PROPOSAL FOR CAMPS TEST DRIVE SYSTEM Page #
PROPOSAL FOR CAMPS TEST DRIVE SYSTEM
Dated September 7, 1983
Submitted to
SUPREME HEADQUARTERS ALLIED POWERS EUROPE
B-7010 SHAPE, Belgium
Prepared by:
CHRISTIAN ROVSING A/S
Lautrupvang 2,
DK-2750 Ballerup, Denmark.
T̲A̲B̲L̲E̲ ̲O̲F̲ ̲C̲O̲N̲T̲E̲N̲T̲S̲
Page
0 SCOPE ..........................................
3
1 BIDDING PROVISIONS .............................
4
1.1 CONTRACT ...................................
4
1.2 VALIDITY ...................................
4
1.3 TYPE OF PROPOSAL ...........................
4
1.4 PAYMENT PLAN ...............................
4
1.5 PAYMENT IN US DOLLARS ......................
4
1.6 DELIVERY SCHEDULE ..........................
5
2 PRICE PROPOSAL .................................
6
3 HARDWARE CONFIGURATION .........................
7
3.1 HARDWARE FOR CAMPS VDU TEST DRIVE SYSTEM ...
7
3.2 HARDWARE FOR MESSAGE TRAFFIC TEST DRIVE
SYSTEM .....................................
9
4 SYSTEM/SOFTWARE ENGINEERING ....................
11
4.1 SYSTEM INTEGRATION .........................
11
4.2 SOFTWARE ...................................
11
5 FABRICATION ....................................
12
5.1 HARDWARE ASSEMBLY BREAKDOWN ................
12
5.2 FAT ........................................
12
6 LOGISTICS SUPPORT ..............................
13
6.1 TRANSPORTATION AND INSTALLATION ............
13
6.2 TRAINING AND DOCUMENTATION .................
14
6.3 MAINTENANCE ................................
14
6.4 SPARES .....................................
14
APPENDIX A
Equipment Matrix for Test Drive System..........
15
APPENDIX B1
CAMPS VDU Test Drive HW Configuration and
Connectivity ..................................
18
APPENDIX B2
CAMPS Message Traffic Test Drive System .......
20
HW Configuration and connectivity
APPENDIX C
RSPL for Test Drive System ....................
21
S̲C̲O̲P̲E̲
This proposal for "CAMPS Test Drive System" is forwarded
in response to:
Telex camps log no 1341: "CAMPS Development and test
drives system", dated 10. Aug 83.
The proposal covers item (3) a CAMPS development system.
Proposals for item (1): a CAMPS development system
and for item (2): a protocol converter and a development
system are not included, but will be forwarded separately.
1̲ ̲ ̲B̲I̲D̲D̲I̲N̲G̲ ̲P̲R̲O̲V̲I̲S̲I̲O̲N̲S̲
1.1 C̲O̲N̲T̲R̲A̲C̲T̲
It is assumed that this proposal will result in a separate
contract between CR and SHAPE if the latter should
accept this proposal.
1.2 V̲A̲L̲I̲D̲I̲T̲Y̲
This proposal including the options is valid for acceptance
until October 1, 1983. For the period from October
1, 1983 to January 1, 1984 a monthly escalation of
0.8% will be added to the price.
1.3 T̲Y̲P̲E̲ ̲O̲F̲ ̲P̲R̲O̲P̲O̲S̲A̲L̲
Firm, fixed price proposal.
1.4 P̲A̲Y̲M̲E̲N̲T̲ ̲P̲L̲A̲N̲
30 percent on order or letter of intent.
70 percent of OEM equipment cost to be paid on presentation
of certificate of conformance.
10 percent of all other costs to be paid on SPA.
The balance to be paid by monthly payments between
1-0-i and FAT.
1.5 P̲A̲Y̲M̲E̲N̲T̲ ̲I̲N̲ ̲U̲S̲ ̲D̲O̲L̲L̲A̲R̲S̲
Of the quoted price for Camps Test Drive System
Dkr. 7,612,673 represent cost incurred in US dollars.
This amount may be payable in US Dollars at an exchange
rate of Dkr. 960,- to 100 US Dollars.
