 Wang WCS documentation floppies

This is an automatic "excavation" of a thematic subset of
artifacts from Datamuseum.dk's BitArchive.

See our Wiki for more about CR80 Wang WCS documentation floppies

Excavated with: AutoArchaeologist - Free & Open Source Software.


top - download

⟦d16c6bc5f⟧ Wang Wps File

    Length: 16282 (0x3f9a)
    Types: Wang Wps File
    Notes: FIKS SYSTEM EXTENSION (2) 
    Names: »5719A «

Derivation

└─⟦b3c9a9699⟧ Bits:30006142 8" Wang WCS floppy, CR 0015A
    └─ ⟦this⟧ »5719A « 

WangText





FIKS SYSTEM EXTENSION                                 SYS/85-02-13

TECHNICAL AND COST PROPOSAL                           Page #


























                       PROPOSAL FOR

                 FIKS-NICS TARE INTERFACE

                     BASE LINE UPDATE

                        (REVISED)




                    TABLE OF CONTENTS



 1 SCOPE ............................................
  3  

 2 DOCUMENTATION ....................................
  4  

 3 PROPOSAL SOLUTION CONCEPT ........................
  5  

 4 PROPOSED SOLUTIONS ...............................
  6  
   4.1 ASM-HANDLING .................................
        6  
   4.2 ASM-RELATED UPDATE ...........................
       11  
   4.3 FINAL TESTING OPTION .........................
       13  

 5 SOFTWARE SPECIFICATION ...........................
 13  

 6 DEVELOPMENT, TEST, DOCUMENTATION .................
 14  

 7 PRICE SUMMARY, PRICE BREAKDOWN ...................
 15  
   7.1 DEVELOPMENT COSTS ............................
       15  
   7.2 OPTION COSTS .................................
       15  

 8 BIDDING PROVISIONS ...............................
 16  

   8.1 VALIDITY .....................................
       16  
   8.2 DELIVERY .....................................
       16  
   8.3 PAYMENT PLAN .................................
       16  


                         1 S̲C̲O̲P̲E̲



         This document provides an unsolicited proposal for
         modification of the FIKS System concerned the FIKS-NICS
         TARE Interface.
         Refer to AMC letters: 
             AHK. 601.1768-102, dated 24 January, 1985.
             AHK. 601.1768-175, dated 13 February, 1985.


         The modification shall include changes and updatings
         of the existing FIKS System to get the present FIKS-NICS
         TARE Interface to function as intended. The proposal
         covers the following main items:

         1.  At the time when the interface was delivered, the
             NICS TARE side of the interface was not ready.
             Since then changes in the interface specifications
             has occured. This concerns mainly "Abreviated Service
             Messages" (ASM's) and the open-/close-link procedure.
             This shall be incorporated in the interface.

         2.  The FIKS-NICS TARE link has to be tested in real
             environment, when the NICS TARE side gets ready.
             The testing may lead to discovering of errors,
             which must be corrected. This porposal contains
             therefore an option, by which AMC after request
             will get qualified personnel from CR to participate
             in these activities.


                     2 D̲O̲C̲U̲M̲E̲N̲T̲A̲T̲I̲O̲N̲



         The following documents are required to establish a
         firm base line for the modifications.

         1)  FIKS SYSTEM SPECIFICATION
             FIX/1000/PSP/0038

         2)  FIKS DATA I/F REFERENCE
             FIX/0100/MAN/0004

         3)  FIKS ISH PROCESSES PSP
             FIX/1160/PSP/0091

         4)  NICS TARE Communication Subsystem
             FIX/1162/DSP/0012

         5)  NICS Telegraph Automatic Relay Equipment (TARE)
             Technical Interface Criteria, Issue 4, 
             dated March, 1983

         6)  FIKS REQUIREMENT SPECIFICATION
             FIX/0000/SPC/0002, issue 5, p. 249-274 (sec. 3.1.1.3.2.4.3)

         7)  PROPOSAL FOR FIKS SYSTEM EXTENSION,
             SCC CONVERSION LOG & RETRANSMISSION PROCEDURE,
             dated 84-12-14

         8)  AMC letter: TST.604.8228/312.1-635, dated 
             2 November 1984.

         9)  AMC letter: AHK.601.1768-102, dated 24 January,
             1985

         10) AMC letter: AHK.601.1768-175, dated 13 February,
             1985


               3 P̲R̲O̲P̲O̲S̲A̲L̲ ̲S̲O̲L̲U̲T̲I̲O̲N̲ ̲C̲O̲N̲C̲E̲P̲T̲



         The modifications will be implemented with as few as
         possible changes in the existing FIKS S/W and H/W to
         reduce the amount of effort involved.

