⟦ee69d3535⟧ Wang Wps File

    Length: 37968 (0x9450)
    Types: Wang Wps File
    Notes: CPS/210/SYS/0001          
    Names: »0602A «

Derivation

└─⟦468384ecf⟧ Bits:30006005 8" Wang WCS floppy, CR 0040A
    └─ ⟦this⟧ »0602A « 

WangText




…02…CPS/210/SYS/0001

…02…821015…02……02…
CAMPS SYSTEM REQUIREMENTS
…02…ISSUE 3.9…02…CAMPS









                 T̲A̲B̲L̲E̲ ̲O̲F̲ ̲C̲O̲N̲T̲E̲N̲T̲S̲
                    S̲e̲c̲t̲i̲o̲n̲ ̲3̲.̲6̲



…02……02…3.6  DOCUMENTATION REQUIREMENTS  ..............  296

…02……02……02…3.6.1  General  .............................  296
…02……02……02…3.6.2  Format and Publication Criteria  .....  296
…02……02……02……02…3.6.2.1  Paper  ...........................  296
…02……02……02……02…3.6.2.2  Binding  .........................  296
…02……02……02……02…3.6.2.3  Numbering  .......................  297
…02……02……02……02…3.6.2.4  Preface  .........................  298
…02……02……02……02…3.6.2.5  Printing and Type  ...............  299
…02……02……02……02…3.6.2.6  Language  ........................  299
…02……02……02……02…3.6.2.7  Security Classification  .........  300
…02……02……02……02…3.6.2.8  Photographs, Illustrations
                    and Drawings  ....................
  300
…02……02……02……02…3.6.2.9  Amendments  ......................  301
…02……02……02……02…3.6.2.10 Levels of Maintenance  ...........  301
…02……02……02……02…3.6.2.11 Use of References  ...............  301

…02……02……02…3.6.3  Approval and Delivery  ...............  301
…02……02……02…3.6.4  Equipment Handbooks  .................  302
…02……02……02……02…3.6.4.1  CR Produced Equipment  ...........  302
           3.6.4.1.1  Equipment Specifications  .... 
           303
           3.6.4.1.2  Installation and Commissioning
                      Instruction  ................. 
             303
           3.6.4.1.3  Operating Instructions  ...... 
           304
           3.6.4.1.4  Technical Description  ....... 
           304
           3.6.4.1.5  Parts List  .................. 
           305

…02……02……02……02…3.6.4.2  OEM Equipment  ...................  305

…02……02……02…3.6.5  Maintenance Handbooks  ...............  306
         3.6.5.1  Preventive Maintenance ........... 
         307
         3.6.5.2  Corrective Maintenance ........... 
         307
         3.6.5.3  Associated Documentation ......... 
         308

…02……02……02…3.6.6  Engineering Drawing Documentation ....  308
         3.6.6.1  Civil Works Requirements ......... 
         308
         3.6.6.2  As-to-be-Built and As-Built Docu-
                  mentation ........................ 
               308

…02……02……02…3.6.7  Inventory  ...........................  310
…02……02……02……02…3.6.7.1  General  .........................  310
…02……02……02……02…3.6.7.2  Property Inventory  ..............  310
…02……02……02……02…3.6.7.3  Final Inventory (optional)  ......  311



…02……02……02…3.6.8  Factory and Acceptance Test           
                Documentation  .......................
  312
…02……02……02……02…3.6.8.1  General  .........................  312
…02……02……02……02…3.6.8.2  Prototype Test Documents  ........  312
…02……02……02……02…3.6.8.3  Factory Acceptance Test Documents 
…02……02……02……02…3.6.8.4  Site Provisional Acceptance
                    Document (SPA)  ..................
  313
…02……02……02……02…3.6.8.5  Test Procedures  .................  313
…02……02……02……02…3.6.8.6  Test Results Forms  ..............  313
…02……02……02……02…3.6.8.7  Approval and Delivery  ...........  314

…02……02……02…3.6.9  Software Documentation  ..............  314
…02……02……02……02…3.6.9.1  General  .........................  314
…02……02……02……02…3.6.9.2  Documentation Structure  .........  314
…02……02……02……02…3.6.9.3  System Design Specification (SDS)   315
…02……02……02……02…3.6.9.4  Subsystem Specification  .........  316
         3.6.9.5  Package Specifications  .......... 
         316
         3.6.9.6  Data Base Design Document  ....... 
         317

…02……02……02…3.6.10 Field Modification Documentation  ....  317
…02……02……02……02…3.6.10.1  General  ........................  317
…02……02……02……02…3.6.10.2  Delivery  .......................  317




3.6      D̲O̲C̲U̲M̲E̲N̲T̲A̲T̲I̲O̲N̲ ̲R̲E̲Q̲U̲I̲R̲E̲M̲E̲N̲T̲S̲



3.6.1    G̲e̲n̲e̲r̲a̲l̲

         a)  Hardware documentation developed by CR under this
             contract will be produced in accordance with the
             requirements as stated in this section of the System
             Requirements Specification.  Documentation for
             OEM equipment will be delivered according to the
             requirements as stated in the contract.

         b)  Software documentation developed by CR under this
             contract will generally be produced in accordance
             with the structure of ACE directive 007-3 issue
             2.

         c)  System Requirements Specification developed under
             this contract shall be produced and maintained
             in accordance with MIL SPEC 490 unless otherwise
             specified in the Configuration Management Plan.



