top - download
⟦d7cf50a8a⟧ Wang Wps File
Length: 6700 (0x1a2c)
Types: Wang Wps File
Notes: Spelunked
Names: »~ORPHAN65.00«
Derivation
└─⟦74592f894⟧ Bits:30006167 8" Wang WCS floppy, CR 0226A
└─ ⟦this⟧ »~ORPHAN65.00«
WangText
A…07…@…0c…@…0d…@
@ ?…09…?…0a…?…0f…?…05…>…0b…>…00…>…06…=…0c…=…00…= <…09…<…0f…<…02…<…06…;…09…;…0b…;…01…; ;…07…:…0b…:…00…:…02…9…0b…9…0f…9…07…8…86…1
…02…
…02…
…02…
2738A/ktd
…02…CPS/INM/001
…02…HAU/821216…02……02…
CAMPS
INSTALLATION
MANUAL
FOR SITE
01…02……02…CAMPS
5 I̲N̲S̲T̲A̲L̲L̲A̲T̲I̲O̲N̲ ̲O̲F̲ ̲S̲I̲T̲E̲ ̲E̲Q̲U̲I̲P̲M̲E̲N̲T̲
5.1 G̲E̲N̲E̲R̲A̲L̲
The following step by step installation procedure contains
a detailed instruction set of how to install the CR
delivered compute racks, frequency stabilizer, supervisory
positions, maintenance position, and user terminals.
The major tasks of the installation sequence are:
5.2 Mechanical rack assembly
5.3 Termination of external power cables and mounting
of conduits
5.4 Installation of external signal cables and
mounting of conduits rack C, D, F and G.
5.5 Remounting of racks
5.6 Installation and termination of internal signal
cables
5.7 Installation of external signal cables
5.8 Connection of iternal power cables
5.9 Power up and check out
5.10 Inspection of status leds
5.11 Installation of Delta VDU
5.12 Installation of Tracor MSP
5.13 Installation of PTP/PTR
5.14 Test of Supp/User Terminals
5.15 Test of PTP/PTR
5.16 H/W Test Processor/Line term. units
5.17 Inventory check
Throughout the installation instruction, references
are made to the AB-Drawings (Doc. PAB/CPS/AB/001) and
the CAMS Hardware Breakdown/Hardware Tree (Doc. CPS/SDS/017).
5.2 M̲E̲C̲H̲A̲N̲I̲C̲A̲L̲ ̲R̲A̲C̲K̲ ̲A̲S̲S̲E̲M̲B̲L̲Y̲
5.2.1 U̲n̲p̲a̲c̲k̲i̲n̲g̲ ̲o̲f̲ ̲R̲a̲c̲k̲s̲
a) Each of the 7 EMI racks for the main site are separately
packed in the original wooden container. The racks
should remain packedduring site internal transportation
and only be unpacked close to the installation
site, but if the space along the access route is
limited, the racks can be unpacked before transportation
to the installation site. The racks are unpacked
as follows
b) Remove the top cover of the wooden container by
demounting the 3 EA 1/4 x 2 1/2" bolts on each
side of the container and the 4EA 1/2 - 13 x 2"
bolts, one in each top corner (see Figure 5.2.1).
c) The 4 walls of the container are removed by oosening
the 21 EA 1/4 x 2 1/2" bolts on each short side.
d) The rack is bolted to the container bottom in each
corner by a 1/2 - 13 x 2 1/2" bolt.
e) These bolts are removed from under the container
bottom.
Figure 5.2.1
5.2.2 T̲r̲a̲n̲s̲p̲o̲r̲t̲a̲t̲i̲o̲n̲ ̲t̲o̲ ̲I̲n̲s̲t̲a̲l̲l̲a̲t̲i̲o̲n̲ ̲S̲i̲t̲e̲
a) After unpacking, the front and rear door of the
racks must be removed. Check that serial numbers
in
the racks correspond to the seral numbers of the
doors.
b) Be careful not to damage the gaskets of the doors.
c) Depending on means of transportation, 4 eyelets
can be mounted in the top of the rack in the position
of the removed 4 EA 1/2 - 13 x 2" bolts.
d) 6 terminal tbles out of the CR delivered 15 tables
are moved into the CAMPS area for the maintenance
and supervisor positions.
e) The FREQ Stabilizer and the storage cabinet are
moved into the CAMPS area.
f) All terminals (28 VDU and 11 MSP) are distribute
to their respective installation sites, unpacked
and the empties removed.
5.2.3 R̲e̲m̲o̲v̲a̲l̲ ̲o̲f̲ ̲U̲p̲p̲e̲r̲ ̲C̲r̲a̲t̲e̲s̲ ̲a̲n̲d̲ ̲D̲-̲F̲a̲n̲s̲
a) To get access for bolting the single racks into
3 bay and 4 bay units, the upper crate in B, C
and E must be removed.
b) Dsmount all connected front and rear cables.
c) Dismount the power cables on the rear side of the
M-fan in rack B and C.
