⟦f0b7f36a3⟧ Wang Wps File

    Length: 18435 (0x4803)
    Types: Wang Wps File
    Notes: PIP                       
    Names: »0022A «

Derivation

└─⟦83a4a04d1⟧ Bits:30005815 8" Wang WCS floppy, CR 0002A
    └─ ⟦this⟧ »0022A « 

WangText



 …02…CPS/100/PIP/0001

…02…GJ/801017…02……02…#
CAMPS PROGRAM IMPLEMENTATION PLAN
…02……02…CAMPS








                               5̲ ̲ ̲P̲R̲O̲G̲R̲E̲S̲S̲ ̲ ̲R̲E̲P̲O̲R̲T̲S̲ ̲A̲N̲D̲ ̲M̲E̲E̲T̲I̲N̲G̲S̲ 



         CR shall participate in formal progress meetings as described below:

         On the second Tuesday of each month a progress meeting shall be held between SHAPE and CR
         throughout the contract period. If that day coincides with a SHAPE or CR holiday, the meeting
         will be held on the second working day after the holiday.

         These meetings shall provide the main forum where any outstanding items and difficulties
         encountered are discussed, and information exchanged between the two parties. The meetings
         shall be chaired by CR's Program Management and its members shall be technical and administrative
         personnel both from CR and SHAPE as required.

         An agenda shall be issued by SHAPE one week prior to the meeting to allow ample time to prepare
         for the discussions. CR shall provide his list of items to SHAPE by telex at least one working
         day prior to the day that SHAPE issues the agenda. Items outside of the prepublished agenda
         may be brought up during the meeting, hovewer, these should be kept to a minimum, and the
         reply to these items may not necessarily be given immediately.



         A progress Report shall be handed over to SHAPE at the commencement of the meeting and this
         report shall provide the basis for CR's presentation of the progress made to date.  The progress
         report shall contain a statement of all the activities that have been started and concluded
         since last meeting with a reference to the Master schedule; a statement of problem areas
         encountered and/or resolved; and a statement and plan for near future activities; and an
         action item list reflecting CR's action towards SHAPE and vice versa.

         An unanimously agreed draft Minutes of the Meeting shall be prepared at the end of each meeting.
         Preparation of these minutes shall be considered as part of the meeting. Thus, long delays
         for coordination after meetings will be avoided. The finally typed minutes shall be issued
         within a week after the meeting. The issue of the final minutes is the responsibility of
         CR. Sufficient copies to satisfy both CR's as well as SHAPE's requirements shall be provided.
         Office of Primary Responsibility (OPR) shall be assigned to any paragraph requiring action.

         The progress meetings shall be held at CR's premises in Ballerup unless otherwise agreed.



         During the meetings problems which are likely to have a cost, technical or schedule effect
         on the project shall be discussed. The problem analysis and solution shall be presented in
         narrative form and shall include, as a minimum, the description of problems, options, proposed
         solution, and effect on project cost, technical performance or schedule.  Amendments to PIP,
         as necessary, shall be made. Critical Path Analysis shall be performed and efforts will be
         made to determine or forecast any problem  areas well in advance so that corrective action
         is taken immediately. Software as well as hardware aspects shall be considered.

         CR shall modify, change or improve any equipment or plan as required in accordance with the
         outcome of these meetings. Any changes in the equipment or plan shall be submitted under
         the procedure as outlined in the Configuration Management Plan. The responsibility of the
         performance and operation of the final equipments and system, and the overall running of
         the project as specified in the requirement specification lies, however, with CR.

         CR shall provide the appropriate technical personnel, organise and present briefings as required,
         provide appropriate facilities, test and design data and supporting analysis to support the
         meetings. CR shall provide technical reports and supporting documents in sufficient quantities
         for inclusion to the minutes of the meeting. 



         In addition to the regular, monthly progress meetings described above, Ad Hoc Working Meetings
         may be called subject to mutual agreement at the request of either SHAPE or CR to resolve
         urgent problems, clarify programme requirements or review progress.

         In addition to the formal progress meetings a number of design reviews shall be held 






                                  6̲ ̲ ̲I̲M̲P̲L̲E̲M̲E̲N̲T̲A̲T̲I̲O̲N̲ ̲D̲E̲F̲I̲N̲I̲T̲I̲O̲N̲



         The detailed implementation of the program will be defined in a series of Plans as required
         by the Contract.

         Each of these plans will describe in full detail how one area of the program will be managed.
          In the following is given a brief description of the content of each of the plans.