3.6.2    F̲o̲r̲m̲a̲t̲ ̲a̲n̲d̲ ̲P̲u̲b̲l̲i̲c̲a̲t̲i̲o̲n̲ ̲C̲r̲i̲t̲e̲r̲i̲a̲

         All documentation delivered by the contractor shall
         be prepared in accordance with the following requirements.



3.6.2.1  P̲a̲p̲e̲r̲

         The documents, exclusive of covers, shall be printed
         on a good grade of white paper of sufficient weight
         and substance to permit printing on both sides. The
         paper size will be DIN A4. The paper used for fold-out
         drawings shall be of a quality and thickness that permits
         repeated opening and folding without cracking or tearing
         at the folds.



3.6.2.2  B̲i̲n̲d̲i̲n̲g̲

         a)  The documents shall be bound between hardbacked
             covers that incorporate a metal binding system
             which will permit easy removal and insertion of
             pages, photographs, illustrations and drawings
             and which will permit the documents to lie flat
             when opened at any page.



         b)  The information on pull-out sheets bound in the
             hard-backed covers shall be positioned so that
             it is clear of the text of its associated document
             when opened up so that the reader can readily cross-refer
             between text, drawings and illustrations.

         c)  If they are not accountable items for security
             reasons, excessively large drawings may be placed
             in pockets formed in the rear covers of binders,
             or in the case of, as-built and installation instructions,
             to contain large drawings in separate folders equipped
             with a fastening arrangement to prevent accidental
             loss and spillage of the contents.

         d)  The cover and title page of the document shall
             show the classification of the document, manufacturer
             of the equipment, number of the document and its
             issue number, number of the contract and the date
             of issue. In the case that a subject is covered
             in more than one volume then an indication of the
             contents of each manual shall be shown. The title
             and number of the document shall also be shown
             on the spine of the cover if applicable.



3.6.2.3  N̲u̲m̲b̲e̲r̲i̲n̲g̲

         a)  The pages of Sections and Chapters are to be separately,
             and sequentially numbered beginning with the number
             one in each case, with the associated Section or
             Chapter number added as a prefix. The page numbers
             are to be inserted at the centre of the lower margin
             above the classification, or in the appropriate
             box if preprinted formsheets are used.

         b)  Paragraphs, sub-paragraphs, and sub-sub-paragraphs,
             are to be numbered sequentially commencing with
             one, and sub-paragraphs are to have the associated
             paragraph number added as a prefix (i.e. 1.1.,
             1.2., 1.3., etc.) and sub-sub-paragraphs, the associated
              sub-paragraph number added as a prefix (i.e. 1.1.1.,
             1.1.2., 1.1.3. etc). The maximum depth will be
             4 (i.e. 1.1.1.1) unless otherwise agreed.

         c)  For sub-divisioning identification, lower-case
             alphabetical characters enclosed in half brackets
             shall be used (i.e. a), b), c), etc.). For Sub-sub
             divisioning, upper-case Arabic numerals enclosed
             in half brackets shall be used (i.e. 1), 2), 3),
             etc).



         d)  Tables shall be captioned and allocated a Table
             Number having the Section or Chapter number as
             appropriate added as a prefix (e.g. Table 1.1).
             Tables may be included as a part of the text or
             printed on a fold-out sheet. When printed on a
             fold-out sheet, the table number must be positioned
             on the fold-out portion so that it is visible on
             opening the document to which it belongs.



3.6.2.4  P̲r̲e̲f̲a̲c̲e̲

         a)  Each separately bound document (manual) shall commence
             with a set of introductory pages, and when a manual
             or set of documentation consists of only one separately
             bound document, the introductory pages shall consist
             of the following:

             1)  Title pages with the security classification
                 of the handbook, manufacturer of the equipment,
                 number of the handbook and its relevant issue
                 number, number of the relevant contract and
                 date of issue.


             2)  When applicable, instructions covering treatment
                 for electric shock.

             3)  Amendment history sheet.

             4)  Record of modifications to the equipment.

             5)  Introduction giving the purpose of the handbook
                 and instructions for its use.

             6)  Table of contents listing the titles of all
                 sections, headings and sub-headings, together
                 with relevant paragraph and page numbers.

             7)  Detailed list of all tables together with relevant
                 table and page numbers.

             8)  Detailed list of all drawings, illustrations
                 and photographs together with a relevant reference
                 and page numbers.

             9)  Legend explaining all abbreviations and symbols
                 used in the text and on the drawings.



             10) Photographs or drawings of the major items/bays
                 described in the handbook.

         b)  When a manual or set of documentation consists
             of more than one volume, each separately bound
             volume, section or part, shall contain a set of
             introductory pages as described, plus an additional
             page inserted after the front sheet containing
             an abbreviated list of contents for the complete
             manual or set of documentation, as applicable.

         c)  Wherever possible, photographs, drawings and illustrations
             shall be bound in the same cover as the associated
             text. In addition when a manual or set of documentation
             consists of more than one separately bound document
             the first document of the series shall be identified
             as the master document and shall contain all information
             of a general nature applicable to all documents
             of the series.



