DataMuseum.dk

Presents historical artifacts from the history of:

CR80 Wang WCS documentation floppies

This is an automatic "excavation" of a thematic subset of
artifacts from Datamuseum.dk's BitArchive.

See our Wiki for more about CR80 Wang WCS documentation floppies

Excavated with: AutoArchaeologist - Free & Open Source Software.


top - download

⟦eaae9a6ca⟧ Wang Wps File

    Length: 42209 (0xa4e1)
    Types: Wang Wps File
    Notes: ACDN/PIP/001 (0.0)        
    Names: »2637A «

Derivation

└─⟦46c7b66fa⟧ Bits:30006139 8" Wang WCS floppy, CR 0233A
    └─ ⟦this⟧ »2637A « 

WangText

…0b……00……00……00……00……0e……0a……00……00……0e……0b……0e……0c……0e……02……0e……07……0d……0b……0d……01……0d…
…0d……05……0d……06……0c……0b……0c……01……0c……06……0b……08……0b……0f……0b……01……0b……02……0b……07……0a……0f……0a……07……09……0a……09……0d……09……0e……09… …08……0a……08……0e……08……05……86…1                                             …02…            …02…    …02…            

…02…ACDN/PIP/0001 

…02…820920   …02……02…#
ACDN PRELIMINARY
PROGRAM IMPLEMENTATION PLAN…02…issue 0.0…02…  ACDN 

















                    ACDN/0110/PIP/0001

       ACDN PRELIMINARY…01…PROGRAM IMPLEMENTATION PLAN



   L̲I̲S̲T̲ ̲O̲F̲ ̲C̲O̲N̲T̲E̲N̲T̲S̲

   1. INTRODUCTION
      1.1   Scope
      1.2   Applicable Documents
      1.3   Abbreviations

   2. ORGANISATION
      2.1   Christian Rovsing Organisation
      2.2   The ACDN Organisation
         2.2.1 Program Management
         2.2.2 System Engineering
         2.2.3 Hardware Development and Production
         2.2.4 Software Development
         2.2.5 Integration and Acceptance Tests
         2.2.6 Integrated Logistics Support
         2.2.7 QA and Configurations Management
         2.2.8 General Line Management Responsibilities

   3. CHRISTIAN ROVSING/AIR CANADA LIAISON
      3.1   Authority
      3.2   Reporting
      3.3   Approval and Submittal of Documentation
      3.4   Progress Reports and Meetings

   4. SUMMARY OF DEVELOPMENT ACTIVITIES
      4.1   Contractual Milestones
         4.1.1 Project Contractual Milestones
         4.1.2 Statement of Work
      4.2   Overall Work Breakdown Structure
      4.3   Master Schedule
      4.4   Documents to be produced
      4.5   Development Approach
      4.6   System Development Baselines
         4.6.1 System Requirement Baseline
         4.6.2 System Design Baseline
         4.6.3 Software Detailed Design Baseline
         4.6.4 Implementation Baseline
         4.6.5 System Verification Baseline
         4.6.6 Network Acceptance Baseline
      4.7   Implementation Approach
      4.8   Development and Migration Strategy



   5. PROGRAM MANAGEMENT
      5.1   Objective
      5.2   Organisation
      5.3   Work Break-down Structure (WBS)
      5.4   Deliverable Items and Documents List
      5.5   Schedule

   6. SYSTEM ENGINEERING
      6.1   Objective
      6.2   Organisation
      6.3   Work Break-down Structure (WBS)
      6.4   Deliverable Items and Documents List
      6.5   Schedule

   7. HARDWARE DEVELOPMENT AND PRODUCTION
      7.1   Development Approach
      7.2   Organisation
      7.3   Work Break-down Structure (WBS)
      7.4   Block Diagrams and Deliverables
         7.4.1 Toronto Node
         7.4.2 Montreal Node
         7.4.3 Winnipeg Node
         7.4.4 Network Management Host
         7.4.5 Electronic Mail Host
      7.5   Schedule

   8. SOFTWARE DEVELOPMENT
      8.1   Software Development Approach
      8.2   Organisation
      8.3   Work Break-down Structure (WBS)
      8.4   ACDN Software Documentation Tree
      8.5   Schedule

   9. INTEGRATION AND ACCEPTANCE TESTS
      9.1   Objective
      9.2   Organisation
      9.3   Work Break-down Structure (WBS)
      9.4   Deliverable Items and Documents List
      9.5   Schedule

   10.   INTEGRATED LOGISTICS SUPPORT
      10.1  Objective
      10.2  Organisation
      10.3  Work Break-down Structure (WBS)
      10.4  Deliverable Items and Documents List
      10.5  Schedule

   11.   APPLICABLE STANDARDS



1.       I̲N̲T̲R̲O̲D̲U̲C̲T̲I̲O̲N̲

1.1      S̲C̲O̲P̲E̲

         The purpose of this document is to define the overall
         plan for the development of the Air Canada Data Network
         (ACDN).

         The plan addressses all tasks through definition, implementation
         and delivery of hardware and software components to
         integration of these components into identified subsystems.
         Furthermore, is addresses  installation, training and
         subsequent system maintenance support.

         The emphasis is on the following major activities,
         which are managed by Christian Rovsing:

             -   Project Management
             -   System Engineering
             -   Hardware Development and Production
             -   Software Development
             -   Integration and Factory Acceptance Test
             -   Transportation
             -   Site Installation and Test
             -   Site Acceptance
             -   Network Acceptance
             -   Documentation
             -   Logistics Support
             -   System Maintenance
             -   Implementation and Migration Plans



1.2      A̲P̲P̲L̲I̲C̲A̲B̲L̲E̲ ̲D̲O̲C̲U̲M̲E̲N̲T̲S̲

         The below references are listed in reverse order
         of precedense:

     -   CEP2026 Rev 1   Sealed Tender

     -   ACDN/PRO/0002   Air Canada Data Network proposal

      1.     ACDN/001/DCN0001              May 14, 1982
      2.     Telex 82539                   May 27, 1982
      3.     ACDN/001/DCN/0002             May 29, 1982
      4.     ACDN/CLN/0001, Issue 01       May 29, 1982
      5.     Letter June 16, 1982          June 16, 1982
      6-25.  ACDN/CLN/0002-21, Issue 01    June 16, 1982
     26.     Telex 82401                   June 22, 1982
     27.     ACDN/CLN/0024, Issue 01       July 2, 1982
     28.     Telex 82447                   July 7, 1982
     29.     ACDN/CLN/0016, Issue 02
     30.     ACDN/CLN/0020, Issue 02
     31.     ACDN/CLN/0022, Issue 01
     32.     ACDN/CLN/0023, Issue 01
     33.     Telex 82449                   July 8, 1982
     34.     Telex 82450                   July 9, 1982
     35.     Telex 82464                   July 20, 1982
     36.     Telex 82467                   July 23, 1982
     37.     Letter July 23, 1982          July 23, 1982
     38.     Telex 82503                   August 9, 1982
     39.     Letter Sep. 7, 1982           Sep. 7, 1982
     40.     CN No. 20, Issue 03           Revised Price
                                           Quotation
     41.     CN No. 25, Issue 04           Milestone and
                                           payment Plan
     42.     CN No. 26, Issue 01           Hardware Reconfiguration
     43.     CN No. 27, Issue 02           Maintenance Charges,
                                           1983-85
     44.     CN No. 28, Issue 01           Exchange Rate
     45.     CN No. 29, Issue 011          Major Software
                                           Milestones


