⟦df6ac255d⟧ Wang Wps File

    Length: 10368 (0x2880)
    Types: Wang Wps File
    Notes: CPS/TCN/072               
    Names: »3787A «

Derivation

└─⟦011bcd343⟧ Bits:30006160 8" Wang WCS floppy, CR 0242A
    └─ ⟦this⟧ »3787A « 

WangText




     
   3787A/rt…02…
 CPS/TCN/072

…02… HAU/830826…02……02…#
CAMPS
 INVENTORY
 CHECK
 PROCEDURE
SITE 2
 - 16                                                …02…CAMPS








…0f…




                 CAMPS INVENTORY CHECK PROCEDURE 
                 SITE 2-16       
                                              

                 CPS/TCN/072
                                          
                                  









         


                 Hans Erik Haureberg 




                 Kurt Nybroe-Nielsen







                 SHAPE (1), BHB, KNN, CL, LU, URH, 
                 Conf. Mgmt., QA, PMS, KM, Library (5)
                 GQAR














                          Install. Mgr.  830826


         Issue 2    



         830826
…0e…                          Conf.Mgmt.     830826



    3787A/rt       …02…CPS/TCN/072

 …02…HAU/830826                                  …02…ii
CAMPS INVENTORY CHECK PROCEDURE           
SITE 2 - 16       …02……02… CAMPS












       830519                  All                         
  1    830826                  All       Update according to
                                       Camps log no. 1338



   3787A/rt       …02… CPS/TCN/072

                                            …02…HAU/830826…02……02…iii
CAMPS INVENTORY CHECK PROCEDURE            
SITE 2 - 16       …02……02… CAMPS





                                      T̲A̲B̲L̲E̲ ̲O̲F̲ ̲C̲O̲N̲T̲E̲N̲T̲S̲




     1   GENERAL ....................................  
         1 
       1.1   PURPOSE ................................  
             1 
       1.2   APPLICABLE DOCUMENTS ...................  
             1 

     2   RECEIPT OF EQUIPMENT AT THE SITE ...........  
         2 
       2.1   RECEIPT ................................  
             2 
       2.2   SHIPPING DOCUMENTS .....................  
             2 
       2.3   SHIPMENT COMPOSITION ...................  
             3 

     3     INCOMING INVENTORY CHECK .................  
           4 
       3.1   INCOMING INVENTORY/INSPECTION ..........  
             4 
       3.2   RESPONSIBILITY .........................  
             4 

     4   FINAL INVENTORY CHECK ......................  
         5 
       4.1   PURPOSE ................................  
             5 
       4.2   PERSONNEL REQUIREMENTS .................  
             5 
       4.3   PROPERTY INVENTORY LIST ................  
             5 
       4.4   INTERNAL INVENTORY CHECK ...............  
             6 
       4.5   OFFICIAL INVENTORY CHECK ...............  
             7 

     Appendix A 



                        1̲ ̲ ̲G̲E̲N̲E̲R̲A̲L̲



1.1      P̲U̲R̲P̲O̲S̲E̲

         The purpose of this document is to identify the inspections
         necessary to verify that all equipment have been delivered
         to the Site in accordance with the property inventory
         list and to state the criteria of responsibilities.



1.2      A̲P̲P̲L̲I̲C̲A̲B̲L̲E̲ ̲D̲O̲C̲U̲M̲E̲N̲T̲

         1.  CAMPS Hardware Assembly Breakdown/Hardware Tree
             CPS/SDS/017

         2.  Inventory List
             CPS/AUX/0XX (Site Dependent)

         3.  CAMPS Packing Procedure
             CPS/AUX/021

         4.  Remote Tare Hardware Assembly Breakdown/Hardware
             Tree.
             CPS/SDS/043

         5.  CAMPS Remote Terminals/Hardware Assembly Breakdown
             CRT/SDS/002     

         6.  CAMPS Equipment Matrix
             CPS/TCN/043

         7.  Packing List
             (Site Dependent)


           2̲ ̲ ̲R̲e̲c̲e̲i̲p̲t̲ ̲o̲f̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲ ̲a̲t̲ ̲t̲h̲e̲ ̲S̲i̲t̲e̲



2.1      R̲E̲C̲E̲I̲P̲T̲

         The receipt of the equipment at the site will be performed
         by CR's installation team. The installation team or
         a CR representative will arrive one day in advance
         of the truck carrying the equipment. The transportation
         company (2 men) will assist CR in moving equipment
         to the installation area.



