…00……00……00……00……0a……0a……00……00……0a……0b……0a……0d……0a……05……0a……06……09……09……09……0d……09……05……86…1 …02… …02… …02…
1983-08-26
PROPOSAL FOR A CAMPS REFERENCE SYSTEM Page #
PROPOSAL FOR CAMPS REFERENCE SYSTEM
Dated August 26, 1983
Submitted to
SUPREME HEADQUARTERS ALLIED POWERS EUROPE
B-7010 SHAPE, Belgium
Prepared by:
CHRISTIAN ROVSING A/S
Lautrupvang 2,
DK-2750 Ballerup, Denmark.
T̲A̲B̲L̲E̲ ̲O̲F̲ ̲C̲O̲N̲T̲E̲N̲T̲S̲
Page
0 SCOPE ..........................................
2
1 BIDDING PROVISIONS .............................
3
1.1 CONTRACT ...................................
3
1.2 VALIDITY ...................................
3
1.3 TYPE OF PROPOSAL ...........................
3
1.4 PAYMENT PLAN ...............................
3
1.5 PAYMENT IN US DOLLARS ......................
4
1.6 DELIVERY SCHEDULE ..........................
4
2 PRICE PROPOSAL .................................
5
3 HARDWARE CONFIGURATION .........................
7
3.1 HARDWARE ...................................
7
4 SYSTEM/SOFTWARE ENGINEERING ....................
10
4.1 DATABASE ...................................
10
4.2 SYSTEM INTEGRATION .........................
10
4.3 SYSTEM ACCEPTANCE ..........................
10
4.4 SOFTWARE ...................................
10
5 FABRICATION ....................................
11
5.1 HARDWARE ASSEMBLY BREAKDOWN ................
11
5.2 FAT ........................................
11
6 LOGISTICS SUPPORT ..............................
11
6.1 TRANSPORTATION AND INSTALLATION ............
11
6.2 TRAINING AND DOCUMENTATION .................
12
6.3 MAINTENANCE ................................
12
6.4 SPARES .....................................
13
6.5 STORAGE WITH LATER INSTALLATION DATE .......
13
APPENDIX A
Equipment Matrix for Reference System...........
14
APPENDIX B
CAMPS Reference System Hardware Connectivity ...
20
APPENDIX C
RSPL for Reference System ......................
27
S̲C̲O̲P̲E̲
This proposal for "CAMPS Reference System" is forwarded
in response to:
telex camps log no 1333: Camps Reference System dated
1 aug 83.
1̲ ̲ ̲B̲I̲D̲D̲I̲N̲G̲ ̲P̲R̲O̲V̲I̲S̲I̲O̲N̲S̲
1.1 C̲O̲N̲T̲R̲A̲C̲T̲
It is assumed that this proposal will result in a separate
contract between CR and SHAPE if the latter should
accept this proposal.
1.2 V̲A̲L̲I̲D̲I̲T̲Y̲
This proposal including the options is valid for acceptance
until October 1, 1983.
1.3 T̲Y̲P̲E̲ ̲O̲F̲ ̲P̲R̲O̲P̲O̲S̲A̲L̲
Firm, fixed price proposal.
1.4 P̲A̲Y̲M̲E̲N̲T̲ ̲P̲L̲A̲N̲
30 percent on order or letter of intent.
70 percent of OEM equipment cost to be paid on presentation
of certificate of conformance.
10 percent of all other costs to be paid on SPA.
The balance to be paid by monthly payments between
1-0-i and FAT.
1.5 P̲A̲Y̲M̲E̲N̲T̲ ̲I̲N̲ ̲U̲S̲ ̲D̲O̲L̲L̲A̲R̲S̲
Of the quoted price for Camps Reference System
Dkr. 11,178,042 represent cost incurred in US dollars.
This amount may be payable in US Dollars at an exchange
rate of Dkr. 960,- to 100 US Dollars.