1.3      A̲B̲B̲R̲E̲V̲I̲A̲T̲I̲O̲N̲S̲

ACDN     Air Canada Data Network
ACNC     Current Air Canada Collins Network Controller
CI       Configuration Item
CPCI     Computer Program Configuration Item
PIP      Program Implementation Plan
PMS      Protected Message Service
WBS      Work Break-down Structure



2.       O̲R̲G̲A̲N̲I̲S̲A̲T̲I̲O̲N̲

2.1      C̲H̲R̲I̲S̲T̲I̲A̲N̲ ̲R̲O̲V̲S̲I̲N̲G̲ ̲O̲R̲G̲A̲N̲I̲S̲A̲T̲I̲O̲N̲

2.2      T̲H̲E̲ ̲A̲C̲D̲N̲ ̲O̲R̲G̲A̲N̲I̲S̲A̲T̲I̲O̲N̲

2.2.1    P̲r̲o̲g̲r̲a̲m̲ ̲M̲a̲n̲a̲g̲e̲m̲e̲n̲t̲

2.2.2    S̲y̲s̲t̲e̲m̲ ̲E̲n̲g̲i̲n̲e̲e̲r̲i̲n̲g̲

2.2.3    H̲a̲r̲d̲w̲a̲r̲e̲ ̲D̲e̲v̲e̲l̲o̲p̲m̲e̲n̲t̲ ̲a̲n̲d̲ ̲P̲r̲o̲d̲u̲c̲t̲i̲o̲n̲

2.2.4    S̲o̲f̲t̲w̲a̲r̲e̲ ̲D̲e̲v̲e̲l̲o̲p̲m̲e̲n̲t̲

2.2.5    I̲n̲t̲e̲g̲r̲a̲t̲e̲d̲ ̲L̲o̲g̲i̲s̲t̲i̲c̲s̲ ̲S̲u̲p̲p̲o̲r̲t̲

2.2.6    Q̲A̲ ̲a̲n̲d̲ ̲C̲o̲n̲f̲i̲g̲u̲r̲a̲t̲i̲o̲n̲s̲ ̲M̲a̲n̲a̲g̲e̲m̲e̲n̲t̲

2.2.7    G̲e̲n̲e̲r̲a̲l̲ ̲L̲i̲n̲e̲ ̲M̲a̲n̲a̲g̲e̲m̲e̲n̲t̲ ̲R̲e̲s̲p̲o̲n̲s̲i̲b̲i̲l̲i̲t̲i̲e̲s̲



3.       C̲H̲R̲I̲S̲T̲I̲A̲N̲ ̲R̲O̲V̲S̲I̲N̲G̲/̲A̲I̲R̲ ̲C̲A̲N̲A̲D̲A̲ ̲L̲I̲A̲I̲S̲O̲N̲

3.1      A̲U̲T̲H̲O̲R̲I̲T̲Y̲

3.2      R̲E̲P̲O̲R̲T̲I̲N̲G̲

3.3      A̲P̲P̲R̲O̲V̲A̲L̲ ̲A̲N̲D̲ ̲S̲U̲B̲B̲M̲I̲T̲T̲A̲L̲ ̲O̲F̲ ̲D̲O̲C̲U̲M̲E̲N̲T̲A̲T̲I̲O̲N̲

3.4      P̲R̲O̲G̲R̲E̲S̲S̲ ̲R̲E̲P̲O̲R̲T̲S̲ ̲A̲N̲D̲ ̲M̲E̲E̲T̲I̲N̲G̲S̲



4.       S̲U̲M̲M̲A̲R̲Y̲ ̲O̲F̲ ̲D̲E̲V̲E̲L̲O̲P̲M̲E̲N̲T̲ ̲A̲C̲T̲I̲V̲I̲T̲I̲E̲S̲

4.1      C̲O̲N̲T̲R̲A̲C̲T̲U̲A̲L̲ ̲M̲I̲L̲E̲S̲T̲O̲N̲E̲S̲

4.1.1    M̲i̲l̲e̲s̲t̲o̲n̲e̲s̲


     Milestones                               month
     ---------------------------------------------------
program management
     1                                        Down-payment       
                                                                 0
     2                                        Program
                                              Implementation
                                              Plan               
                                                                 2
     3                                        DEF Contract       
                                                                 3

equipment development and production
     6                                        EMH,
                                              Test
                                              Environment,
                                              FAT                
                                                                 6
     7                                        EMH,
                                              Spares             
                                                                 6
     8                                        Hardware
                                              Development        11
     9                                        Toronto
                                              Node,
                                              FAT                10
     10                                       Montreal
                                              Node,
                                              FAT                11
     11                                       Winnipeg
                                              Node,
                                              FAT                13
     12                                       Toronto
                                              Node,
                                              spares
                                              + consumeables     16
     13                                       Depot,
                                              Spares
                                              and consumeables   17
     14                                       Montreal
                                              Node,
                                              spares
                                              and consum.        25
     15                                       Winnipeg
                                              Node,
                                              spares
                                              and consum.        29

system engineering
     5                                        System
                                              Requirement
                                              Specification      
                                                                 5
     16                                       System
                                              Design
                                              Specification      11
     17                                       RMA Report         12
     18                                       Test
                                              Procedures         13

software development
     19                                       BCS,
                                              detail
                                              design             
                                                                 7
     20                                           
                                              unit
                                              test               10
     23                                       Prel
                                              TAS/AC40x,
                                              detail
                                              design             
                                                                 8
     24                                           
                                                  
                                                  
                                               unit
                                              test               12
     25                                       Prelim
                                              INAS,
                                              detailed
                                              design             
                                                                 7
     26                                           
                                                  
                                                 unit
                                              test               11
     27                                       Prelim
                                              NCS,
                                              detailed
                                              design             
                                                                 8
     28                                           
                                                  
                                                unit
                                              test               13
     29                                       .............................VERSION
                                              1                  16


Milestones                                   month
----------------------------------------------------
 30  Prel. IBM VTAM/AC 40x, detail design    14
 31                   unit test              16
 32  .............................VERSION 2  17
 35  Prel. IBM VTAM/3270, detail design      15
 36                 unit test                19
 .................................VERSION 3  19
 21  NSS, detailed design                    16
 22       unit test                          20
 33  TAS, detail design                      17
 34       unit test                          21
 37  UNIVAC CMS, detail design               17
 38              unit test                   21
 41  SCS, prelim design                      17
 42       unit test                          21
 43  NCS, prelim design                      21
 44       detail design                      21
 45  EMS, detail design                      21
 46       unit test                          25
 50  INAS, prelim design                     17
 51        detail design                     21
 47  .............................VERSION 4  25
 39  UNIVAC VIA, detail design               19
 40              unit test                   24
 48  ENAS, detail design                     19
 49        detail design                     24
 52  NMS, preliminary design                 16
 53  NMS, nmh/ncc                            22
 54  NMS, inventory control                  22
 55  NMS, statistical acquisition            22
 56  NMS, network modelling                  22
 57  NCS, geo back-up, detail design         20
 58                    unit test             24
 59  .............................VERSION 5  28
 60  Volume Generator, prelim design          8
 61                    unit test             12
 62  Message gen, detail design              11
 63               unit test                  14


