DataMuseum.dk

Presents historical artifacts from the history of:

CR80 Wang WCS documentation floppies

This is an automatic "excavation" of a thematic subset of
artifacts from Datamuseum.dk's BitArchive.

See our Wiki for more about CR80 Wang WCS documentation floppies

Excavated with: AutoArchaeologist - Free & Open Source Software.


top - download

⟦d8d20add1⟧ Wang Wps File

    Length: 4203 (0x106b)
    Types: Wang Wps File
    Notes: SHAPE MEETING NO. 7       
    Names: »0886A «

Derivation

└─⟦3eaaffc64⟧ Bits:30006034 8" Wang WCS floppy, CR 0057A
    └─ ⟦this⟧ »0886A « 

WangText





…02…           

…02…810521…02……02…#
MINUTES OF MEETING NO. 7
…02……02…CAMPS











                           
…02……02……02……02…         …02…81-05-20…02…  7. …02…CR A/S
                                       

         …0e…Minutes of Meeting at Christian Rovsing A/S 19-21 May
         1981.…0f…

  …0f…SHAPE…0e…

  Mr. D.A. Gardiner      Mr. K. Nybroe-Nielsen   Gert Jensen
  Mr. J. Herrinck        Mr. F. Enevoldsen
  Mr. J. P. Lohisse
                 …02…     
                      
              
   
                 
             
              
                
…06…1…02…        …02…   …02…   …02…   …02…                …02…                          


         1   L̲O̲G̲G̲I̲N̲G̲ ̲R̲E̲Q̲U̲I̲R̲E̲M̲E̲N̲T̲S̲

          CR will correlate the traffic model, the revised logging
          records, and the statement in the SDS concerning the
          amount of storage required for logging in the light
          of changes to the records and the model.



         2   S̲I̲T̲E̲ ̲D̲A̲T̲A̲

          CR have four of the nine required data item inputs
          required for the first site data base.

          Analysis has shown that:

          1) The data is for 1 HQ only. - SHAPE consists of
             more than one HQ/Agency.

          2) The SDLs for Peace, Exercise and Crisis should
             be stated separately. - The provided data states
             only the distribution for peace.

          3) No distribution should be entered against the exercise
             SICS AEA - AZZ in any standard Distribution List.



             4)  No distribution should be entered
                 against the qualifying SICS AAA, ABA,
                 ACA, ADA since pre-determined action
                 is taken on recognition of these.

             5)  Missing at this point in time are

                 1)  Channel designation (c.d.) list

                 2)  AG/AIG tables

                 3)  PLA/RI/CIRCUIT/CHANNEL/CLASS TABLE

                 4)  PLA NO/PLA TABLE

                 CR indicated an impact on acceptance
                 test procedures. Also, on receipt
                 of the full data set alternative data
                 table design approaches may be evaluated.

                 Finally the data sets are required
                 for the preparation of the SPA functional
                 tests.

                 SHAPE will attempt to determine a
                 schedule for the production of this
                 data for the sites.



         3   T̲R̲A̲F̲F̲I̲C̲ ̲H̲A̲N̲D̲L̲I̲N̲G̲ ̲C̲L̲A̲R̲I̲F̲I̲C̲A̲T̲I̲O̲N̲S̲

             a)  T̲r̲e̲a̲t̲m̲e̲n̲t̲ ̲o̲f̲ ̲O̲u̲t̲g̲o̲i̲n̲g̲ ̲B̲o̲o̲k̲ ̲M̲e̲s̲s̲a̲g̲e̲

                 The relationship between CAMPS and
                 the relay network is clarified in
                 ACP 127 NATO Supp. 3 page 2-5 para
                 207 c).

                 1)  Addressees of book messages to
                     whom delivery has been effected
                     prior to introducing the message
                     into m̲e̲s̲s̲a̲g̲e̲ ̲r̲e̲l̲a̲y̲ ̲n̲e̲t̲w̲o̲r̲k̲s̲, or
                     who have been protected by separate
                     transmission n̲e̲e̲d̲ ̲n̲o̲t̲ ̲b̲e̲ ̲i̲n̲c̲l̲u̲d̲e̲d̲
                     in the message handling.

                 2)  The operating signal ZEX shall
                     be inserted in FL5 following the
                     DTG.

                 As a result, the proposal to manipulate
                 the addressees in an outgoing book
                 message from CAMPS is withdrawn (CN.
                 18).



             b)  N̲a̲t̲i̲o̲n̲a̲l̲ ̲E̲y̲e̲s̲ ̲O̲n̲l̲y̲

                 CN 5 is agreed.

             c)  R̲o̲u̲t̲i̲n̲g̲ ̲I̲n̲d̲i̲c̲a̲t̲o̲r̲s̲

                 CN 34 is accepted.

             d)  M̲e̲s̲s̲a̲g̲e̲ ̲S̲e̲c̲t̲i̲o̲n̲i̲n̲g̲

                 ICD/0003 should be updated to reflect
                 the message sectioning requirements.
                 However, CR stated that the SRS requires
                 message action description in FL12
                 c, and design is proceeding assuming
                 this.

             e)  M̲u̲l̲t̲i̲p̲l̲e̲ ̲S̲u̲b̲j̲e̲c̲t̲ ̲S̲I̲C̲s̲

                 The treatment of a message with multiple
                 subject SICs is contained in CN 35.

             f)  I̲/̲C̲ ̲M̲e̲s̲s̲a̲g̲e̲ ̲w̲i̲t̲h̲ ̲A̲I̲G̲

                 CAMPS will compare RIs in FL2 with
                 the 8 x 24 RIs relevant to the CAMPS
                 site. If they are all recognised,
                 the check proceeds to a comparison
                 of FL 2 with FL 7/8 PLA/RIs and a
                 comparison that the related PLAs are
                 also relevant to the CAMPS Site. In
                 the case of an AIG in FL 7/8 an attempt
                 will be made to expand it and convert
                 to PLAs. This set of PLAs is then
                 searched for a CAMPS relevant PLA.

                 If the AIG in FL 7/8 cannot be expanded
                 because it is not known to the CAMPS
                 site then the message will be considered
                 misrouted and will be sent to the
                 MSO.

                 If any part of the RI comparison checks
                 fails the message will be sent to
                 the MSO.





         4   D̲E̲S̲I̲G̲N̲

             a)  D̲a̲t̲a̲ ̲B̲a̲s̲e̲ ̲a̲n̲d̲ ̲I̲n̲t̲e̲r̲f̲a̲c̲e̲ ̲D̲e̲f̲i̲n̲i̲t̲i̲o̲n̲

                 The internal standards are part complete
                 for these items.

             b)  C̲o̲n̲f̲i̲g̲u̲r̲a̲t̲i̲o̲n̲ ̲M̲a̲n̲a̲g̲e̲m̲e̲n̲t̲

                 Data base items and interface descriptions
                 will come under C.M. after the PDR.