DataMuseum.dk

Presents historical artifacts from the history of:

CR80 Wang WCS documentation floppies

This is an automatic "excavation" of a thematic subset of
artifacts from Datamuseum.dk's BitArchive.

See our Wiki for more about CR80 Wang WCS documentation floppies

Excavated with: AutoArchaeologist - Free & Open Source Software.


top - download

⟦dbf1e52a8⟧ Wang Wps File

    Length: 13044 (0x32f4)
    Types: Wang Wps File
    Notes: Technical Summary         
    Names: »0751A «

Derivation

└─⟦4bcf3d88d⟧ Bits:30005999 8" Wang WCS floppy, CR 0048A
    └─ ⟦this⟧ »0751A « 

WangText

 …00……00……00……00….…02……00……86…1                                             …02…           …02…   …02…        








                                   SECTION I
                               TECHNICAL PROPOSAL






                      V̲O̲L̲U̲M̲E̲ ̲I̲


   1. TECHNICAL SUMMARY




   2. REQUIREMENTS ANALYSIS                              2-
                                                         
                                                         1

     2.1 SYSTEM OVERVIEW                                 2-
                                                         
                                                         3
       2.1.1 Image Production
       2.1.2 Data Processing Management and
             System Log Production
       2.1.3 Quality Assessment

     2.2 INTERFACES                                      2-
                                                         
                                                         9
       2.2.1 Introduction
       2.2.2 Input
       2.2.3 Output

     2.3 OPERATIONAL REQUIREMENTS                        2-
                                                         15
       2.3.1 Staffing Requirements
       2.3.2 Operational Responsability

     2.4 FUNCTIONAL REQUIREMENTS                         2-
                                                         17
       2.4.1 Input Data Processing
         2.4.1.1 PCD Data
         2.4.1.2 Time Code Search
         2.4.1.3 Data Synchronization
         2.4.1.4 Demultiplexing
         2.4.1.5 Calibration Data Extraction


       2.4.2 Image Data Visualization
       2.4.3 Cloud Coverage Assessment
       2.4.4 Radiometric Corrections
       2.4.5 Geometric Corrections
       2.4.6 Raw Data CCT Production
       2.4.7 Quick Look CCT Production
       2.4.8 System Corrected CCT Production
       2.4.9 Quality Assessment at Fucino and Kiruna


                      V̲O̲L̲U̲M̲E̲ ̲I̲


       2.4.10 System Management and Logging
       2.4.11 Archieving and Cataloging
       2.4.12 Frascati Quality Control System
       2.4.13 Adaptability to Future Satellite Systems
       
         2.4.13.1 SPOT
         2.4.13.2 COMSS
         2.4.13.3 LASS

     2.5 PERFORMANCE REQUIREMENTS                           2-
                                                            45
       2.5.1 HDDR Raw data Input
       2.5.2 Quick Look Production
         2.5.2.1 Quality Requirements
           2.5.2.1.1 Radiometric Corrections
           2.5.2.1.2 Cloud Assessment
           2.5.2.1.3 Image Reduction

         2.5.2.2 Processing Requirements

       2.5.3 System Corrected Full Frame All Band Images    2-
                                                            49
         2.5.3.1 Quality Requirements
           2.5.3.1.1 Geometric and Radiometric Accuracy
           2.5.3.1.2 Radiometric Corrections
           2.5.3.1.3 Output Image Pixel Size
           2.5.3.1.4 Mapping Functions
           2.5.3.1.5 Resampling Functions
           2.5.3.1.6 Special Thematic Mapper
                     Quality Factors

         2.5.3.2 Processing Requirements
           2.5.3.2.1 Assumptions
           2.5.3.2.2 Number of Arithmetic Operations

       2.5.4 Product Generation and Output Spooling         2-
                                                            75
         2.5.4.1 Product Description
         2.5.4.2 Processing Requirements
         2.5.4.3 Storage Capacity