1.6 D̲E̲L̲I̲V̲E̲R̲Y̲ ̲S̲C̲H̲E̲D̲U̲L̲E̲
The price proposal is made on the assumption that the
hardware production and the installation can take place
immediately after all other CAMPS systems have been
respectively produced and installed. It means, that
the factory acceptance test will be completed 1st July,
1984, and the site provisional acceptance will be completed
1st January, 1985 or eight months after SPA at SHAPE,
whichever comes later. As some HW-items have a long
lead time, CR need a L-o-i 9 months before the FAT
to be able to keep the schedule as stated.
…01…2̲ ̲ ̲P̲R̲I̲C̲E̲ ̲P̲R̲O̲P̲O̲S̲A̲L̲
1. Program Management ......................... Dkr.
2,571,438
2. System/Software Eng. ....................... Dkr.
1,336,422
2.1 Database ............... Dkr. 222,028
2.2 System Integration ..... Dkr. 733,042
2.3 System Acceptance ...... Dkr. 381,352
3. Hardware Development ....................... Dkr.
281,352
3.1 HW Assembly Breakdown Dkr. 281,352
4. Software Development ....................... Dkr.
0
5. Hardware Fabrication ....................... Dkr.
18,519,152
5.1 HW cost ................ Dkr. 15,925,174
5.2 HW Integration + Test .. Dkr. 2,382,965
5.3 Factory Acc. Test Proc.
and Report ............. Dkr. 211,013
6. Site Installation .......................... Dkr.
1,175,935
6.1 Site Preparation Req. .. Dkr. 277,107
6.2 Site ATBB Drawing ...... Dkr. 184,738
6.3 Transportation ......... Dkr. 124,000
6.4 Site Installation ...... Dkr. 590,090
7. Site Acceptance ............................ Dkr.
184,738
8. Logistics Support .......................... Dkr.
3,862,847
8.1 Warranty ...................................
8.1.1 SW Warranty .......... Dkr. 1,688,112
8.1.2 HW Warranty .......... Dkr. 953,186
8.2 Training ...................................
8.2.1 DAMOS, PASCAL,
SWELL + CAMPS ...... Dkr. 292,853
8.2.2 System and Database
Generation Course... Dkr. 554,213
8.4 Maintenance ................................
8.4.1 Spares ............. Dkr. 374,483
9. Documentation ................................
Dkr. 281,352
9.1 System Generation Manual......Dkr. 281.352
Total ............................................
Dkr. 28,213,236
Options:
6.5.1 Relocation (estimated)...................... Dkr. 1,360,673
6.5.2 Additional costs with later
installation date .......................... Dkr. 647,758
8.4.2 Recommended Additional Spares .............. Dkr. 850,755
8.3 CR rep. site visit (pr. week)
in warranty period ......................... Dkr. 28,248
9.1.1 SW-documentation on Floppy ................. Dkr. 173,176
9.1.2 HW-documentation on Floppy ................. Dkr. 173,176
3̲ ̲ ̲H̲A̲R̲D̲W̲A̲R̲E̲ ̲C̲O̲N̲F̲I̲G̲U̲R̲A̲T̲I̲O̲N̲
3.1 H̲A̲R̲D̲W̲A̲R̲E̲
The hardware configuration required is shown in figure
3.1.
It consists of Tempest Dualised Main Equipment with
adaptors provided for metallic and opto connections
up to the equipped limit.
To the main equipment will be connected the following:
32 VDU PORTS OPTO 12 Connected to VDU devices
8 Connected to the test
drive system
16 MSPs PORTS OPTO 12 Connected to MSP device
1 CCIS PORT METALLIC Connected optionally
to
PC or TDS
1 SCARS PORT METALLIC Connected optionally
to
SCARS or TDS
6 TARE PORTS 2 Connected optionally
to
TARE or TDS
24 LOW SPEED PORTS, (MET) 12 Connected to circuits
and
12 to the TDS
1 PAPERTAPE READER/PUNCH Connected to PTR/P device
1 OCR PORT Connected to OCR device
Additionally there is 1 VDU and 1 MSP on the engineering
position.
In appendix A is shown the equipment matrix for the
system.
Appendix B specifies the connectivity of the CAMPS
ref. sytem and the rack configuration.
Remote Equipment.
This proposal is based on the following concept for
use of the remote equipment.
1) No connectivity in the main rack equipment is permanently
allocated to remote channels.
