DataMuseum.dk

Presents historical artifacts from the history of:

CR80 Wang WCS documentation floppies

This is an automatic "excavation" of a thematic subset of
artifacts from Datamuseum.dk's BitArchive.

See our Wiki for more about CR80 Wang WCS documentation floppies

Excavated with: AutoArchaeologist - Free & Open Source Software.


top - download

⟦d78dd9a85⟧ Wang Wps File

    Length: 7589 (0x1da5)
    Types: Wang Wps File
    Notes: SD/STD017                 
    Names: »0783A «

Derivation

└─⟦4bcf3d88d⟧ Bits:30005999 8" Wang WCS floppy, CR 0048A
    └─ ⟦this⟧ »0783A « 

WangText




…02…SD/STD/017
 

…02… EV/810717…02……02…#
INCOMING
 INSPECTION
 STANDARD
…02……02…GENERAL








                T̲A̲B̲L̲E̲ ̲O̲F̲ ̲C̲O̲N̲T̲E̲N̲T̲S̲



…02…1  PURPOSE  ...............................................
  4

…02…2  APPLICABLE DOCUMENTS AND TERMS  ........................
  5

…02…3  SURVEY  ................................................
  6

…02……02…3.1  FLOW CHART  ........................................
  6
   3.2  INCOMING INSPECTION REPORT  ........................
    6
…02……02…3.3  SPECIAL EQUIPMENT  .................................
  6
     3.1.1  FLOW CHART  ....................................
      7

…02…4  INCOMING INSPECTION REPORT  ............................
  8

…02……02…4.1  GENERAL  ...........................................
  8
…02……02…4.2  RESPONSIBILITY  ....................................
  8
…02……02…4.3  AIDS  ..............................................
  8
…02……02…4.4  REPORT FROM INSPECTION  ............................
  8
     4.1.1  INDGANGSKONTROL RAPPORT  .......................
      9
     4.4.1  RAPPORT FRA INSPEKTIONEN  ......................
     10

…02…5  TAGS  ..................................................
 11

…02……02…5.1  GENERAL  ...........................................
 11
…02……02…5.2  TAGS  ..............................................
 11
     5.2.1  TAGS  ..........................................
     13

…02…6  DETAILED INCOMING INSPECTION  ..........................
 14

…02……02…6.1  GENERAL  ...........................................
 14
…02……02…6.2  SPECIAL TEST PROCEDURES  ...........................
 14
…02……02…6.3  PHYSICAL SEPARATION  ...............................
 14
…02……02…6.4  INSPECTION DEGREE  .................................
 14

…02…7  SAMPLE CHECK  ..........................................
 15

…02……02…7.1  GENERAL  ...........................................
 15
…02……02…7.2  SAMPLE QUANTITY  ...................................
 15
…02……02…7.3  DECISION  ..........................................
 15
     7.1.1  SAMPLING TABLE  ................................
     16




                        1̲ ̲ ̲P̲U̲R̲P̲O̲S̲E̲



1.1…02…P̲U̲R̲P̲O̲S̲E̲

         This document defines the requirements to incoming
         inspection activities performed in the Systems Division
         of CRA.



            3̲ ̲ ̲A̲P̲P̲L̲I̲C̲A̲B̲L̲E̲ ̲D̲O̲C̲U̲M̲E̲N̲T̲S̲ ̲A̲N̲D̲ ̲T̲E̲R̲M̲S̲



3.1      A̲P̲P̲L̲I̲C̲A̲B̲L̲E̲ ̲D̲O̲C̲U̲M̲E̲N̲T̲S̲

         The following documents are applicable to the Incoming
         Inspection Standard:

         a)  AQAP-1
             NATO Quality Control System Requirements for Industry

         b)  MIL-I-45208A
             Inspection System Requirements

         c)  MIL-STD-105D
             Sampling Procedures and Tables for inspection by
             attributes.



                        3̲ ̲ ̲S̲U̲R̲V̲E̲Y̲



3.1      F̲L̲O̲W̲ ̲C̲H̲A̲R̲T̲

         The flow chart, fig. 3.1.1 outlines the flow from the
         reception to stock.



3.2      I̲N̲C̲O̲M̲I̲N̲G̲ ̲I̲N̲S̲P̲E̲C̲T̲I̲O̲N̲ ̲R̲E̲P̲O̲R̲T̲

         The heading of the report will be filled in immediately
         after receipt. When detailed inspection and test have
         been carried out, all relevant information will be
         filled in and the report will be closed.



3.3      S̲P̲E̲C̲I̲A̲L̲ ̲E̲Q̲U̲I̲P̲M̲E̲N̲T̲

         Special equipment mainly delivered from other suppliers
         will be inspected according to special test procedures
         prepared for the concerned equipment.