1.6 D̲E̲L̲I̲V̲E̲R̲Y̲ ̲S̲C̲H̲E̲D̲U̲L̲E̲
The price proposal is made on the assumption that the
hardware production and the installation can take place
immediately after all other CAMPS systems have been
respectively produced and installed. It means, that
the factory acceptance test will be completed 1st September,
1984, and the site provisional acceptance will be completed
1st January, 1985 or eight months after SPA at SHAPE,
whichever comes later. As some HW-items have a long
lead time, CR need a L-o-i 9 months before the FAT
to be able to keep the schedule as stated.
…01…2̲ ̲ ̲P̲R̲I̲C̲E̲ ̲P̲R̲O̲P̲O̲S̲A̲L̲
1. Program Management ......................... Dkr.
2,570,000
2. System/Software Eng. ....................... Dkr.
562,704
2.1 System Integration ..... Dkr. 422,028
2.2 System Acceptance ...... Dkr. 140,676
3. Hardware Development ....................... Dkr.
281,352
3.1 HW Assembly Breakdown Dkr. 281,352
0
4. Software Development ....................... Dkr.
5. Hardware Fabrication ....................... Dkr.
13,219,406
5.1 HW cost ................ Dkr. 11,311,646
5.2 HW Integration + Test .. Dkr. 1,696,747
5.3 Factory Acc. Test Proc.
and Report ............. Dkr. 211,013
6. Site Installation .......................... Dkr.
1,175,935
6.1 Site Preparation Req. .. Dkr. 277,107
6.2 Site ATBB Drawing ...... Dkr. 184,738
6.3 Transportation ......... Dkr. 124,000
6.4 Site Installation ...... Dkr. 590,090
7. Site Acceptance ............................ Dkr.
184,738
8. Logistics Support .......................... Dkr.
4,257,742
8.1 Warranty ...................................
8.1.1 SW Warranty .......... Dkr. 1,688,112
8.1.2 HW Warranty .......... Dkr. 953,186
8.2 Training ...................................
8.2.1 Test Drive System
Course Development +
Conduction Dkr. 554,213
8.4 Maintenance ................................
8.4.1 Spares ............. Dkr. 1,062,231
9. Documentation .............................. Dkr.
281,352
9.1 TDS Operators .Manual... Dkr. 281,352
TOTAL.......................................... Dkr.
22,533,229
3̲ ̲ ̲H̲A̲R̲D̲W̲A̲R̲E̲ ̲C̲O̲N̲F̲I̲G̲U̲R̲A̲T̲I̲O̲N̲
3.1 H̲A̲R̲D̲W̲A̲R̲E̲ ̲F̲O̲R̲ ̲C̲A̲M̲P̲S̲ ̲V̲D̲U̲ ̲T̲E̲S̲T̲ ̲D̲R̲I̲V̲E̲ ̲S̲Y̲S̲T̲E̲M̲
The hardware configuration required for CAMPS VDU Test
Drive System is shown in figure 3.1.
It consists of non-dualised Equipment in tempest racks.
To the main equipment the following will be connected
:
3 VDUs CR quotes for Delta-Data due to
the logistic back-up problems with
other VDUs.
1 DUAL STATION Identical to the floppy station
in
FLOPPY CAMPS main equipment.
1 SMD Disk unit 80MB, identical to Main
CAMPS SMD.
1 MSP CR quotes for Tracor 8000 due to
logistic back-up problems with
other printers.
The VDU ports are proposed in optical versions as shown
in figure 3.1 and appendix B.1.
Cables connecting the VDU Test Drive System to a CAMPS
site are included in this proposal, assuming the distance
is max. 100 meters.
In appendix A is shown the equipment matrix for the
VDU Test Drive System.
Appendix B.1 shows the CAMPS VDU Test Drive HW configuration
and Connectivity.
CAMPS VDU TEST DRIVE SYSTEM
Figure 3.1
3.2 H̲A̲R̲D̲W̲A̲R̲E̲ ̲F̲O̲R̲ ̲C̲A̲M̲P̲S̲ ̲M̲E̲S̲S̲A̲G̲E̲ ̲T̲R̲A̲F̲F̲I̲C̲ ̲T̲E̲S̲T̲ ̲D̲R̲I̲V̲E̲ ̲S̲Y̲S̲T̲E̲M̲
The hardware configuration required for CAMPS Message
Traffic Test Drive System is shown in figure 3.2.
It consists of non-dualised Equipment in tempest racks.