       2.5.5 Quality Control                                2-
                                                            79
         2.5.5.1 Nature of the Requirement
         2.5.5.2 Fast Fourier Transform
         2.5.5.3 Image Display

     2.6 SUPPORT REQUIREMENTS                               2-
                                                            82
       2.6.1 Transportation and Installation                2-
                                                            83
         2.6.1.1 Phase 1 - Requirements
         2.6.1.2 Phase 2 - Requirements


                      V̲O̲L̲U̲M̲E̲ ̲1̲

       2.6.2 Training                                       2-
                                                            85
         2.6.2.1 Phase 1 - Requirements
         2.6.2.2 Phase 2 - Requirements

       2.6.3 Documentation                                  2-
                                                            87
         2.6.3.1 Phase 1 - Requirements
         2.6.3.2 Phase 2 - Requirements

       2.6.4 Maintenance                                    2-
                                                            88
         2.6.4.1 Phase 1 - Requirements
         2.6.4.2 Phase 2 - Requirements

       2.6.5 On-Site Test                                   2-
                                                            90




   3 PHASE I PORPOSAL FOR SYSTEM STUDY AND DESIGN           3-
                                                            
                                                            1

     3.1 INTRODUCTION                                       3-
                                                            
                                                            1




     3.2 PROPOSED TECHNICAL SOLUTION                        3-
                                                            
                                                            5
       3.2.1 Baseline System                                3-
                                                            10
         3.2.1.1 Overview
         3.2.1.2 Expandability
         3.2.1.3 Options
           3.2.1.3.1 Future Satellites
           3.2.1.3.2 Cubic Convolution
           3.2.1.3.3 Precision Preprocessing

       3.2.2 Operational Aspects                            3-
                                                            33
         3.2.2.1 Operational Interface
         3.2.2.2 Modes of Operation

       3.2.3 Performance Analysis                           3-
                                                            41
         3.2.3.1 Equipment Characteristics
         3.2.3.2 Load Prediction






                      V̲O̲L̲U̲M̲E̲ ̲1̲

       3.2.4 Hardware Specification                         3-
                                                            55
         3.2.4.1 Front-End Subsystem
           3.2.4.1.1 HDDR Controller
           3.2.4.1.2 Format Synchronizer
             3.2.4.1.2.1 Operation
             3.2.4.1.2.2 TMFS Synchronization Strategy
             3.2.4.1.2.3 TMFS input-output formats
             3.2.4.1.2.4 Controls and Indicators

           3.2.4.1.3 Moving window Display
             3.2.4.1.3.1 Controls and Indicators

         3.2.4.2 Image Processing Chain                     3-
                                                            76
           3.2.4.2.1 The CR80D Concept
             3.2.4.2.1.1 General
             3.2.4.2.1.2 Processor Unit
             3.2.4.2.1.3 I/O Subsystem Organization
             3.2.4.2.1.4 CR80D Buses

           3.2.4.2.2 File Processor
             3.2.4.2.2.1 Data Demultiplexer

           3.2.4.2.3 Image Processor
             3.2.4.2.3.1 Special Floating Point Processor

           3.2.4.2.4 Control Processor
           3.2.4.2.5 I/O Subsystem and Mass Storage
           3.2.4.2.6 Quality Assessment Display

         3.2.4.3 Image Control and Software                 3-108
                 Maintenance System
           3.2.4.3.1 Processor Configuration
           3.2.4.3.2 Quality Control Display

         3.2.4.4 SPOT Optional Equipment                    3-113





                     V̲O̲L̲U̲M̲E̲ ̲I̲I̲


       3.2.5 Software Specification                         3-117
         3.2.5.1 Standard Software                          3-120
         3.2.5.2 CR80D Support Software                     3-122
           3.2.5.2.1 Terminal Operating System
           3.2.5.2.2 Language Processors
           3.2.5.2.3 System Generating Software
           3.2.5.2.4 Debugging Software
           3.2.5.2.5 Utilities