3.6.2.5  P̲r̲i̲n̲t̲i̲n̲g̲ ̲a̲n̲d̲ ̲T̲y̲p̲e̲

         A conventional typewriter font shall be employed for
         the printing of all letters and figures in the text
         of all documents.

         All titles and headings shall be underlined.

         Operation and maintenance manuals shall be printed
         using either a multilith or offset process.



3.6.2.6  L̲a̲n̲g̲u̲a̲g̲e̲

         All documents shall be written in the English language.

         All descriptions shall be written in a clear and precise
         manner, using unambiguous English and a minimum of
         words. Wherever feasible descriptions and procedures
         shall be supported either by diagrams and photographs
         or other types of illustrations to facilitate understanding
         of the text by personnel having only a working knowledge
         of the English language.





3.6.2.7  S̲e̲c̲u̲r̲i̲t̲y̲ ̲C̲l̲a̲s̲s̲i̲f̲i̲c̲a̲t̲i̲o̲n̲

         Manuals and documents shall be classified in accordance
         with the classification of the information included
         therein. The relevant classification of a document
         shall be printed at the centre top and bottom of all
         pages, photographs, illustrations and drawings, and
         at the centre top and bottom of the front cover of
         all binders. The highest classification of any section
         of a document shall be printed on the cover of that
         binder.

         Applicable document for security classification is
         NATO Document CM(55)15 Final "Security within the North
         Atlantic Treaty Organization".


3.6.2.8  P̲h̲o̲t̲o̲g̲r̲a̲p̲h̲s̲,̲ ̲I̲l̲l̲u̲s̲t̲r̲a̲t̲i̲o̲n̲s̲ ̲a̲n̲d̲ ̲D̲r̲a̲w̲i̲n̲g̲s̲

         a)  All titles and included text and annotations shall
             be in the English language in addition to any other
             language that may be employed. To facilitate correlation
             the figure numbers are to be preceded by the associated
             chapter or section number as appropriate (e.g.
             Figure 1.1).

         b)  The lettering and layout of drawings shall be in
             accordance with recognized industrial or national
             standards. Hand lettering shall be avoided except
             on advance information copies and for marking-up
             ATBB documents during site implementation.

         c)  Symbols, when employed, shall be defined so that
             there can be no confusion in their interpretation.
             The definitions may, at the discretion of the contractor,
             be given on the drawings or collectively in the
             associated document in the form of a glossary.

         d)  The use of drawings and illustrations that exceed
             1 x 1.5 metres shall be avoided. Where necessary
             the scale shall be shown.





3.6.2.9  A̲m̲e̲n̲d̲m̲e̲n̲t̲s̲

         The contractor shall be responsible for the issue,
         control and distribution of amendments to all delivered
         documents, resulting from changes and/or modifications
         in the equipment or spare parts, until expiration of
         the warranty period for the associated equipment. In
         the case of the training documentation the contractor
         shall be similarly responsible until the end of the
         first training year.



3.6.2.10 L̲e̲v̲e̲l̲s̲ ̲o̲f̲ ̲M̲a̲i̲n̲t̲e̲n̲a̲n̲c̲e̲

         Documentation shall be written to be in keeping with
         all the levels of maintenance as outlined in contractor's
         maintenance plan.



3.6.2.11 U̲s̲e̲ ̲o̲f̲ ̲R̲e̲f̲e̲r̲e̲n̲c̲e̲s̲

         To avoid duplication of information references to other
         parts of the documentation may be made.


3.6.3    A̲p̲p̲r̲o̲v̲a̲l̲ ̲a̲n̲d̲ ̲D̲e̲l̲i̲v̲e̲r̲y̲

         Approval and delivery of documentation will be in accordance
         with paragraph 15 Special Provisions under this contract
         unless otherwise agreed or stated in this section.

         a)  Six months before the provisional site acceptance
             (PSA) of the first site four copies of each draft
             document shall be submitted to the purchaser for
             review. The resulting recommended changes shall
             be considered and incorporated by the contractor
             who shall re-submit one copy of the revised document
             for printing approval. Upon receipt, in writing
             from the purchaser, that the contents of the revised
             version contain all of the purchaser's recommended
             correcti- ons, changes and comments to his satisfaction,
             the contractor shall be responsible for the editing,
             production and delivery of the required number
             of the documents. The contractor shall provide
             page changes or if necessary shall re-issue portions
             of the documents whenever changes/modifications
             in equipment or spare parts are made.



         b)  In the event that approved copies are not available
             at the time of on-site acceptance of equipments,
             preliminary version of each document (advance information
             in sufficient detail to permit satisfactory operation
             and maintenance of the equipment) shall be provided
             to each site at the time of the provisional site
             acceptance.

         c)  Q̲u̲a̲n̲t̲i̲t̲i̲e̲s̲ 

             The contractor shall deliver the following quantities
             of handbooks (i.e. Equipment, maintenance and Test
             Equipment Handbooks).…06…1         …02…   …02…   …02…   …02…      
                                                   