Milestones                                         month
----------------------------------------------------------

documentation
  64   documentation plan                           6
  65   sys descrip manual                          11
  66   instal manual                               15
  67   operating manual                            15
  68   network operator manual                     22
  69   technical manuals                           15
  70   peripheral equip manual                     15
  71   programming and development tools           25
  72   s/w description                             25
training
  73   training plan                                2
  74   maintenance course, prep                     7
  75                       conduct                 10
  76   gen system course, prep                      7
  77                      conduct                  10
  78   network course, prep                        15
  79                   conduct                     24
  80   network oper course, prep                   17
  81                        conduct                25
  82   s/w course, prep                             2
  83               conduct                          4

implementation
  4    Site Survey Report                           4
  -    EMH transportation and installation          6
  84   Toronto Node, trans and installation        15
  85   ..............SAT                           15
  86   Montreal Node, trans and installation       25
  87   ..............SAT                           26
  88   Winnipeg Node, trans and installation       29
  89   ..............SAT                           30
  90   Network Acceptance Test                     34
  91   Retension                                   34



4.1.2 S̲T̲A̲T̲E̲M̲E̲N̲T̲ ̲O̲F̲ ̲W̲O̲R̲K̲

      This section contains a statement of work (SOW)
      for each of the milestones identified in Section
      4.1.1.

      Each SOW shall contain as a minimum

          -   description
          -   schedule
          -   results
          -   dependencies



4.2      O̲V̲E̲R̲A̲L̲L̲ ̲W̲O̲R̲K̲ ̲B̲R̲E̲A̲K̲-̲D̲O̲W̲N̲ ̲S̲T̲R̲U̲C̲T̲U̲R̲E̲

         This section presents the ACDN WBS in form summary
         work break-down structures.

         W̲B̲S̲ ̲ ̲ ̲ ̲ ̲D̲e̲s̲c̲r̲i̲p̲t̲i̲o̲n̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
         1.0     Program Management
         2.0     System Engineering
         3.0     Equipment
         4.0     Equipment Development
         5.0     Standard Software
         6.0     Software Development
         7.0     Acceptance Tests
         8.0     Documentation
         9.0     Training
         10.0    Transportation
         11.0    Installation
         12.0    Equipment Mtce
         13.0    Software Mtce


         The WBS consists of all work packages required to implement
         a given task/program.

         The WBS is defined by means of Work Package Description
         (WPD).  The WPDs are constructed by performing a preliminary
         design of the system.  However, the WPDs do not represent
         a design, but is used by the management team as a planning
         tool to obtain enough visibility in order to control
         what to produce, resource allocation, schedule, and
         cost.

         WPDs can at any time be updated and will be updated
         prior to turn over to a developer.

         The WBS is constituted by Summary Work Packages, Work
         Packages and Work Units.

         Summary work packages shall satisfy the same requirements
         as a work package.  A summary work package will typically
         be assigned a department/division.

         Each work package (WP) shall satisfy the following:

         -   object or product oriented whereiever feasible,
             or cover a destinit, clearly identifiable functional
             task, e.g. project control, project administration
             

         -   qualify for assignment to one specific person (WP
             manager), who will be responsible for its tecnical
             content, schedule and cost

         -   clearly defined start and end.


         The lowest level of the WBS-structure is the work unit.
          Each work unit will satisfy the following:

         -   identify a specific task, which one person may
             perform in a reasonable period

         -   clearly defined start and end.



4.3      M̲A̲S̲T̲E̲R̲ ̲S̲C̲H̲E̲D̲U̲L̲E̲



4.4      D̲E̲L̲I̲V̲E̲R̲A̲B̲L̲E̲ ̲D̲O̲C̲U̲M̲E̲N̲T̲S̲

         This section identifies the documents to be produced
         as part of the AADN project.

         For each document identified the following shall be
         stated:

             -   short description
             -   schedule (due date)
             -   quantity
             -   dependencies

    W̲P̲-̲i̲d̲ ̲ ̲ ̲D̲o̲c̲-̲i̲d̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲D̲e̲s̲c̲r̲i̲p̲t̲i̲o̲n̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
    ̲ ̲ ̲ ̲ ̲

    2.1.1   ACDN/SRS/0001   System Requirement Specification

    2.2.1   ACDN/ICD/0001   Network Supervisor Procedures
                            and Generic Formats
    2.2.2   ACDN/ICD/0002   User Producedures and Generic
                            Formats
    2.2.3   ACDN/ICD/0003   ICC Access line Interface
    2.2.4   ACDN/ICD/0004   ACNC Interface (gateway)
    2.2.5   ACDN/ICD/0005   IBM VTAM SUpport
    2.2.6   ACDN/ICD/0006   Univac CMS Support
    2.2.7   ACDN/ICD/0007   Univac VIA Interface
    2.2.8   ACDN/ICD/0008   SITA and ARINC Interface
    2.2.9   ACDN/ICD/0009   CNT Interface
    2.2.10  ACDN/ICD/0010   NMH Operator Procedures and
                            Generic Formats
    2.2.11  ACDN/ICD/0011   EMH operator Procedures and
                            Generic Formats
    2.2.12  ACDN/IDC/0012   Standard TAS

    2.3.1   ACDN/SDS/0001   System Design Specfication

    2.4.1   ACDN/TPR/0001   System Test Specs and Procedures





4.5      D̲E̲V̲E̲L̲O̲P̲M̲E̲N̲T̲ ̲A̲P̲P̲R̲O̲A̲C̲H̲

         The implementation of the ACDN has three major objectives:

         -   based on top-down development and baseline management
             provide an efficient overall technical control
             of the ACDN development

         -   development to take place by means of an incremental
             implementation where software is developed through
             a number of builds

         -   migration from the existing ACNC network to the
             new ACDN network aimed at meeting ACs objectives.

         The baselines and development approach are further
         described in the remainder of this section while section
         4.7 describes the migration approach.

         The following baselines have been established for the
         ACDN program:

         -   system requirement specification
         -   system design
         -   preliminary (subsystem) design
         -   detailed design
         -   production (coding and unit test)
         -   system integration and test
         -   system acceptance
         -   network acceptance

         At any time, during the ACDN program development cycle,
         all previously established baselines together with
         approved changes to the baselines, constitute the contractual
         identification of the system.

         To assure correctness and completeness of a baseline,
         series of reviews/inspections are established, during
         which the produced documents/components are evaluated.
          A subsequent baseline will only be initiated when
         the previous baseline has been approved.

         The use of early validation and verification accomplished
         via reviews, walk throughs, and inspections will furthermore
         contribute to secure that the final product meets its
         requirements.  Furthermore, it provides management
         with better tools to measure progress - and thus serves
         to ensure proper attention to critical items providing
         the most important tool for schedule control.



         The development strategy adhered to by CR on the ACDN
         program is that of incremental implementation.

         This implies that the following activities take place
         in distinct, sequential phases:

         -   system requirement specification,
         -   system design,
         -   preliminary (subsystem) design.

         The Requirements Specification phase is a refinement
         of the commitments presented by the proposal augmented
         by the requirements of the Sealed Tender.  The outcome
         of this phase is a specification for ACDN network functional
         and physical capabilities; a document which consists
         of contractual commitments of exactly what is to be
         provided presented in an unambiguous way; a document
         which forms the baseline for the design and subsequent
         validation processes; thus, an important aspect of
         the document is to present commitments in a form which
         is verifiable.