         3.2.5.3 Man-Machine Interface                      3-125
         3.2.5.4 System Management                          3-129
         3.2.5.5 Front-End Control                          3-132
         3.2.5.6 HDDR Data Decommutation and Spooling       3-134
           3.2.5.6.1 Demux Handler
           3.2.5.6.2 Data Collection
           3.2.5.6.3 Spooling Control

         3.2.5.7 Image Preprocessing                        3-143
           3.2.5.7.1 Radiometric correction
           3.2.5.7.2 System Corrected Processing
           3.2.5.7.3 Calculation of System
                     Calibration Parameters

         3.2.5.8 CCT Generation                             3-159
         3.2.5.9 System Logging and Order Handling          3-164
         3.2.5.10 Quality Assessment and Control            3-168

       3.2.6 Major Test Equipment                           3-170
         3.2.6.1 Test Generator baseline                    3-170
           3.2.6.1.1 Thematic Mapper Test Generator
           3.2.6.1.2 Test Generator Operation

         3.2.6.2 Test simulator baseline                    3-180
           3.2.6.2.1 Basic Approach
           3.2.6.2.2 LANDSAT-3 MSS to TM conversion         3-184

         3.2.6.3 Dianostics aids

       3.2.7 Reliability, Maintainability and               3-156
             Availability
         3.2.7.1 Equipment Reliability (MTBF)               3-191
         3.2.7.2 Equipment Maintainability (MTTR)           3-193
         3.2.7.3 Predicted Availability                     3-196


                     V̲O̲L̲U̲M̲E̲ ̲I̲I̲

     3.3 PHASE I STATEMENT OF WORK                          3-198
       3.3.1 Requirements Analysis
       3.3.2 System Design Specification
       3.3.3 Specification of HW, SW and
             Major Test Equipment
       3.3.4 Integration and Test Planning
       3.3.5 Acceptance Test Specifications
       3.3.6 Installation Planning                          3-207
         3.3.6.1 Site Surveys
         3.3.6.2 Site Requirements
         3.3.6.3 Transportation and Installation Planning

       3.3.7 Training Planning                              3-210
         3.3.7.1 Management and Organization
         3.3.7.2 Integrated Training Plan
           3.3.7.2.1 Course Overview

       3.3.8 Documentation                                  3-215
         3.3.8.1 Introduction
         3.3.8.2 Documentation Standards

       3.3.9 Maintenance Planning                           3-220
         3.3.9.1 Maintenance Plan
         3.3.9.2 Recommendated Spare Parts List (RSPL)
         3.3.9.3 Tools and Test Equipment List

       3.3.10 Phase II Implementation Planning              3-228
         3.3.10.1 Procurement Planning
         3.3.10.2 Development, Integration and Test Planning
         3.3.10.3 Management and Financial Proposal

       3.3.11 Quality Assurance                             3-237
         3.3.11.1 General
         3.3.11.2 QA Support







                     V̲O̲L̲U̲M̲E̲ ̲I̲I̲


   4 PHASE II PROPOSAL FOR SYSTEM IMPLEMENTATION            4-
                                                            
                                                            1

     4.1 HARDWARE/SOFTWARE PROCUREMENT                      4-
                                                            
                                                            2
       4.4.1 Internal Products
       4.1.2 External Products

     4.2 HARDWARE DEVELOPMENT AND MANUFACTURING             4-
                                                            
                                                            5

     4.3 SOFTWARE DEVELOPMENT                               4-
                                                            
                                                            6

     4.4 PROTOTYPE INTEGRATION AND TEST                     4-
                                                            
                                                            8

     4.5 INTEGRATION AND TEST OF SITE CONFIGURATION         4-
                                                            11

     4.6 FACTORY ACCEPTANCE (TEST PLAN)                     4-
                                                            11

     4.7 TRANSPORTATION AND INSTALLATION                    4-
                                                            14
       4.7.1 Transportation
       4.7.2 Installation
         4.7.2.1 Site Installation Procedures
         4.7.2.2 Site Readiness Verification
         4.7.2.3 Site Installation
         4.7.2.4 Typical Layout