   T̲O̲         D̲R̲A̲F̲T̲ ̲P̲R̲E̲L̲I̲M̲I̲N̲A̲R̲Y̲ ̲V̲E̲R̲S̲I̲O̲N̲    F̲I̲N̲A̲L̲ ̲V̲E̲R̲S̲I̲O̲N̲


   Each Site  0                            2 (each)    (Delivery
                                                       2
                                                       weeks
                                                       before
                                                       PSA)

   Purchaser  4 (each) Delivery 6 months   5 (each)  
        "
                before PSA of first site

   NCS        0                           20 (each)  
        "



3.6.4    E̲q̲u̲i̲p̲m̲e̲n̲t̲ ̲H̲a̲n̲d̲b̲o̲o̲k̲s̲



3.6.4.1  C̲R̲ ̲P̲r̲o̲d̲u̲c̲e̲d̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲

         Equipment handbooks shall be prepared for all main
         and miscellaneous equipment supplied. The equipment
         handbook shall contain as a minimum:

         a)  Equipment Specifications.

         b)  Installation and Commissioning Instructions.

         c)  Operating Instructions.

         d)  Technical Description.

         e)  Parts Lists.




3.6.4.1.1    E̲q̲u̲i̲p̲m̲e̲n̲t̲ ̲S̲p̲e̲c̲i̲f̲i̲c̲a̲t̲i̲o̲n̲s̲

         a)  This section shall contain a listing of all the
             important parameters of the described equipment.
             It shall include but not be limited to the following:

         b)  The required external power supply voltage and
             frequency characteristics with acceptable tolerances.

         c)  Power consumption, ventilation and environmental
             control data.

         d)  Characteristics and acceptable tolerances of all
             input and output signals.

         e)  The environmental conditions over which the equipment
             performance will continue to meet the design performance
             criteria.

         f)  The overall weight and the weight of each typical
             unit or sub-unit.

         g)  The overall dimensions and the dimensions of each
             major unit or sub-unit.


3.6.4.1.2    I̲n̲s̲t̲a̲l̲l̲a̲t̲i̲o̲n̲ ̲a̲n̲d̲ ̲C̲o̲m̲m̲i̲s̲s̲i̲o̲n̲i̲n̲g̲ ̲I̲n̲s̲t̲r̲u̲c̲t̲i̲o̲n̲s̲

         a)  This section shall include the electrical and mechanical
             information necessary for mounting and demounting
             the equipment especially:

         b)  Detailed mechanical installation instructions.

         c)  Detailed external and inter-unit cabling instructions,
             including earthing connections.

         d)  Specification of the cables to be used.

         e)  A detailed list of checks to be carried out prior
             to application of power for the first time.

         f)  A detailed list of checks to be carried out following
             the application of power and prior to putting the
             equipment into service. Where these checks are
             identical to the maintenance procedures references
             shall be made to the maintenance procedures. Duplication
             of the text is not required.



         g)  List of tools and test equipment required for installation,
             commissioning and check-out of the equipment.


3.6.4.1.3    O̲p̲e̲r̲a̲t̲i̲n̲g̲ ̲I̲n̲s̲t̲r̲u̲c̲t̲i̲o̲n̲s̲

         a)  The operating instructions shall be detailed and
             cover all applicable equipment both central computer
             and peripherals.

         b)  Operating instructions shall include the basic
             functions such as:

             1)  Power ON and OFF.

             2)  Emergency power OFF.

             3)  Interpretation of alarm and warning conditions
                 and associated immediate action instructions.

             4)  Description of controls and indicators.

         c)  A manual will be written for the following:

             1)  CAMPS Users Manual.
                 Tab dividers are inserted in this manual for
                 easy reference to the various chapters. A fold-out
                 is placed as the last page, showing references
                 to keyboard layout etc.

             2)  CAMPS Maintenance Position Manual

             3)  CAMPS Supervisor Manual.

             4)  CAMPS Message Distribution Control Operator
                 Manual.

             5)  CAMPS Message Service Operator Manual.

         The manuals describe all the functions of the CAMPS
         System and illustrate how to operate it





3.6.4.1.4    T̲e̲c̲h̲n̲i̲c̲a̲l̲ ̲D̲e̲s̲c̲r̲i̲p̲t̲i̲o̲n̲

         a)  The depth of description will be in accordance
             with the level of maintenance as outlined in contractor's
             maintenance plan.

         b)  First section will give a general introduction
             to the equipment and explain its purpose. It shall
             give a brief description covering the overall physical,
             electrical and electronic characteristics as applicable,
             using as back-up information block diagrams, photographs
             or other suitable illustrations.

 …86…1         …02…   …02…   …02…   …02…                                       
      
         c)  Subsequent sections will describe the major elements
             and assemblies, and present the overall functional
             description of the system.

         d)  The object of the Technical Description is to provide
             sufficient technical information to operating and
             maintenance personnel to enable them to understand
             and use the Maintenance Handbooks and Operating
             Instructions respectively.