         The System Design phase is a refinement and consolidation
         of the design presented in the proposal.  An important
         part in this phase is that of establishing the exact
         functions to be provided by a given package together
         with the exact interfaces between packages.  Once this
         has been established and verified against the requirements,
         the preliminary and detailed design can proceed leading
         to the coding and testing phase implementing and final
         verification the fulfillment of requirements.

         Subsequent phases of the ACDN program are broken down
         in a number of builds.  The following activities take
         place for each build:

         -   detailed design
         -   code
         -   unit test
         -   integration
         -   acceptance testing

         The final Network Acceptance Test constitutes the last
         phase of the ACDN development.

         Builds serve as the vehicle for an ordered, manageable
         software development.

         Builds enable segmentation of a complex software development
         into smaller, functionally oriented sections.



         Thus, the build is a significant partial subset of
         the system and consists of one or more software modules.
          Generally, a software module implements one function.
          An equal important aspect of a build is that it demonstrates
         a significant, partial functional capability of the
         system.  It culminates in a demonstration of the full
         system in form of the Network Acceptance Test, which
         occurs as a neutral concluding step of integrating
         the last build to the accumulation of previous builds.





4.6      S̲Y̲S̲T̲E̲M̲ ̲D̲E̲V̲E̲L̲O̲P̲M̲E̲N̲T̲ ̲B̲A̲S̲E̲L̲I̲N̲E̲S̲

         The following sections describe the baselines applicable
         at the system level.

         At lower levels than the system level a number of baselines
         are defined.

         The hardware and software implementation will be divided
         into a number of sub-phases where each completed subphase
         will establish a baseline.

         The system development cycle is presented in figure
         4.6-1.

         Whenever this section specifies CR internal reviews,
         AC participation is assumed.




















































                       Figure 4.6-1
                 SYSTEM DEVELOPMENT CYCLE


4.6.1    S̲y̲s̲t̲e̲m̲ ̲R̲e̲q̲u̲i̲r̲e̲m̲e̲n̲t̲ ̲B̲a̲s̲e̲l̲i̲n̲e̲

         The system requirement definition phase will be completed
         by a System Requirements Review (SRR). The objective
         of this review is to ensure the compliance and completeness
         of the system requirements. After ACs approval of the
         System Requirements Specification, and associated Interface
         Control Documents, these will establish the baseline
         for all subsequent development activities.



4.6.2    S̲y̲s̲t̲e̲m̲ ̲D̲e̲s̲i̲g̲n̲ ̲B̲a̲s̲e̲l̲i̲n̲e̲

         During the system design phase, the system requirements
         are broken down into subsystems and components of hardware
         and software to ensure

         a)  that the system design specification represents
             a complete and optional synthesis of the system
             requirements

         b)  that the system is complete and feasible, and

         c)  that a technical direction is provided to the implementation

         An internal Christian Rovsing A/S System Design Review
         (SDR) will be scheduled.

         After approval of the system design specification by
         the ACDN program management, this will establish the
         design requirement baseline.



4.6.3    P̲r̲e̲l̲i̲m̲i̲n̲a̲r̲y̲ ̲D̲e̲s̲i̲g̲n̲ ̲B̲a̲s̲e̲l̲i̲n̲e̲

         The actual design of subsystems and hardware and software
         components identified during the system design will
         be divided into two phases; the preliminary phase,
         and the detailed design phase 



         The preliminary design baseline (subsystem design)
         is established prior to detailed design in order to

         a)  evaluate the progress and technical adequacy of
             the selected design approach

         b)  determine its compatibility with the requirements,
             and

         c)  establish the existence and compatibility of the
             physical and functional interfaces between system
             components (i.e. hardware, software, peripherals,
             or facilities)

         An internal Christian Rovsing A/S Preliminary Design
         Review (PDR) will be conducted to ensure correctness
         and adequacy of the preliminary design baseline.



4.6.4    D̲e̲t̲a̲i̲l̲e̲d̲ ̲D̲e̲s̲i̲g̲n̲ ̲B̲a̲s̲e̲l̲i̲n̲e̲

         Before the actual implementation is initiated, a Detailed
         Design Review (DDR) internal Christian Rovsing A/S
         will be conducted to

         a)  determine that the detailed design satisfies the
             design requirement baseline.

         b)  establish the exact interface relationship between
             the system components

         After approval the detailed design forms the baseline
         for implementation of the actual hardware or software
         components.



4.6.5    I̲m̲p̲l̲e̲m̲e̲n̲t̲a̲t̲i̲o̲n̲ ̲B̲a̲s̲e̲l̲i̲n̲e̲s̲

         When the Hardware/Software components have been produced
         these shall be tested and integrated into subsystems.
         The baselines are established when the subsystems have
         been approved by the CR A/S QA Department.





4.6.6    S̲y̲s̲t̲e̲m̲ ̲V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲ ̲B̲a̲s̲e̲l̲i̲n̲e̲

         At the time of completion of system integration and
         verification, a System Verification Review is conducted
         to verify that the system performes as required, and
         that product specification, manuals, and handbooks
         are accurate.



4.6.7    S̲y̲s̲t̲e̲m̲ ̲A̲c̲c̲e̲p̲t̲a̲n̲c̲e̲ ̲B̲a̲s̲e̲l̲i̲n̲e̲s̲

         The formal system acceptance phase has been separated
         into a number of sub-phases each resulting in a baseline.
         The Acceptance baselines are:

         -   DSMT System Test baseline

         -   In Plant Software Test baseline

         -   Factory (H/W) Acceptance baseline

         -   Software functional baseline

         -   Software operational baseline

         -   Site Provisional Acceptance baseline

         For further details please refer to ACDN Acceptance
         Test Plan



4.6.8    N̲e̲t̲w̲o̲r̲k̲ ̲A̲c̲c̲e̲p̲t̲a̲n̲c̲e̲ ̲B̲a̲s̲e̲l̲i̲n̲e̲

         TBD


4.7      I̲M̲P̲L̲E̲M̲E̲N̲T̲A̲T̲I̲O̲N̲ ̲A̲P̲P̲R̲O̲A̲C̲H̲

         This section will address the strategy to be applied
         in order to assure that all requirements will be implemented
         accordingly.

         In order to assure that all requirements are identified
         the ACDN system requirements identified in the ADCN
         System Requirements Specification and associated ICDs
         will be allocated to the pertinent hardware and software
         subsystems. This is done during system design and will
         be contained in a Verification Control Document.

         To assure that the requirements are implemented in
         the software subsystems/packages the requirements will
         be allocated to each package/module in Unit Development
         Folders (UDF). Refer to UDF Standard SD/STD/006.

         The above requirement allocation will be verified during
         the preliminary/detailed design reviews.All the unit/packages
         test cases shall include testing of these requirements.During
         system integration and verification the Verification
         Control Document will be used to track the requirements
         via the test procedures and results.

         To assure that the requirements are implemented in
         the hardware sybsystems/items the requirements will
         be allocated to each subsystem/item in the Product
         specifications or the Subsystem Specifications. The
         detailed design review will verify that the requirements
         are accounted for. The test cases developed for the
         items and subsystems will test the allocated requirements.
         During the system integration and verification the
         VCD will be used to track the requirements.



4.8      D̲E̲V̲E̲L̲O̲P̲M̲E̲N̲T̲ ̲A̲N̲D̲ ̲M̲I̲G̲R̲A̲T̲I̲O̲N̲ ̲S̲T̲R̲A̲T̲E̲G̲Y̲

         The development activities and the migration of AC
         terminals and hosts, existing as new, to the new ACDN
         data network will be parallel activities.  Furthermore,
         it is envisaged that some of the development activities
         take place at AC in Canada.