     4.8 ACCEPTANCE AND HAND-OVER                           4-
                                                            24

     4.9 CUSTOMER TRAINING                                  4-
                                                            24
       4.9.1 Development of Courses
       4.9.2 Training Schedule

     4.10 DOCUMENTATION                                     4-
                                                            27
       4.10.1 Preliminary Delivery
       4.10.2 Final Documentation
       4.10.3 Quality Control

     4.11 MAINTENANCE AND SUPPORT                           4-
                                                            29

     4.12 QUALITY ASSURANCE                                 4-
                                                            33
       4.12.1 General
       4.12.2 Quality Assurance Plan
       4.12.3 Standards and Work Instructions


                T̲E̲C̲H̲N̲I̲C̲A̲L̲ ̲A̲P̲P̲E̲N̲D̲I̲C̲E̲S̲

           APPENDIX A: Standard Software


     A.1 DAMOS OVERVIEW

       A.1.1 Software Layers
       A.1.2 DAMOS Data Types
       A.1.3 Security Features

     A.2 DAMOS Kernel
       A.2.1 Process Management
       A.2.2 Process Communication
       A.2.3 Interrupt Handling
       A.2.4 Processor Unit Management
       A.2.5 Memory Management
       A.2.6 Device Handlers
       A.2.7 Error Processing
       A.2.8 On-line Confidence Checks
       A.2.9 File Management System
       A.2.10 Input/output System

     A.3 Terminal OS 

     A.4 Language Processes
       A.4.1 PASCAL Compiler
       A.4.2 COBOL Compiler
       A.4.3 SWELL-80 Linker/Compiler
       A.4.4 Assembler
       A.4.5 ADA Compiler

     A.5 System Generating Software

     A.6 Debugging Software
       A.6.1 Test Output Facility
       A.6.2 Debug



           APPENDIX B: Software Standards

   B.1       Design Guideline
   B.2       Subsystem Documentation
   B.3       Module Documentation
   B.4       Unit Development Folder
   B.5       Quality Assurance Plan
   B.6       Quality Assurance Policy




         APPENDIX C: Standard CR80D Modules



                    P̲h̲a̲s̲e̲ ̲I̲ ̲W̲B̲S̲



…02……02……02……02…1  Project Management

…02……02……02……02…1.1  Project Administration
…02……02……02……02…1.2  Project Control

…02……02……02……02…1.2.1  Planning and scheduling
…02……02……02……02…1.2.2  Cost Control
…02……02……02……02…1.2.3  Subcontractor Management

…02……02……02……02…1.3  Progress Reporting

…02……02……02……02…1.3.1  Progress Reports
…02……02……02……02…1.3.2  Progress Meetings
…02……02……02……02…1.3.3  Review Meetings

…02……02……02……02…1.4  Configuration Management
…02……02……02……02…1.5  Quality Assurance



…02……02……02……02…2  Systems Engineering

…02……02……02……02…2.1  Systems Analysis

…02……02……02……02…2.1.1  Requirements Analysis
…02……02……02……02…2.1.2  System Studies

…02……02……02……02…2.2  External Interface specification
…02……02……02……02…2.3  System Design Specification
…02……02……02……02…2.4  Acceptance Test Specification

…02……02……02……02…3  System Specification

…02……02……02……02…3.1  Hardware Procurement Specification
…02……02……02……02…3.2  Softare Design Specification
…02……02……02……02…3.3  Major Test Equipment Specification
…02……02……02……02…3.4  Integration and Test Planning