         The proposed solution assumes that the activities concerned
         other FIKS System modifications are carried out. Refer
         to ref. 7 + 8.

         To overcome the problem concerned the limited amount
         of spare CR80 - program memory, implementation using
         "background processing" will be used. In case the the
         CR80- computers at a latter point of time will be equipped
         with the XAMOS System, the background processing can
         be transferred to ordinary processing and thereby improving
         the performance.

         Test configurations used at the development will be
         implemented in a way, that they, by slight modification,
         can be used at related development/testing.

         No hardware is involved in this proposal.


                   4 P̲R̲O̲P̲O̲S̲E̲D̲ ̲S̲O̲L̲U̲T̲I̲O̲N̲S̲



4.1      A̲S̲M̲-̲H̲A̲N̲D̲L̲I̲N̲G̲

         An outline is shown in figure 4.1.

         The following ASM's shall be known and processed by
         the FIKS-System.

         ASM's transmitted from FIKS to NICS TARE:

         -   Open Channel (QRV), ref. 5, sec. 10.6.2.1. 
             The ASM is despatched when the SCC-supervisor issues
             an "Open Channel"- command. The incoming channel
             is hereby opened for narrative messages. The event
             is logged in the "Conversion Log".

         -   Close Channel (QRT), ref 5, sec. 10.6.2.2.
             The ASM is despatched when the SCC-supervisor issues
             a "Close Channel"- command. The incoming channel
             is hereby closed for narrative messages. The event
             is logged in the "Conversion Log".

         -   Flash Receipt (R Z), ref. 5, sec. 10.6.2.5.
             FIKS will after reception of a flash-precedence
             message despatch this ASM.

         -   Channel Account/Final Numbers (ZID), ref. 5, sec.
             10.6.3.2.3. 
             FIKS will after reception of a message with a TI
             (Transmission Identification) equal to 1 or when
             the SCC-supervisor issues a "Reset TI's"- command,
             reset its own TI's (incoming and outgoing) and
             despatch the ASM. The event (including last received
             TI) is logged in the "Conversion Log".

         -   Channel Check, ref. 5, sec. 10.6.2.6.
             The SCC-supervisor can by issueing the "Check Channel"
             - command initiate despatch of this ASM. The ASM
             will automatically be despatch after the "Open
             Channel"- ASM (test of channel). The return of
             the ASM is expected within 15 minutes. Return/timeout
             will be logged in the "SCC-Event Log".


















































                        FIGURE 4.1
                   ASM HANDLING OUTLINE


         -   Channel Continuity, ref. 5, sec. 10.6.2.7. 
             If the outgoing channel is open and no outgoing
             traffic has taken place in a period of 5 minutes,
             then FIKS will despatch this ASM.

         ASM's received from NICS TARE by FIKS:

         -   Open Channel (QRV), ref. 5, sec. 10.6.3.1.1. 
             FIKS will not despatch any narrative messages before
             this ASM has been received. The event is logged
             in the "Conversion Log".

         -   Close Channel (QRT), ref. 5, sec. 10.6.3.1.2.
             FIKS will not despatch any narrative messages after
             this ASM has been received. The event is logged
             in the "Conversion Log".

         -   Flash Receipt (R Z), ref. 5, sec. 10.6.3.2.5. 
             FIKS expects to receive this ASM within 5 mnutes
             after despatch of a flash precedence message. When
             it is received or timeout occurs, this is logged
             in the "Conversion Log".

         -   Channel Account/Final Numbers (ZID), ref. 5, sec.
             10.6.2.2.3.
             FIKS will check that the TI, contained in the ASM,
             confirms with that of FIKS. The event (including
             the last TI received by NICS TARE) is logged in
             the "Conversion Log". If the TI-checking fails,
             then the logging will be marked with "Outgoing
             TI-missing".

         -   Channel Check, ref. 5, sec. 10.6.3.1.5.
             The incident will be logged in the "SCC Event Log".

         -   Channel Continuity, ref 5, sec. 10.6.1.6.
             FIKS expects to receive this ASM if the incoming
             channel is open and nothing else has been received
             within 6 minutes. If not then "Missing Channel
             Continuity" will be logged in the "SCC-Event Log".

         -   Other ASM's received.
             The event will be logged in the "SCC Event Log"
             including at least the first 32 characters of format
             line 12. (Unknown ASM).