3.6.4.1.5    P̲a̲r̲t̲s̲ ̲L̲i̲s̲t̲

         This section shall consist of a tabulation following
         a "family tree" type breakdown of all parts for the
         described equipment, and shall provide the following
         information.

         a)  Manufacturer's part number and an associated brief
             descriptive phrase for each major assembly.

             b)  The component reference number as used on the
                 circuit diagrams for all electrical/electronic
                 components parts. Each reference number shall
                 be followed by a brief descriptive phrase,
                 nominal value, rating and tolerance of the
                 associated component, together with the manufacturer's
                 reference number and manufacturer's address
                 or NATO code (if readily available).

             c)  Manufacturer's part number and an associated
                 brief descriptive phrase for each mechanical
                 part, together with the manufacturer's address
                 for each item listed.

             d)  A list of the sizes and types of nuts, bolts,
                 washers and fasteners supplied as a repair
                 kit to each site and depot.



3.6.4.2  O̲E̲M̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲

         Handbooks and other relevant documentation for peripherals
         and test equipment supplied shall be delivered in accordance
         with the terms of the contract.



         Contents of the documentation must be relevant to the
         supplied equipment, and will be identical in scope
         wherever applicable to that described in 3.6.4.1. The
         applicability can be met either by the contents itself
         or by marking up the document in a clear and unambiguous
         way. Such markings shall be consistent with good legibility,
         readability and utility of the end product.


3.6.5    M̲a̲i̲n̲t̲e̲n̲a̲n̲c̲e̲ ̲H̲a̲n̲d̲b̲o̲o̲k̲


         The maintenance procedures handbook is the basic document
         which outlines how the maintenance of the system will
         be effected. It shall be, in effect, the final version
         of the contractor's maintenance plan. It shall be the
         one document which will give precise instructions to
         a  technician as to how he will fulfil his responsibilities.

         Drawings, illustrations and photographs used in connection
         with maintenance will permit identification of the
         location of all replaceable units to permit a technician
         to repair and to satisfactorily maintain the equipment.
         Equipment layout drawings, inter-unit and sub-unit
         cabling and wiring diagrams shall be provided for all
         electrical and electronic assemblies. Annotated line
         drawings, annotated cut-away illustrations, and annotated
         photographs, as appropriate, shall be provided to permit
         identification of all mechanical assemblies and mechanisms
         and parts thereof. As a minimum the following drawings
         shall be included:

         a)  Block diagram of the whole equipment.

         b)  Block diagram of assemblies divided into units.

         c)  Block diagram of major units.

         d)  Detailed interconnection diagrams and internal
             cabinet cabling diagrams including the views of
             plug-in connectors.

         e)  If applicable, flow diagrams of the signals through
             the equipment will be shown as part of the fault
             isolation procedure.

         f)  Circuit diagrams of all units and subassemblies
             will be supplied as part of the depot maintenance
             documentation.





3.6.5.1  P̲r̲e̲v̲e̲n̲t̲i̲v̲e̲ ̲M̲a̲i̲n̲t̲e̲n̲a̲n̲c̲e̲

         The preventive maintenance instructions shall contain:

         a)  All recommended routine maintenance tasks necessary
             to ensure continuous and satisfactory performance
             of the equipment, based on the periodicity of maintenance
             (i.e. daily, weekly, monthly etc.).

         b)  Illustrations and test set up schematics shall
             be included to ensure that the procedures can be
             understood by the CAMPS technician.

         c)  All test points clearly identified. The nominal
             values and the acceptable limits that should be
             measured at each test point shall be indicated.

         d)  The document shall include system and sub-system
             alignment procedures.

         e)  Where necessary, reference shall be made to other
             documentation where more detailed information regarding
             the maintenance task may be found.

         f)  List of all required tools and test equipment supplied
             for maintenance purposes.

         g)  Dismantling and re-assembly instructions shall
             be given where applicable.

         h)  Procedures for adjusting factory sealed controls
             and mechanisms are also required and shall include
             statements giving the levels of maintenance where
             these adjustments would normally be performed (i.e.
             depot, etc.).



3.6.5.2  C̲o̲r̲r̲e̲c̲t̲i̲v̲e̲ ̲M̲a̲i̲n̲t̲e̲n̲a̲n̲c̲e̲

         The corrective maintenance instructions supplied to
         each site will reflect the level of maintenance applicable
         to CAMPS, i.e. module replacement.

         The corrective maintenance instructions shall contain:

         a)  Detailed descriptions of the symptoms of a fault
             to include alarm conditions if applicable.



         b)  Description of the possible fault isolation methods
             and tools used in connection with fault isolation.

         c)  Comprehensive procedures for fault tracing and
             fault isolation.



3.6.5.3  A̲s̲s̲o̲c̲i̲a̲t̲e̲d̲ ̲D̲o̲c̲u̲m̲e̲n̲t̲a̲t̲i̲o̲n̲

         Appropriate documentation, either in the form of the
         manufacturer's handbook or leaflet, shall be provided
         where applicable for each delivered item of test equipment.
         Similarly, documentation shall be provided for those
         tools, other than simple hand tools, which require
         operation and maintenance instructions, when full information
         is not given in the Maintenance and Operating Manual.