6.1      S̲Y̲S̲T̲E̲M̲S̲ ̲D̲E̲V̲E̲L̲O̲P̲M̲E̲N̲T̲ ̲P̲L̲A̲N̲

         A systems development plan which clearly identifies what is to be done by whom, when and
         for how much will be written for Systems Engineering, H/W development and S/W development.


         The essentials of the plan will be:

         -   A summary of the program which will state the essentials of the program.

         -   A list of all deliverable end products in such a way that when they are produced they
             can be easily identified and compared with the plan.

         -   A list of milestones identified in such a way that there can be no ambiquity about whether
             a milestone has been achieved.

         -   A Work Breakdown Structure (WBS) that is detailed enough to provide identification of
             all tasks.

         -   From the milestone list and the WBS the activity schedules will be produced.  See also
             section 4.

         -   The review process will be elaborated. 

         -   The major technical items to be planned for are mentioned in section 2.2.




6.1.1    D̲e̲s̲i̲g̲n̲ ̲S̲t̲a̲n̲d̲a̲r̲d̲s̲.̲

         Based upon the Systems Requirements Specifications a set of standards to be used during preparation
         of the design documents, source listings, test procedures, etc. will be written. These standards
         will be written in accordance with the structure of the ACE directive 007-3 issue 2. See
         the contract para 15 for additional information.



6.1.2    I̲n̲t̲e̲g̲r̲a̲t̲i̲o̲n̲ ̲a̲n̲d̲ ̲V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲ ̲P̲l̲a̲n̲

         The Integration and Verification plan describes the subsystem software verification philosophy,
         software interface test planning and the system level software integration and test activities.
          The general requirements to be planned for are listed in section 2.2. The plan will also
         identify the procedures to be produced and what these products shall contain.



6.1.3    R̲e̲l̲i̲a̲b̲i̲l̲i̲t̲y̲ ̲a̲n̲d̲ ̲M̲a̲i̲n̲t̲a̲i̲n̲a̲b̲i̲l̲i̲t̲y̲ ̲P̲l̲a̲n̲ ̲

         The Reliability and Maintainability Plan contains a description of the philosophy used to
         model, analyse, and control the reliability and maintainability of the H/W components.



6.2      L̲O̲G̲I̲S̲T̲I̲C̲S̲ ̲S̲U̲P̲P̲O̲R̲T̲ ̲P̲L̲A̲N̲ ̲

         In the following section the Logistics Support Plans are described.



6.2.1.   T̲r̲a̲i̲n̲i̲n̲g̲ ̲P̲l̲a̲n̲



6.2.1.1  G̲e̲n̲e̲r̲a̲l̲

         The CAMPS Training Plan will describe the mandatory and optional training programs offered
         by Contractor:

         -   Technical Hardware Training
         -   On The Job Training
         -   Software Training (optional)
         -   Training of Resident Site Technicians.



6.2.1.2  T̲e̲c̲h̲n̲i̲c̲a̲l̲ ̲H̲a̲r̲d̲w̲a̲r̲e̲ ̲T̲r̲a̲i̲n̲i̲n̲g̲

         This course will provide training for 80 students, i.e. 8 courses with a class size of 10
         students. The courses will be conducted in the period May 1982 to October 1983. Each course
         will consist of a 2 weeks hardware module and a 3 weeks software module.





6.2.1.3  O̲n̲ ̲T̲h̲e̲ ̲J̲o̲b̲ ̲T̲r̲a̲i̲n̲i̲n̲g̲

         Contractor will develop course and training material for on the job training of customer's
         maintenance technicians. Courses will be conducted by customer.



6.2.1.4  O̲p̲e̲r̲a̲t̲o̲r̲ ̲T̲r̲a̲i̲n̲i̲n̲g̲

         Contractor will develop courses for customers operator. The courses will be conducted on
         site by customer using course material supplied by contractor.



6.2.1.5  So̲f̲t̲w̲a̲r̲e̲ ̲T̲r̲a̲i̲n̲i̲n̲g̲ ̲(̲o̲p̲t̲i̲o̲n̲a̲l̲)̲

         Contractor will develop and conduct courses on software. The training will commence when
         Customer has built-up the necessary expertise.



6.2.1.6  T̲r̲a̲i̲n̲i̲n̲g̲ ̲o̲f̲ ̲R̲e̲s̲i̲d̲e̲n̲t̲ ̲S̲i̲t̲e̲ ̲T̲e̲c̲h̲n̲i̲c̲i̲a̲n̲s̲

         Contractor will develop and conduct courses for the Resident Site Technician assigned to
         a CAMPS installation.  Customer will assign one technician to each CAMPS site and make him
         available for training for a 6 month period.