2.2      S̲H̲I̲P̲P̲I̲N̲G̲ ̲D̲O̲C̲U̲M̲E̲N̲T̲S̲

         The shipment will be accompanied by the following shipping
         documents:

         -   A complete set of packing lists
         -   Proforma Invoice
         -   Shipping Letter
         -   Customs Form 302
         -   Authorization to Ship telex

         All containers are marked with a package number. A
         set of above documents is enclosed in container No.
         1 and a set is attached to the outside of container
         No. 1.






2.3      S̲H̲I̲P̲M̲E̲N̲T̲ ̲C̲O̲M̲P̲O̲S̲I̲T̲I̲O̲N̲

         a)  The shipment consists of a number of containers.
             Each container is marked with a unique number.

         b)  The CAMPS equipment for the sites will be shipped
             dissassembled and packed as follows:


         -   Rack Assemblies are spearated in individual racks
             and packed in a wooden container.

             Similar containers are used for shipment of the
             Frequency Stabilizer Rack and the Modem Rack (TARE).

         -   Disk Units, Multiplexers, Frequency Units, Power
             Linefilters and Modules are removed from the racks
             and shipped in their own containers.

         -   Cables between racks are generally shipped as part
             of one of the racks.

         -   Terminal equipment (VDU, MSP, PTP/PTR) and auxiliary
             equipment (tables, storage cabinet) are shipped
             in their own containers.

         -   Site spare parts are individually packed and are
             shipped together with the main equipment.


               3̲ ̲ ̲I̲N̲C̲O̲M̲I̲N̲G̲ ̲I̲N̲V̲E̲N̲T̲O̲R̲Y̲ ̲C̲H̲E̲C̲K̲



3.1      I̲N̲C̲O̲M̲I̲N̲G̲ ̲I̲N̲V̲E̲N̲T̲O̲R̲Y̲/̲I̲N̲S̲P̲E̲C̲T̲I̲O̲N̲)

         1)  CR will perform an incoming inventory of the containers
             according to the packing lists found attached to
             the out side of container No. 1.

         2)  Before the containers are moved to the installation
             site, the containers will be inspected for any
             visual damages.

         3)  The results of the above mentioned 1) and 2) will
             be recorded and a copy will be given to the transportation
             company.

         4)  The incoming inventory/inspections of the containers
             are witnessed by the local property custodian.

         5)  The shipment documents (ref. 2.2) are handed over
             to the property custodian.

         6)  The packing list will form the record of the incoming
             inventory and will be signed by the property custodian
             of the site and given "back" to the transportation
             company or the CR representative.

         7)  A copy of the signed packing list will be retained
             by the property custodin of the site for evidence
             of receipt in relationship to the Shape/Territorial
             Host Nation responsibilities stated in paragrapgh
             3.2 below.


3.2      R̲E̲S̲P̲O̲N̲S̲I̲B̲I̲L̲I̲T̲Y̲

         1)  SHAPE/Teritorial Host Nation (THN) takes over the
             responsibility of the equipment after the incoming
             inventory/inspection regarding fire-, water-, theft
             and other damages to the equipment not caused by
             the CR installation team.

         2)  The responsibility regarding damages to the equipment
             caused by the CR installation team during the installation
             period up to completion of SPA remains with CR.

         3)  SHAPE/THN takes over all the above mentioned responsibilities
             after completion of SPA.




                 4̲ ̲ ̲F̲I̲N̲A̲L̲ ̲I̲N̲V̲E̲N̲T̲O̲R̲Y̲ ̲C̲H̲E̲C̲K̲



4.1      P̲U̲R̲P̲O̲S̲E̲

         The inventory check shall verify that all equipment
         to subassembly level related to the actual site has
         been delivered in accordance with the contents of the
         property inventory list.



4.2      P̲E̲R̲S̲O̲N̲N̲E̲L̲ ̲R̲E̲Q̲U̲I̲R̲E̲M̲E̲N̲T̲S̲

         The official inventory check will be done by the customer
         assisted by a CR representative.