3.6.6    E̲n̲g̲i̲n̲e̲e̲r̲i̲n̲g̲ ̲D̲r̲a̲w̲i̲n̲g̲ ̲D̲o̲c̲u̲m̲e̲n̲t̲a̲t̲i̲o̲n̲



3.6.6.1  C̲i̲v̲i̲l̲ ̲W̲o̲r̲k̲s̲ ̲R̲e̲q̲u̲i̲r̲e̲m̲e̲n̲t̲s̲

         The civil works requirements are to be provided by
         contractor 12 months prior to equipment installation
         at each site.  This document should, as a minimum,
         be in the form of engineering sketches and written
         text describing all civil works that need to be accomplished
         to prepare the site for contractor equipment installation.
          This documentation must be in sufficient technical
         detail to instruct a civil works contractor in the
         work to be performed.



3.6.6.2  A̲s̲-̲t̲o̲-̲b̲e̲-̲B̲u̲i̲l̲t̲ ̲a̲n̲d̲ ̲A̲s̲-̲B̲u̲i̲l̲t̲ ̲D̲o̲c̲u̲m̲e̲n̲t̲a̲t̲i̲o̲n̲

         a)  This documentation shall provide full details of
             how all the major assemblies of the supplied equipment
             at each location have been physically installed
             and electrically integrated.  They will be supplied
             by CR as two deliveries:

             1)  As-to-be-Built drawings (due nine months before
                  scheduled start of equipment installations).

             2)  As-Built Drawings (due at time of PSA).



         b)  These documents shall be self sufficient and not
             depend on any other documents other than the supplied
             maintenance manual and equipment handbooks.  If
             reference to another document is unavoidable, then
             a copy of, or a pertinent extract from the reference
             document shall be included.  These documents shall
             be prepared for each location and include all relevant
             information covering the following:

             1)  Floor and wall plans showing all cable runs
                 within the CAMPS equipment room.  Cable runs
                 must be CAMPS related or have COMSEC implications.
                  Signal cable runs from CAMPS equipment room
                 to user terminals shall be incorporated in
                 the as-to-be-built and as-built documentation.
                  (Information on the routing of the cable-runs
                 will be provided by customer).

             2)  Plan showing grounding system related to CAMPS
                 with description of conductors, electrodes
                 and joints.  Drawings and specifications to
                 be provided by customer.

             3)  Cable racking and cable runs with cable numbers
                 and cable functions to include as appropriate
                 all terminating points, connections, connectors
                 and sockets.  The functions of all conductors
                 shall be shown.

             4)  Physical layout (plan and elevation) of all
                 major equipments.

             5)  Ventilation and environmental control systems
                 that impact on COMSEC.  Drawings and specifications
                 to be supplied by customer if installed or
                 modified after site survey.

             6)  Cross-connection frames and patch panel details.

             7)  Power distribution boards, cabling, wiring
                 and distribution schemes showing position of
                 filters if fitted.  Drawings and specifications
                 to be supplied by customer.

             8)  Ancillary equipment that have COMSEC implications.
                  Drawings and specifications to be provided
                 by customer if installed or modified after
                 site surveys.



             9)  Layout and cable runs of all intercom equipment
                 having a COMSEC impact relative to CAMPS equipment.
                  Drawings and specifications to be supplied
                 by customer if installed after site surveys.

             10) All other information necessary for the Purchaser
                 to operate, maintain, and expand or modify
                 the installation.



3.6.7    I̲n̲v̲e̲n̲t̲o̲r̲y̲



3.6.7.1  G̲e̲n̲e̲r̲a̲l̲

         The contractor shall prepare a property inventory for
         each CAMPS site.



3.6.7.2  P̲r̲o̲p̲e̲r̲t̲y̲ ̲I̲n̲v̲e̲n̲t̲o̲r̲y̲

         a)  The contractor shall prepare a property inventory
             of each site and shall deliver them to the related
             sites before provisional site acceptance (PSA).

         b)  The inventory shall be prepared in block form and
             shall consist of the following sections, as applicable:

             1)  Main Equipment.

             2)  Ancillary Equipment.

             3)  Test Equipment.

             4)  Technical Furnishings (tools etc.).

             5)  Spare Parts (Site and Depot).

             6)  Installation Material (Cable and Hardware).

             7)  Documentation (Handbooks and Drawings, Installation
                 Drawings, and Plans, As Built Drawings, Cable
                 and Wiring Diagrams).



         c)  For each applicable item a family tree breakdown
             of the equipment (from main equipment, major assembly,
             sub-assembly items etc. down to module PC board
             level) shall be given in the inventory.

         d)  The inventory information, shall include as a minimum
             the following data elements:

             -   Site
             -   Item Number
             -   Description
             -   True Manufacturer's Part Number
             -   Manufacturer's Identification Code
             -   Quantity
             -   Price
             -   NATO Stock Number (as available)
             -   Item Serial Number (for test equipment and
                 for major assemblies)
             -   Working or Spare
             -   Remarks

         e)  The inventory shall be checked against the installed
             equipment at time of PSA and changed as necessary.
             The marked up copy shall then form the official
             record of all equipment and other items that have
             been delivered.  The deliverable final inventory
             will be submitted in the form of a hard copy list
             subsequent to SPA.