To the main equipment the following will be connected
:
6 VDUs CR quotes for Delta-Data due to
the logistic back-up problems with
other VDUs.
1 DUAL STATION Identical to the floppy station
in
FLOPPY CAMPS main equipment.
1 SMD Disk unit 80MB, identical to Main
CAMPS SMD.
6 MSPs CR quotes for Tracor 8000 due to
logistic back-up problems with
other printers.
Cables connecting the Message Test Drive System to
a CAMPS site are included in this proposal, under the
assumption that the distance is max. 100 meters.
In appendix A is shown the equipment matrix for the
Message Traffic Test Drive System.
Appendix B.2 shows the CAMPS Message Traffic Test Drive
HW configuration and the Connectivity of the TDX System.
C̲A̲M̲P̲S̲ ̲M̲E̲S̲S̲A̲G̲E̲ ̲T̲R̲A̲F̲F̲I̲C̲ ̲T̲E̲S̲T̲ ̲D̲R̲I̲V̲E̲ ̲S̲Y̲S̲T̲E̲M̲
Figure 3.2
4̲ ̲ ̲S̲Y̲S̲T̲E̲M̲/̲S̲O̲F̲T̲W̲A̲R̲E̲ ̲E̲N̲G̲I̲N̲E̲E̲R̲I̲N̲G̲
4.1 S̲Y̲S̲T̲E̲M̲ ̲I̲N̲T̲E̲G̲R̲A̲T̲I̲O̲N̲
The System SW will be installed on the test drive system,
together with the additional SW mentioned in 4.2.
4.2 S̲O̲F̲T̲W̲A̲R̲E̲
The following will be delivered:
All software to enable the TDS to drive the reference
system CAMPS with defined messages and transaction
in a defined manner (timings, message contents, etc).
All software to enable the creation of the transaction
sequences and contents prior to a test run.
5̲ ̲ ̲F̲A̲B̲R̲I̲C̲A̲T̲I̲O̲N̲
5.1 H̲A̲R̲D̲W̲A̲R̲E̲ ̲A̲S̲S̲E̲M̲B̲L̲Y̲ ̲B̲R̲E̲A̲K̲D̲O̲W̲N̲
A HW assembly breakdown will be delivered, as the basis
for fabrication of the system.
5.2 F̲A̲C̲T̲O̲R̲Y̲ ̲A̲C̲C̲E̲P̲T̲A̲N̲C̲E̲ ̲T̲E̲S̲T̲
The system will be factory tested prior to shipment.
6̲ ̲ ̲L̲O̲G̲I̲S̲T̲I̲C̲S̲ ̲S̲U̲P̲P̲O̲R̲T̲
6.1 T̲R̲A̲N̲S̲P̲O̲R̲T̲A̲T̲I̲O̲N̲ ̲A̲N̲D̲ ̲I̲N̲S̲T̲A̲L̲L̲A̲T̲I̲O̲N̲
Site preparation requirements and ATBB-drawings will
be produced as on the main CAMPS contract. CR assumes
that a site survey can be conducted at the latest 5
months before SPA.
It means that the SPR will be delivered 4 months before
SPA, and the ATBB-drawings 2 months before. The site
verification is completed 2 months before, and the
installation can start 1 month before SPA.
The system will be installed on a site in Belgium.
The price proposal assumes that the test drive system
is installed independently of the reference system.
6.2 T̲R̲A̲I̲N̲I̲N̲G̲ ̲A̲N̲D̲ ̲D̲O̲C̲U̲M̲E̲N̲T̲A̲T̲I̲O̲N̲
Development and Conduction of a two week course for
6 students on the use of the CAMPS-specific test drive
system is quoted.
The course is scheduled for late 84, to be held at
CR, or in Belgium, if the necessary computer equipment
is available.
An operator manual for the test drive system is developed.
It gives an overview of all test drive tools, how they
are used during tests, how changes of different kinds
may be made using the tools, how testing is carried
out etc.
No other documentation will be delivered, as CR understands
that copies of the CAMPS site documentation will be
delivered directly from SHAPE to ISSC.
6.3 M̲A̲I̲N̲T̲E̲N̲A̲N̲C̲E̲
The costs of HW-and SW-warranty on the conditions as
in the main CAMPS contract during the one year warranty
period from the site delivery are included in the proposal.
