⟦eb736a2e4⟧ Wang Wps File

    Length: 3563 (0xdeb)
    Types: Wang Wps File
    Notes: Spelunked
    Names: »~ORPHAN08.00«

Derivation

└─⟦231b08da1⟧ Bits:30006068 8" Wang WCS floppy, CR 0022A
    └─ ⟦this⟧ »~ORPHAN08.00« 

WangText




              PROGRESS MEETING NO. 3

…02…801010…02……02…#

…02……02…CAMPS












…02……02……02……02……02……02…1980-10-10…02…3…02…CR A/S
…02…          Conclusion of PROGRESS MEETING and the Formal
          System Requirement Specification eld at Christian
          Rovsing A/S on the 10th October 1980.


…02…Ltc. Stoltz…02……02…
          Col. Woodruff    Gert Jensen
          Mr Mc Daniel                    Jens Peter
                                          Ringgaard
          Mr. Woodcock                    Kurt Nybroe-Nielsen
          Mr. Bodur                              Boje
                                                 Rinhart
          Mr. Agusman      
          Mr. Lohisse      




            1̲.̲ ̲ ̲P̲R̲O̲G̲R̲A̲M̲ ̲I̲M̲P̲L̲E̲M̲E̲N̲T̲A̲T̲I̲O̲N̲ ̲P̲L̲A̲N̲

DN 9        SHAPE accepted CRs comments

DN 13       PIP will not be updated to reflect a system software
            acceptance plan and a special test bed.

            If a special test bed is rquired to verify the security
            CR will provide such one.

            CR are willing to establish test cases which only address
            the security requirement.

DN 17       SHAPE withdrawn their comment.
            CR will deliver a System Design Documentation (Contract
            L.I. 2.3.1)
DN 18       No update to the PIP.
            CR will provide SHAPE with a plan that addresses CR
            needs for equipment from NICSMA (BID1000)

DN 21       CR will update the master plan to reflect the as-built
            documentation per site.

            CR will reflect dependencies in miletone planning charts.

DN 22       SHAPE would like to receive all plans up front containing
            all milestones.

            SHAPE, however, recognizes that they are not in a position
            to force CR to do so.


             CR will update the subcontract management plan and
             procedures to reflect subcontracts and associated major
             milestones. It will be issued the 1/11 1980.

DN 23        Source listings willbe under configuration control
             before and after the system acceptance.

DN 27        DN withdrawn

DN 29        CR agrees to update the PIP during the program.

             Criteria for updates are issues that trigger changes
             related to major CAMPS program milestones.



              ̲ ̲S̲T̲A̲T̲U̲S̲ ̲O̲N̲ ̲C̲P̲S̲/̲2̲3̲0̲/̲I̲C̲D̲/̲0̲0̲0̲3̲

             Conclusion: SHAPE agrees the content of the document
             as updated.

             The final approval will be notified to CR, within 5
             days after final draft, receipt.

             The following comments were noted:

             1.  All DNs have been impleented satisfactory.

             2.  DN No. 30, 31, 34, 35, 41 have been implemented
                 in a draft form and approved by SHAPE

             3.  DN 68: A small change concernig print out of precedence.

             4.  CR/SHAPE agree to remove the flow diagram.

             5.  Section on Applicable ocuments shall be inserted

             6.  Editorial change of format presentation:

                 -   system generated data on the screen in CAMPS
                 -   user entered data in lower case

             7.  All retries, that presently are stated as 10 shall
                 be 5.

             8.  Update in transaction D in accordance with SRS
                 (Time stamp).


             9.  SRS doc. page 116: Format B shall be entered in
                 para 3.2.3.4(b).

             10  The final document CPS(230/ICD/0001 will be airfreighted.



             3̲ ̲ ̲S̲T̲A̲U̲T̲U̲S̲ ̲O̲F̲ ̲S̲U̲P̲E̲R̲V̲I̲S̲O̲R̲ ̲C̲O̲M̲A̲N̲D̲ ̲C̲P̲S̲/̲I̲C̲D̲/̲0̲0̲0̲2̲
             SHAPE has reviewed the ICD/0002 and has forward their
             comments. These commnets were received with the enclosures.
             SHAPE will clarify the situation.



             4̲ ̲ ̲T̲H̲E̲ ̲S̲T̲A̲T̲U̲S̲ ̲O̲N̲ ̲C̲P̲S̲/̲2̲3̲0̲/̲I̲C̲D̲/̲0̲0̲0̲3̲

             -   There are two open items

                 -   DN 25
                 -   DN 120/121

             -   T close those DNs CR will telex SHAPE 13/10 1980
                 and SHAPE shall respond by telex no later than
                 15/10 1980

             -   CR will update the CPS/230/ICD/003 and airmail
                 to SHAPE 22/10 1980 for SHAPE to proofread the
                 editorial updates.