2) If VDU's, MSP's or OCR are going to be connected
through the remote rack, the following operations
must be conducted:
a) Move the adapters (opto or L/L, as applicable)
from the CTX-crate of the main rack to the
Adapter crate of the remote rack.
b) Connect (existing) Back-panels in the Main
site CTX-crates, where the adapters have been
removed.
This operation connects the LTUX-S channels
to the stat.mux of the main site. The channels
are now connected through to the remote site.
c) Connect the Terminal device (VDU, MSP, OCR)
to the remote channel entry of the remote rack.
d) No system operator activities (change of tables
etc.) are required to support the transport
of connectivity from main to remote site as
described in a) - c) above.
3) The following alternative combinations of connectivity
on the remote site can be achieved
a) 4 VDU's, opto or metallic
4 MSP's, opto or metallic
b) 4 VDU's, opto or metallic
3 MSP's, metallic
1 OCR, metallic
Note: Remote OCR, max speed: 1200 bps.
CAMPS REFERENCE SYSTEM (TEMPEST)
Figure 3.1
4̲ ̲ ̲S̲Y̲S̲T̲E̲M̲/̲S̲O̲F̲T̲W̲A̲R̲E̲ ̲E̲N̲G̲I̲N̲E̲E̲R̲I̲N̲G̲
4.1 D̲A̲T̲A̲B̲A̲S̲E̲
The database for the CAMPS reference system as described
in para. 3.1 will be generated, documented and tested
by CR.
4.2 S̲Y̲S̲T̲E̲M̲ ̲I̲N̲T̲E̲G̲R̲A̲T̲I̲O̲N̲
The System SW and the application SW will be installed
on the reference system. The operational software will
be configured to represent the hardware configuration
of the reference system as described in para. 3.1.
4.3 S̲Y̲S̲T̲E̲M̲ ̲A̲C̲C̲E̲P̲T̲A̲N̲C̲E̲
The reference system will be tested in a system test
the same as the functional test on a full site CAMPS.
4.4 S̲O̲F̲T̲W̲A̲R̲E̲
No additional software will be developed.
The SW delivered under the CAMPS contract will be delivered
according to the latest CAMPS baseline.
The support SW deliverables under the CAMPS contract
executed on the development system will enable the
creation of systems which will execute on the reference
system under debug/trace or without debug/trace in
"operational" mode.
5̲ ̲ ̲F̲A̲B̲R̲I̲C̲A̲T̲I̲O̲N̲
5.1 H̲A̲R̲D̲W̲A̲R̲E̲ ̲A̲S̲S̲E̲M̲B̲L̲Y̲ ̲B̲R̲E̲A̲K̲D̲O̲W̲N̲
A HW assembly breakdown at a level of detail as in
the CAMPS program will be delivered, as the basis for
fabrication of the system.
5.2 F̲A̲C̲T̲O̲R̲Y̲ ̲A̲C̲C̲E̲P̲T̲A̲N̲C̲E̲ ̲T̲E̲S̲T̲
The system will be factory tested as the CAMPS systems.
6̲ ̲ ̲L̲O̲G̲I̲S̲T̲I̲C̲S̲ ̲S̲U̲P̲P̲O̲R̲T̲
6.1 T̲R̲A̲N̲S̲P̲O̲R̲T̲A̲T̲I̲O̲N̲ ̲A̲N̲D̲ ̲I̲N̲S̲T̲A̲L̲L̲A̲T̲I̲O̲N̲
Site preparation requirements and ATBB-drawings will
be produced as on the main CAMPS contract. CR assumes
that a site survey can be conducted at the latest 8
months before SPA.
It means that the SPR will be delivered 6 months before
SPA, and the ATBB-drawings 3 months before. The site
verification is completed 3 months before, and the
installation can start 2 months before SPA.
The system will be installed in a site in Belgium as
other CAMPS systems. It is assumed that the cable distance
between the main rack and the remote rack is no more
than 15 meter.
A relocation to another site in Belgium will in addition
cost approximately the same. All documents have to
be rewritten, the HW dismantled, packed, transported,
installed and tested on the new site. Based on more
information a more detailed quote could be forwarded.