If a shorter warranty period is requested, the costs
can be cut proportionally.
6.4 S̲P̲A̲R̲E̲S̲
To ensure that spares for 90 days are available CR
recommends SHAPE to purchase spares as for an operational
site.
In Appendix C the spare parts list is given under that
assumption.
The recommended spares will cost Dkr. 1,062,231 for
the test drive system.
Spare parts for a test drive system runnning with a
degraded connectivity are defined too. The spare part
costs for this option is Dkr. 539,053.
APPENDIX A
----------
VDU
Test Mes.
CR-Number. Name Unit Drv. Trf. To-
Total OEM
Price Sys TDS tal
Price
Dkr. ea. ea. ea.
Dkr.
--------------------------------------------------------------------------
2 CR80 PROCESSOR UNIT
MODULES
------------------------------
21 CR8003M/040PC/00 CPU/CACHE 116,059
3 3 6
696,354
25 CR8020M/000PC/00 MAP
89,181
1 1 2
178,362
26 CR8071M/010--/00 MIA
40,486
1 1 2
80,972
27 CR8021M/010-C/01 STI
81,976
1 1 2
163,952
28 CR8073M/010--/00 TIA
22,169
1 1 2
44,338
29 CR8016M/512PC/00 512
K RAM 162,840
2 2 4
651,360
3 CR80 CHANNEL UNIT MODULES
----------------------------
31 CR8081M/010A-/00 CIA-A
25,020
1 1 2
50,040
33 CR8044M/041AB/00 DISC
CTL/32K 64,194
1 1 2
128,388
34 CR8084M/010--/00 DCA
10,465
1 1 2
20,930
35 CR8047M/040AB/00 ST
FD CTLR 38,742
1 1 2
77,484
36 CR8087M/010--/00 SFA
5,124
1 1 2
10,248
37 CR8066M/010AB/00 LTU,SYNC/16K
34,688
1 2 3
104,064
38 CR8082M/010--/00 LIA-N
3,731
1 5 6
22,386
39 CR8066/020AB/00 LTU,
SYNC/32K 43,688
- 3 3
131,064
5 TDX SYSTEM MODULES
---------------------
51 CR1070S/000--/00 TDX
CONTL'R 23,799
1 1 2
47,598
52 CR2501 X-NET CABLE TERMINATION
499
4 4 8
3,992
53 CR2500 (100M) X-NET
CABLE 1,405
1 1 2
2,810
54 CR2510-/000--/00 X-NET
OUTLET 1,127
5 7 12
13,524
55 CR1074S/000--/00 BSM-X
15,712)
3 5 8
125,696
56 CR1066-/000--/00 BSM-X
PANEL )
57 CR1060S/000--/00 LTUX
TYPE1 23,855 - 2 2
47,710
58 CR1060S/000--/00 LTUX,TYPE2 23,855 - 2 2
47,710
59 CR1060S/000--/00 LTUXS
TYPE3 23,855 - 6 6
143,130
60 CR1060S/000--/00 LTUXS
TYPE4 23,855
5 - 5
119,275
5A CR80109/000--/00 V28
ADAP 4C 26,511
- 6 6
159,066 X
5B CR80110/000--/00 V28L
ADAP 1C 29,428
4 8
12
353,136 X
5C CR1053S/000--/00 5U
CTX-CRATE 15,656
3 5 8
125,248
5D CR8022S/000--/00 POWER
SUPPLY 36,597
3 5 8
292,776
5E CR8105S/010--/00 FAN
UNIT,CTX 5,190
3 4 7
36,330
5F CR1104S/000--/00 ADAP
CRATE 15,656
1 2 3
46,968
5G CR1102S/000--/00 ADAP POW SUP 28,104
4 7
11
309,144 X
5L CR1100S/000--/00 BP-8
2,771
1 4 5
13,855
VDU
Test Mes.
CR-Number. Name Unit Drv. Trf. To-
Total OEM
Price Sys TDS tal
Price
Dkr. ea. ea. ea.
Dkr.
