⟦dd6bbb36d⟧ Wang Wps File

    Length: 5340 (0x14dc)
    Types: Wang Wps File
    Notes: CPS/TPR/016               
    Names: »1692A «

Derivation

└─⟦af82dd301⟧ Bits:30006082 8" Wang WCS floppy, CR 0127A
    └─ ⟦this⟧ »1692A « 

WangText




…02…CPS/TPR/016

…02… EV/820311…02……02…#
INSPECTION PROCEDURE FOR
EMI EQUIPMENT RACKS…02…Issue 1…02…CAMPS









                 T̲A̲B̲L̲E̲ ̲O̲F̲ ̲C̲O̲N̲T̲E̲N̲T̲S̲



   1   SCOPE ........................................
         4
     1.1 DEFINITION .................................
           4
       1.1.1 ACCESSORIES ............................
               5

   2   APPLICABLE DOCUMENTS AND DRAWINGS ............
         6

   3   INCOMING INSPECTION ..........................
         7
     3.1 GENERAL ....................................
           7
       3.1.1 Registration ...........................
               7
       3.1.2 Failure Reporting ......................
               7
       3.1.3 Documentation ..........................
               7
         3.1.3.1 Invoice and COCs ...................
                   7

     3.2 INCOMING INSPECTION LOG ....................
           7

   4   INSPECTION POINTS ............................
         8
     4.1 GENERAL ....................................
           8
     4.2 INSPECTION STEPS ...........................
           8


   APPENDIX A:  INCOMING INSPECTION LOG .............
    A1
   APPENDIX B:  MEASURING POINTS ....................
    B1



                         1  S̲C̲O̲P̲E̲

         This document describes the procedures and guidelines
         for inspection of the EMI Equipment Racks delivered
         from Electronic Enclosures to Christian Rovsing A/S.



1.1      D̲E̲F̲I̲N̲I̲T̲I̲O̲N̲


 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲

 ̲R̲a̲c̲k̲ ̲T̲y̲p̲e̲:̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲L̲e̲f̲t̲ ̲P̲a̲n̲e̲l̲ ̲ ̲R̲i̲g̲h̲t̲ ̲P̲a̲n̲e̲l̲ ̲ ̲I̲n̲t̲e̲r̲m̲e̲d̲i̲a̲t̲e̲ ̲ ̲S̲t̲a̲n̲d̲ ̲A̲l̲o̲n̲e̲
 ̲

 ̲H̲i̲n̲g̲e̲ ̲F̲r̲o̲n̲t̲ ̲D̲o̲o̲r̲:̲ ̲ ̲ ̲ ̲L̲ ̲ ̲ ̲ ̲R̲ ̲ ̲ ̲ ̲ ̲ ̲L̲ ̲ ̲ ̲ ̲ ̲R̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲L̲ ̲ ̲ ̲ ̲R̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲L̲ ̲ ̲ ̲ ̲ ̲R̲ ̲ ̲
 ̲

 ̲H̲i̲n̲g̲e̲ ̲R̲e̲a̲r̲ ̲D̲o̲o̲r̲:̲ ̲ ̲ ̲ ̲ ̲R̲ ̲ ̲ ̲ ̲L̲ ̲ ̲ ̲ ̲ ̲ ̲R̲ ̲ ̲ ̲ ̲ ̲L̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲R̲ ̲ ̲ ̲ ̲L̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲R̲ ̲ ̲ ̲ ̲ ̲L̲ ̲ ̲
 ̲

 Shipment  l             2            5            2             3
 Shipment  2                    3     1                    4     4
 Shipment  3                    1     3                    4     4
 Shipment  4        2           2     1       2    1       4     1
 Shipment  5             4            3            6             
 Shipment  6        5    5      4     2       6    8       
 Shipment  7        4    4      2     3       6    5
 S̲h̲i̲p̲m̲e̲n̲t̲ ̲ ̲8̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲2̲ ̲ ̲ ̲ ̲6̲ ̲ ̲ ̲ ̲ ̲ ̲1̲ ̲ ̲ ̲ ̲ ̲3̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲3̲ ̲ ̲ ̲ ̲9̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲

 T̲O̲T̲A̲L̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲1̲3̲ ̲ ̲ ̲2̲1̲ ̲ ̲ ̲ ̲ ̲1̲3̲ ̲ ̲ ̲ ̲2̲1̲ ̲ ̲ ̲ ̲ ̲ ̲1̲7̲ ̲ ̲ ̲3̲1̲ ̲ ̲ ̲ ̲ ̲ ̲1̲2̲ ̲ ̲ ̲ ̲1̲2̲ ̲ ̲