6.2 T̲R̲A̲I̲N̲I̲N̲G̲ ̲A̲N̲D̲ ̲D̲O̲C̲U̲M̲E̲N̲T̲A̲T̲I̲O̲N̲
A Standard Pascal, Swell and DAMOS utilities course
(8 days) is quoted for 6 students to be given on a
site in Belgium. The quote is given under the assumption
that a computer with the necessary peripherals is available
at this site and that the course can be given before
february 1, 85. As an extension to the standard courses
a one week CAMPS orientation course will be given on
the same assumptions.
A 2 weeks CAMPS system and database generation course
is quoted for max 6 students to be held at CR.
A system generation manual for the reference system
will be developed.
One copy of all Wang resident CAMPS SW-documentation
and HW-documentation on floppy discette plus one reproduction
master paper copy of the same material is quoted as
an option. Only documentation available on the Wang
textprocessor will be delivered on floppy discette.
No other documentation will be delivered, as CR understands
that copies of the CAMPS site documentation will be
delivered directly from SHAPE to ISSC.
6.3 M̲A̲I̲N̲T̲E̲N̲A̲N̲C̲E̲
The costs of HW-and SW-warranty on the conditions as
in the main CAMPS contract during the one year warranty
period from the SPA are included in the proposal.
If a shorter warranty period is requested, the costs
can be cut down proportionally.
As an extension to the normal warranty conditions,
CR-rep. visit on site is quoted too as an option. The
quote includes an on-call service for HW or SW errors
which cannot be isolated/reproduced as the warranty
conditions calls for. The price quoted is for one man-working
week. Every time a new week is started an additional
one week cost is added.
6.4 S̲P̲A̲R̲E̲S̲
The amount of money available for spares does not allow
SHAPE to purchase the number of spares recommended
by CR, to ensure full availability of the reference
system.
In Appendix C is the spare parts list for an operational
site given with unit prices quoted.
The recommended spares will cost Dkr. 1,225,238 for
the reference system.
If only 30% of the money is available, CR recommends
that modules are purchased to ensure that the reference
system can run non-dualized with degraded connectivity.
Spare parts for a reference system running dualized,
but with degraded connectivity are defined too. The
spare part cost for this option is Dkr. 584,423.
6.5 L̲A̲T̲E̲R̲ ̲I̲N̲S̲T̲A̲L̲L̲A̲T̲I̲O̲N̲ ̲D̲A̲T̲E̲
As an option the additional costs at a later installation
date, if it is requested by SHAPE, is quoted. The costs
cover storage of systems, retest of system in factory
and reeducation of installation team. CR assumes that
the SPA takes place 1 year later than scheduled.
The warranty period will, independent of the new installation
date, expire one year after the original scheduled
SPA (see 1.6).
APPENDIX A
----------
CR-Number. Name Unit Ref. Total OEM
Price Sys Price
Dkr. ea. Dkr.
------------------------------------------------------------------------
1 CR80 WATCHDOG MODULES
------------------------
11 CR8115M/005PC/00 W'DOG
CRATE 39,634
1
39,634
12 CR8066M/010AB/00 WATCHDOG
LTU 34,688
1
34,688
13 CR8076M/010--/00 WCA
17,589
1
17,589
14 CR8089M/010--/00 CCA
16,769
3
50,307
15 CR8091M/-----/00 CCBA
13,847
1
13,847
16 CR8142M-----/-- TSP
1,929
3
5,787
17 CR8042M/010/00 CUCP
10,316
1
10,316
2 CR80 PROCESSOR UNIT
MODULES
------------------------------
21 CR8003M/040PC/00 CPU/CACHE 116,059
6
696,354
25 CR8020M/000PC/00 MAP
89,181
2
178,362
26 CR8071M/010--/00 MIA
40,486
2
80,972
27 CR8021M/010-C/01 STI
81,976
2
163,952
28 CR8073M/010--/00 TIA
22,169
4
88,676
29 CR8016M/512PC/00 512
K RAM 162,840
6
977,040
3 CR80 CHANNEL UNIT MODULES
----------------------------
31 CR8081M/010A-/00 CIA-A
25,020
1
25,020
32 CR8081M/010-B/00 CIA-B
25,020
1
25,020
33 CR8044M/041AB/00 DISC
CTL/32K 64,194
3
192,582
34 CR8084M/010--/00 DCA
10,465
3
31,395
35 CR8047M/040AB/00 ST
FD CTLR 38,742
1
38,742
36 CR8087M/010--/00 SFA
5,124
1
5,124
37 CR8066M/010AB/00 LTU,SYNC/16K
34,688
3
104,064
38 CR8082M/010--/00 LIA-N
3,731
3
11,193
5 TDX SYSTEM MODULES
---------------------
51 CR1070S/000--/00 TDX
CONTL'R 23,799
2
47,598
52 CR2501 X-NET CABLE TERMINATION
499
4
1,996
53 CR2500 (100M) X-NET
CABLE 1,405
1
1,405
54 CR2510-/000--/00 X-NET
OUTLET 1,127 26
29,302
55 CR1074S/000--/00 BSM-X
15,712) 10
157,120
56 CR1066-/000--/00 BSM-X
PANEL )
CR-Number, Name Unit Ref. Total OEM
Price SYS Price
Dkr. Dkr.