--------------------------------------------------------------------------
6 CR80 SPECIAL MODULES
-----------------------
61 CR-----/000--/00 OM-1(VDU) 29,348
- 6 6
176,088 X
62 CR80108/000--/00 OM-2(CAMAC) 29,348 20
11
31
909,788 X
63 CR-----/000--/00 OM-3(MSP) 29,348
- 5 5
146,740 X
7 CR80 RACK, CRATES, ACCESSORIE
--------------------------------
73 RACK,EMI,1,(LE,RH)
) )
74 RACK,EMI,1,(LE,LH)
) )
75 RACK,EMI,2,(RE,RH)
) 121,021 )3 4 7
847,147 X
76 RACK,EMI,2,(RE,LH)
) )
77 RACK,EMI,3,( I,RH)
) )
78 RACK,EMI,3,( I,LH)
) )
7B CR8108-/220--/00 MAINS
SWITCH 7,885
3 4 7
55,195
7D CR8107-/010--/00 POW
DIST PAN 3,114
4 5 9
28,026
7E CR8050M/010--/00 POW
SUPPLY 20,350
3 3 6
122,100
7G CR8125M/225PC/00 PU
CRATE 58,081
1 1 2
116,162
7H CR8125M/425AB/00 CU
CRATE 68,077
1 1 2
136,154
7J CR8105M/020--/00 FAN
UNIT 16,118
2 2 4
64,472
7K CR8055M/020--/00 MBT(PU)
3,250
4 6
10
32,500
7L CR8211M/738--DATA CHAN
TERM 3,483
1 1 2
6,966
7M CR8055M/020AB/00 MBT
(CU) 3,250
2 - 2
6,500
7P FILTER BOX 55,920
1 1 2
111,840 X
7Q POWER LINE FILTER
7,631
1 2 3
22,893 X
8 CR80 CABLES
--------------
81 CR8201D DATA CHAN CABLE
1,682
1 1 2
3,364
82 CABLE,BSM-X-X-NET OUTL
625
3 5 8
5,000
83 CABLE,TIA-X-NET OUTL
878
1 1 2
1,756
84 CABLE,TDXCTRL-X-NET
OUTL 565
1 1 2
1,130
86 CABLE, FLOPPY DISK
631
1 1 2
1,262
8A CR8201S POW CABLE 0,5M )
)
8D CR8201S POW CABLE 2,5M )
)
8E CR8201S POW CABLE 3,5M )
542
)
18
23
41
22,222
8F CR8201D POW CABLE 0,5M )
)
8G CR8201D POW CABLE l,0M )
)
8H CR8201D POW CABLE 1,5M )
)
8J Ground Wire for BP-8
158
1 3 4
632
VDU
Test Mes.
CR-Number. Name Unit Drv. Trf. To-
Total OEM
Price Sys TDS tal
Price
Dkr. ea. ea. ea.
Dkr.
--------------------------------------------------------------------------
8M Ground Wire 158 15
18
33
5,214
8W POWER CABLE l,0MM l,0M
)
8X POWER CABLE l,0MM l,5M
542
)
5 6
11
5,962
8Y POWER CABLE l,0MM 2,5M
)
A1 Internal Cable type
1 394
1 3 4
1,576
A2 BSM to TDX Opto Cable
293
1 1 2
586
9 V24 SIGNAL CABLES
--------------------
91 V24 CABLE 9A/240
92 V24 CABLE 9A/270
93 V24 CABLE 9A/300
94 V24 CABLE 9A/330
95 V24 CABLE 10A/360
96 V24 CABLE 9A/390
97 V24 CABLE 17A/270
656
8
40
48
31,488
98 V24 CABLE 17A/300
99 V24 CABLE 17A/330
9A V24 CABLE 17A/360
9B V24 CABLE 10B/240
9C V24 CABLE 10E/150
9F OPTICAL FIBER (100M)
15,309 20
12
32
489,888 X
9T OPTO CONNECTORS (stk)
582
80
48
128
74,496 X
9U FILTERED CONN 10 POL
2,464
-
24
24
59,136 X
9V FILTERED CONN 18 POL
3,114
- 8 8
24,912 X
G MECHANICS
------------
GW LUMP SUM PER RACK
1,947
3 4 7
13,629
H PERIPHERAL EQUIPMENT
-----------------------
H1 VDU, TEMPEST
179,426
3 6 9 1,614,834 X
H2 MSP, TEMPEST
195,727
1 6 7 1,370,089 X
H3 MOUNTING TABLE 11,329
3 6 9
101,961 X