Loosen the 4 6mm front screws and pull out the
fan units from the front of the racks.
d) Loosen the 8 (M-crate) and 4 (Scrate) 6mm front
screws and pull out the crates by the handles from
the front of the racks.
Figure 5.2.2
MOUNTING OF GASKETS
5.2.4 R̲e̲m̲o̲v̲a̲l̲ ̲o̲f̲ ̲M̲a̲i̲n̲s̲ ̲S̲w̲i̲t̲c̲h̲e̲s̲
a) To get access for bolting the rack in the bottom,
the mains switches in rack B, C, E, F, and G must
be removed.
b) Dismount the power cables nd the ground wire on
the rear side of the mains switches.
c) Loosen the 4 6mm front screws and pull out the
mains switches from the front of the racks.
5.2.5 M̲o̲u̲n̲t̲i̲n̲g̲ ̲o̲f̲ ̲L̲e̲v̲e̲l̲l̲e̲r̲s̲
The 4 levellers are mounted from under the racks two
by two by tilting the racks (see AB drawing 115)
The levellers are mounted to a distance of 40 mm between
the bottom of the rack and the floor.
5.2.6 M̲o̲u̲n̲t̲i̲n̲g̲ ̲o̲f̲ ̲G̲a̲s̲k̲e̲t̲s̲
a) To secure a correct shielding between the racks,
gasket strips must be mouted before boltering the
racks into 3 or 4 BAY units. See fig. 5.1. The
gaskets, having pressure sensitive tape adhesive,
must be applied at room temperature as follows:
b) Clean the mounting surface for old glue, if necessary,
with a laquer thin2̲7̲3̲8̲A̲…00…CPS/INM/001 (II)
…00…bel/ktd …00…HAU …00…INSTAL.MAN.(Site
01)…00…0̲8̲…00…0̲9̲…00…8̲2̲…00…1̲3̲…00…3̲0̲…00… ̲ ̲ ̲ ̲…00…1̲9̲…00… ̲ ̲ ̲3̲7̲8̲…00…2̲1̲…00…0̲6̲…00…8̲3̲…00…1̲2̲…00…4̲4̲…00… ̲ ̲ ̲3̲…00…07…00… ̲ ̲5̲0̲2̲6…00…2̲2̲…00…0̲6̲…00…8̲3̲…00…0̲9̲…00…3̲5̲…00…23…00…06…00…83…00…09…00…52…00…0226A…00…
81…00… ̲ ̲1̲3̲…00…36…00… 1104…00… ̲1̲6̲4̲10…00……16……00……01……00……11……02……00…c…00……01……10……05…'…10……11……01……80…*̲J̲…15……05……00……00……00……00……00……00……00…B
V…01……86……00……00……00……00…?…0a……00……00…?…0b…?…0f…= =…05…<…0b…<…0c…<…01…<…07…;…0d…;
:…08…:…0e…: 9…09…9…0e…9
8…0a…8…0d…8…01…8 8…06…7…0c…7…0f…7…02…7…06…6…0b…6…0d…6…06…5…0a…5…02…5 5…07…4…86…1
…02… …02… …02…
2738A/ktd …02…CPS/INM/001
…02…HAU/830620…02……02…#
CAMPS INSTALLATION MANUAL
FOR SITE 01…02……02…CAMPS
4 I̲N̲S̲T̲A̲L̲L̲A̲T̲I̲O̲N̲ ̲O̲F̲ ̲S̲I̲T̲E̲ ̲E̲Q̲U̲I̲P̲M̲E̲N̲T̲
4.1 G̲E̲N̲E̲R̲A̲L̲
The following step by step installation procedure contains
a detailed instruction set of how to install the CR
delivered compute racks, frequency stabilizer, supervisory
positions, maintenance position, and user terminals.
The major tasks of the installation sequence are:
4.2 Mechanical rack assembly
4.3 Termination of external power cables and mounting
of conduits
4.4 Installation of external signal cables and
mounting of conduits rack C, D, F and G.
4.5 Remounting of racks
4.6 Installation and termination of internal signal
cables
4.7 Installation of external signal cables
4.8 Connection of iternal power cables
4.9 Power up and check out
4.10 Inspection of status leds
4.11 Installation of Delta VDU
4.12 Installation of Tracor MSP
4.13 Installation of PTP/PTR
4.14 Test of Supp/User Terminals
4.15 Test of PTP/PTR
4.16 H/W Test Processor/Line term. units
4.17 Inventory check
Throughout the installation instruction, references
are made to the AB-Drawings (Appendix A) and the CAMPS
Hardwa