         A number of measures have been taken to meet these
         targets:

         -   an initial development and test system is made
             available at AC facilities, Toronto early 1984

         -   part of the network equipment is used by CR for
             in-house development and test in Copenhagen

         -   software developed in builds aimed at satisfying
             AC migration plans

         -   hardware reconfigured to meet development and test
             needs; refurbishment to final configurations take
             place at AC facilities, Canada.



4.8.1    S̲t̲a̲g̲e̲s̲

         The equipment is seen as stable configurations through
         a number of phases identified as stages.

         a.  C̲R̲ ̲C̲o̲p̲e̲n̲h̲a̲g̲e̲n̲

             1.  May-Jun 83        CR/stage 1
                                   -  NMH and Toronto Node

             2.  Jun-Aug 83        CR/stage 2
                                   -  NMH, Toronto Node and
                                      Montreal Node

             3. (Aug 83 - Sep 84)  CR/stage 3
                                   -  NMH and Montreal Node
                                   -  Winnipeg Node configurated
                                      as development system

             4.( Sep - Dec 84)     CR/stage 4
                                   -  NMH and Winnipeg Node


         b.  A̲C̲,̲ ̲T̲o̲r̲o̲n̲t̲o̲ ̲(̲Y̲Y̲Z̲)̲

             1. (Feb - Oct 83)     AC/stage 1
                                   -  Development and Test System
                                      (EMH equipment)

             2. (Oct 83 - Jan 84)  AC/stage 2)
                                   -  Development and Test System
                                      (EMH equipment Toronto
                                      Node (GWY only)

             3. (Jan - Sep 84)     AC/stage 3
                                   -  Development and Test System
                                   -  Toronto Node (GWY ? FEP)

             4. (Sep - Dec 84)     AC/stage 4
                                   -  Toronto Node
                                   -  Montreal Node
                                   -  Electronic Mail Host

             5. (Dec 84 -)         AC/stage 5
                                   -  Toronto Node
                                   -  Montreal Node
                                   -  Winnipeg Node
                                   -  Network Management Host
                                   -  Electronic Mail Host



4.8.2    D̲e̲v̲e̲l̲o̲p̲m̲e̲n̲t̲ ̲A̲c̲t̲i̲v̲i̲t̲i̲e̲s̲

         This section outlines the development activities of
         each stage.

         a.  C̲R̲,̲ ̲C̲o̲p̲e̲n̲h̲a̲g̲e̲n̲

             1,2.    CR/stage 1 and 2                      
                       

                 -   initial development of software version
                     1 for 
                     -  gateway   (GWY)
                     -  front-end (FEP)
                     -  monitoring and control with ICC-environment
                        capacity for some 6 simultaneous users
                     -  test
             3.  C̲R̲/̲s̲t̲a̲g̲e̲ ̲3̲

                 -   completion of version 01 (GWY)
                 -   development of version 2 and 3 (FEP) capacity
                     some 20 simultaneous users
                 -   development of version 4
                     -  build 1 through TBD1
                 -   initial development of version 5
                     -  build TBD1 through TBD2

             4.  CR/stage 4
                 -   completion of version 5



         b.  A̲C̲,̲ ̲T̲o̲r̲o̲n̲t̲o̲

             1.  AC/stage 1
                 -   development of test utilities
                     capacities for some 6 simultaneous users
                 -   parallel development on version 1
                     -  control
                     -  gateway
                 -   test with ACNC

             2.  AC/stage 2
                 -   integration with ACNC and ICC network
                     -  control
                     -  GWY
                 -   integration of AC terminals (stabilization)
                     to new network

             3.  AC/stage 3
                 -   integration with new OPNS/CGO host
                 -   integration with new host terminals
                 -   integration of AC terminals (cont'd)
                 -   parallel development on version 4

             4.  AC/stage 4
                 -   integration with RCCSH, Montreal
                 -   integration with RCCS terminals, Montreal
                 -   integration with ICC network, Montreal
                 -   migration of AC terminals (cont'd)
                 -   parallel development on version 5

             5.  AC/stage 5
                 -   integration of ICC network, Winnipeg
                 -   migration of AC terminals (cont'd)
                 -   network acceptance test


4.8.2.1  V̲e̲r̲s̲i̲o̲n̲ ̲1̲:̲ ̲L̲i̲m̲i̲t̲e̲d̲ ̲G̲a̲t̲e̲w̲a̲y̲ ̲C̲a̲p̲a̲b̲i̲l̲i̲t̲y̲

         This software version will provide access of AC 40x
         type of devices connected to the new ACDN to following
         resources of the existing ACNC:

                 -   RES
                 -   VIA
                 -   Dorval
                 -   PMS

         Multi sign-on like the current ACNC sign-on will be
         supported.

         Furthermore, limited monitoring and control facilities
         will be provided by this software version to support
         an operating network. These facilities will allow configuration
         changes to be made to enable migration of terminals
         to the ACDN.

         This software version is constitured of subsets of
         the following packages:

                 -   INAS
                 -   NCS
                 -   NSS, internal transport
                 -   SCS, single NSP
                 -   TAS, AC40x handling





4.8.2.2  V̲e̲r̲s̲i̲o̲n̲ ̲2̲:̲ ̲L̲i̲m̲i̲t̲e̲d̲ ̲I̲B̲M̲ ̲V̲T̲A̲M̲ ̲C̲a̲p̲a̲b̲i̲l̲i̲t̲y̲

         This software version will add access of AC 40x type
         of terminals access to an IBM VTAM host to the capabilities
         of Version 1. The terminals may be connected to either
         the new ACDN or the existing ACNC.

         This software version is constituted of subsets of
         the following software elements:

                 -   HAS I, IBM VTAM
                 -   SCS, multiple NSPs
                 -   TAS, AC 40x to IBM emulation





4.8.2.3  V̲e̲r̲s̲i̲o̲n̲ ̲3̲:̲ ̲L̲i̲m̲i̲t̲e̲d̲ ̲I̲B̲M̲ ̲3̲2̲7̲0̲ ̲C̲a̲p̲a̲b̲i̲l̲i̲t̲y̲

         This software version will add access of IBM 3270 type
         of terminals access to one IBM VTAM host to the capabilities
         of Version 2.

         This software version is constituted of a subset of
         the software elements:

                 -   HAS I, IBM VTAM

                 -   TAS, IBM 3270 terminal support

         A single node is supported.



4.8.2.4  V̲e̲r̲s̲i̲o̲n̲ ̲4̲:̲ ̲N̲e̲t̲w̲o̲r̲k̲ ̲a̲n̲d̲ ̲P̲r̲o̲t̲e̲c̲t̲e̲d̲ ̲M̲e̲s̲s̲a̲g̲e̲ ̲S̲e̲r̲v̲i̲c̲e̲ ̲C̲a̲p̲a̲b̲i̲l̲i̲t̲y̲

         This major software version completes four major ACDN
         capabilities.

