DataMuseum.dk

Presents historical artifacts from the history of:

CR80 Wang WCS documentation floppies

This is an automatic "excavation" of a thematic subset of
artifacts from Datamuseum.dk's BitArchive.

See our Wiki for more about CR80 Wang WCS documentation floppies

Excavated with: AutoArchaeologist - Free & Open Source Software.


top - download

⟦e348168a5⟧ Wang Wps File

    Length: 7005 (0x1b5d)
    Types: Wang Wps File
    Notes: AIR CANADA PROPOSAL       
    Names: »2069A «

Derivation

└─⟦4363da632⟧ Bits:30006256 8" Wang WCS floppy, CR 0156A
    └─ ⟦this⟧ »2069A « 

WangText



            
             
             
             
   CHAPTER 2
                       
                       
                       
                       
                       
                       
                       
                       
                       
                       
                       
                       
                       
                       
                       
                       
                       
                       
                       
                       
                       
                       
                       
                       
                       
                       
                       
                       
                       
                       
                       
                       Page
                       #
                       
   DOCUMENT I
          COMMERCIAL
 PROPOSAL    
        Apr. 29,
 1982





         LIST OF CONTENTS                             Page

2.       CONTRACTUAL PROVISIONS.......................  2
2.1      Introduction.................................  2
2.2      Bidding Provisions...........................  2
2.3      Contract Compliance Statement................  3






2.       C̲O̲N̲T̲R̲A̲C̲T̲U̲A̲L̲ ̲P̲R̲O̲V̲I̲S̲I̲O̲N̲S̲



2.1      I̲n̲t̲r̲o̲d̲u̲c̲t̲i̲o̲n̲

         This chapter is submitted in response to Air Canada's
         RFP 2001 Part 2 Chapter 4, "Typical Contract Requirements".

         In Section 2.3 below, please find the Contract Compliance
         Statement which by reference to the numbering and headings
         of the RFP Part 2 Chapter 4, lists Christian Rovsing's
         comments to the Typical Contract Requirements.

2.2      B̲i̲d̲d̲i̲n̲g̲ ̲P̲r̲o̲v̲i̲s̲i̲o̲n̲s̲



2.2.1    

         This proposal shall remain valid and open for accept
         for 300 days following the closing date.



2.2.2    

         Christian Rovsing hereby accepts that this proposal
         shall become the property of Air Canada and that it
         shall not be returned.



2.2.3    

         Nothing contained in this proposal shall be construed
         to be an escalator clause or a qualifying condition
         as mentioned in the RFP Part 2 Chapter 2 section 2.1.7
         (d).





2.3 C̲o̲n̲t̲r̲a̲c̲t̲ ̲C̲o̲m̲p̲l̲i̲a̲n̲c̲e̲ ̲S̲t̲a̲t̲e̲m̲e̲n̲t̲ ̲

    Please find below Christian Rovsing's comments to the
    Typical Contract Requirements.  An "OK" signifies compliance,
    while areas which may prove difficult to comply with
    or where alternative solutions are suggested have been
    commented on, in some cases in addition to the "OK".


    Reference     Title of Clause     Comment
    in RFP Part
    2̲ ̲C̲h̲a̲p̲t̲e̲r̲ ̲4̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
    ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

    4.1           Laws                OK

    4.2           Assignment          OK

    4.3           Term                OK

    4.4           Termination         Christian Rovsing
                                      is
                  and cancellation    willing to submit
                                      to such termination
                                      for convenience and
                                      termination for non-performance-clauses
                                      which are usually
                                      applied to large
                                      international system
                                      procurements by e.g.
                                      NATO or the European
                                      Space Agency.

    4.5           Invoices            OK

    4.6           Purchase Options    OK

    4.7           Liquidated          Acceptable, provided
                  Damages             attention is given
                                      to Christian Rovsing's
                                      interest in limiting
                                      its liabililty reasonably.
                                      Also, Christian Rovsing
                                      should be allowed
                                      substantial flexibility
                                      in its planning of
                                      achievement of milestones,
                                      provided the ultimate
                                      delivery, installatin,
                                      and acceptance dates
                                      are met.



    Reference     Title of Clause     Comment
    in RFP Part
    2̲ ̲C̲h̲a̲p̲t̲e̲r̲ ̲4̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
    ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

    4.8           Insolvency          Christian Rovsing
                                      is prepared to discuss
                                      this requirement
                                      and to include such
                                      covenants in the
                                      contract as would
                                      reasonably protect
                                      Air Canada. During
                                      the project execution
                                      Christian Rovsing
                                      will provide CNCP
                                      full information
                                      on and disclosure
                                      of the technical
                                      and project management
                                      details of the program,
                                      thus ensuring that
                                      a critical situation
                                      in Christian Rovsing
                                      would not detrimentally
                                      affect the program.
                                      CNCP, or a third
                                      party assisted by
                                      CNCP, could carry
                                      the program through.
                                      If required, Christian
                                      Rovsing is prepared
                                      to discuss the establishment
                                      of insurance or guarantee
                                      protection of Air
                                      Canada. However,
                                      the cost hereof has
                                      not been included
                                      in the bid.