6.2.1.7  T̲r̲a̲i̲n̲i̲n̲g̲ ̲o̲f̲ ̲N̲C̲S̲ ̲I̲n̲s̲t̲r̲u̲c̲t̲o̲r̲s̲

         The contractor will train 2 instructors from NCS Latina during the period January - June
         1983.



6.2.2    R̲S̲P̲L̲,̲ ̲A̲S̲P̲L̲



6.2.2.1  R̲S̲P̲L̲

         CR shall submit a Recommended Spare Parts List (RSPL) within 60 days contract signature.

         The RSPL will include all spare parts required to support the equipment delivered. The recommended
         spare parts will support towards the achievement of predicted availability at each site with
         a given level of confidence.


         The RSPL will be based on on-site held spares sufficient to cover 90 days of operation at
         each site. Furthermore it will include both a single depot concept and a two supply depots
         concept with the spares required to cover 270 days of operation. The confidence level to
         be used when determining the RSPL shall be 80%.

         The RSPL will give due consideration to maintenance float at the central depot(s) as well
         as insurance type items, i.e. items which though not required for pure statistical reasons
         must be included due to operational reasons or lead time considerations. Notification will
         be made on each item of the RSPL as to whichever method has been applied.

         The RSPL will be submitted in tabular form under the following headings:

         -   site or depot identification
         -   item number
         -   description and type
         -   NATO Stock Number (where applicable)
         -   True Manufacturer's Part Number
         -   Quantity installed at each site
         -   Recommended quantity of spares per site
         -   Unit Price
         -   Remarks


         A separate list will be provided for each site and one for each of the two central depot
         concepts.



6.2.2.2. A̲S̲P̲L̲

         The Approved Spare Parts List (ASPL) shall be determined jointly by SHAPE and CR during provisioning
         meetings to be held by CR A/S. The ASPL shall be derived by using the RSPL and equipment
         documentation. The final ASPL shall be agreed to and incorporated in the contract not later
         than 60 days after the submission of the RSPL.



6.2.3    D̲o̲c̲u̲m̲e̲n̲t̲a̲t̲i̲o̲n̲ ̲P̲l̲a̲n̲

         The Documentation Plan will describe how all documentation related to the CAMPS Project will
         be managed. Documentation standards will be described as well as quality control procedure
         applicable to  documentation.

         The plan will be divided in two main sections:

         1.  Organization and Documentation Management
         2.  Description of the various documentation items and their associated standards.



         CAMPS documentation will be the responsibility of the Logistics Department. Generally, the
         contributors of the data will provide reviewed drafts to the documentation department where
         the final version will be produced.

         The Technical handbooks will be divided into two types of manuals: Maintenance Procedures
         Handbooks and Equipment Handbooks.

         The Maintenance Procedures Handbook will describe how customers Maintenance technicians can
         maintain the equipment to the required level i.e. module replacement.

         Equipment handbooks will give technical details about the Operational and functional aspects
         of the equipment.

         User Manuals will be written for CAMPS user, supervisor, supervisor assistent and for the
         CAMPS H/W operator.

         As-built documentation is derived from Civil Works Requirements Specifications and AS-TO-BE-BUILT
         drawings. The drawings will be generated by a subcontractor to CR in accordance to standards
         governing the CAMPS project.



         Test documentation will be generated to accommodate both internal and external verifications
         conduction on the CAMPS program. Each document will be designed to record the test it is
         associated with. In most cases, the test form itself is an integral part of the test procedure
         to be followed during the test.

         Inventory documentation will be developed to cover all sites including depots.


6.3      P̲R̲O̲D̲U̲C̲T̲I̲O̲N̲ ̲P̲L̲A̲N̲

         The plan will describe how contractor intends to manufacture, assemble and test the CAMPS
         systems. 

         The allocation of responsibilities between the two divisions will be described i.e. System
         Division(SD) having over all responsibility and Electronics Division (ED) developing and
         producing the CR-80 modules hardware.

         A detailed production and integration plan will be described illustrating the interrelationship
         with development and testing.



6.4      I̲N̲S̲T̲A̲L̲L̲A̲T̲I̲O̲N̲ ̲A̲N̲D̲ ̲T̲R̲A̲N̲S̲P̲O̲R̲T̲A̲T̲I̲O̲N̲ ̲P̲L̲A̲N̲



6.4.1    S̲i̲t̲e̲ ̲S̲u̲r̲v̲e̲y̲s̲

         All sites under contract will be surveyed to provide the establishment of a good baseline
         for site preparation and installation.

         These surveys will provide for the initial contact between host nation  representatives,
         the contractor and the SHAPE delegation.