         -   transport network between multiple nodes
         -   network control capabilities
         -   protected message service (PMS)
         -   full gateway capability to ACNC

         This software version constitutes the completion of
         the following packages or elements:

         -   multiple Hosts at each node
             HAS I,  IBM VTAM
         -   HAS II, Univac CMS
         -   TAS, AC 40x to any host
         -   NCS, exclusive geographical back-up
         -   SCS
         -   INAS
         -   NSS
         -   EMS




4.8.2.5  V̲e̲r̲s̲i̲o̲n̲ ̲5̲:̲ ̲N̲e̲t̲w̲o̲r̲k̲ ̲M̲a̲n̲a̲g̲e̲m̲e̲n̲t̲,̲ ̲E̲x̲t̲e̲r̲n̲a̲l̲ ̲N̲e̲t̲w̲o̲r̲k̲ ̲A̲c̲c̲e̲s̲s̲
         ̲a̲n̲d̲ ̲V̲I̲A̲ ̲H̲o̲s̲t̲ ̲A̲c̲c̲e̲s̲s̲ ̲C̲a̲p̲a̲b̲i̲l̲i̲t̲y̲

         This major software version represents completion of
         the ACDN capabilities, specifically the following:

         -   Network Management
         -   Geographically backed up Network Control
         -   Access to VIA host
         -   Access to external networks, e.g.
             o   SITA,
             o   ARINC,
             o   CNT
         -   Virtual Terminal Capability




5.       P̲R̲O̲G̲R̲A̲M̲ ̲M̲A̲N̲A̲G̲E̲M̲E̲N̲T̲

5.1      O̲b̲j̲e̲c̲t̲i̲v̲e̲
5.2      O̲r̲g̲a̲n̲i̲s̲a̲t̲i̲o̲n̲


5.3      W̲o̲r̲k̲ ̲B̲r̲e̲a̲k̲-̲d̲o̲w̲n̲ ̲S̲t̲r̲u̲c̲t̲u̲r̲e̲ ̲(̲W̲B̲S̲)̲

         W̲P̲-̲i̲d̲ ̲ ̲ ̲D̲e̲s̲c̲r̲i̲p̲t̲i̲o̲n̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
         1.1     Project Implementation Plan


5.4      D̲e̲l̲i̲v̲e̲r̲a̲b̲l̲e̲ ̲I̲t̲e̲m̲s̲ ̲a̲n̲d̲ ̲D̲o̲c̲u̲m̲e̲n̲t̲s̲ ̲L̲i̲s̲t̲

         W̲P̲-̲i̲d̲ ̲ ̲ ̲D̲o̲c̲-̲i̲d̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲D̲e̲s̲c̲r̲i̲p̲t̲i̲o̲n̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
         ̲ ̲

         1.1     ACDN/PIP/0001    ACDN Program Implementation
                                  Plan


5.5      S̲c̲h̲e̲d̲u̲l̲e̲


6.       S̲Y̲S̲T̲E̲M̲ ̲E̲N̲G̲I̲N̲E̲E̲R̲I̲N̲G̲

6.1      O̲b̲j̲e̲c̲t̲i̲v̲e̲

6.2      O̲r̲g̲a̲n̲i̲s̲a̲t̲i̲o̲n̲


6.3      W̲o̲r̲k̲ ̲B̲r̲e̲a̲k̲-̲d̲o̲w̲n̲ ̲S̲t̲r̲u̲c̲t̲u̲r̲e̲ ̲(̲W̲B̲S̲)̲

         W̲P̲-̲i̲d̲ ̲ ̲ ̲D̲e̲s̲c̲r̲i̲p̲t̲i̲o̲n̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
         ̲ ̲

         2.0     System Engineering

         2.1     Requirements Definition
         2.1.1   System Requirements Specification
         2.2     Interface Control
         2.2.1   Network Supervisor Procedures and Generic Formats
         2.2.2   User Procedures and Generic Formats
         2.2.3   ICC Access Line Interface
         2.2.4   ACNC (gateway) Interface
         2.2.5   IBM VTAM Support
         2.2.6   Univac CMS Support
         2.2.7   Univac VIA Interface
         2.2.8   SITA and ARINC Interface
         2.2.9   CNT Interface
         2.2.10  NMH Operator Procedures and Generic Formats
         2.2.11  EMH Operator Procedures and Generic Formats
         2.2.12  Standard TAS

         2.3     System Design
         2.3.1   Network Control Software Spec.
         2.3.2   System Control Software Spec.
         2.3.3   Basic Comm. Service Spec.
         2.3.4   Nodal Switch Software Spec.
         2.3.5   Terminal Access Software Spec.
         2.3.6   Host Access Software Spec.
         2.3.7   Internal Network Access Software Spec.
         2.3.8   External Network Access Software Spec.
         2.3.9   Network Management Software Spec.
         2.3.10  Electronic Mail SOftware Spec.
         2.3.11  Test Software Spec.
         2.3.12  ACDN Data Description Document

         2.4     System Integration and Test
         2.4.1   Acceptance Test Specification and Procedures


6.4      D̲e̲l̲i̲v̲e̲r̲a̲b̲l̲e̲ ̲I̲t̲e̲m̲s̲ ̲a̲n̲d̲ ̲D̲o̲c̲u̲m̲e̲n̲t̲s̲ ̲L̲i̲s̲t̲

         W̲P̲-̲i̲d̲ ̲ ̲ ̲D̲o̲c̲-̲i̲d̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲D̲e̲s̲c̲r̲i̲p̲t̲i̲o̲n̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
         ̲ ̲ ̲ ̲ ̲

         2.1.1   ACDN/SRS/0001    System Requirement Specification
         2.2.1   ACDN/ICD/0001    Network Supervisor Procedures
                                  and Generic Formats
         2.2.2   ACDN/ICD/0002    User Procedures and Generic
                                  Formats
         2.2.3   ACDN/ICD/0003    ICC Access line Interface
         2.2.4   ACDN/ICD/0004    ACNC Interface (gateway)
         2.2.5   ACDN/ICD/0005    IBM VTAM Support
         2.2.6   ACDN/ICD/0006    Univac CMS Support
         2.2.7   ACDN/ICD/0007    Univac VIA Interface
         2.2.8   ACDN/ICD/0008    SITA and ARINC Interface
         2.2.9   ACDN/ICD/0009    CNT Interface
         2.2.10  ACDN/ICD/0010    NMH Operator Procedures and
                                  Generic Formats
         2.2.11  ACDN/ICD/0011    EMH Operator Procedures and
                                  Generic Formats
         2.2.12  ACDN/ICD/0012    Standard TAS

         2.3.1   ACDN/SDS/0001    System Design Specification

         2.4.1   ACDN/TPR/0001    System Test Specs and Procedures



6.5      S̲c̲h̲e̲d̲u̲l̲e̲



7.       H̲A̲R̲D̲W̲A̲R̲E̲ ̲D̲E̲V̲E̲L̲O̲P̲M̲E̲N̲T̲ ̲A̲N̲D̲ ̲P̲R̲O̲D̲U̲C̲T̲I̲O̲N̲

7.1      D̲e̲v̲e̲l̲o̲p̲m̲e̲n̲t̲ ̲A̲p̲p̲r̲o̲a̲c̲h̲

7.2      O̲r̲g̲a̲n̲i̲s̲a̲t̲i̲o̲n̲


7.3      W̲o̲r̲k̲ ̲B̲r̲e̲a̲k̲-̲d̲o̲w̲n̲ ̲S̲t̲r̲u̲c̲t̲u̲r̲e̲ ̲(̲W̲B̲S̲)̲

         W̲P̲-̲i̲d̲ ̲ ̲ ̲D̲e̲s̲c̲r̲i̲p̲t̲i̲o̲n̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
         ̲ ̲

