top - download
⟦e6db8e20d⟧ Wang Wps File
Length: 1440 (0x5a0)
Types: Wang Wps File
Notes: Spelunked
Names: »~ORPHAN61.08«
Derivation
└─⟦83a4a04d1⟧ Bits:30005815 8" Wang WCS floppy, CR 0002A
└─ ⟦this⟧ »~ORPHAN61.08«
WangText
8.3 F̲i̲n̲a̲l̲ ̲R̲e̲p̲o̲r̲t̲s̲
At finalization of a project QAD shall issue a final
report describing the quality status of the product.
This report will be an official document establishng
QAD's position towards the product.
The final report shall conclude either rejection, acceptance
with reservation, or full acceptance of the product.…86…1
…02… …02… …02… …02… …02…
204 Software Support
Tools, Techniques
and Methoddologies 1.2
Major
Quality
Aspects
3.1
PLANS,
General
3.3
Description
of
Plans
4.1
STANDARDS,
General
4.3 Description of Standards
5.
REVIEWS
7.
AUDITS
8.
REPORTS
205. Planning General
206. Work Instructions 3.
PLANS
207. Configuration Man. Plan
being
prepared
agreement (CM) (3.3.3
Configuration
control
plan)
208. Librry Controls Included
in
configuration
management
plan
209. Software Documentation 4.3
Description
of
Standards
210. Reviews/Audits 5.
REVIEWS
7.
AUDITS
8.
REPORTS
211. Testin 6. VERIFICATION
212. Corrective Action 6.
VERIFICATION
8.
REPORTS
213. Subcontractor Control 2.5
QA
Relation
to
Subcontractors.
214 Purchaser Supplied Materiel 2.6
Purchaser
supplied
material
215 Preparation for Delivery 8.4
Final
Reports 216
Accommodation
and
Assistance 2.4
QA
ccess