         At each site information necessary to prepare the  site civil works requirements and AS-TO-BE-BUILT
         drawings will be gathered. Host nation delivered documents/drawing will be verified. Items
         like transportation, temporary storage, installation, and installation support will be assessed.



6.4.2.   S̲i̲t̲e̲ ̲P̲r̲e̲p̲a̲r̲a̲t̲i̲o̲n̲ ̲a̲n̲d̲ ̲V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲

         In the period following site surveys the information gathered during site surveys will be
         reviewed concerning preparation of site civil works requirements and AS-TO-BE-BUILT drawings.
         If necessary, supplementary data is to be requested from host nation through SHAPE.

         Contractor's civil works requirements will be used by host nation to design and prepare the
         site for installation of the CAMPS equipment.

         Contractor will also prepare AS-TO-BE-BUILT drawings, which will contain all details concerning
         equipment installation.

         Upon completion of the site preparation works a verification at each site will take place.
         The verification shall prove that the site is ready for installation of the CAMPS equipment.


         The proving will consist of inspections and tests according to a site verification procedure.

         The procedure will be prepared on the basis of contractor's civil works specifications, the
         AS-TO-BE-BUILT drawings and host nation civil works drawings.

         The procedure is to be signed off by the representatives from host nation, SHAPE and CR and
         issued as a site verification report.

         Discrepancies found during the verification will be recorded together with corrective actions
         to be taken and completion date of actions.

         After successfull completion of the verification the site is ready for installation.



6.4.3    T̲r̲a̲n̲s̲p̲o̲r̲t̲a̲t̲i̲o̲n̲

         Delivery of equipment for CAMPS will follow the schedule of the Master Schedule Plan. Actual
         dates of shipment are to be determined with consideration to each site's readiness and transportation
         time needed for the selected way of transportation.


         A transportation plan, which describes how the Contractor will coordinate each site delivery
         will be forwarded to SHAPE.

         The plan will deal with packing, marking, shipping documentation, transport of equipment,
         and reception at each site.



6.4.4    I̲n̲s̲t̲a̲l̲l̲a̲t̲i̲o̲n̲

         An installation schedule will be set up which optimizes personnel utilization within the
         overall program scope and ensures that each site installation is completed in a timely fashion
         to allow adequate test and checkout of equipment for site acceptance.

         Contractor will forward to SHAPE an installation plan, which describes how he will manage
         and coordinate the installation task

         The plan will deal with manpower loading, installation scheduling, on site installation support,
         Contractor's installation organization and responsibilities of the installation team.


6.5      A̲C̲C̲E̲P̲T̲A̲N̲C̲E̲ ̲T̲E̲S̲T̲ ̲P̲L̲A̲N̲



         Based upon the acceptance criterias to be specified during the requirements specification
         phase, an acceptance test plan will be written. The plan defines the acceptance philosophy
         for the h/w and s/w. The acceptance test procedures are procedures written by CR A/S and
         are basically a subset of the systems verification procedures.

         It furthermore:

         -   provides the test schedule
         -   identifies the performance requirements
         -   identifies the acceptance criterias
         -   provides a test tool development plan if any
         -   describes the objective and purpose of each test
         -   specifies staffing and other resources required to accomplish the task.



6.6      Q̲U̲A̲L̲I̲T̲Y̲ ̲A̲S̲S̲U̲R̲A̲N̲C̲E̲ ̲P̲L̲A̲N̲

         An independent Quality Assurance Department is responsible for all Quality Assurance activities
         pertaining the CAMPS project.

         As basis for this activity will be used the established Quality Assurance Programme outlined
         in Quality Assurance Plan SD/040/PLN/001 of which the following is a summary



         The product assurance planning is divided into five separate activity areas as follows:

         -   Hardware Quality Assurance
         -   Software Quality Assurance
         -   System Reliability
         -   Parts and Materials
         -   Configuration Management

         The detailed requirements for these areas are defined in five separate subplans. Each subplan
         defines the quality assurance surveillance and the establishment of standards and procedures
         for the equivalent area.

         The purchaser QA delegate has the necessary access to perform the required QA in accordance
         with NATO Stanag 4107 and 4108. The QA plan should be drafted in line with AQAP-1.

6.6.1    H̲a̲r̲d̲w̲a̲r̲e̲ ̲Q̲u̲a̲l̲i̲t̲y̲ ̲A̲s̲s̲u̲r̲a̲n̲c̲e̲ ̲P̲l̲a̲n̲

         This plan comprises:

         -   Hardware design
         -   Hardware production
         -   Hardware testing
         -   Production of specification and drawings
         -   Calibration of instruments
         -   Inspection of products delivered by purchaser or other suppliers
         -   Reviews and audits of hardware production