------------------------------------------------------------------------
57 CR1060S/000--/00 LTUX
TYPE1 8)
58 CR1060S/000--/00 LTUX,TYPE2 23,855 11)
477,100
59 CR1060S/000--/00 LTUXS
TYPE3 1)
5A CR80109/000--/00 V28
ADAP 4C 26,511
7
185,577 X
5B CR80110/000--/00 V28L
ADAP 1C 29,428
5
147,140 X
5C CR1053S/000--/00 5U
CTX-CRATE 15,656 10
156,560
5D CR8022S/000--/00 POWER
SUPPLY 36,597 10
365,970
5E CR8105S/010--/00 FAN
UNIT,CTX 5,190
6
31,140
5F CR1104S/000--/00 ADAP
CRATE 15,656
1
15,656
5G CR1102S/000--/00 ADAP POW SUP 28,104 12
337,248 X
5L CR1100S/000--/00 BP-8
2,771
7
19,397
5M CR1103S/-----/-- TSP
572
5
2,860
6 CR80 SPECIAL MODULES
-----------------------
61 CR-----/000--/00 OM-1(VDU) 29,348 13
381,524 X
62 CR80108/000--/00 OM-2(CAMAC) 29,348 50 1,467,400 X
63 CR-----/000--/00 OM-3(MSP) 29,348 13
381,524 X
7 CR80 RACK, CRATES, ACCESSORIE
--------------------------------
7N RACK,19",6"H STAB 23,408
1
23,408 X
73 RACK,EMI,1,(LE,RH)
) )2
74 RACK,EMI,1,(LE,LH)
) )
75 RACK,EMI,2,(RE,RH)
) 121,021 )2
726,126 X
76 RACK,EMI,2,(RE,LH)
) )
77 RACK,EMI,3,( I,RH)
) )2
78 RACK,EMI,3,( I,LH)
) )
7B CR8108-/220--/00 MAINS
SWITCH 7,885
6
47,310
7D CR8107-/010--/00 POW
DIST PAN 3,114 10
31,140
7E CR8050M/010--/00 POW
SUPPLY 20,350
6
122,100
7G CR8125M/225PC/00 PU
CRATE 58,081
2
116,162
7H CR8125M/425AB/00 CU
CRATE 68,077
1
68,077
7J CR8105M/020--/00 FAN
UNIT 16,118
3
48,354
7K CR8055M/020--/00 MBT(PU)
3,250
8
26,000
7L CR8211M/738--DATA CHAN
TERM 3,483
2
6,966
CR-Number, Name Unit Ref. Total OEM
Price SYS Price
Dkr. DKr.