J MASS STORAGES
----------------
J1 CR8300-/080--/00
DISK DRV SMD 175,780 1 1 2
351,560 X
J2 CR8319-/080--/00
DISK PACK, 80MB 5,428 4 4 8
43,424 X
J6 CR8308-/216--/00
FD ST 2xSGL 28,522 1 1 2
57,044 X
Total
11,311,646
OEM TOTAL 7,223,186
APPENDIX B.1…01…****************
APP B.1
CAMPS VDU TEST DRIVE HW CONFIGURATION
CAMPS VDU TEST DRIVE SYSTEM…01…CONNECTIVITY (VDUs, MSPs, LOW SPEED
CHANNELS)
----------*-------*-------*-------*-------*-------* *------------*
TDX * * * * * * *
TOTAL
*
UNIT * 1 * 2 * 3 * 4 * * *
*
NO. * * * * * * *
NUMBERS
*
----------*-------*-------*-------*-------*-------* *-------*----*
CRATE * X * X * X * X * * *CRATES *
3
*
----------*-------*-------*-------*-------*-------* *-------*----*
LTUX 1 * * * * * * * *
*
CH. 1-4 * 4 * 4 * 4 * * * *LTUXs *
5
*
LTUX 2 * * * * * * * *
*
CH. 5-8 * 4 * 4 * * * * * *
*
----------*-------*-------*-------*-------*-------* *-------*----*
ADAPT. 1A * * * * * * * *
*
CH. 1-4 * * * * * * *Os *
20
*
ADAPT. 1B * * * * * * * *
*
CH. 1 * O * O * O * * * *Ls *
*
ADAPT. 2A * * * * * * * *
*
CH. 5-8 * * * * * * *BPs *
*
ADAPT. 2B * * * * * * * *
*
CH. 2 * O * O * O * * * * *
*
ADAPT. 3 * * * * * * * *
*
CH. 3 * O * O * O * * * * *
*
ADAPT. 4 * * * * * * * *
*
CH. 4 * O * O * O * * * * *
*
ADAPT. 5 * * * * * * * *
*
CH. 5 * O * O * * * * * *
*
ADAPT. 6 * * * * * * * *
*
CH. 6 * O * O * * * * * *
*
ADAPT. 7 * * * * * * * *
*
CH. 7 * O * O * * * * * *
*
ADAPT. 8 * * * * * * * *
*
CH. 8 * O * O * * * * * *
*
BP 1 * * * * * * * *
*
CH. 1-4 * * * * * * * *
*
BP 2 * * * * * * * *
*
CH. 5-8 * * * * * * * *
*
----------*-------*-------*-------*-------*-------* *-------*----*
OPTICAL INTERFACE
APPENDIX B.2…01…**************
CAMPS MESSAGE TRAFFIC TEST DRIVE SYSTEM…01…H/W CONFIGURATION
CAMPS MESSAGE TRAFFIC TEST DRIVE SYSTEM
CONNECTIVITY
----------*-------*-------*-------*-------*-------*------*
TDX * * * * * *
*
UNIT * 1 * 2 * 3 * 4 * 5 *
6
*
NO. * * * * * *
*
----------*-------*-------*-------*-------*-------*------*
CRATE * X * X * X * X * X *
*
----------*-------*-------*-------*-------*-------*------*
LTUX 1 * * * * * *
*
CH. 1-4 * 1 * 2 * 4 * 4 * 4 *
*
LTUX 2 * * * * * *
*
CH. 5-8 * 1 * 2 * 4 * 4 * 4 *
*
----------*-------*-------*-------*-------*-------*------*
ADAPT. 1A * * * * * *
*
CH. 1-4 * * * L * L * L *
*
ADAPT. 1B * * * * * *
*
CH. 1 * O * O * * * *
*
ADAPT. 2A * * * * * *
*
CH. 5-8 * * * L * L * L *
*
ADAPT. 2B * * * * * *
*
CH. 2 * O * O * * * *
*
ADAPT. 3 * * * * * *
*
CH. 3 * O * O * * * *
*
ADAPT. 4 * * * * * *
*
CH. 4 * O * O * * * *
*
ADAPT. 5 * * * * * *
*
CH. 5 * O * O * * * *
*
ADAPT. 6 * * * * * *
*
CH. 6 * * * * * *
*
ADAPT. 7 * * * * * *
*
CH. 7 * * * * * *
