DataMuseum.dk

Presents historical artifacts from the history of:

CR80 Wang WCS documentation floppies

This is an automatic "excavation" of a thematic subset of
artifacts from Datamuseum.dk's BitArchive.

See our Wiki for more about CR80 Wang WCS documentation floppies

Excavated with: AutoArchaeologist - Free & Open Source Software.


top - download

⟦d7cf50a8a⟧ Wang Wps File

    Length: 6700 (0x1a2c)
    Types: Wang Wps File
    Notes: Spelunked
    Names: »~ORPHAN65.00«

Derivation

└─⟦74592f894⟧ Bits:30006167 8" Wang WCS floppy, CR 0226A
    └─ ⟦this⟧ »~ORPHAN65.00« 

WangText



A…07…@…0c…@…0d…@
@   ?…09…?…0a…?…0f…?…05…>…0b…>…00…>…06…=…0c…=…00…= <…09…<…0f…<…02…<…06…;…09…;…0b…;…01…; ;…07…:…0b…:…00…:…02…9…0b…9…0f…9…07…8…86…1
                        
                        
                        
                        
                        
                        
                        
                        
                        
                        
                        
                        
                        
                        
                        
                        
                        
                        
                        
                        
                        
                        
                        
                        
                        
                        
                        
                        
                        
                        
                        
                        
                        
                        
                        
                        
                        
                        
                        
                        
                        
                        
                        
                        
                        …02…
                        
                        
                        
                        
                        
                        
                        
                        
                        
                        
                        …02…
                        
                        
                        …02…
                        
                        
                        

2738A/ktd
 …02…CPS/INM/001

…02…HAU/821216…02……02…
 
CAMPS
 INSTALLATION
 MANUAL
FOR SITE
 01…02……02…CAMPS







            5  I̲N̲S̲T̲A̲L̲L̲A̲T̲I̲O̲N̲ ̲O̲F̲ ̲S̲I̲T̲E̲ ̲E̲Q̲U̲I̲P̲M̲E̲N̲T̲



5.1      G̲E̲N̲E̲R̲A̲L̲

         The following step by step installation procedure contains
         a detailed instruction set of how to install the CR
         delivered compute racks, frequency stabilizer, supervisory
         positions, maintenance position, and user terminals.


         The major tasks of the installation sequence are:

         5.2     Mechanical rack assembly

         5.3     Termination of external power cables and mounting
                 of conduits
         5.4     Installation of external signal cables and
                 mounting of conduits rack C, D, F and G.

         5.5     Remounting of racks

         5.6     Installation and termination of internal signal
                 cables

         5.7     Installation of external signal cables

         5.8     Connection of iternal power cables

         5.9     Power up and check out

         5.10    Inspection  of status leds

         5.11    Installation of Delta VDU

         5.12    Installation of Tracor MSP

         5.13    Installation of PTP/PTR

         5.14    Test of Supp/User Terminals

         5.15    Test of PTP/PTR


         5.16    H/W Test Processor/Line term. units

         5.17    Inventory check

         Throughout the installation instruction, references
         are made to the AB-Drawings (Doc. PAB/CPS/AB/001) and
         the CAMS Hardware Breakdown/Hardware Tree (Doc. CPS/SDS/017).



5.2      M̲E̲C̲H̲A̲N̲I̲C̲A̲L̲ ̲R̲A̲C̲K̲ ̲A̲S̲S̲E̲M̲B̲L̲Y̲



5.2.1    U̲n̲p̲a̲c̲k̲i̲n̲g̲ ̲o̲f̲ ̲R̲a̲c̲k̲s̲

         a)  Each of the 7 EMI racks for the main site are separately
             packed in the original wooden container. The racks
             should remain packedduring site internal transportation
             and only be unpacked close to the installation
             site, but if the space along the access route is
             limited, the racks can be unpacked before transportation
             to the installation site. The racks are unpacked
             as follows

         b)  Remove the top cover of the wooden container by
             demounting the 3 EA 1/4 x 2 1/2" bolts on each
             side of the container and the 4EA 1/2 - 13 x 2"
             bolts, one in each top corner (see Figure 5.2.1).

         c)  The 4 walls of the container are removed by oosening
             the 21 EA 1/4 x 2 1/2" bolts on each short side.

         d)  The rack is bolted to the container bottom in each
             corner by a 1/2 - 13 x 2 1/2" bolt.

         e)  These bolts are removed from under the container
             bottom.

















                       Figure 5.2.1


5.2.2    T̲r̲a̲n̲s̲p̲o̲r̲t̲a̲t̲i̲o̲n̲ ̲t̲o̲ ̲I̲n̲s̲t̲a̲l̲l̲a̲t̲i̲o̲n̲ ̲S̲i̲t̲e̲

         a)  After unpacking, the front and rear door of the
             racks must be removed. Check that serial numbers
             in
             the racks correspond to the seral numbers of the
             doors.

         b)  Be careful not to damage the gaskets of the doors.

         c)  Depending on means of transportation, 4 eyelets
             can be mounted in the top of the rack in the position
             of the removed 4 EA 1/2 - 13 x 2" bolts.

         d)  6 terminal tbles out of the CR delivered 15 tables
             are moved into the CAMPS area for the maintenance
             and supervisor positions.

         e)  The FREQ Stabilizer and the storage cabinet are
             moved into the CAMPS area.

         f)  All terminals (28 VDU and 11 MSP) are distribute
             to their respective installation sites, unpacked
             and the empties removed.