------------------------------------------------------------------------
7P FILTER BOX 55,920
1
55,920 X
7Q POWER LINE FILTER
7,631
3
22,893 X
7R STAT, MUX 28
110,481
1
110,481 X
8 CR80 CABLES
--------------
81 CR8201D DATA CHAN CABLE
1,682
2
3,364
82 CABLE,BSM-X-X-NET OUTL
625 20
12,500
83 CABLE,TIA-X-NET OUTL
878
4
3,512
84 CABLE,TDXCTRL-X-NET
OUTL 565
2
1,130
86 CABLE, FLOPPY DISK
631
1
631
87 CABLE,WDCC 1,087
2
2,174
88 CCB CABLE, COMPUTER
RACKS 2,843
1
2,843
89 CCB CABLE, LINE TERM
RACKS 3,516
1
3,516
8R CCB CABLE CRT-LTR TYPE
1
85 CCB CABLE CRT-LTR TYPE
2
8A CR8201S POW CABLE 0,5M )
)
8D CR8201S POW CABLE 2,5M )
)
8E CR8201S POW CABLE 3,5M )
542
)
39
21,138
8F CR8201D POW CABLE 0,5M )
)
8G CR8201D POW CABLE l,0M )
)
8H CR8201D POW CABLE 1,5M )
)
8P POWER CABLE 2A/140
)
8U POWER CABLE 2A/180
158
)
6
948
8V POWER CABLE 2A/220
)
8W POWER CABLE l,0MM l,0M
)
8X POWER CABLE l,0MM l,5M
542
11
5,962
8Y POWER CABLE l,0MM 2,5M
)
CR-Number, Name Unit Ref. Total OEM
Price SYS Price
Dkr.- Dkr.
------------------------------------------------------------------------
9 V24 SIGNAL CABLES
--------------------
91 V24 CABLE 9A/240
92 V24 CABLE 9A/270
93 V24 CABLE 9A/300
94 V24 CABLE 9A/330
95 V24 CABLE 10A/360
96 V24 CABLE 9A/390
97 V24 CABLE 17A/270
656 51
33,456
98 V24 CABLE 17A/300
99 V24 CABLE 17A/330
9A V24 CABLE 17A/360
9B V24 CABLE 10B/240
9C V24 CABLE 10E/150
9D V24 CABLE -TARE
9F OPTICAL FIBER (100M)
15,309
7
107,163 X
9T OPTO CONNECTORS (stk)
582
110
64,020 X
9U FILTERED CONN 10 POL
2,464 32
78,848 X
9V FILTERED CONN 18 POL
3,114
6
18,684 X
CR-Number, Name Unit Ref. Total OEM
Price SYS Price
Dkr.- Dkr.
------------------------------------------------------------------------
G MECHANICS
------------
GB BY-PASS SWITCH UNIT
6,036
1
6,036
GT THERMOSTAT 2,410 11
26,510
GW LUMP SUM PER RACK
1,947
6
11,682
H PERIPHERAL EQUIPMENT
-----------------------
H1 VDU, TEMPEST
179,426 13
2,332,538 X
H2 MSP, TEMPEST
195,727 13
2,544,451 X
H3 MOUNTING TABLE 11,329 13
147,277 X
H4 PTP/R, TEMPEST
477,984
1
477,984 X
H7 FREQ STABILIZER SGL
PH 88,606
3
265,818 X
H8 V11/V28 35,373
1
35,373 X
J MASS STORAGES
----------------
J1 CR8300-/080--/00
DISK DRV SMD 175,780 1 175,780 X
J2 CR8319-/080--/00
DISK PACK, 80MB 5,428 6 32,568 X
J5 STORAGE CABINET
6,306
1
6,306 X
J6 CR8308-/216--/00
FD ST 2xSGL 28,522 1 28,522 X
J7 CR8302-/080 DISK DRIVE,MMD
221,351 2
442,702 X
CR-Number, Name Unit Ref. Total OEM
Price SYS Price
Dkr. Dkr.