         3.0     Equipment

         3.1     Development System
         3.2     Network Nodes
         3.2.1   Toronto Node
         3.2.2   Montreal Node
         3.2.3   Winnipeg Node
         3.3     Network Control Centres
         3.4     Network Management Host
         3.5     Electronic Mail Host

         4.0     Equipment development


7.4      B̲l̲o̲c̲k̲ ̲D̲i̲a̲g̲r̲a̲m̲s̲ ̲a̲n̲d̲ ̲D̲e̲l̲i̲v̲e̲r̲a̲b̲l̲e̲s̲

7.4.1    T̲o̲r̲o̲n̲t̲o̲ ̲N̲o̲d̲e̲ (incl. NCC)

7.4.1.1  B̲l̲o̲c̲k̲ ̲D̲i̲a̲g̲r̲a̲m̲


7.4.1.2  D̲e̲l̲i̲v̲e̲r̲a̲b̲l̲e̲s̲

         o   Watchdog Subsystem
             -   Watchdog with associated operator's position
                 (CRT and matrix printer)
             -   Crate Control Adaptors in each Unit of Toronto
                 Node

         o   System Control Subsystem (SCPs)
             -   2 Processor Units, each with
                 o   2 CPUs
                 o   768 Kwords of memory

         o   System Control CU Subsystem (SCUs)
             -   2 80 Mbytes MMD with 2 Mbytes fixed head disks
                 and associated CR80 modules (2 32K disk controllers
                 and 2 associated adaptors)

(NCC)        -   4 Colour Graphical Terminals and associated
                 CR80 termination modules

(NCC)        -   1 TI810 150 cps matrix printer and associated
                 CR80 termination module

             -   Channel Units, etc. as required to connect
                 above

         o   Nodal Switch PU Subsystem (NSPs)
             -   3 Processor Units, each with
                 o   4 CPUs
                 o   512 Kwords of memory

         o   Nodal Switch CU Subsystem (NCUs)
             CR80 device controller and adaptors required to
             connect:

             -   2 host channels (IBM or Univac)
             -   5 56 Kbps internodal trunks
             -   69 2.4 Kbps ICC access lines
             -   5  9.6 Kbps ACNC access lines
             -   2  2.4 Kbps ARINC lines
             -   1  2.4 Kbps ICC type to SITA
             -   2 150 bps CNT (AES weather)
             -   3 150 bps CNT (Airline switching)
             -   2 250 bps CPAIR/BA
             -   4 low speed connections

         o   S-net Subsystem
                   
             -   2 suprabusses and associated CR80 modules
             -   2 suprabus connection to EMH complex

         o   Rack, cables, fans, etc. required by above CR80
             units and modules.


7.4.2    M̲o̲n̲t̲r̲e̲a̲l̲ ̲N̲o̲d̲e̲ (incl. NCC)

7.4.2.1  B̲l̲o̲c̲k̲ ̲D̲i̲a̲g̲r̲a̲m̲


7.4.2.2  D̲e̲l̲i̲v̲e̲r̲a̲b̲l̲e̲s̲

         o   Watchdog Subsystem
             -   Watchdog with associated operator's position
                 (CRT and matrix printer)
             -   Crate Control Adaptors in each Unit of Toronto
                 Node

         o   System Control Subsystem (SCPs)
             -   2 Processor Units, each with
                 o   2 CPUs
                 o   768 Kwords of memory

         o   System Control CU Subsystem (SCUs)
             -   2 80 Mbytes MMD with 2 Mbytes fixed head disks
                 and associated CR80 modules (2 32K disk controllers
                 and 2 associated adaptors)

(NCC)        -   4 Colour Graphical Terminals and associated
                 CR80 termination modules

(NCC)        -   1 TI810 150 cps matrix printer and associated
                 CR80 termination module

             -   Channel Units, etc. as required to connect
                 above

         o   Nodal Switch PU Subsystem (NSPs)
             -   3 Processor Units, each with
                 o   4 CPUs
                 o   512 Kwords of memory

         o   Nodal Switch CU Subsystem (NCUs)
             CR80 device controller and adaptors required to
             connect:

             -   2 host channels (IBM or Univac)
             -   5 56 Kbps internodal trunks
             -   81 2.4 Kbps ICC access lines
             -   17 9.6 Kbps IBM access lines
             -   16 4.8 Kbps IBM access lines

         o   S-net Subsystem
                   
             -   2 suprabusses and associated CR80 modules

         o   Rack, cables, fans, etc. required by above CR80
             units and modules.


7.4.3    W̲i̲n̲n̲i̲p̲e̲g̲ ̲N̲o̲d̲e̲

7.4.3.1  B̲l̲o̲c̲k̲ ̲D̲i̲a̲g̲r̲a̲m̲


7.4.3.2  D̲e̲l̲i̲v̲e̲r̲a̲b̲l̲e̲s̲

         o   Watchdog Subsystem
             -   Watchdog with associated operator's position
                 (CRT and matrix printer)
             -   Crate Control Adaptors in each Unit of Toronto
                 Node

         o   System Control Subsystem (SCPs)
             -   2 Processor Units, each with
                 o   2 CPUs
                 o   768 Kwords of memory

         o   System Control CU Subsystem (SCUs)
             -   2 80 Mbytes MMD with 2 Mbytes fixed head disks
                 and associated CR80 modules (2 32K disk controllers
                 and 2 associated adaptors)

         o   Nodal Switch PU Subsystem (NSPs)
             -   4 Processor Units, each with
                 o   4 CPUs
                 o   512 Kwords of memory

         o   Nodal Switch CU Subsystem (NCUs)
             CR80 device controller and adaptors required to
             connect:

             -   2 host channels (IBM or Univac)
             -   6 56 Kbps internodal trunks
             -   58 2.4 Kbps ICC access lines
             -   4  9.6 Kbps IBM access lines
             -   4  4.8 Kbps IBM access lines

         o   S-net Subsystem
                   
             -   2 suprabusses and associated CR80 modules

         o   Rack, cables, fans, etc. required by above CR80
             units and modules.


7.4.4    N̲e̲t̲w̲o̲r̲k̲ ̲M̲a̲n̲a̲g̲e̲m̲e̲n̲t̲ ̲H̲o̲s̲t̲ ̲S̲y̲s̲t̲e̲m̲

7.4.4.1  B̲l̲o̲c̲k̲ ̲D̲i̲a̲g̲r̲a̲m̲


7.4.4.2  D̲e̲l̲i̲v̲e̲r̲a̲b̲l̲e̲s̲

         o   Watchdog Subsystem
             -   Crate Control Adaptors in each Unit of NMH
                 System

         o   Processor Unit Subsystem (NMP)
             -   1 PU with
                 o   2 CPUs
                 o   768 Kwords of memory

         o   Channel Unit Subsystem (NCUs)
             
             -   2 80Mbytes MMD with 2 Mbytes fixed head disks
                 and associated CR80 modules (2 32K disk controllers
                 and 2 associated adaptors)

             -   1 300 Mbytes SMD disk and associated CR80 modules
                 (1 32K disk controller and associated adaptor)

             -   2 FT9000 Tape deck and deck and associated
                 CR80 modules

             -   3 Infoton VDUs and associated CR80 termination
                 modules

             -   1 high speed printer (600 lpm) and associated
                 CR80 termination module

             -   Channel Units as required to connect above

         o   S-net Subsystem

             -   2 suprabusses and associated CR80 modules

         o   Rack, cables, fans, etc. required by aove CR80
             units and modules.