5.2.3    R̲e̲m̲o̲v̲a̲l̲ ̲o̲f̲ ̲U̲p̲p̲e̲r̲ ̲C̲r̲a̲t̲e̲s̲ ̲a̲n̲d̲ ̲D̲-̲F̲a̲n̲s̲

         a)  To get access for bolting the single racks into
             3 bay and 4 bay units, the upper crate in B, C
             and E must be removed.

         b)  Dsmount all connected front and rear cables.

         c)  Dismount the power cables on the rear side of the
             M-fan in rack B and C. 
             Loosen the 4  6mm front screws and pull out the
             fan units from the front of the racks.

         d)  Loosen the 8 (M-crate) and 4 (Scrate) 6mm front
             screws and pull out the crates by the handles from
             the front of the racks.















































                       Figure 5.2.2

                   MOUNTING OF GASKETS


5.2.4    R̲e̲m̲o̲v̲a̲l̲ ̲o̲f̲ ̲M̲a̲i̲n̲s̲ ̲S̲w̲i̲t̲c̲h̲e̲s̲

         a)  To get access for bolting the rack in the bottom,
             the mains switches in rack B, C, E, F, and G must
             be removed.

         b)  Dismount the power cables nd the ground wire on
             the rear side of the mains switches.

         c)  Loosen the 4  6mm front screws and pull out the
             mains switches from the front of the racks.



5.2.5    M̲o̲u̲n̲t̲i̲n̲g̲ ̲o̲f̲ ̲L̲e̲v̲e̲l̲l̲e̲r̲s̲

         The 4 levellers are mounted from under the racks two
         by two by tilting the racks (see AB drawing 115)

         The levellers are mounted to a distance of 40 mm between
         the bottom of the rack and the floor.



5.2.6    M̲o̲u̲n̲t̲i̲n̲g̲ ̲o̲f̲ ̲G̲a̲s̲k̲e̲t̲s̲

         a)  To secure a correct shielding between the racks,
             gasket strips must be mouted before boltering the
             racks into 3 or 4 BAY units. See fig. 5.1. The
             gaskets, having pressure sensitive tape adhesive,
             must be applied at room temperature as follows:

         b)  Clean the mounting surface for old glue, if necessary,
             with a laquer thin2̲7̲3̲8̲A̲…00…CPS/INM/001 (II)       
              …00…bel/ktd             …00…HAU                 …00…INSTAL.MAN.(Site
             01)…00…0̲8̲…00…0̲9̲…00…8̲2̲…00…1̲3̲…00…3̲0̲…00… ̲ ̲ ̲ ̲…00…1̲9̲…00… ̲ ̲ ̲3̲7̲8̲…00…2̲1̲…00…0̲6̲…00…8̲3̲…00…1̲2̲…00…4̲4̲…00… ̲ ̲ ̲3̲…00…07…00… ̲ ̲5̲0̲2̲6…00…2̲2̲…00…0̲6̲…00…8̲3̲…00…0̲9̲…00…3̲5̲…00…23…00…06…00…83…00…09…00…52…00…0226A…00…
             81…00… ̲ ̲1̲3̲…00…36…00… 1104…00… ̲1̲6̲4̲10…00……16……00……01……00……11……02……00…c…00……01……10……05…'…10……11……01……80…*̲J̲…15……05……00……00……00……00……00……00……00…B
V…01……86……00……00……00……00…?…0a……00……00…?…0b…?…0f…=    =…05…<…0b…<…0c…<…01…<…07…;…0d…;
:…08…:…0e…:      9…09…9…0e…9
8…0a…8…0d…8…01…8     8…06…7…0c…7…0f…7…02…7…06…6…0b…6…0d…6…06…5…0a…5…02…5 5…07…4…86…1                                   
                              …02…           …02…   …02…   

2738A/ktd …02…CPS/INM/001

…02…HAU/830620…02……02…#
CAMPS INSTALLATION MANUAL
FOR SITE 01…02……02…CAMPS







            4  I̲N̲S̲T̲A̲L̲L̲A̲T̲I̲O̲N̲ ̲O̲F̲ ̲S̲I̲T̲E̲ ̲E̲Q̲U̲I̲P̲M̲E̲N̲T̲



4.1      G̲E̲N̲E̲R̲A̲L̲

         The following step by step installation procedure contains
         a detailed instruction set of how to install the CR
         delivered compute racks, frequency stabilizer, supervisory
         positions, maintenance position, and user terminals.


         The major tasks of the installation sequence are:

         4.2     Mechanical rack assembly

         4.3     Termination of external power cables and mounting
                 of conduits
         4.4     Installation of external signal cables and
                 mounting of conduits rack C, D, F and G.

         4.5     Remounting of racks

         4.6     Installation and termination of internal signal
                 cables

         4.7     Installation of external signal cables

         4.8     Connection of iternal power cables

         4.9     Power up and check out

         4.10    Inspection  of status leds

         4.11    Installation of Delta VDU

         4.12    Installation of Tracor MSP

         4.13    Installation of PTP/PTR

         4.14    Test of Supp/User Terminals

         4.15    Test of PTP/PTR


         4.16    H/W Test Processor/Line term. units

         4.17    Inventory check

         Throughout the installation instruction, references
         are made to the AB-Drawings (Appendix A) and the CAMPS