------------------------------------------------------------------------
Remote Site:
5 TDX SYSTEM MODULES
---------------------
5E CR8105S/010--/00 FAN
UNIT CTX 5,190
1
5,190
5F CR1104S/000--/00 ADAP
CRATE 15,656
1
15,656
5G CR1102S/000--/00ADAP
PWR SUP 28,104
1
28,104 X
5L CR1100S/000--/00BP-8
2,771
2
5,542
6 CR80 SPECIAL MODULES
-----------------------
62 CR80108/000--/00 OM-2
CAMAC 29,348
8
234,784 X
7 CR80 RACK, CRATES, ACCESSORIE
--------------------------------
79 RACK, EMI, 4 (SA/RH)
121,021
1
121,021 X
7B CR8108-/220--/00
MAINS SWITCH 7,885 1
7,885
7D CR8107-/010--/00
PWR DIST PNL 3,114 1
3,114
7P FILTER BOX 55,920
1
55,920 X
7Q POWER LINE FILTER 7,631 1
7,631 X
7R STAT MUX, 8 CHANNELS
110,481
1
110,481 X
8 CR80 CABLES
--------------
8Y POWER CABLE l,0MM 2,5M
542
3
1,626
9 V24 SIGNAL CABLES
--------------------
91 V24 CABLE 9A/240
656
4
2,624
9D V24 CABLE l0B/060
656
2
1,312
9O V24 CABLE 9C/180
656
8
5,248
9P V24 CABLE l0D/120
656
1
656
9U FILTERED CONN 10 POL
2,464
8
19,712 X
9V FILTERED CONN 18 POL
3,114
1
3,114 X
APPENDIX B
----------
CAMPS REFERENCE SYSTEM
CONNECTIVITY (VDUs, MSPs, LOW SPEED CHANNELS)
----------*-------*-------*-------*-------*-------*------*
TDX * * * * * *
*
UNIT * 1 * 2 * 3 * 4 * 5 *
6
*
NO. * * * * * *
*
----------*-------*-------*-------*-------*-------*------*
CRATE * X * X * X * X * X *
X
*
----------*-------*-------*-------*-------*-------*------*
LTUX 1 * * * * * *
*
CH. 1-4 * 1 * 1 * 1 * 1 * 2 *
2
*
LTUX 2 * * * * * *
*
CH. 5-8 * 1 * 1 * 1 * 1 * 2 *
2
*
----------*-------*-------*-------*-------*-------*------*
ADAPT. 1A * * * * * *
*
CH. 1-4 * * * * * *
*
ADAPT. 1B * * * * * *
*
CH. 1 * O * O * O * O * O *
O
*
ADAPT. 2A * * * * * *
*
CH. 5-8 * * * * * *
*
ADAPT. 2B * * * * * *
*
CH. 2 * O * O * O * O * O *
O
*
ADAPT. 3 * * * * * *
*
CH. 3 * O * O * O * O * O *
O
*
ADAPT. 4 * * * * * *
*
CH. 4 * O * O * O * O * O *
O
*
ADAPT. 5 * * * * * *
*
CH. 5 * O * O * O * O * O *
O
*
ADAPT. 6 * * * * * *
*
CH. 6 * O * O * O * O * O *
O
*
ADAPT. 7 * * * * * *
*
CH. 7 * O * O * O * O * O *
O
*
ADAPT. 8 * * * * * *
*
CH. 8 * O * O * O * O * O *
O
*
BP 1 * * * * * *
*
CH. 1-4 * * * * X * *
X
*
BP 2 * * * * *) * *
*)
*
CH. 5-8 * * * * X * *
X
*
----------*-------*-------*-------*-------*-------*------*
(Sheet 1 of 2)
*) NOTE: BP and O not connected at same time.