         An ASM will by FIKS be identified as such if the general
         ACP127- format specified in ref. 6 is observed and
         the routing indicators (RI's) in format line 2 + 3
         contains one and only one of two unique RI's - a "FIKS"-
         RI or a "NICS TARE"- RI.

         The implementation of the abovementioned is outlines
         as follows: (ref. figure 4.1):

         -   A new ASM-process is introduced. This process generates
             upon request (contained in an AMOS-message) the
             required ASM and enqueues it to the CPM-process.
             A new logical "ISH-channel" (ref.3) will be associated
             to the AMS's. This channel is used to separate
             ASM- and narrative message traffic.

         -   The CPM-process will enqueue the ASM directly into
             the NICS TARE-queue. CPM will receive the acknowledge
             from NICS TARE and is in this way capable to control
             the ASM-flow to NICS TARE.

         -   Incoming ASM's will be routed to the MAS-process
             together with the narrative messages. …02…MAS shall
             be updated such that it is able to extracxt ASM's
             from the message flow and enqueue them directly
             to the ASM-process.

         -   The ASM-process, shall analyse the received ASM's,
             perform the necessary updating (channel status
             changes), initiate the required logging and inform
             the other processes if needed.

         -   The ASM-process shall be the controller of timeout
             of "Check Channel"- answers, "Missing Channel Continuity"
             and "Flash Receipt". To do this the TIMER- process
             is used. The TIMER-process will have to be updated.
             In case timeout occurs, then the ASM shall initiate
             the required loggings.

         -   The IOMP-process in the NICS TARE Subsystem (ref.4)
             shall supervise "outgoing channel continuity",
             i.e. initiate despatch of "Channel Continuity"
             - ASM if required.



         -   The MAS-process will supervise "incoming channel
             continuity" and report in case of "Missing Channel
             Continuity".

         -   The TEPTNT-process shall be updated so that the
             range of SCC-supervisor commands is expanded with
             "Open Channel", "Close Channel", "Check Channel"
             and "Reset TI's. The execution of the commands
             is handed over to the ASM-process via an AMOS-message.

         -   The CPM-process shall initiate despatch of "Flash
             Receipt" when the event is sensed, and inform the
             ASM-process to start timeout-test, in case a flash
             message is despatched.



4.2      A̲S̲M̲-̲R̲E̲L̲A̲T̲E̲D̲ ̲U̲P̲D̲A̲T̲E̲

         Certain features has, caused by the introduction of
         ASM's into the FIKS System, been actualised. This concerns:

         -   Incoming TI-checking.
             The TI-sequence of incoming messages will be checked
             continuously. If the checking indicates missing
             messages, this will be logged as "Incoming TI missing"
             in the "Conversion Log". If the incoming TI equals
             1 an "Final Numbers" -ASM shall be despatched to
             NICS TARE. The MAS-process will perform the abovementioned.

         -   TI-checkpointing.
             The TI's (incoming and outgoing) will be checkpointed,
             so that the FIKS System after start/restart is
             able to continue the TI-sequence and perform correct
             TI-accounting with NICS TARE. The MSA-, ASM-processes
             will checkpoint outgoing TI's, the MAS-process
             the incoming TI's.

         -   Reset TI-command
             After start/restart or switch off 
             NICS TARE-connection (to another site) the TI-sequences
             may be undefined. This problem can be overcome
             by the SCC-supervisor by issueing a "Reset TI"-command.
             The outgoing TI will be reset (=1) and a "Final
             Numbers" - ASM will be despatched to the NICS TARE.
             The FIKS expects next incoming TI to be 1.



4.3      F̲I̲N̲A̲L̲ ̲T̲E̲S̲T̲I̲N̲G̲ ̲O̲P̲T̲I̲O̲N̲

         As the FIKS-NICS TARE link has never been tested in
         real environment, the existing FIKS-NICS TARE Interface
         may contain some concealed errors not convered by any
         contractors guarantee. These error, whenever they are
         detected, has to be corrected. A test of the FIKS-NICS
         TARE interface in full scale must be performed when
         the NICS TARE is ready. Test-procedures must be specified,
         scheduled and performed. The result of the testing
         shall be analysed and possible discovered errors corrected.
         An option which includes the abovementioned activities
         is therefore proposed. CR shall after request from
         AMC within 2 months place qualified personnel at desposal
         for participating in the activities. The option will
         cover a maximum of 4 man month in a period of 12 month
         from contract signature.





                 5 S̲O̲F̲T̲W̲A̲R̲E̲ ̲S̲P̲E̲C̲I̲F̲I̲C̲A̲T̲I̲O̲N̲



         The propsed solutions are implemented by adding/updating
         of the following software modules of the FIKS-system.