    4.9           Title               OK

    4.10          Risk of Loss        OK, please refer
                                      to I Section 1.3.

    4.11          Installation and
                  Delivery Dates      (a) OK
                                      (b) OK, but Christian
                                          Rovsing would
                                          expect compensation
                                          for additional
                                          cost incurred
                                          due to the postponement
                                      (c) OK

    4.12          Transportation etc  OK

    4.13          Site Preparation    OK



    Reference     Title of Clause     Comment
    in RFP Part
    2̲ ̲C̲h̲a̲p̲t̲e̲r̲ ̲4̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
    ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

    4.14          Terms of Use        a) OK
                                      b) Not applicable

    4.15          Standard of         Acceptable in principle
                  Performance

    4.16          Replacement         OK
                  of Equipment etc.

    4.17          Field Modifica-     Acceptable, please
                                      refer to
                  tions               Document III, Section
                                      9.2

    4.18          Alterations and     OK
                  Attachments

    4.19          Maintenance of      OK
                  Equipment

    4.20          Technical Support   OK

    4.21          Training and        OK
                  Documentation

    4.22          Guaranteed Support  OK, please refer
                                      to Document III,
                                      Section 9.2.

    4.23          Conversion Plan     OK, please refer
                                      to I, Section 3.4

    4.24          Patent Protection   Acceptable in principle

    4.25          Warranty            OK

    4.26          General Provisions  (a) OK
                  -Warranties         (b) OK
                  and Guarantees      (c) Needs precise
                                          definition of
                                          conditions.
                                      (d) OK
                                      (e) OK
                                      (f) OK
                                      (g) OK
                                      (h) OK



    Reference     Title of Clause     Comment
    in RFP Part
    2̲ ̲C̲h̲a̲p̲t̲e̲r̲ ̲4̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
    ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

    4.27          Systems, Equipment,
                  Software, and 
                  Parts Warranty      (a) OK, Christian
                                          Rovsing's base
                                          prices include
                                          12 months warranty
                                          on both software
                                          and hardware
                                          from site acceptance
                                      (b) OK
                                      (c) Acceptable in
                                          principle
                                      (d) First part OK,
                                          second part not
                                          immediately acceptable
                                      (e) Corrections is
                                          not expected
                                          to be performed
                                          by Air Canada
                                          of its subcontractor.
                                          Should this be
                                          the case, however,
                                          charges to Christian
                                          Rovsing must
                                          be based on standard
                                          costs per type
                                          of repair/correction.
                                      (f) Comment as under
                                          (e), however
                                          acceptable in
                                          principle.
                                      (g) OK
                                      (h) OK



    Reference     Title of Clause     Comment
    in RFP Part
    2̲ ̲C̲h̲a̲p̲t̲e̲r̲ ̲4̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
    ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

    4.28          Software Rights     1̲s̲t̲ ̲p̲a̲r̲a̲g̲r̲a̲p̲h̲

                                      Christian Rovsing
                                      expects the right
                                      to commercial exploitation,
                                      i.e. resale, to remain
                                      with our company.
                                       Christian Rovsing
                                      is willing to consider
                                      a royalty arrangement
                                      by which - in case
                                      of resale - Air Canada
                                      is gradually compensated
                                      for its development
                                      costs.
                                      Christian Rovsing
                                      would have no benefit
                                      from having software
                                      returned and therefore
                                      finds it difficult
                                      to credit Air Canada
                                      for such return.

                                      2̲n̲d̲ ̲p̲a̲r̲a̲g̲r̲a̲p̲h̲

                                      Needs further definition
                                      but the principle
                                      is at least partly
                                      acceptable.

    4.29          Suppliers           OK
                  Personnel
                  Disciplines

    4.30          Suppliers           Acceptable, although
                                      the
                                      amount of the insurance
                                      seems larger than
                                      expected.  This,
                                      however, is a matter
                                      of cost. Such cost
                                      has not been included
                                      in the price proposal.

    4.31          Definition          (a) OK
                  of Terms            (b) OK
                                      (c) OK
                                      (d) OK
                                      (e) OK
                                      (f) OK
                                      (g) OK
                                      (h) OK
                                      (i) OK
                                      (j) OK
                                      (k) OK
                                      (l) OK, please refer
                                          to Chapter 1,
                                          subsection 1.1.6.


    Reference     Title of Clause     Comment
    in RFP Part
    2̲ ̲C̲h̲a̲p̲t̲e̲r̲ ̲4̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
    ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

                                      (m) OK
                                      (n) OK
                                      (o) OK
                                      (p) OK
                                      (q) OK
                                      (r) Acceptable, but
                                          the criteria
                                          for the operating
                                          condition should
                                          be objective.
                                      (s) OK
                                      (t) OK
                                      (u) OK
                                      (v) OK