3.6.7.3  F̲i̲n̲a̲l̲ ̲I̲n̲v̲e̲n̲t̲o̲r̲y̲ ̲(̲o̲p̲t̲i̲o̲n̲a̲l̲)̲

         An Optional Final Inventory will be prepared by contractor
         in a form compatible with the purchaser's computer
         punch cards or magnetic tapes with a hard copy. This
         inventory will be made based on the hard copy inventory.

         Work on the Optional Final Inventory will be initiated
         after basic contract has been appropriately amended.





3.6.8    F̲a̲c̲t̲o̲r̲y̲ ̲a̲n̲d̲ ̲A̲c̲c̲e̲p̲t̲a̲n̲c̲e̲ ̲T̲e̲s̲t̲ ̲D̲o̲c̲u̲m̲e̲n̲t̲a̲t̲i̲o̲n̲



3.6.8.1  G̲e̲n̲e̲r̲a̲l̲

         As stated in section 4 of System Requirements Specification
         the delivered equipment will be tested to verify its
         compliance with the contractual requirements.

         The quality and quantity of documentation produced
         and delivered by contractor for class II tests is determined
         solely by the extent to which customer and contractor
         has agreed to test the equipment (i.e. requirements
         stated in System Requirements Specification).

         The documentation requirements listed below are applicable
         for the tests conducted according to the test plan.

         Documentation for class I test (contractor's internal
         verification) will be developed for in-house use only.



3.6.8.2  P̲r̲o̲t̲o̲t̲y̲p̲e̲ ̲T̲e̲s̲t̲ ̲D̲o̲c̲u̲m̲e̲n̲t̲s̲

         Documentation for the following class II tests will
         be submitted by contractor:

         -   DSMT (Prototype) System Verification
         -   Availability Verification
         -   In-Plant Software Verification
         -   Software Functional Verification
         -   Software Operational Verification

         Detailed test requirements will be described in the
         System Integration and Test Plan.



3.6.8.3  F̲a̲c̲t̲o̲r̲y̲ ̲A̲c̲c̲e̲p̲t̲a̲n̲c̲e̲ ̲T̲e̲s̲t̲ ̲D̲o̲c̲u̲m̲e̲n̲t̲s̲

         Factory Acceptance Test Document shall contain the
         procedures for the tests that have to be performed
         on each equipment and its associated accessories following
         manufacture to ensure that all items to be delivered
         are in accordance with the requirements of the contract
         prior to shipment from the factory.





3.6.8.4  S̲i̲t̲e̲ ̲P̲r̲o̲v̲i̲s̲i̲o̲n̲a̲l̲ ̲A̲c̲c̲e̲p̲t̲a̲n̲c̲e̲ ̲D̲o̲c̲u̲m̲e̲n̲t̲ ̲(̲S̲P̲A̲)̲

         This document shall contain all test procedures and
         inspections that are necessary to verify that the equipment
         has been correctly installed and aligned. It shall
         also contain a check list of all items that should
         be supplied under terms of the contract such as accessories,
         spare parts, tools, test equipment and documentation.
         (For a brief description of the SPA test see section
         4.2.3.2 of System Requirements Specifications).



3.6.8.5  T̲e̲s̲t̲ ̲P̲r̲o̲c̲e̲d̲u̲r̲e̲s̲

         Each procedure shall, where applicable, include as
         a minimum the following:

         a)  The title of the proposed procedure and a list
             of all required test equipment, where applicable.

         b)  Required test limits, where applicable.

         c)  A detailed step-by-step procedure written so that
             the procedure can be understood by technician.

         d)  A block diagram of the required test set-up if
             more than two test connections are involved.



3.6.8.6  T̲e̲s̲t̲ ̲R̲e̲s̲u̲l̲t̲ ̲F̲o̲r̲m̲s̲

         The Test Results Forms to be used in conjunction with
         the test procedures may be part of the test procedure
         itself. They shall contain as a minimum a space for
         inclusion of:

         a)  Test location and date.

         b)  Equipment type and serial number(s).

         c)  Test procedure reference number and issue number.

         d)  Type of test equipment employed.

         e)  Test Results.

         f)  Comments.



         g)  Signatures of official representatives of the contractor
             and the purchaser.



3.6.8.7  A̲p̲p̲r̲o̲v̲a̲l̲ ̲a̲n̲d̲ ̲D̲e̲l̲i̲v̲e̲r̲y̲

         A copy of each class II test document complete with
         samples of the associated test result forms, shall
         be submitted to SHAPE for approval at least thirty
         days before the scheduled date for commencement of
         the associated tests. Submittal will take place only,
         if SHAPE has not previously approved the document.
         SHAPE and the contractor shall mutually agree on any
         changes to the scope and content during the period
         between submission of the test procedures and the scheduled
         date for commencement of the associated tests.



3.6.9    S̲o̲f̲t̲w̲a̲r̲e̲ ̲D̲o̲c̲u̲m̲e̲n̲t̲a̲t̲i̲o̲n̲



3.6.9.1  G̲e̲n̲e̲r̲a̲l̲

         CR will produce all future CAMPS related software documentation
         in accordance with ACE directive 007-3 issue 2, dated
         14th January 1980.