*
ADAPT. 8 * * * * * *
*
CH. 8 * * * * * *
*
BP 1 * * * * * *
*
CH. 1-4 * * * * * *
*
BP 2 * * * * * *
*
CH. 5-8 * * * * * *
*
----------*-------*-------*-------*-------*-------*------*
(Sheet 1 of 2)
----------*-------*-------*-------*-------*-------* *------------*
TDX * * * * * * *
TOTAL
*
UNIT * 7 * 8 * 9 * 10 * * *
*
NO. * * * * * * *
NUMBERS
*
----------*-------*-------*-------*-------*-------* *-------*----*
CRATE * * * * * * *CRATES *
5
*
----------*-------*-------*-------*-------*-------* *-------*----*
LTUX 1 * * * * * * * *
*
CH. 1-4 * * * * * * *LTUXs *
10
*
LTUX 2 * * * * * * * *
*
CH. 5-8 * * * * * * * *
*
----------*-------*-------*-------*-------*-------* *-------*----*
ADAPT. 1A * * * * * * * *
*
CH. 1-4 * * * * * * *Os *
10
*
ADAPT. 1B * * * * * * * *
*
CH. 1 * * * * * * *Ls *
6
*
ADAPT. 2A * * * * * * * *
*
CH. 5-8 * * * * * * *BPs *
*
ADAPT. 2B * * * * * * * *
*
CH. 2 * * * * * * * *
*
ADAPT. 3 * * * * * * * *
*
CH. 3 * * * * * * * *
*
ADAPT. 4 * * * * * * * *
*
CH. 4 * * * * * * * *
*
ADAPT. 5 * * * * * * * *
*
CH. 5 * * * * * * * *
*
ADAPT. 6 * * * * * * * *
*
CH. 6 * * * * * * * *
*
ADAPT. 7 * * * * * * * *
*
CH. 7 * * * * * * * *
*
ADAPT. 8 * * * * * * * *
*
CH. 8 * * * * * * * *
*
BP 1 * * * * * * * *
*
CH. 1-4 * * * * * * * *
*
BP 2 * * * * * * * *
*
CH. 5-8 * * * * * * * *
*
----------*-------*-------*-------*-------*-------* *-------*----*
(Sheet 2 of 2)
APPENDIX C
----------
S̲p̲a̲r̲e̲ ̲P̲a̲r̲t̲s̲ ̲L̲i̲s̲t̲:
ITEM NAME DESCRIPTION MANUFAC UNIT
PRICE
…02…RSPL…02…
SPL
DKR.…02…SITE…02…
30%
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
CPU/CACH CR8003M/040PC/00 CR 116,059 1 1
RAM 512K CR8016M/512PC/00 - 162,840 1 1
MAP CR8020M/000PC/00 -
89,181 1 1
MIA CR8071M/010--/00 -
40,486 1 1
STI CR8021M/010-C/00 -
81,976 1
CIA-A CR8081M/010A-/00 -
25,020 1
DISKCTRL CR8044M/040AB/00 -
64,194 1
DCA CR8084M/010--/00 -
10,465 1
OUTLET CR2510-/000--/00 -
1,127 1
SPWRSUPP CR8022S/000--/00 -
36,597 1
CTX FAN CR8105S/010--/00 -
5,190 1
ADPWRSUP CR1102S/000--/00 -
28,104 1
OM-3 OPTO -T/R OM3 -
29,348 1
PWRSUP M CR8050M/010--/00 -
20,350 1
FANUNITM CR8105M/020--/00 -
16,118 1
CARD JRVV CDC
5,207 1
CARD 6SGV -
8,476 1
CARD FLPV -
8,222 1
CARD JLQV -
8,006 1
CARD ELUV -
7,791 1
CARD MLVV -
6,088 1
(continued)
ITEM NAME DESCRIPTION MANUFAC UNIT
PRICE
…02…RSPL…02…
SPL
DKR.…02…SITE…02…
30%
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
ASSY POWER SUPPLY SHUGART
9,692 1
PCP PCB SA801-2 -
10,124 1
KTT DDSC SITE KIT DDSC
72,702 1
UNIT MSP MODEL 8000 TRACOR 195,727 1
PART FAN FOR M-CRATE CR
1,045 1
PART FAN FOR S-CRATE -
2,096 1
TOTAL DKR. 1,062,231
408,566
of which to be invoiced in US $ 389,487