         -   New ASM-process
             Generation and control of ASM's

         -   CPM-process update.
             ASM-distribution, Flash Receipt-supervision.

         -   IOMP-process update
             Outgoing Channel Continuity supervision.

         -   MAS-process updated
             Adaption for AMS's. Incoming Channel Contintuity
             supervision, TI-checkpointing.

         -   MSA-process update
             TI-checkpointing.

         -   TEPINT-process update.
             New SCC-supervisor commands.

         -   HSP-process udate.
             New SCC-event loggings.

         -   SMAILB-critical region update
             New "ASM-ISH logical channel", extra "Conversion
             Log"- entries.

         -   Miscellaneous FIKS-update.
             New queues, TIMER-process updated, etc.





            6 D̲E̲V̲E̲L̲O̲P̲M̲E̲N̲T̲,̲ ̲T̲E̲S̲T̲,̲ ̲D̲O̲C̲U̲M̲E̲N̲T̲A̲T̲I̲O̲N̲



         Development (design and coding) and low level module
         testing will take place at CRAS, Ballerup. High level
         module tests, integration tests and acceptance test
         shall take place at the FIKS Test System at Vedb`k.
         Occasionally employment of the operational SCC at Vedb`k
         may occur. AMC must arrange for the abovementioned.
         The acceptance test procedure shall be approved by
         AMC before the test is carried out.

         A document containing the product specification for
         the solutions and test procedures, will be issued and
         delivered to AMC before integration test is started.
         The needed update of system software interface documents
         will be specified as DCN's to the existing documents.





             7 P̲R̲I̲C̲E̲ ̲S̲U̲M̲M̲A̲R̲Y̲,̲ ̲P̲R̲I̲C̲E̲ ̲B̲R̲E̲A̲K̲D̲O̲W̲N̲



         The total cost of the proposals will be:

                 9̲5̲3̲,̲1̲7̲9̲.̲5̲0̲ ̲K̲r̲.



7.1      D̲E̲V̲E̲L̲O̲P̲M̲E̲N̲T̲ ̲C̲O̲S̲T̲S̲

         Manpower consumption in weeks of 38.75 hours

         Task                       Manpower       Duration/Weeks
          ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
         ̲ ̲ ̲ ̲ ̲ ̲

         Management                    E1                4
         Design/Docuementation         E1               19
         S/W coding/Module test        E2               18
         Integration/Acceptance Test   E2                5
         Secretariate                  S1                3
         Technical Support             T1                1

         MANPOWER COSTS

         Manpower         Weeks       Price/hour      Price
          ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
         ̲ ̲ ̲ ̲ ̲ ̲

             E1            23           574        511,577,50
                 Kr.
             E2            23           437        389,476,25
                 Kr.
             T1             1           373         14,453,75
             Kr.
             S1             3           324         37,665,00
             Kr.
          ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
         ̲ ̲ ̲ ̲ ̲ ̲

         Total                                     953,170,50
         Kr.

         E1:     Senior Engineer     T1: Technician
         E2:     Junior Engineer     S1: Secretary



7.2      O̲P̲T̲I̲O̲N̲ ̲C̲O̲S̲T̲S̲

         "Time and Material" - accounting at rates valid at
         the time of invoicing.

         Note:   Option Costs is not included in Total Price.
                 (ref.7.1)


                   8 B̲I̲D̲D̲I̲N̲G̲ ̲P̲R̲O̲V̲I̲S̲I̲O̲N̲S̲



8.1      V̲A̲L̲I̲D̲I̲T̲Y̲

         The aforementioned costs are under assumption that:

         1.  Sufficient spare CR80-memory is available to contain
             the extended software modules.

         2.  The FIKS test system and the SCC-installation at
             Vedb`k will available for testing of the proposed
             solution at the needed scope.

         3.  The proposal in ref. 7 is accepted, and the FIKS
             modification specified in ref. 8, enclosure 1 is
             carried out.

         4.  Acceptance of this proposal is performed before
             30 APR. 1985.

         All prices are quoted at price level February, 1985.
         These prices are subject to price variation in accordance
         with labour/material indices.



8.2      D̲E̲L̲I̲V̲E̲R̲Y̲

         The proposal solution (H/W and S/W) can be delivered
         for installation 8 months after signature of contract.



8.3      P̲A̲Y̲M̲E̲N̲T̲ ̲P̲L̲A̲N̲

         30% at Contract Signature
         25% at Design Completion
         25% at Code Completion
         20% at Acceptance