…02……02……02……02…4  Logistics Support

…02……02……02……02…4.1  Site Preparation

…02……02……02……02…4.1.1  Site Survey
…02……02……02……02…4.1.2  Installation Sites Requirements

…02……02……02……02…4.2  Site installation Planning
…02……02……02……02…4.3  Maintenance Planning
…02……02……02……02…4.4  Training Planning
…02……02……02……02…4.5  Documentation Planning

…02……02……02……02…5  Specification of Options

…02……02……02……02…5.1  Precission Preprocessing
…02……02……02……02…5.2  Output product optional formats
…02……02……02……02…5.3  SPOT/HRV option
…02……02……02……02…5.4  Real time visualisation of data during acquisition

…02……02……02……02…6  Phase II Proposal

…02……02……02……02…6.1  Management Proposal

…02……02……02……02…6.1.1  WBS
…02……02……02……02…6.1.2  Planning and scheduling

…02……02……02……02…6.2  Cost Proposal


                    P̲h̲a̲s̲e̲ ̲I̲I̲ ̲W̲B̲S̲



…02……02……02……02…1  Project Management

…02……02……02……02…1.1  Project Administration
…02……02……02……02…1.2  Project Control

…02……02……02……02…1.2.1  Planning and scheduling
…02……02……02……02…1.2.2  Cost Control
…02……02……02……02…1.2.3  Subcontractor Management

…02……02……02……02…1.3  Progress Reporting

…02……02……02……02…1.3.1  Progress Reports
…02……02……02……02…1.3.2  Progress Meetings
…02……02……02……02…1.3.3  Reviews and adhoc Technical Meetings

…02……02……02……02…1.4  Configuration Management

…02……02……02……02…2  Product Assurance

…02……02……02……02…2.1  Incoming Inspection of all hardware
…02……02……02……02…2.2  Quality Assurance

…02……02……02……02…3  Systems Engineering

…02……02……02……02…3.1  Design specification updates
…02……02……02……02…3.2  Interface control
…02……02……02……02…3.3  Systems Analysis
…02……02……02……02…3.4  Acceptance Test Procedures

…02……02……02……02…4  External Procurements

…02……02……02……02…4.1  Procurement Management
…02……02……02……02…4.2  Processor chain Items Procurement
…02……02……02……02…4.3  Procurement of Tools and Test equipment

…02……02……02……02…5  Hardware development and manufacturing

…02……02……02……02…6  Software Development

…02……02……02……02…6.1  Standard system softare
…02……02……02……02…6.2  "Basic" Application Software
…02……02……02……02…6.3  "System Correction" Application Software



…02……02……02……02…7  Hardware Integration

…02……02……02……02…7.1  Fucino equipment
…02……02……02……02…7.2  Kiruna equipment
…02……02……02……02…7.3  Frascati equipment

…02……02……02……02…8  Factory Integration and Test

…02……02……02……02…8.1  Integration and Test of Basic System
…02……02……02……02…8.2  Integration and Test of "System Corrected" system
…02……02……02……02…8.3  In house Factory Test

…02……02……02……02…9  Factory Acceptance Test

…02……02……02……02…9.1  Factory Acceptance Test Procedures
…02……02……02……02…9.2  Fuchino system
…02……02……02……02…9.3  Kiruna system
…02……02……02……02…9.4  Frascati system

…02……02……02……02…10 Site Preparation and Transportation

…02……02……02……02…10.1 Site Readiness Verification
…02……02……02……02…10.2 Transportation

…02……02……02……02…11 Installation and Final Acceptance

…02……02……02……02…11.1  Fucino site
…02……02……02……02…11.2  Kiruna site
…02……02……02……02…11.3  Frascati site

…02……02……02……02…12 Documentation

…02……02……02……02…12.1 Preliminary deliveries
…02……02……02……02…12.2 Final documentation package

…02……02……02……02…13 Training

…02……02……02……02…14 Maintenance and technical support after acceptance