1.1.1    A̲c̲c̲e̲s̲s̲o̲r̲i̲e̲s̲

         The below mentioned accessories shall be shipped to
         each rack:

         a)   4 x 1/2" (12,7 mm)  FLAT WASHER

         b)   4 x 1/2" (12,7 mm)  SPLIT LOCK WASHER

         c)  24 x 1/4" (6,35 mm) x 20 x 1 1/4" (31,75 mm) 
             LG. HEX HD. BOLT

         d)  24 x NYLON WASHER

         e)  24 x INSULATED SHOULDER WASHER

         f)  24 x 7/16" (11,1 mm)  THICK PHENOLIC BLOCK

         g)   6 x 0,69" (17,5 mm)  THICK PHENOLIC BLOCK

         h)  48 x 1/32" (0,8 mm)  THICK PHENOLIC SHIM-WASHER

         i)  24 x 1/4" (6,35 mm) x 20  STUD NUT

         j)   4 x 10-32  BALL STUD

         k)   2 x  AIR-FILTERS

         l)   4 x  LEVELLING JACKS

         m)   4 x  EYEBOLT ASSEMBLY



           2  A̲P̲P̲L̲I̲C̲A̲B̲L̲E̲ ̲D̲O̲C̲U̲M̲E̲N̲T̲S̲ ̲A̲N̲D̲ ̲D̲R̲A̲W̲I̲N̲G̲S̲

         SD/STD/017
         Incoming Inspection Standard.

         PAD/PRC/002
         Non-conformance Handling.

         CPS/AUX/009
         Quality Requirements for Equipment
         Purchased for the CAMPS Project.

         ARC No. 52-7234
         EMI Feature Quality Provisions and 
         Acceptance Criteria.

         E-4626-1 thru 4 (F)
         EMI/RFI Shielded Enclosures.

         30-940 (2)
         Panel Mounting Channels/Configuration.

         30-940 (4)
         Panel Mounting Channel II Transrack.

         30-940 (4) 
         Panel Mounting Channel I Transrack.

         30-940 (2)
         Knockout Configurations.

         30-94l (1)
         Knockout Configurations.…86…1         …02…   …02…   …02…   …02…       
                                            
                  3  I̲N̲C̲O̲M̲I̲N̲G̲ ̲I̲N̲S̲P̲E̲C̲T̲I̲O̲N̲



3.1      G̲E̲N̲E̲R̲A̲L̲

         Unpacking, registration, inspection for shipping damage
         and visual inspection of the racks shall be performed
         by the ILS - Incoming Inspection Personnel.

3.1.1    R̲e̲g̲i̲s̲t̲r̲a̲t̲i̲o̲n̲

         Registration shall be performed in agreement with the
         lines laid down in SD/STD/017, Incoming Inspection
         Standard and all racks shall be attached with a serial
         number.

3.1.2    F̲a̲i̲l̲u̲r̲e̲ ̲R̲e̲p̲o̲r̲t̲i̲n̲g̲

         All failures, discrepancies etc.  shall be reported
         in agreement with the lines laid down in PAD/PRC/002,
         Non-conformance Handling.

3.1.3    D̲o̲c̲u̲m̲e̲n̲t̲a̲t̲i̲o̲n̲



3.1.3.1  I̲n̲v̲o̲i̲c̲e̲ ̲a̲n̲d̲ ̲C̲O̲C̲'̲s̲

         Invoice  and Certificates of Conformance shall be distributed
         in copies to the Project Office.



3.2      I̲N̲C̲O̲M̲I̲N̲G̲ ̲I̲N̲S̲P̲E̲C̲T̲I̲O̲N̲ ̲L̲O̲G̲

         The Incoming Inspection Log App. A shall be filled
         in consistently and carefully during the whole inspection
         operation. This log will be an appendix to the concerned
         Incoming Inspection Report (IKR).…86…1         …02…   …02…   …02… 
          …02…                                           
                   4  I̲N̲S̲P̲E̲C̲T̲I̲O̲N̲ ̲P̲O̲I̲N̲T̲S̲



4.1      G̲E̲N̲E̲R̲A̲L̲

         The below mentioned inspections and measurements shall
         be performed by the ILS-Incoming Inspection personnel.



4.2      I̲N̲S̲P̲E̲C̲T̲I̲O̲N̲ ̲S̲T̲E̲P̲S̲

         S̲T̲E̲P̲ ̲1̲:
         Check the received quantity of racks according to para.
         1.1.

         S̲T̲E̲P̲ ̲2̲:
         Check that the mix of rack options is in accordance
         with para. 1.1.

         S̲T̲E̲P̲ ̲3̲:
         Check the function of the handles.

         S̲T̲E̲P̲ ̲4̲:
         Check the accessory quantity to in accordance with
         para. 1.1.1 and check measures on sample-basis.

         S̲T̲E̲P̲ ̲5̲:
         Check serial number plates and that all three show
         the same number.

         S̲T̲E̲P̲ ̲6̲:
         Visual Inspection:
         a)  Painting Finish
         b)  Surface Finish
         c)  Knock-outs (shall be closely fitted)
         d)  Gaskets
         e)  Foreign Bodies from manufacturing 
             (shawings etc.)
         f)   Workmanship  generally

         S̲T̲E̲P̲ ̲7̲:
         Measurings according to APP. B.