CAMPS REFERENCE SYSTEM…01…CONNECTIVITY (VDUs, MSPs, LOW SPEED CHANNELS)
----------*-------*-------*-------*-------*-------* *------------*
TDX * * * * * * *
TOTAL
*
UNIT * 7 * 8 * 9 * 10 * * *
*
NO. * * * * * * *
NUMBERS
*
----------*-------*-------*-------*-------*-------* *-------*----*
CRATE * X * X * X * X * * *CRATES *
10
*
----------*-------*-------*-------*-------*-------* *-------*----*
LTUX 1 * * * * * * * *
*
CH. 1-4 * 2 * 2 * 2 * 3 * * *LTUXs *
19
*
LTUX 2 * * * * * * * *
*
CH. 5-8 * 2 * 2 * 2 * 2 * * * *
*
----------*-------*-------*-------*-------*-------* *-------*----*
ADAPT. 1A * * * * * * * *
*
CH. 1-4 * L * L * L * * * *Os *
32
*
ADAPT. 1B * * * * * * * *
*
CH. 1 * * * * L * * *Ls *
8
*
ADAPT. 2A * * * * * * * *
*
CH. 5-8 * L * L * L * L * * *BPs *
3
*
ADAPT. 2B * * * * * * * *
*
CH. 2 * * * * * * * *
*
ADAPT. 3 * * * * * * * *
*
CH. 3 * * * * * * * *
*
ADAPT. 4 * * * * * * * *
*
CH. 4 * * * * * * * *
*
ADAPT. 5 * * * * * * * *
*
CH. 5 * * * * * * * *
*
ADAPT. 6 * * * * * * * *
*
CH. 6 * * * * * * * *
*
ADAPT. 7 * * * * * * * *
*
CH. 7 * * * * * * * *
*
ADAPT. 8 * * * * * * * *
*
CH. 8 * * * * * * * *
*
BP 1 * * * * * * * *
*
CH. 1-4 * * * * *) X * * * *
*
BP 2 * * * * * * * *
*
CH. 5-8 * * * * * * * *
*
----------*-------*-------*-------*-------*-------* *-------*----*
(Sheet 2 of 2)
*) NOTE: BP and L not connected at same time.
CAMPS REFERENCE SYSTEM
CAMPS REFERENCE SYSTEM
CAMPS REFERENCE SYSTEM
CAMPS REFERENCE SYSTEM
CAMPS REFERENCE SYSTEM
APPENDIX C
----------
S̲p̲a̲r̲e̲ ̲P̲a̲r̲t̲s̲ ̲L̲i̲s̲t̲:
ITEMNAME DESCRIPTION MANUFAC UNIT
PRICE
…02…RSPL
SITE…02…SPL…02…
SPL
DKR.…02……02…DEGRADED…02…
30%
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲C̲O̲N̲N̲E̲C̲T̲I̲V̲I̲T̲Y̲
̲ ̲ ̲
CPU/CACH CR8003M/040PC/00 CR 116,059 1 1 1
RAM 512K CR8016M/512PC/00 - 162,840 1 1 1
MAP CR8020M/000PC/00 -
89,181 1 1 1
MIA CR8071M/010--/00 -
40,486 1 1 1
STI CR8021M/010-C/00 -
81,976 1 1
CIA-A CR8081M/010A-/00 -
25,020 1 1
CIA-B CR8081M/010-B/00 -
25,020 1 1
DISKCTRL CR8044M/040AB/00 -
64,194 1
DCA CR8084M/010--/00 -
10,465 1
OUTLET CR2510-/000--/00 -
1,127 1
SPWRSUPP CR8022S/000--/00 -
36,597 1
CTX FAN CR8105S/010--/00 -
5,190 1
ADPWRSUP CR1102S/000--/00 -
28,104 1
OM-3 OPTO -T/R OM3 -
29,348 1
PWRSUP M CR8050M/010--/00 -
20,350 1 1
PWRSUPCU CR8050M/020--/00 -
20,350 1 1
FANUNITM CR8105M/020--/00 -
16,118 1
CARD JRVV CDC
5,207 1
CARD 6SGV -
8,476 1
CARD FLPV -
8,222 1
CARD JLQV -
8,006 1
CARD ELUV -
7,791 1
CARD MLVV -
6,088 1
(continued)
ASSY POWER SUPPLY SHUGART
9,692 1
PCP PCB SA801-2 -
10,124 1
PCB PUNCH LOGIC
PCB EECO
19,683 1
PCB POS LOGIC PCB -
14,498 1
ASSY READ HEAD ASSY -
13,682 1
ASSY PUNCH MOTOR
ASSY -
69,774 1
KTT DDSC SITE KIT DDSC
72,702 1
UNIT MSP MODEL 8000 TRACOR 195,727 1
PART FAN FOR M-CRATE CR
1,045 1 1
PART FAN FOR S-CRATE -
2,096 1 1
̲
̲
̲
̲
̲
̲
̲
̲
̲
̲
̲
̲
̲
̲
̲
̲
̲
̲
̲
̲
̲
̲
̲ TOTAL
DKR.
1,225,238
584,423
374,483