4.3      P̲R̲O̲P̲E̲R̲T̲Y̲ ̲I̲N̲V̲E̲N̲T̲O̲R̲Y̲ ̲L̲I̲S̲T̲

         a)  CR will prepare a property inventory list for each
             site.

         b)  The inventory list is prepared in block form and
             has the following sections (see Appendix A):

             1)  Main Equipments and disk units
                 (Racks, Modules, Cables, etc.)

             2)  Terminal Equipments
                 (VDU), Printers, and PTP/PTR) 

             3)  Ancillary Equipments
                 (Cabinets, Tables, etc.)

             4)  Tools and Test Equipment for hardware and software

             5)  Installation Material

             6)  Documentation for hardware and software

             7)  Spare Parts 

             8)  Verification

             9)  All Software Deliverables


         c)  The inventory list includes the following Data
             elements:

             1)  Site Number

             2)  Item Number

             3)  Description

             4)  True Manufacturers Part Number

             5)  Serial Number

             6)  Manufacturers Identification Code

             7)  NATO Stock No.

             8)  Configuration Reference (CM/MR Items)

             9)  Remarks

             10) Delivered Quantity

             11) Received Quantity


         d)  The Assembly Reference will be a separate document
             which contains the following information: True
             Manufacturers Part No., Assembly Reference, and
             a column for Serial Numbers. An example of this
             document is attached at Appendix A.



4.4      I̲N̲T̲E̲R̲N̲A̲L̲ ̲I̲N̲V̲E̲N̲T̲O̲R̲Y̲ ̲C̲H̲E̲C̲K̲

         a)  CR will check the inventory list against the installed
             equipment prior to the time of the SPA.

         b)  The inventory list will be updated to reflect the
             final status at the time of the SPA.


4.5      O̲F̲F̲I̲C̲I̲A̲L̲ ̲I̲N̲V̲E̲N̲T̲O̲R̲Y̲ ̲C̲H̲E̲C̲K̲

         a)  As a part of the SPA, the customer will perform
             an official inventory check.

         b)  The marked up inventory list will form the record
             of all equipment and other items that has been
             delivered.

         c)  The official inventory check will be witnessed
             by CR.

         d)  The results of the official inventory check will
             be recorded on the marked up inventory list.

         e)  The verification part of the inventory list will
             be signed by both parties.

             NOTE: The inventory list will be checked against
             the documents referenced in paragraph 1.2.1, 1.2.4,
             1.2.5, The Site ASPL, Tools and Test Equipment
             List, Software Delivereables, and the Documentation
             Plan to ensure that all contracted items have been
             delivered.…86…1         …02…   …02…   …02…   …02…                 
                                      













                        APPENDIX A


                             


         …0c…insert 2 sider CAMPS inventory list, CPS/AUX/039…0c…


         …0c…insert 2 sider CAMPS inventory list, CPS/AUX/039…0c…


    CAMPS HARDWARE ASSEMBLY REFERENCE BY TMFG PART NO


LINE DESCRIPTION              TMFG PART NO.  ASSEMBLY      
 SERIAL
NO.                                          REFERENCE     
 NO.
-------------------------------------------------------------------

0000 EMI RACK, L-END/R-HINGED                4.44502-00   1A1    -
                                             1A3          -
                                             2A1          -
                                             2A3          -
                                             2A4          -
                                             2A8          -

0001 EMI RACK,L-END/L-HINGED 4.44502-01      1A1          -
                                             1A3          -
                                             2A1          -
                                             2A4          -
                                             2A8          -

0002 EMI RACK, INTER/R-HINGED                4.44502-02   1A2    -
                                             2A2          -
                                             2A3          -
                                             2A4          -

0003 EMI RACK, INTER/L-HINGED                4.44502-03   1A2    -
                                             2A2          -
                                             2A3          -
                                             2A4          -

0004 EMI RACK, R-END/R-HINGED                4.44502-04   1A1    -
                                             1A3          -
                                             2A1          -
                                             2A3          -
                                             2A4          -
                                             2A5          -
                                             2A9          -

0005 EMI RACK, L-END/L-HINGED                4.44502-05   1A1    -
                                             1A3          -
                                             2A1          -
                                             2A3          -
                                             2A4          -
                                             2A9          -