3.6.9.2  D̲o̲c̲u̲m̲e̲n̲t̲a̲t̲i̲o̲n̲ ̲S̲t̲r̲u̲c̲t̲u̲r̲e̲

         The CAMPS software documentation shall be structured
         in a hierarchical system of levels in accordance with
         the hierarchical structure of the software.

         The software shall be documented in 2 levels:

         -   System Design Specification.
             System Engineering CDRL NO. 07.

         -   Detailed Design Specifications.
             Software Development CDRL NO. 05.

         The software documentation shall, furthermore, be complemented
         with:



         -   Data Base Design Specification.

         -   Software Test Specification and Test Procedures.



3.6.9.3  S̲y̲s̲t̲e̲m̲ ̲D̲e̲s̲i̲g̲n̲ ̲S̲p̲e̲c̲i̲f̲i̲c̲a̲t̲i̲o̲n̲ ̲(̲S̲D̲S̲)̲

         The System Design Specification shall provide an introduction
         to the complete CAMPS system consisting of both hardware,
         firmware, and software. It shall show how the system
         is constructed of subsystems, how these subsystems
         are interrelated, and how the requirements of this
         System Requirements Specification and associated ICDs
         are mapped onto the subsystems. ACE Directive 007-3
         is generated for software specifications only, and
         is consequently not adequate for a full System Design
         Specification. CR shall, however, use ACE Directive
         007-3 as a guideline when producing the SDS.

         a)  S̲u̲b̲s̲y̲s̲t̲e̲m̲ ̲D̲e̲f̲i̲n̲i̲t̲i̲o̲n̲

             A Subsystem shall have a well defined function
             represented by a well defined set of requirements.
             It is further essential that the division into
             subsystems is made so that inter-subsystem interfaces
             are simple and well defined.

             The CAMPS subsystem shall be specified as follows:

             1)  Hardware Subsystems shall be documented as
                 described in section 3.6.4 to 3.6.6 (incl.)

             2)  The system software subsystems shall be documented
                 in accordance with the following:

                 a)  Existing system software and software that
                     is a modification of existing software
                     shall be documented in accordance with
                     CR standard for system software.

                 b)  Purchased software products shall be documented
                     in accordance with the internal standards
                     of the Purchaser. The level of details
                     shall, however, be equivalent to ACE Directive
                     007-3.



                 c)  New System Software developed by CR shall
                     be documented in accordance with ACE Directive
                     007-3 Annex C.

             3)  The application software subsystems shall be
                 specified in accordance with ACE Directive
                 007-3 Annex C Subsystem Specification.

         b)  D̲o̲c̲u̲m̲e̲n̲t̲ ̲C̲o̲n̲t̲e̲n̲t̲

             The SDS shall include the following information:

             1)  A chart showing the hierarchical breakdown
                 into subsystems.

             2)  Input-process-output diagrams (HIPO) showing
                 the flow of data between the subsystems.

             3)  Flow charts showing the logical relationship
                 between the subsystems.

             4)  Hardware configuration.

             5)  A mapping of the software and firmware onto
                 the hardware.

             6)  A mapping of the requirements of the SRS onto
                 the individual subsystem.

             7)  Performance budgets for the individual subsystem.

             8)  A description of how all the security requirements
                 are being met.



3.6.9.4  D̲e̲t̲a̲i̲l̲e̲d̲ ̲D̲e̲s̲i̲g̲n̲ ̲S̲p̲e̲c̲i̲f̲i̲c̲a̲t̲i̲o̲n̲

         The software shall be broken down into software package
         with well defined functions and interfaces. The Application
         software package and new System Software shall be specified
         in accordance with ACE Directive 007-3 Annex D "Program
         Specification". The package Specifications will appear
         in two issues: As-to-be-built and As-built.





3.6.9.6  D̲a̲t̲a̲ ̲B̲a̲s̲e̲ ̲D̲e̲s̲i̲g̲n̲ ̲D̲o̲c̲u̲m̲e̲n̲t̲

         All commonly used data and files shall be specified
         in accordance with ACE Directive 007-3 Annex E "Data
         Base Specification" (Dated l4th January 1980).



3.6.10   F̲i̲e̲l̲d̲ ̲M̲o̲d̲i̲f̲i̲c̲a̲t̲i̲o̲n̲ ̲D̲o̲c̲u̲m̲e̲n̲t̲s̲



3.6.10.1 G̲e̲n̲e̲r̲a̲l̲

         Copies of all modification advices shall be supplied
         giving full information as regards all modifications
         carried out on the equipment up to expiration of the
         warranty period for the equipment in question. The
         modification advices shall include the reason for the
         modification, tools required, time required, parts
         required, equipment to be modified and full instructions
         for the implementation of the modification.

         A master list of all modifications carried out on the
         equipment shall be provided. The modifications shall
         be presented consecutively showing the reason for the
         modification equipment modified and a short description
         of how it was carried out.

         Where a modification necessitates amendment of the
         documentation changed pages shall be provided in sufficient
         quantity to amend all affected documentation.



3.6.10.2 D̲e̲l̲i̲v̲e̲r̲y̲

         The contractor shall provide 2 copies at each modification
         advice to the purchaser and 2 copies to each site affected
         by the particular modification.