7.4.5    E̲l̲e̲c̲t̲r̲o̲n̲i̲c̲ ̲M̲a̲i̲l̲ ̲H̲o̲s̲t̲ ̲S̲y̲s̲t̲e̲m̲

7.4.5.1  B̲l̲o̲c̲k̲ ̲D̲i̲a̲g̲r̲a̲m̲


7.4.5.2  D̲e̲l̲i̲v̲e̲r̲a̲b̲l̲e̲s̲

         o   Watchdog Subsystem
             -   Watchdog with associated operator's position
                 (CRT and matrix printer)
             -   Crate Control Adaptors in each Unit of the
                 EMH

         o   Processor Unit Subsystem (EMPs)
             -   2 Processor Units, each with
                 o   2 CPUs
                 o   512 Kwords of memory

         o   Channel Unit Subsystem (ECUs)
             -   2 80 Mbytes MMD with 2 Mbytes fixed head disks
                 and associated CR80 modules (2 32K disk controllers
                 and 2 associated adaptors)

             -   2 300 Mbytes SMD disks and associated CR80
                 modules (2 32K disk controllers and 2 associated
                 adaptors)

             -   1 FT9000 Tape Deck and associated CR80 modules

             -   4 Infoton VDUs and associated CR80 termination
                 modules

             -   1 TI810 150 cps matric printer and associated
                 CR80 termination module

             -   Channel units as required to connect above

         o   S-net Subsystem
             -   2 Suprabusses and associated CR80 modules

         o   Rack, cables, fans etc. required by above CR80
             units and modules


7.5      S̲c̲h̲e̲d̲u̲l̲e̲



8.       S̲O̲F̲T̲W̲A̲R̲E̲ ̲D̲E̲V̲E̲L̲O̲P̲M̲E̲N̲T̲

8.1      S̲o̲f̲t̲w̲a̲r̲e̲ ̲D̲e̲v̲e̲l̲o̲p̲m̲e̲n̲t̲ ̲A̲p̲p̲r̲o̲a̲c̲h̲

8.2      O̲r̲g̲a̲n̲i̲s̲a̲t̲i̲o̲n̲


8.3      W̲o̲r̲k̲ ̲B̲r̲e̲a̲k̲-̲d̲o̲w̲n̲ ̲S̲t̲r̲u̲c̲t̲u̲r̲e̲ ̲(̲W̲B̲S̲)̲

         W̲P̲-̲i̲d̲ ̲ ̲ ̲D̲e̲s̲c̲r̲i̲p̲t̲i̲o̲n̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
         ̲ ̲

         5.0     Standard Software

         5.1     Toronto Node
         5.2     EMH
         5.3     NMH
         5.4     Montreal Node
         5.5     Winnipeg Node

         6.0     Software Development

         6.1     Network Control Software
         6.2     System Control Software
         6.3     Basic Communication Service
         6.4     Nodal Switch Software
         6.5     Terminal Access Software
         6.6     Host Access Software
         6.6.1   HAS I/IBM VTAM
         6.6.2   HAS II,  Univac CMS
         6.6.3   HAS III, Univac VIA
         6.7     Internal Network Access Software
         6.8     External Network Access Software
         6.9     Network Management Software
         6.10    Electronic Mail Software
         6.11    Test Software



8.4      A̲C̲D̲N̲ ̲S̲o̲f̲t̲w̲a̲r̲e̲ ̲D̲o̲c̲u̲m̲e̲n̲t̲a̲t̲i̲o̲n̲ ̲T̲r̲e̲e̲

         W̲P̲-̲i̲d̲ ̲ ̲ ̲D̲o̲c̲-̲i̲d̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲D̲e̲s̲c̲r̲i̲p̲t̲i̲o̲n̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
         ̲ ̲ ̲ ̲ ̲





8.5      S̲c̲h̲e̲d̲u̲l̲e̲


9.       I̲N̲T̲E̲G̲R̲A̲T̲I̲O̲N̲ ̲A̲N̲D̲ ̲A̲C̲C̲E̲P̲T̲A̲N̲C̲E̲ ̲T̲E̲S̲T̲S̲

9.1      O̲b̲j̲e̲c̲t̲i̲v̲e̲

9.2      O̲r̲g̲a̲n̲i̲s̲a̲t̲i̲o̲n̲


9.3      W̲o̲r̲k̲ ̲B̲r̲e̲a̲k̲-̲d̲o̲w̲n̲ ̲S̲t̲r̲u̲c̲t̲u̲r̲e̲ ̲(̲W̲B̲S̲)̲

         W̲P̲-̲i̲d̲ ̲ ̲ ̲D̲e̲s̲c̲r̲i̲p̲t̲i̲o̲n̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
         ̲ ̲

         7.0     Integration and Acceptance Tests

         7.1     Factory Acceptance Tests (FAT)
         7.1.1   EMH, Development System
         7.1.2   Toronto Node
         7.1.3   Montreal Node
         7.1.4   Winnipeg Node

         7.2     Site Acceptance Tests (SAT)
         7.2.1   EMH, Developmnet System
         7.2.2   Toronto Node
         7.2.3   Montreal Node
         7.2.4   Winnipeg Node

         7.3     Software Builds Acceptance Tests
         7.3.1   Build I
         7.3.2   Build II
         7.3.3   Build III
         7.3.4   Build IV
         7.3.5   Build V

         7.4     Network Acceptance Test



9.4      D̲e̲l̲i̲v̲e̲r̲a̲b̲l̲e̲ ̲I̲t̲e̲m̲s̲ ̲a̲n̲d̲ ̲D̲o̲c̲u̲m̲e̲n̲t̲s̲ ̲L̲i̲s̲t̲



9.5      S̲c̲h̲e̲d̲u̲l̲e̲


10.      I̲N̲T̲E̲G̲R̲A̲T̲E̲D̲ ̲L̲O̲G̲I̲S̲T̲I̲C̲S̲ ̲S̲U̲P̲P̲O̲R̲T̲

10.1     O̲b̲j̲e̲c̲t̲i̲v̲e̲

10.2     O̲r̲g̲a̲n̲i̲s̲a̲t̲i̲o̲n̲



10.3     W̲o̲r̲k̲ ̲B̲r̲e̲a̲k̲-̲d̲o̲w̲n̲ ̲S̲t̲r̲u̲c̲t̲u̲r̲e̲ ̲(̲W̲B̲S̲)̲

         W̲P̲-̲i̲d̲ ̲ ̲ ̲D̲e̲s̲c̲r̲i̲p̲t̲i̲o̲n̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
         ̲ ̲

         8.0     Documentation

         9.0     Training

         10.0    Transportation

         11.0    Installation

         12.0    Equipment Mtce

         13.0    Software Mtce



10.4     D̲e̲l̲i̲v̲e̲r̲a̲b̲l̲e̲ ̲I̲t̲e̲m̲s̲ ̲a̲n̲d̲ ̲D̲o̲c̲u̲m̲e̲n̲t̲s̲ ̲L̲i̲s̲t̲

10.5     S̲c̲h̲e̲d̲u̲l̲e̲



11.      A̲P̲P̲L̲I̲C̲A̲B̲L̲E̲ ̲S̲T̲A̲N̲D̲A̲R̲D̲S̲