              4̲ ̲ ̲I̲N̲C̲O̲M̲I̲N̲G̲ ̲I̲N̲S̲P̲E̲C̲T̲I̲O̲N̲ ̲R̲E̲P̲O̲R̲T̲



4.1      G̲E̲N̲E̲R̲A̲L̲

         The formula "Indgangskontrol Rapport", fig. 4.1.1 is
         being kept in a file consecutive numbered yearly. The
         IKR-number will be the traceability of the received
         items after incoming inspection. The report has to
         be filled in immediately after receiving the goods
         and these shall be marked with tags showing IKR-number
         and inspection status.



4.2      R̲E̲S̲P̲O̲N̲S̲I̲B̲I̲L̲I̲T̲Y̲

         The QAM is responsible for ensuring that the inspection
         is performed in accordance with this standard.

         Results of all checks and tests carried out on received
         materials or parts will be checked and approved by
         the Quality Assurance Manager.



4.3      A̲I̲D̲S̲

         Inspection and test equipment, drawings, specifications
         and instructions shall be available to perform the
         necessary tests and inspections by receipt of the items
         being purchased.

         The Project/Department Management ordering is bound
         to distribute order copies and special requirements.



4.4      R̲E̲P̲O̲R̲T̲ ̲F̲R̲O̲M̲ ̲I̲N̲S̲P̲E̲C̲T̲I̲O̲N̲

         The formula "Rapport fra Inspektionen", fig. 4.4.1
         shall be used during inspection and is an appendix
         to the IKR.








                         5̲ ̲ ̲T̲A̲G̲S̲



5.1      G̲E̲N̲E̲R̲A̲L̲

         Using of tags for inspection status is performed:

         a)  To identify

         b)  To state inspection status

         c)  To obtain traceability.



5.2      T̲A̲G̲S̲

         Two sorts of tags will be used.  (See fig. 5.2.1)

         a)  T1, acceptance tag.

…02…         The tag is showing:

             1)  Project

             2)  Identification

             3)  Serial number(s)

             4)  Incoming Inspection Record number

             5)  Date of acceptance

             6)  Initials

             This tag will be available when incoming inspection/test
             is finished without remarks

         b)  T2, accept/reject tag.

             The tag is showing:

             1)  Project

             2)  Identification



             3)  Serial number(s)

             4)  Incoming Inspection Record number

             5)  Non-conformance report number

             6)  Accept/reject date

             7)  Initials

             This tag will be available when incoming inspection/test
             is finished with a non-conformance report.  Accept/reject
             date shall be filled in when a decision is made
             by the Material review board.





             6̲ ̲ ̲D̲E̲T̲A̲I̲L̲E̲D̲ ̲I̲N̲C̲O̲M̲I̲N̲G̲ ̲I̲N̲S̲P̲E̲C̲T̲I̲O̲N̲



6.1      G̲E̲N̲E̲R̲A̲L̲

         Procured items (parts, materials, equipment, etc.)
         shall be evaluated for compliance with technical and
         quality requirements.  Deficiencies shall be returned
         for correction to the involved suppliers in accordance
         with the non-conformance rules.



6.2      S̲P̲E̲C̲I̲A̲L̲ ̲T̲E̲S̲T̲ ̲P̲R̲O̲C̲E̲D̲U̲R̲E̲S̲

         To ensure that complicated parts or equipment will
         be inspected satisfactory, there shall for each such
         part be made a special test procedure with all relevant
         test and inspection points demanded in the requirements
         for the concerned equipment.  These documents shall
         be updated as required.



6.3      P̲H̲Y̲S̲I̲C̲A̲L̲ ̲S̲E̲P̲A̲R̲A̲T̲I̲O̲N̲

         Physical separation of raw material and of purchased
         manufactured items shall be maintained during and after
         different test steps.  This shall provide as a minimum
         separation of:

         -   Conforming Materials or other items (Green storage
             T1)

         -   Rejected Materials or other items. (Red storage
             T2)



6.4      I̲N̲S̲P̲E̲C̲T̲I̲O̲N̲ ̲D̲E̲G̲R̲E̲E̲

         The degree of inspection performed shall be consistent
         to the criticallity of the item, the information available
         from previous inspections and tests, and the quality
         history of the item.  Statistical sampling techniques
         will be used where applicable as long as the reliability
         goal of the project is met.


                     7̲ ̲ ̲S̲A̲M̲P̲L̲E̲ ̲C̲H̲E̲C̲K̲



7.1      G̲E̲N̲E̲R̲A̲L̲

         An incoming inspection of all procured items shall
         be performed on a sample basis using the sampling table
         fig. 7.1.1 taken from MIL-STD-105D.



7.2      S̲A̲M̲P̲L̲E̲ ̲Q̲U̲A̲N̲T̲I̲T̲Y̲

         The sample quantity from fig. 7.1.1 shall be found
         equally from the whole lot to be representative.



7.3      D̲E̲C̲I̲S̲I̲O̲N̲

         Does the rejected quantity exceed the allowed according
         to the table the rest of the presented lot shall be
         inspected 100%.